LCSD - RFP - Site Improvements.pdf
PDF 2 MB Posted
- Attached to
- Lake Country School District Site Improvements
- Solicitation number
- LCSD-10172025-2
- Issued by
- Waukesha County, Wisconsin
About this file
Request for Proposal Summary
This is a Request for Proposal (RFP) issued by the Lake Country School District in Hartland, Wisconsin for site improvements as part of a district-wide infrastructure improvement effort associated with an April 2024 capital referendum. The District seeks a single prime contractor to complete multiple site improvement projects including asphalt replacement at the parking lot, drive lanes, and playground; concrete sidewalk, curb, and gutter replacement; installation of a concrete driveway and flume; and lighting replacement with LED fixtures and motion-activated controls. A pre-proposal conference is scheduled for Friday, October 24, 2025, at 9:00 a.m., with site tours available. Contractors must submit digital proposals to Jordan Steger, Director of Buildings and Grounds, by 3:00 p.m. on Monday, November 17, 2025. The deadline for written clarification questions is 5:00 p.m. on Wednesday, November 5, 2025. Contract award is expected in December 2025, with planning and procurement occurring from January through May 2026, construction commencing on June 8, 2026, and project completion targeted for August 2026. The District reserves the right to accept or reject any submittal that does not comply with requested format or content.
Bidders must submit itemized cost proposals on the provided Bid Form, with all costs to be inclusive of fees, materials, labor, services, and rentals necessary to complete the work. The base bid includes nine line items for various asphalt and concrete work, with an additional alternate bid for concrete sidewalk at the entry. Contractors are responsible for all local approvals, permitting, and coordination with school schedules and campus activities. Submitted cost proposals are expected to become the basis for budget establishment, with the selected contractor supporting the District in refining design scope and establishing final contract value. The project scope is contingent on compliance with applicable codes and regulations, with vendors expected to proactively seek clarifications to ensure complete and integrated solutions. Funding for the project is derived from the April 2024 capital referendum approved by district voters.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by Cadence Consulting on behalf of the Lake Country School District.
Request for Proposal
Site Improvements Friday, October 17, 2025
Lake Country School District
1800 Vettelson Road, Hartland, WI 53029
Proposals are due by: Monday, November 17, 2025.
A digital proposal copy is to be submitted via email to Jordan Steger, Director of Buildings and Grounds – Lake Country School
District (stegerj@mylakecountryschool.org). Any submittals are subject to the terms and conditions contained herein and will become the property of the Lake Country School District. The district retains the right to accept, or reject, any submittal received after the above deadline, and/or, that does not comply with the requested format or content.
Scope of Proposal
The Lake Country School District seeks a construction partner to complete a capital improvement projects as part of a district-wide infrastructure improvements effort. These investments are associated with the April 2024 capital referendum. The District intends to partner with a single prime contractor who would be responsible for all associated scope, trades, and subcontractors related to the project below. The vendor would be responsible for all local approvals and project-related permitting. Project construction and possible phasing to be coordinated closely with the district in alignment with the school schedule, and campus activities.
Interested contractors to submit an itemized cost proposal for projects described below, and include preliminary timeline for construction. Proposals should be inclusive of all fees, materials, labor, services, rentals, ect. to complete the work as outlined.
The district has provided a project narrative which outlines project scope to the best of the district’s current direction. Vendor is required to submit for any additional information, or clarifications, needed; and should provide a detailed proposal outlining all assumptions. Submitted costs proposals expected to become the basis for budget establishment with the selected partner supporting the district in refining the design scope and establishing a final contract value.
Project Narrative
Project Schedule:
- Contract Award: December 2025
- Planning and Procurement: January – May 2026
Note: District Spring Break: March 30 – April 3 2026
- Commence Construction: June 8, 2026
- Construction Completion: August 2026
Project Scope:
1. Exhibit A – Scope Narrative
RFP Exhibits:
1. Exhibit B – Scope Diagram
Proposal Submittal Requirements
Requests for Clarification: All questions, or needed clarifications should be directed to Jordan Steger, Director of Buildings and
Grounds – Lake Country School District (stegerj@mylakecountryschool.org) in writing via email. Questions will be gathered with formal responses being issued to all interested parties. The deadline for submitted questions is: 5:00pm on Wednesday, November 5, 2025.
Pre-proposal Conference: Friday, October 24. Enter at Door A. The District will conduct a brief RFP overview, answer any preliminary questions, and conclude with a building / site tour as needed. This will be the only opportunity to access the site within the RFP timeframe, attendance is highly encouraged.
- 9:00am: Doors and Windows & Site Improvements
- 10:30am: Mechanical Systems
Submittal: A digital proposal copy is to be submitted via email to Jordan Steger, Director of Buildings and Grounds – Lake
Country School District (stegerj@mylakecountryschool.org) by 3:00pm on Monday, November 17, 2025. Submitting Vendors are required to complete the attached Bid Form as a summary of their final proposal; and are encouraged to supplement this with any additional materials needed to outline a complete proposal.
mailto:stegerj@mylakecountryschool.org mailto:stegerj@mylakecountryschool.org
Bid Form | Site Improvements
Referendum Project Scope
Bids Due: Thursday, November 13, 2025
To: Lake Country School District
Attention: Jordan Steger, Director of Buildings and Ground
Name of Corporation, Partnership, Sole Owner of ________________________________________________________________________
Street City Zip Phone hereby agree(s) to execute proposed contract and to furnish all labor and materials required for the construction of the project designed above for the prices set forth below, in accordance with the construction bid documents supplied.
