LCSS 2027_02 L Frazier MS Boiler Replacement .pdf
PDF 2 MB Posted
- Solicitation number
- PE-68910-NONST-2027-000000052
- Issued by
- Lanier County, Georgia
About this file
This is a construction drawing set for a boiler replacement project at L. Frazier Middle School, a facility within the Liberty County Schools System in Liberty County, Georgia. The project, identified as RFP 2027-02 with Facility Code 689-0197, involves the removal of an existing Peerless 211A-16 boiler and installation of two new Lochinvar VSP 100-120 condensing boilers with a combined output capacity of 1,443,000 BTU/HR and maximum input capacity of 1,500,000 BTU/HR. The design includes new hot water circulation pumps, piping modifications to connect 3-inch hot water supply and return lines from the existing 4-inch mains, installation of a boiler emergency stop at the mechanical room exit, a carbon monoxide detector, and condensate neutralization. The project is designed by Chatham Engineering Company, LLC, located at 109 Park of Commerce Drive, Suite 6, Savannah, Georgia 31405. The drawings have been released for construction and comply with 2023 National Electrical Code, 2024 International Fire Code, 2024 International Energy Conservation Code, 2024 International Fuel Gas Code, 2024 International Mechanical Code, 2024 International Plumbing Code, and 2024 International Building Code with Georgia amendments.
The project specifications require coordination with the gas company for shutdown and venting procedures, with existing gas piping to be capped below the structure and the existing 14-inch flue removed to one foot below grade. All work must comply with Liberty County School operations and minimize disruption to school operations. The existing end suction pumps, makeup water, backflow preventor, and combustion air ducts will remain in place. New equipment will be installed on a reinforced concrete base with appropriate clearances maintained. The electrical work includes providing a new 60-amp, three-pole breaker in the existing panel space and updating the panel directory, with all boxes, panels, and disconnect switches to be labeled to indicate circuit numbers and equipment served. Hydrostatic pressure testing of all water piping systems at 100 PSIG is required before concealing any lines, and natural gas piping will be tested at 200 PSI for one hour with all leaks repaired prior to project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CADD PLOT
$$$USER$$$
$TIME
$$$DATE$$$$
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
P a rk o f
C o m m e rc e D ri v e
S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
$$$DATE$$$$
$$$$$$$$$$$$$$$FILE$$$$$$$$$$$$$$$1 INCH
Stamp
P H
O N
E
-2
F
A X
-2
C h a th a m
E n g in e e ri n g C o m p a n y L
L C
P ri n ts a re t o b e r e tu rn e d t o
C h a th a m
E n g in e e ri n g
C o m p a n y L
L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m
E n g in e e ri n g C o m p a n y L
L C i s n o t p e rm it te d
26087.00
L
IB
E R
T Y
C O
U N
T Y
G
E O
R G
IA
R F
P
-0
B O
IL
E
R R
E P
L A
C E
M E
N T
F A
C
IL
IT
Y
C O
D E
-0
L
F R
A Z
IE
R
M
ID
D L
E S
C H
O O
L
L
IB
E R
T Y
C O
U N
T Y
S C
H O
O L
S Y
S T
E M
L E
A S
E D
F O
R C
O N
S T
R U
C T
IO
N
JM
SS
T0.1
TITLE SHEET
DRAWING LIST: CONTACT LIST:
CODE REQUIREMENTS:
2023 Edition
2024 Edition
2015 Edition
2024 Edition
2024 Edition
2024 Edition
2024 Edition
National Electrical Code
International Fire Code
International Energy Conservation Code ...
