Section C - Descriptions and Specifications
PART I: STATEMENT OF WORK
PART II: FULL TEXT CLAUSES
PART I – STATEMENT OF WORK
C.1.0 GENERAL SCOPE OF WORK
The Light Amphibious Warship (LAW) program is soliciting Concept Studies (CS)/Preliminary Design (PD) for the ship class. The CS/PD will be accomplished in a two phase approach. It is the intention of the Government to award multiple contracts pursuant to this solicitation for LAW Concept Studies. There will be a midpoint Design Maturity Assessment (DMA) of the contractor’s concept design, which is the output of the CS Phase. Following the DMA, the Government will determine if a PD option will be exercised for the offeror going forward, based on an assessment of the risk and capability of the design, and the available program funding. An award for CS (CLIN 0001) does not guarantee the option for PD (CLIN 0002) will be exercised.
The Contractor shall complete the CS/PD efforts required to support design maturity of a platform which meets the requirements in the Preliminary Circular of Requirements (Attachment J-1) and this contract. The effort required for the CS/PD of LAW is defined in the remainder of this contract.
Only the Procuring Contracting Officer (PCO) and Administrative Contracting Officer (ACO) have the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to direct the contractor to perform different or additional work. The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by, the PCO or the ACO.
To perform the tasks associated with this contract, the contractor will require use of classified data up to the SECRET level. The contractor’s storage, transmittal and handling of classified data under this contract shall be in accordance with the Contract Security Classification Specification, DD Form 254 (Attachment J-4).
Business sensitive data such as financial reporting and shipyard capability information may be marked as “proprietary”, where such proprietary marking is justified by the Contractor and approved by the Government. Any proprietary or sensitive business data provided by the Contractor via a deliverable must be marked appropriately and will not be shared with other industry participants.
CLIN 0001 - LAW CONCEPT STUDIES AND DOCUMENTATION
The Contractor shall furnish all resources necessary to perform CS for the LAW Class ship(s) at a Contractor’s facilities.
The Contractor shall perform CS for the LAW, including engineering analyses, tradeoff studies, and engineering and design documentation defining CS.
The Contractor shall provide the management effort necessary to ensure the on-schedule completion of the CS phase. The Contractor shall identify and take steps to correct all problems and potential problems arising during contract performance.
Deliverables for the CS Phase are identified in the Concept Studies Data Requirements List (Attachment J-2). Technical documentation is also identified in Section C.2.3.1 Design Maturity Assessment.
CLIN 0002 (OPTION)- LAW PRELIMINARY DESIGN AND DOCUMENTATION
The Contractor shall furnish all resources necessary to perform PD for the LAW Class ship(s) at a Contractor’s facilities.
The Contractor shall perform PD for the LAW, including engineering analyses, tradeoff studies, and engineering and design documentation defining PD.
The Contractor shall provide the management effort necessary to ensure the on-schedule completion of the PD phase. The Contractor shall identify and take steps to correct all problems and potential problems arising during contract performance.
At the end of the period of performance as specified in Section F, the Contractor shall deliver a complete price and technical estimate for the detail design and construction effort of the LAW Program. The price and technical estimate delivered under this contract shall not be a binding proposal.
All deliverables for PD are defined in the Preliminary Design Data Requirements List (Attachment J-3).
Deliverables for the PD Phase include updated and matured deliverables from the CS Phase, and all remaining deliverables identified in this contract.
CLIN 0003 (OPTION)- PURCHASE OF LAW TECHNICAL DATA PACKAGE
At the completion of CLIN 0002, the Government may exercise a buy-out option to purchase the Technical Data Package for the Contractor’s LAW design. If exercised, the Contractor shall grant a Government Purpose Rights license for each item of Technical Data (TD), Computer Software (CS), and Computer Software Documentation (CSD) identified in the Preliminary Design Data Requirements List (DRL) (Attachment J-3) and delivered as part of the TDP. Following option exercise, the Contractor shall deliver all future data submittals with markings and legends consistent with the rights furnished hereunder. The TDP purchased by the Government will be used in the Detail Design and Construction Phase of the LAW program. The data (CLIN 0006) to be furnished hereunder shall include all data that is usable to perform detailed design, construct, integrate, test, trial and deliver a LAW without assistance from the developer of the TDP or the Government.
If the Offeror chooses to propose the buy-out option under this CLIN, the Contractor shall provide the Government with a cost for the purchase of the TDP. The TDP option will only be exercised for one design, and the Government shall obtain the rights to issue the TDP to a Contractor for Construction of the LAW Design contained in the TDP.
The requirements and deliverables specified in the remainder of this contract are also applicable to the TDP.
CLIN 0004 (OPTION)- TECHNICAL DATA PACKAGE SUPPORT
Upon the exercise of CLIN 0003, the Government may exercise the option for engineering and design support for the TDP to be used in the Detail Design and Construction Phase of the LAW program. The Contractor shall provide the Government the labor rate associated with one thousand (1,000) hours of engineering and design support services. If exercised, the Offeror shall provide general engineering and design support to the Government, or another corporate entity, to respond to technical inquiries about the Offeror’s proposed LAW TDP.
