This is Addendum 18 to solicitation LBNF-ND-350921-BWQ for the Long Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities Near Detector Complex RFP, issued by Fermi Research Alliance on December 14, 2024. The addendum contains responses to four technical questions (379-382) addressing power supply specifications, fire alarm interconnections, and manhole/handhole requirements. Key details include confirmation that 3-phase, 34.5kV power with 184 Amps capacity will be provided by FFDG at no cost to the Subcontractor through the overhead power line east of the detector site.

The related solicitation details indicate this is a Firm Fixed Price (FFP) construction services contract for building a Near Detector Complex, including a service building, primary and secondary shafts, detector cavern, and site improvements. A mandatory pre-proposal conference was held on July 10, 2024, questions were due by August 8, 2024, and proposals must be valid for 7 months from the February 7, 2024 opening date. The work includes all labor, materials, tools, equipment, excavation, shoring, testing, and inspection services.

View the file

Other files

File Type Posted
LBNF-ND-350921-BWQ Addendum 25.zip ZIP file
LBNF-ND-350921-BWQ Addendum 24.zip ZIP file
LBNF-ND-350921-BWQ Addendum 23.pdf PDF
LBNF-ND-350921-BWQ Addendum 22.zip ZIP file
LBNF-ND-350921-BWQ Addendum 21.pdf PDF
LBNF-ND-350921-BWQ Addendum 20.zip ZIP file
LBNF-ND-350921-BWQ Addendum 19.zip ZIP file
LBNF-ND-350921-BWQ Addendum 17.zip ZIP file
LBNF-ND-350921-BWQ Addendum 16.zip ZIP file
LBNF-ND-350921-BWQ Addendum 15.zip ZIP file
LBNF-ND-350921-BWQ Addendum 15.zip ZIP file
LBNF-ND-350921-BWQ Addendum 14.zip ZIP file
LBNF-ND-350921-BWQ Addendum 13.pdf PDF
LBNF-ND-350921-BWQ Addendum 12.zip ZIP file
LBNF-ND-350921-BWQ Addendum 11.pdf PDF
LBNF-ND-350921-BWQ Addendum 10.zip ZIP file
LBNF-ND-350921-BWQ Addendum 9.zip ZIP file
LBNF-ND-350921-BWQ Addendum 8.zip ZIP file
LBNF-ND-350921-BWQ Addendum 7.zip ZIP file
LBNF-ND-350921-BWQ Addendum 6.zip ZIP file
LBNF-ND-350921-BWQ Addendum 5.zip ZIP file
LBNF-ND-350921-BWQ Addendum 4.zip ZIP file
LBNF-ND-350921-BWQ Addendum 3.zip ZIP file
LBNF-ND-350921-BWQ Addednum 2.zip ZIP file
LBNF-ND-35091-BWQ Addendum 1.zip ZIP file
DRAFT 03 Package 3 (RFP Reference Documents - Specifications).pdf PDF
DRAFT 00 RFP Letter.pdf PDF
DRAFT 04 Package 4 (Sample Subcontract).pdf PDF
DRAFT 01 Package 1 (RFP Documents).pdf PDF
DRAFT 02 Package 2 (RFP Reference Documents - Drawings).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO SOLICITATION

ADDENDUM NO.

DATE OF ADDENDUM:

12/14/2024

SOLICITATION NO.

LBNF-ND-350921-BWQ

DATE ISSUED:

6/05/2024

PROJECT NO.

N/A

OPENING DATE:

2/7/2024

TITLE OF PROJECT:

LONG BASELINE NEUTRINO FACILITY (LBNF) NEAR SITE CONVENTIONAL FACILITIES (NSCF)

NEAR DETECTOR COMPLEX RFP

Bidders must acknowledge this Addendum prior to the hour and date set forth in the solicitation by one of the following methods:

1. By completing the Representations, Certifications and Acknowledgments (PUR-466), or

2. By separate email.

If by virtue of this Addendum you desire to change a bid already submitted, such change may be made by email, provided such email makes reference to the Solicitation and this Addendum and is received prior to the time set for opening.

This Addendum is providing additional information on the items below:

I. QUESTIONS AND RESPONSES:

(Numbering continues from Questions and Responses addressed in Addendum 17)

379. During the site walkthrough on 7/10/24 it was noted that the power lines to the east of the Near Detector site could be utilized for temporary site power. Please confirm the following: Is this service 3-phase? What volume of amps could be utilized for temporary site power? Would the cost of power be covered by FRA or would the Subcontractor need to setup a meter and reimburse FRA? If the Subcontractor is to reimburse FRA is the power supply subject to typical charges in the area or does the facility have a discounted rate?

Response: The power is provided by FFDG at no cost to the Subcontactor. The overhead power line east of the near detector site is owned by Fermilab and is 3 phase, 34.5kV with an overall ampacity of 184 Amps, #2 ACSR conductors. This line is connected to the Frog Farm substation located off Giese Rd. which has a 7.5 MVA transformer.

380. Specification 01 00 10, Section 1.9.D states that electric power will be furnished by FRA for the Subcontractor's use and connections to the existing power sources are the responsibility of the Subcontractor. Please provide the locations of the power sources.

Response: See above response to question 379.

381. There are fire alarm interconnecting ties, Firus and Wide EMG, for both new structures shown on the fire alarm one lines, but no indication of what this cabling is or its origin & destination points. Please advise.

Response: Site single mode fiber terminates at telecommunications equipment rooms/racks. Coordinate with Fermilab for strand assignment. Extend copper circuits to FACP.

382. There is no specification for manholes or hand holes. Please provide.

Response: Manholes and handholes shall be as shown in the details on drawings E-SW-ND-501 & E-SW-ND-502 and as specified in section 260543 Underground Ducts and Raceways for Electrical Systems.

ALL OTHER TERMS AND CONDITIONS AS REFERENCED UNDER THE SUBJECT RFP REMAIN UNCHANGED.