International Fuel Gas Code
International Mechanical Code
International Plumbing Code
International Building Code
LOCATION:
(912) 238-2400
SAVANNAH, GA 31405-1396
109 PARK OF COMMERCE DRIVE, SUITE 6
CHATHAM ENGINEERING COMPANY, LLC
HINESVILLE, GA 31313
910 LONG FRAZIER DR.
BOARD OF EDUCATION
FOR LIBERTY COUNTY SCHOOL SYSTEM
LCSS RFP#: 2027-02
BOILER REPLACEMENT
LEWIS FRAZIER MIDDLE SCHOOL
M1.1.............HVAC - DEMOLITION & PROPOSED PLAN
M0.1.............HVAC - LEGEND, SCHEDULE, DETAILS
E1.0..............ELECTRICAL FLOORPLANS
T0.1..............TITLE SHEET
SCALE: 1/8" = 1' - 0"
FLOOR PLAN - ELECTRICAL
E1.0
SCALE: 1/8" = 1' - 0"
FLOOR PLAN - DEMOLITION
E1.0
ELECTRICAL DEMOLTION NOTES:
ED-2. EXISTING EQUIPMENT TO REMAIN.
MODIFY PANEL DIRECTORY. VERIFY CIRCUITS IN FIELD.
ED-1. DASHED EQUIPMENT TO BE DISCONNECTED. REMOVE WIRING AND
ELECTRICAL GENERAL NOTES:
ELECTRICAL LEGEND
JUNCTION BOX
(AMPS)/(POLES)/(NEMA ENCLOSURE)
DISCONNECT SWITCH - LOCKABLE
EQUIPMENT AS NOTED
PANELBOARD
HOME RUN
J
P.M.
E1.0
P.M.
FLOOR PLANS
ELECTRICAL
ELECTRICAL REQUIREMENTS.
EG-6. REFER TO DIVISION 26 OF SPECIFICATIONS FOR OTHER
TO INDICATE CIRCUIT NUMBER AND EQUIPMENT SERVED.
EG-5. ALL BOXES, PANELS AND DISCONNECT SWITCHES TO BE LABELLED
STANDARDS.
EG-4. ALL WORK SHALL COMPLY WITH LIBERTY COUNTY SCHOOL
OPERATIONS.
EG-3. ALL WORK TO BE SCHEDULED TO MINIMIZE DISRUPTION TO SCHOOL
PROVIDED.
EG-2. COORDINATE ALL EQUIPMENT CONNECTIONS WITH EQUIPMENT
AMENDMENTS AND ALL STATE AND LOCAL ORDINANCES.
EG-1. ALL WORK SHALL COMPLY WITH 2023 NEC WITH GEORGIA
P-D2 P-D1
SPACE FOR NEW PANEL LK2
RELOCATE TO PROVIDE
TO REMAIN.
PUMP SELECTOR PANEL
EXISTING
PANEL
BOILER CONTROL
WIRING FROM
AND CONTROL
REMOVE POWER
VERIFY IN FIELD.
CIRCUIT LK1-30.
BEING DEMOLISHED.
EXISTING BOILER
REMOVE POWER TO
PANEL LK
EXISTING
PANEL LK1
EXISTING
PANEL LK
EXISTING
P-D2 P-D1
NEW BOILER D1A
NEW BOILER D2A
REMAIN
PUMPS TO
HOT WATER
EXISTING
J
TO NEW BOILERS
EXTEND WIRING
SWITCHES AND
EMERGENCY STOP
CONNECT TO BOILER
PANEL LK2
NEW
NOT TO SCALE
PARTIAL ONE-LINE DIAGRAM
E1.0
ON THIS SHEET
SEE PANEL SCHEDULE
NEW PANEL LK2
REQUIRED. UPDATE DIRECTORY.
MAKE ALL MODIFICATIONS
BREAKER TO MATCH EXISTING.
EXISTING SPACE.