CLIN 0005 - DATA FOR CLIN 0001
Data shall be prepared in accordance with this Contract, the Preliminary Circular of Requirements (Attachment J-1) and the associated CDRL as specified in the Concept Studies Data Requirements List (DRL) (Attachment J-2). This item is not separately priced (NSP).
CLIN 0006 - DATA FOR CLIN 0002
Data shall be prepared in accordance with this Contract, the Preliminary Circular of Requirements (Attachment J-1) and the associated CDRL as specified in the Preliminary Design Data Requirements List (DRL) (Attachment J-3). This item is not separately priced (NSP).
C.2.0 REQUIREMENTS
C.2.1 PROGRAM MANAGEMENT
The Contractor shall provide program management services necessary to ensure the on-schedule completion of all the work associated with this contract. The Contractor shall identify and maintain visibility with the Government of all schedule, cost, and technical problems and potential problems arising. The contractor shall submit the LAW Program Management Plan (DI-01) that defines the Contractor’s program management structure and assures the Government that the Contractor can perform the scope of this contract and achieve the technical requirements at an effective cost within established schedules.
As the contract proceeds, the Contractor shall track the status and provide updates to the LAW Program Management Plan and the CS/PD Master Schedule (DI-02) highlighting any changes, especially differences between planned and actual. The Contractor shall provide and implement mitigation plans for moderate and high-risk items to ensure on-schedule completion of deliverables that satisfy the full work scope of the contract.
The Contractor shall submit a Monthly Progress Report (DI-03) to report the CS and PD progress against the CS/PD Master Schedule.
The Contractor shall submit a Monthly Cost Report (DI-04) to report the cost incurred to date, including the expended cost as it relates to the overall cost of the CS/preliminary design effort. The report shall illustrate the Contractor’s progress towards an estimate at completion value consistent with the value of this contract.
The Contractor may consult with regulatory bodies during contract performance. Regulatory bodies include, but are not limited to American Bureau of Shipping (ABS), United States Coast Guard (USCG), International Maritime Organization (IMO), and Environmental Protection Agency (EPA). The Contractor shall provide copies of all outgoing and incoming correspondence between the Contractor and regulatory bodies in a Regulatory Body Correspondence Report (DI-05).
C.2.2 OPERATIONAL SECURITY (OPSEC) PROGRAM
The Contractor shall utilize an approved operational security (OPSEC) program to protect classified and sensitive unclassified activities, information, equipment and material used or developed by the Contractor and any subcontractor during the performance of this Contract. The Contractor shall be responsible for subcontractor implementation of the OPSEC requirements of this Contract.
C.2.3 CONFERENCES AND REVIEWS
The Contractor shall conduct a Post Award Conference (PAC) for CS/PD within thirty (30) days of award of CLIN 0001. The Contractor shall hold the Conference at the Contractor’s facility, and/or an approved virtual platform, if necessary and approved by the Government. The purpose of the conference is to (1) review the contract and technical requirements, (2) review the schedule requirements including the schedule of design reviews, and (3) discuss the roles and working relationships between the Contractor and the Government. Representatives from each engineering and design firm on the Contractor’s team shall attend. The Contractor shall prepare Post Award Conference Agenda (DI-06), Post Award Conference Presentation (DI-07) and Post Award Minutes (DI-08).
The Contractor shall conduct Design Reviews (DRs) every other month after PAC through the end of CS/PD, described below, is the period prior to the Design Maturity Assessment (DMA). PD is the period following the DMA. The final design spiral leading to successful completion of this contract defines PD. The Contractor shall hold DRs at the Contractor’s facility, and/or an approved virtual platform, if necessary and approved by the Government, on dates acceptable to the Government. The Contractor’s design agent (if used) and Network and Navigation System Integrators (if used) shall attend DRs and the DMA. The Contractor shall prepare Design Review Agendas (DI-09), Design Review Presentations (DI-10), and Design Review Minutes (DI-11).
The Contractor shall conduct the PAC, DRs, and DMA per the schedules below.
Table 1: Concept Studies Conferences and Reviews
| Month1 |
| 1 |
| 2 |
| 3 |
| Post Award Conference |
| X |
Design Review
X
Design Maturity Assessment2
X
Note 1: Months are measured from CLIN 0001 Award
Note 2: The DMA shall be held only once and may be concurrent with an earlier DR.
Table 2: Preliminary Design Reviews
| Month1 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| Design Review |
| X |
X
X
X
Note 1: Months are measured from CLIN 0002 Award
Technical Exchange Meetings (TEMs) can be held in an ad-hoc basis. The Contractor and Government may present TEMs as mutually agreed.
C.2.3.1 DESIGN MATURITY ASSESSMENT
The DMA shall demonstrate the readiness of the Contractor’s design and selected technologies for proceeding into the PD phase. The DMA shall be held no later than three (3) months after CLIN 0001 award. If the Contractor completes the deliverables identified below prior to three months after CLIN 0001 award, the Contractor may present the DMA earlier, at the time of their choosing, subject to Government availability. At the completion of DMA, the Government will make a determination on the exercise of CLIN 0002 option.