Base Bid:
1. Asphalt Replacement – Parking Lot: $____________________________
2. Asphalt Replacement - Drive Lane: $____________________________
Asphalt Widening: $____________________________
3. Asphalt Replacement - Playground: $____________________________
4. Concrete Sidewalk and Curb/Gutter Replacement: $____________________________
5. Rolled Face Concrete Curb: $____________________________
6. Concrete Driveway Installation: $____________________________
7. Concrete Flume: $____________________________
8. Lighting Replacement: $____________________________
9. Additional Scope: $____________________________
Total Base Bid: $____________________________
(written)_______________________________________________________________________________
Alternate Bid:
1. Concrete Sidewalk - Entry: $____________________________
The undersigned acknowledges having visited the project site, become familiar with existing conditions and having attended the Pre-bid Conference. If awarded the contract, the undersigned agrees to commence work upon receipt of Owner’s written ‘Notice to Proceed’ or award of Contract.
Signature:
Firm Name: _______________________________
Signature: _______________________________
Title: _______________________________
Date: _______________________________
Exhibit A – Scope Narrative | Site Improvements Friday, October 17, 2025
1800 Vettelson Road, Hartland, WI 53029
Scope Disclaimer
The scope summary provided herein is intended to serve as a foundational framework for the overall project scope. It is the vendor’s responsibility to develop and deliver solutions that are fully compliant with applicable codes and regulations, thoughtfully coordinated with all relevant building systems and components, and designed to be both cost-effective and durable over the long term. The vendor is expected to proactively seek any necessary clarifications to ensure a complete and integrated solution that aligns with project objectives and stakeholder expectations.
Scope Narrative
1. Asphalt Replacement - Parking Lot: Mill and replacement of existing asphalt parking lot with new asphalt.
Restripe parking lot to maximize parking quantity and efficiency of drop-off / pick-up vehicle circulation, coordinate layout closely with District. Include all paint striping.
2. Asphalt Replacement – Drive Lane: Mill and replacement of existing asphalt vehicle drive with new asphalt. In addition to vehicle circulation, the proposed solution to account delivery truck, garbage truck, and bus traffic. Include all paint striping.
a. Asphalt Widening – Multiple Locations: Expand existing asphalt drives in areas as indicated.
Expansion to align with adjacent asphalt replacement projects for seamless finished product.
Include all paint striping.
3. Asphalt Replacement – Playground: Mill and replacement of existing asphalt playground surface with new asphalt. Final playground striping to be coordinated with District. Include all paint striping.
4. Concrete Sidewalk, and Curb / Gutter Replacement: Replace existing concrete sidewalk with new concrete surfaces. Replacement of the existing concrete curb and gutter with new concrete 18” curb and gutters. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended).
5. Rolled Face Concrete Curb: Installation of new concrete roll faced concrete curb. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended).
6. Concrete Driveway Installation: Installation of new 12’ wide concrete driveway. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete
7. Concrete Flume: Installation of new concrete flume and coordinate with stormwater management. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended).
8. Lighting Replacement: Replacement of existing light pole and fixtures to improve overall site lighting.
Poles to be replaced in existing locations, pole heights to be increased. New light fixtures to be LED, tie into the building lighting control system, and include motion-activated control and dimming.
9. Additional Scope
a. Vehicle Circulation Signage: Provide a proposed signage allowance for installation of new vehicle circulation and parking signage.
b. Landscape Restoration: Restore all adjacent, and disturbed ground surfaces / landscaping to existing condition.
Alternate Bid:
1. Concrete Sidewalk - Entry: Replace existing concrete sidewalk with new concrete surfaces. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete caden Text Box Lake Country School District Referendum Project caden Text Box Project:
caden Text Box
OR1.0
caden Text Box Plans provided as diagrammatic tools for project narrative / description purposes only. Not for Construction. Not to Scale.
caden Line caden Line
Owner Image
Owner Line
Owner Text Box Disclaimer:
Owner Text Box No.:
Owner Text Box Exhibit B | Scope Diagram Site Improvements
Owner Text Box Drawing:
Owner Line
Owner Text Box 10/17/2025
Owner Text Box Date:
Owner Image
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Callout
2. Asphalt Replacement - Drive
Owner Callout
1. Asphalt Replacement - Parking Lot
Owner Line
Owner Callout
6. Concrete Drive
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Polygon
Owner Callout
2. Asphalt Drive Widening
Owner PolyLine
Owner PolyLine
Owner PolyLine
Owner Callout
4. Concrete Sidewalk Replacement
Owner Callout
5. Roll Faced Concrete Curb
Owner Callout
5. Roll Faced Concrete Curb
Owner Callout
5. Roll Face Concrete Curb
Owner Polygon
Owner Callout
2. Asphalt Parking Lot / Drive Expansion
Owner Callout
3. Asphalt Playground Replacement
Owner Callout
7. Stormwater Management Improvement
Owner Ellipse
Owner Callout
7. Concrete Flume
Owner Ellipse
Owner Callout
7. Concrete Flume
Owner Polygon
Owner Polygon
Owner Polygon
Owner Callout Alternate 1. Concrete Sidewalk - Entry
File details come from the government source that posted it. Updated .