60A/3P BREAKER IN
PROVIDE AND INSTALL NEW
1 NO.8(G)
1¼"C W/4 NO.4,
(20/3)
LK2-14
(20/3)
LK2-13
MONITOR
NEW CO
LOCKABLE
30/3/I
CADD PLOT
$$$USER$$$
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
P a rk o f
C o m m e rc e D ri v e
S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
$$$DATE$$$$
$$$$$$$$$$$$$$$FILE$$$$$$$$$$$$$$$1 INCH
Stamp
P H
O N
E
-2
F
A X
-2
C h a th a m
E n g in e e ri n g C o m p a n y L
L C
P ri n ts a re t o b e r e tu rn e d t o
C h a th a m
E n g in e e ri n g
C o m p a n y L
L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m
E n g in e e ri n g C o m p a n y L
L C i s n o t p e rm it te d
26087.00
L
IB
E R
T Y
C O
U N
T Y
G
E O
R
P
-0
B O
IL
E
R R
E P
L A
C E
M E
N T
F A
C
IL
IT
Y
C O
D E
-0
L
F R
A Z
IE
R
M
ID
D L
E S
C H
O O
L
L
IB
E R
T Y
C O
U N
T Y
S C
H O
O L
S Y
S T
L E
A S
E D
F O
R C
O N
S T
R U
C T
IO
N
MECH. RM.
ELEC. RM.
KITCH. STOR.
MECH. RM.
MECH. RM.
ELEC. RM.
KITCH. STOR.
MECH. RM.
CADD PLOT
$$$USER$$$
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
P a rk o f
C o m m e rc e D ri v e
S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
$$$DATE$$$$
$$$$$$$$$$$$$$$FILE$$$$$$$$$$$$$$$1 INCH
Stamp
P H
O N
E
-2
F
A X
-2
C h a th a m
E n g in e e ri n g C o m p a n y L
L C
P ri n ts a re t o b e r e tu rn e d t o
C h a th a m
E n g in e e ri n g
C o m p a n y L
L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m
E n g in e e ri n g C o m p a n y L
L C i s n o t p e rm it te d
26087.00
L
IB
E R
T Y
C O
U N
T Y
G
E O
R
P
-0
B O
IL
E
R R
E P
L A
C E
M E
N T
F A
C
IL
IT
Y
C O
D E
-0
L
F R
A Z
IE
R
M
ID
D L
E S
C H
O O
L
L
IB
E R
T Y
C O
U N
T Y
S C
H O
O L
S Y
S T
L E
A S
E D
F O
R C
O N
S T
R U
C T
IO
N
ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION
MLD/MD
A/C
MANUAL DAMPER
ABOVE CEILING
AHU AIR HANDLING UNIT
AD DUCT ACCESS DOOR
T'STAT
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
HOT WATER SUPPLY HWS
HOT WATER RETURN HWR
CLG CEILING
CU CONDENSING UNIT
DWGS DRAWINGS
EF EXHAUST FAN
METERED BALANCING VALVE MBV
GATE VALVE GV
ELEC ELECTRIC
CHECK VALVE CV
EXH EXHAUST
EXIST EXISTING
MOTOR OPERATED (2-WAY) VALVE MOV
GPM GALLONS PER MINUTE
HVAC HEATING VENTILATING & AIR CONDITIONING
STRAINER
UNION
FIRE DAMPER FD
MAX MAXIMUM
MIN MINIMUM
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
HWS
HWR
TG TRANSFER GRILLE
TYP TYPICAL
AFF ABOVE FINISHED FLOOR
LEGEND & ABBREVIATIONS
DIRECTION OF FLOW
TT
OR
DN DOWN
HOT WATER BOILER
DUCT SMOKE DETECTOR SKD
SKD
AIR CONDITIONER AC
SHUT-OFF VALVE
P PUMP
ERU
UV
GENERAL NOTES:
1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
3. DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.
FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED TO RECTANGULAR OR SQUARE DUCT 4.
5. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE MITERED ELBOWS.
WITH A SPIN-IN COLLAR WITH SCOOP AND DAMPER.
SENSORS 48 INCHES ABOVE FINISHED FLOOR.
