Lead Survey_Bldg-2_20120319.pdf
PDF 3 MB Posted
- Attached to
- Replace Repair Roof TPO Building 2
- Solicitation number
- W911SG25BA018
About this file
This document is a Lead-Based Paint Survey report for Building 2 at Fort Bliss, Texas, conducted by Terracon Consultants, Inc. on March 19, 2012. The survey, performed by an EPA-accredited Lead Inspector named Larri Erstad, examined building materials to establish lead levels in paint coatings. The investigation found twelve paint materials with lead concentrations exceeding 1 mg/cm², primarily associated with stair and handrail components both inside and outside the building across various wings (A, C, D, and Wings).
The report recommends that if the client does not intend to renovate or demolish the facility, the lead-based paint materials should be managed carefully. This includes repairing damaged materials not removed during renovation, protecting remaining lead-based paint from further damage, and developing a plan to periodically monitor the condition of these materials. The survey was conducted in accordance with Texas Environmental Lead Reduction Rules and HUD guidelines, with the primary purpose of identifying potential lead hazards prior to any renovation or demolition activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .