layout.pdf
PDF 190 KB Posted
- Attached to
- Carpet Tile Installation
- Solicitation number
- 360-76-25-065
- Issued by
- Stutsman County, North Dakota
About this file
This file is a building layout diagram showing detailed floor plans for what appears to be a Department of Transportation (DOT) facility. The layout spans multiple floors including a main level, basement, and includes detailed measurements for various rooms and office spaces. The main floor features administrative areas including a District Engineer's office, Assistant Engineer's office, conference rooms, storage areas, and general office spaces. The total square footage for the main floor spaces amounts to approximately 5,626.29 square feet with a perimeter of 1,173.50 feet.
The layout includes specific room dimensions and designations for various functional areas including a construction room (1,240.25 SF), front office/hallway/printer area (1,017.49 SF), and conference room (598.13 SF). The basement level contains shop areas, storage rooms, and a sign shop, while additional spaces include laboratory facilities, a shaker lab, and conference/meeting rooms. The building features multiple exits, carpeted areas, and necessary facilities such as bathrooms, break rooms, and janitorial closets throughout the structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid+Documents.pdf | ||
| 0370_001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A T R O L
H
IG
H W
A
YCONSTRUCTION
DOT
U P
BATHROOM BATHROOM STORAGE ROOM
OFFICE
CONSTRUCTION
S T
O R
A G
E
P L
A N
R O
O M
ROOM
CONFERENCE/BREAK
COPY ROOM
ROOM
WAITING VESTIBULE
L O
B B
Y
W A
IT
IN
G R
O O
M
ADMIN. OFFICE
S T
O R
A G
E
S T
O R
A G
E
ROOM
CONFERENCE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
SQUAD ROOM
E N
T R
Y
HALLWAY
HALLWAYHALLWAY
CLOSET
COPY
CLOSET
STORAGE
OFFICE
GENERAL / ADMINISTRATION
OFFICE
COORDINATOR
MATERIALS
OFFICE
COORDINATOR
MAINTENANCE
OFFICE
DISTRICT ENGINEER
ASSISTANT
OFFICE
ENGINEER
DISTRICT
D N
CLOSET
JANITOR'S
VESTIBULE
CARPETED AREA'S
118 FT
1,240.25 SF
53.5 FT
191.24 SF
53.5 FT
189.24 SF
54.5 FT
198.24 SF
59.5 FT
227.35 SF
46 FT
141.14 SF
146.5 FT
1,017.49 SF
82 FT
406.75 SF
54.5 FT
169.46 SF
32 FT
96 SF
56.5 FT
264 SF
13 FT
21 SF
83 FT
415 SF
45.5 FT
170 SF
88 FT
598.13 SF
90 SF
UP
DN
BREAK ROOM
BATHROOM
BATHROOM
STORAGE ROOM
SHOP
SHOP
SHOP
STORAGE ROOM
DN / UP
DN / UP
CLOSET
JANITOR'S
SHOP
SHOP
HALLWAY
OFFICE
SHOP
OFFICE
TELECOM / RADIO
OFFICE
SHOPKEEPER
OFFICE
MAINTENANCE
DICKINSON
SIGN SHOP
OFFICE
SIGN SHOP
SHOP
WASH BAY
EXIT EXIT
EXIT
EXIT
EXIT
EXITEXIT
CARPTED AREA'S
75 FT
107 SF
B A S E
M E N T
UP / DN
UP / DN
UP / DN
ROOM
CONFERENCE / MEETING
STORAGE
STORAGE
ROOM
STORAGE / SWITCH
ROOM
SHAKER
LAB
ROOM
LAB / OVEN
LIFT
H A
L L
W A
Y
OFFICE
LAB
EXIT
EXIT
CARPTED AREA'S
158.24 FT
1,441 SF
112.5 FT
84 SF
Room Area (SF) Perimeter
Downstairs Hallway 84.00 112.50
Construction Entryway (Vestibule) 96.00 32.00
Back Hallway 264.00 56.50
Front Entryway (Vestibule) 90.00 0.00
Front Hall / Lobby 415.00 83.00
Front Conference Room 598.13 88.00
Hall Storage Closet 21.00 13.00
Front Storage Room 170.00 45.50
Plan Room 169.46 54.50
Break Room 406.75 82.00
Copy Room 141.14 46.00
Stairwell Area 107.00 75.00
Construction Room 1,240.25 118.00
Front Office/Hallway/Printer Area 1,017.49 146.50
DE Office 227.35 59.50
ADE Office 198.24 54.50
Maintenance Office 189.24 53.50
Materials Office 191.24 53.50
Totals: 5,626.29 1,173.50
File details come from the government source that posted it. Updated .