2. UNLESS OTHERWISE INDICATED, INSTALL ALL SPACE THERMOSTATS, HUMIDISTATS AND
TRIPLE DUTY VALVE TDV
P PRESSURE GAUGE
DUCT MOUNTED SENSORS
THERMOSTAT / ZONE SENSOR
MUW
G G
MUW MAKE-UP WATER
GAS
CWS
CWR CWR
CWS CHILLED WATER SUPPLY
CHILLED WATER RETURN
DUCTWORK OR ORDERING OF PIPE.
IN MECHANICAL ROOMS PRIOR TO FABRICATION OF
SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND
MODIFICATIONS MAY BE REQUIRED. CONTRACTOR
SHALL NOTIFY THE ENGINEER IMMEDIATELY AS
ON THE DESIGN DOCUMENTS, THE CONTRACTOR
ACTUAL CONDITIONS AND THE CONDITIONS SHOWN
ANY DEVIATIONS ARE DISCOVERED BETWEEN THE
CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF
PLANS WHERE AVAILABLE. AS SUCH, THE
BASIC FIELD INVESTIGATIONS AND EXISTING
EXISTING CONDITIONS: THE DESIGN IS BASED ON
HP
B
EH ELECTRIC HEATER
DETAILS
ABBREVIATIONS,
SCHEDULE,
HVAC - LEGEND,
SNS
M0.1
ET EXPANSION TANK
TW THROUGH WALL PTAC
PTAC PACKAGED TERMINAL AIR CONDITIONER
C CHILLER
HEAT PUMP
ENERGY RECOVERY UNIT
U/G UNDER GROUND
HWP
AS AIR SEPERATOR
CH CEILING HEATER
5 3
3 5
9. 1" DIAMETER
1. TO SYSTEM
2. FILL FUNNEL
3. SHUT-OFF VALVE
4. PUMP BALANCING VALVE
5. UNION
6. CHEMICAL FEED TANK
8. FROM PUMP
3 SHOT TYPE CHEMICAL FEEDER
SCALE: NOT TO SCALEM0.1
UNIT VENTILATOR (BLOWER COIL UNIT)
BMS BUILDING MANAGEMENT SYSTEM
CTE CONNECT TO EXISTING
SNS
SYMBOL
TYPE
LOCATION
REMARKS
1,500,000
1,443,000
CONDENSING
SEE ELEC DWGS
CHARACTERISTICS
ELECTRICAL
BTU/HR
OUTPUT CAPACITY,
BTU/HR
MAX. INPUT CAPACITY,
HOT WATER BOILERS
W A
T E
R
H O
T
FLOW, GPM
ENT. TEMP., F
LVG. TEMP., F
SYMBOL
TYPE
REMARKS
INLINE
208V 1PH
LOCATION
CHARACTERISTICS
ELECTRICAL
B-D1A
208V 1PH
INLINE
B-D1B
HEAD, FT. H 02
PUMPS
FLOW, GPM
RPM
MIN. EFFICIENCY, %
MAXIMUM MOTOR HP
HWP-1A
SEE ELEC DWGS
ETR
7.5
7.5
2 2
NOT TO SCALEM0.1
BOILER PIPING
1. SUCTION
2. DISCHARGE
3. PUMP
4. SHUT-OFF VALVE
5. STRAINER
6. REDUCING TEE
9 6 10 11964
11. BALANCING VALVE
10. CHECK VALVE
9. UNION
8. PRESSURE GAUGE
NOT TO SCALEM0.1
IN-LINE CENTRIFUGAL PUMP PIPING
7.¾" HOSE GATE VALVE
7. ¼" GAUGE COCK
MANNER DESCRIBED FOR THE ENTIRE SYSTEM.
BEFORE COMPLETION, THIS PORTION SHALL BE TESTED SEPARATELY IN A
WHERE A PORTION OF THE WATER PIPING SYSTEM IS TO BE CONCEALED
LESS THAN 2 HOURS IN ORDER TO PERMIT INSPECTION OF ALL JOINTS.
OF 100 PSIG AND PROVED TIGHT AT THIS PRESSURE FOR A PERIOD OF NOT
CIRCULATION PIPING SYSTEMS SHALL BE TESTED AT HYDROSTATIC PRESSURE
FIXTURES, THE ENTIRE DOMESTIC COLD WATER, HOT WATER, AND HOT WATER
WATER PIPING. UPON COMPLETION OF THE ROUGH-IN AND BEFORE SETTING2.
TIGHT AT ALL JOINTS.
LEAST 2 HOURS BEFORE THE INSPECTION STARTS. THE SYSTEM SHALL BE
SHALL BE KEPT IN THE SYSTEM, OR IN THE PORTION UNDER TEST FOR AT
SUBMITTED TO A TEST OF AT LEAST 10 FT. HEAD OF WATER. THE WATER
THE BUILDING EXCEPT THE UPPER MOST 10 FT. OF THE SYSTEM HAS BEEN
PRECEDING SECTION SHALL BE TESTED SO THAT EACH JOINT OR PIPE IN
TESTING SUCCESSIVE SECTIONS, AT LEAST THE UPPER 10 FT. OF THE NEXT
WITH WATER AND TESTED WITH AT LEAST A 10 FT. HEAD OF WATER. IN
CLOSED EXCEPT THE HIGHEST OPENING, AND THE SYSTEM SHALL BE FILLED
APPLIED TO THE ENTIRE SYSTEM, ALL OPENINGS IN THE PIPING SHALL BE
TO THE SYSTEM EITHER IN ITS ENTIRETY OR IN SECTIONS. IF THE TEST IS
WATER BEFORE INSTALLING FIXTURES. WATER TESTS SHALL BE APPLIED
SANITARY WASTE AND VENT PIPING. THE PIPING SHALL BE TESTED WITH1.
PLUMBING SYSTEMSB.
WITHOUT ADDITIONAL COST TO THE OWNER.
UNDERGROUND SHALL BE TESTED BEFORE BACKFILLING BY THE CONTRACTOR
OF THE ARCHITECT OR HIS DESIGNATED REPRESENTATIVE. PIPING LOCATED
BEFORE CONCEALING OR COVER. TEST SHALL BE CONDUCTED IN THE PRESENCE
GENERAL, CONCEALED PIPING AND INSULATED PIPING SHALL BE TESTED IN PLACE A.
TESTING PIPE SYSTEMS
INTERNATIONAL PLUMBING CODE, 2024 EDITION WITH GEORGIA AMENDMENTS.1.
THE PLUMBING INSTALLATION AND EQUIPMENT SHALL CONFORM TO THE FOLLOWING:A.
CODES
ALL WORK SHALL COMPLY TO CODES.E.
SOCKET FUSED JOINTS.
UNDERGROUND NATURAL GAS PIPING SHALL BE SDR 11 POLYETHYLENE PIPE WITHD.
REPAIRED.
PIPING SHALL BE TESTED AT 200 PSI FOR 1HR. ALL LEAKS SHALL BE 3.
TO DRIP LEGS SHALL BE FROM THE BOTTOM OF THE MAIN.
TAKEOFFS FOR EQUIPMENT SHALL BE FROM THE TOP OF THE MAIN. TAKEOFFS2.
VALVED DRIP LEGS.
HORIZONTAL PIPING SHALL BE SLOPED 1/8" PER FOOT TOWARD THE 1.
INSTALLATIONC.
PIPE ASTM120 WITH 150lb THREADED MALLEABLE IRON FITTINGS ASTM A47
ABOVE GROUND NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEELB.
DRAWINGS.
PROVIDE A COMPLETE SYSTEM OF NATURAL GAS PIPING AS SHOWN ON THE A.
NATURAL GAS SYSTEM
HANGER SPACING SHALL COMPLY TO THE INTERNATIONAL PLUMBING CODE.B.
AS REQUIRED FOR PIPING SYSTEMS AS INSTALLATION.
HANGERS SHALL BE CLEVIS TYPE HANGERS. HANGERS SHALL BE COATEDA.
HANGERS
B-D1A B-D1B
CONDENSING
1,443,000
1,500,000
HWP-1B P-D1 P-D2
ETR
BASIS OF DESIGN LOCHINVAR VSP 100-120.
INFORMATION FOR TEST AND BALANCE PURPOSES.
HOT WATER PUMP (BOILER PUMP)
BASIS OF DESIGN IS LOCHINVAR FBN1501.
FUTURE), CONDENSATE NEUTRIZATION, AND LOCKABLE DISCONNECT.
PROVIDE BOILER WITH BMS BACNET CONTROLS GATEWAY (FOR
6. EQUIPMENT
4. CONCRETE BASE
2 6
REF 7
3. WWF 6x6 - W2.9 X W2.9,WITH 2" COVER
9. 1" CLEAR FROM BOTTOM OF SLAB.
10. 4" UNLESS NOTED OTHERWISE ON DRAWINGS.
REF 10
REF 9
8. 3/4 " CHAMFER ALL AROUND
1. FINISHED FLOOR
2. CLEAN AND ROUGHEN FLOOR UNDER BASE
7. CONCRETE BASE SHALL BE 3" LARGER ALL AROUND THAN THE BASE OF EQUIPMENT BEING SUPPORTED
MINIMUM 4 DOWELS; SET WITH CEMENTIOUS GROUT.
5. DRILL AND SET DOWELS (#4 REINFORCING W/ 8" HOOK) SPACE 36" ON CENTER;
4 CONCRETE BASE
SCALE: NOT TO SCALEM0.1
1. BOILER
2. HOT WATER SUPPLY
3. HOT WATER RETURN 10. UNION OR FLANGE
R
9. CHECK VALVE
8. SHUT-OFF VALVE
14. FINISHED FLOOR
5. PRESSURE GAUGE
4. THERMOMETER 11. TO FLOOR DRAIN
12.¾" HOSE END DRAIN
13. EXISTING CONCRETE BASE6. AIR VENT
7. PRESSURE RELIEF VALVE
16. STRAINER
15. OMITTED
F S
17. FLOW LIMITER
18. FLOW SENSOR
WITH BOILER)
PUMP (PROVIDED
19. BOILER CIRCULATION
C0
M1.0
SNS
SNS
PROPOSED PLAN
HVAC - DEMOLITION &
M1.0
SCALE: 1 / 4 " = 1' - 0"
HVAC - DEMOLTION PLAN
M1.0
SCALE: 1 / 4 " = 1' - 0"
HVAC - PROPOSED PLAN
HVAC - DEMOLTION NOTES:
SHUT DOWN AND VENTING WITH OWNER AND GAS COMPANY.
REMOVED AND DISPOSED OF OFF SITE. COORDINATE GAS
EXISTING GAS PIPING TO BOILER SHOWN DASHED SHALL BE
CAP, SEAL AND INSULATE 14" FLUE PIPE.
BELOW STRCUTURE.
EXISTING 14" FLUE SHALL BE REMOVED TO A POINT 1 FOOT
REMAIN.
EXISTING MAKEUP WATER AND BACKFLOW PREVENTOR SHALL
EXISTING END SUCTION PUMPS SHALL REMAIN.
EXISTING COMBUSTION AIR DUCTS SHALL REMAIN.
CONTROLS SHALL BE REMOVED AND DISPOSED OF OFF SITE.
EXISTING BOILER CONTROL MODULE AND ALL ASSOCIATED
BOILER IS A PEERLESS 211A-16.
SHALL BE REMOVED AND DISPOSED OF OFF SITE. EXISTING
EXSTING BOILER AND ALL ASSOCIATED PIPE AND GAS TRAIN
EXISTING TO REMAIN
EXISTING TO BE REMOVED
METER
NATURAL GAS
EXISTING
P
D2
P
D1
G
4"
SELECTOR (ETR)
EXISTING PUMP
(ETR)
ET
4" HWR
B
D1
G
4" HWS
(ETR)
AS
4"HWS/HWR
2.5" HWS/HWR
HVAC - PROPOSED NOTES:
B
D1A
B
D1B 1 1
PRESSURE REQUIREMENT WITH BOILER MANUFACTURER.
AND EXTEND TO BOILER. CONNECT TO GAS REGULATOR, COORDINATE
3" GAS DN TO BOILER. INSTALL VALVE, UNION, AND DRIP LEG
SHALL MATCH EXISTING PIPE MATERIAL.
CONNECT TO EXISTING GAS PIPING AT STRUCTURE. NEW PIPING
EXISTING. TRANSITION TO EXISTING FLUE AS REQUIRED.
8" FLUE FROM BOILER UP TO EXISTING 14" FLUE. CONNECT TO
3/M0.1 FOR DETAIL.
PROVIDE AND INSTALL NEW BOILER CHEMICAL FEED. REFER TO
PROVIDE TWO SETS OF CONTACTS.
E-STOP SHALL DE-ENERGIZE BOILERS UPON ACTIVATION.
PROVIDE AND INSTALL BOILER EMERGENCY STOP AT EXIT.
ACCORDANCE WITH GA BOILER CODE.
ALARM AND SHALL ALARM AND DE-ENERGIZE BOILER IN
MECHANICAL ROOM. SENSOR SHALL HAVE AUDIBLE AND VISUAL
PROVIDE AND INSTALL CARBON MONOXIDE DETECTOR IN
FROM NEUTRALIZATION TANK TO NEAREST FLOOR DRAIN.
CLEARANCES TO BE MAINTAINED TO BOILER. PIPE CONDENSATE
EQUIPMENT PAD DETAIL. DASHED AREA REPRESENTS
1/M0.1 FOR PIPING DIAGRAM. REFER TO 4/M0.1 FOR
SHALL BE PROVIDED WITH BOILER HOT WATER PUMP, REFER TO
BOILER. REFER TO 2/M0.1 FOR PIPING DETAIL. BOILER
& CONNECT 3" HWS/HWR TO BOILER FROM 4" HWS/HWR MAIN TO
INSTALL NEW CONDENSING BOILER ON EQUIPMENT PAD. EXTEND
PROPOSED
EXISTING TO REMAIN
4"
4" G
3" G
CADD PLOT
$$$USER$$$
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
P a rk o f
C o m m e rc e D ri v e
S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
$$$DATE$$$$
$$$$$$$$$$$$$$$FILE$$$$$$$$$$$$$$$1 INCH
Stamp
P H
O N
E
-2
F
A X
-2
C h a th a m
E n g in e e ri n g C o m p a n y L
L C
P ri n ts a re t o b e r e tu rn e d t o
C h a th a m
E n g in e e ri n g
C o m p a n y L
L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m
E n g in e e ri n g C o m p a n y L
L C i s n o t p e rm it te d
26087.00
L
IB
E R
T Y
C O
U N
T Y
G
E O
R
P
-0
B O
IL
E
R R
E P
L A
C E
M E
N T
F A
C
IL
IT
Y
C O
D E
-0
L
F R
A Z
IE
R
M
ID
D L
E S
C H
O O
L
L
IB
E R
T Y
C O
U N
T Y
S C
H O
O L
S Y
S T
L E
A S
E D
F O
R C
O N
S T
R U
C T
IO
N
GG
MECH. RM.
MECH. RM.
MECH. RM.
MECH. RM.
| T0_1 |
| E1.0 |
| M0.1 |
| M1.0 |
File details come from the government source that posted it. Updated .