The Contractor shall present the DMA after:
1. The Contractor provides their Master Equipment List and equipment selection rationale for the critical items.
1. The following data items reflect architectures that are sufficiently developed and are consistent among themselves:
1. General Arrangement Drawing
1. Machinery Arrangement Drawing
1. Topside Arrangement Drawing
1. Design Weight Estimate
1. Intact and Damage Stability Report
1. Speed and Power Report
1. Master Equipment List (MEL)
1. Electric Power Load Analysis (EPLA)
1. Seakeeping Performance Report
1. Beaching Report
1. Nested Mooring Drawing
The Contractor shall prepare a Design Maturity Assessment Report (DI-12) describing the Contractor’s readiness to move into the PD Phase, and containing a summary of the Contractor’s design. The report shall contain an explanation for the concept’s capabilities to meet the requirements contained in the Preliminary Circular of Requirements (Attachment J-1).
All deliverables listed shall be delivered under their respective DI and associated CDRL as identified in the Concept Studies Data Requirements List (Attachment J-2).
C.2.4 DESIGN SUMMARY REPORT
The Contractor shall prepare a Design Summary Report (DI-13), which describes and summarizes the results of the completed PD and shall be submitted at the completion of this contract. The Design Summary Report shall not be a compilation of other deliverables of this contract. The report shall list major design vessel characteristics, a summary of the features of the design, a placemat for the design, and an explanation for the vessels capabilities to meet requirements contained in the Preliminary Circular of Requirements (Attachment J-1).
C.2.5 PRODUCTION REPORT
The Contractor shall prepare the Production Report (DI-14) describing the shipyard facilities, build strategy through module identification and erection sequencing, launch plan, docking facilities and procedures, and post-launch pier plan, and contain supporting calculations as necessary. The report shall include details of all work currently being done at the shipyard, all future work that is under contract to be performed at the shipyard, all future work in which the Contractor is seeking to be involved, and the integration of LAW into the aforementioned work. The Production Report shall demonstrate that the Contractor is capable of supporting construction of up to four (4) LAW per year, and have the capacity to handle production of multiple ships simultaneously.
C.2.6 PRODUCT SUPPORT PLANNING AND SUSTAINABILITY
The Contractor shall deliver a Product Support Plan (DI-15) describing the overall approach for product support of the LAW program. This plan shall include at a minimum the following aspects:
1. Provide a general description of the approach to develop product support documentation.
1. Configuration Management - Describe your configuration management process and how it will be applied to LAW.
1. Supply Support– Describe background on general approach for developing provisioning documentation, identifying on board material requirements and supporting ship outfitting of spares and equipment to support onboard sustainment of systems.
2. Include background on identification of support and test equipment, calibration requirements.
2. Include approach for storage and preservation of equipment and spares.
1. Maintenance planning – Provide a description or approach to developing reliability centered maintenance procedures including preventative maintenance development.
3. Include approach on development of a Class Maintenance Plan.
3. Include discussion on familiarity with Condition-Based Maintenance and approach to incorporate into the design.
1. Technical Data - Include approach on development of Technical Manuals for submission to the Government.
1. Training- Describe the ability to develop and administer crew training. Include any approaches that include simulators, on-site facilities, or other hands on specialized training.
1. Reliability approach – Provide a description on how reliability is handled and the approach to measure overall reliability of the major subsystems and the platform itself.
The Contractor shall conduct an assessment of fleet introduction and sustainment and deliver this within the Sustainability Report (DI-16). Include consideration of:
1. Any Supply Chain issues that may be a factor in the sustainment of major equipment or subsystems.
1. Crew manning and support of the vessel both onboard and at an ashore facility.
1. Projected annual maintenance cost and economic service life; include the relationship between reliability and maintenance resourcing, both onboard the platform and ashore.
C.2.8 QUALITY ASSURANCE PROGRAM
The Contractor shall deliver the Quality Assurance Program Plan (DI-17) describing their adherence to and maintaining of an ISO 9000 compliant Quality Program developed for the LAW program. This Program shall ensure compliance with Contract requirements and the requirements contained in the Preliminary Circular of Requirements (Attachment J-1). The Quality Assurance Program for the CS/PD phase shall only account for the engineering activities necessary to perform the requirements of this contract, and should not include construction or production quality assurance.
C.2.9 NOTIONAL DETAIL DESIGN AND CONSTRUCTION SCHEDULE
The Contractor shall prepare a Notional Detail Design and Construction Schedule (DI-18) identifying the major design and production milestones in the detail design and construction phase of the LAW program.
C.2.10 DETAIL DESIGN AND CONSTRUCTION ESTIMATE
At the end of the period of performance for PD, as specified in Section F, the contractor shall deliver a Detail Design and Construction Estimate (DI-19) identifying a complete price and technical estimate for detail design and construction. The price and technical estimate delivered under this contract shall not be a binding proposal.
C.2.11 LAW PRELIMINARY CIRCULAR OF REQUIREMENTS REVIEW AND DEVELOPMENT
The Contractor shall review the Preliminary Circular of Requirements (Attachment J-1) and shall prepare the Preliminary Circular of Requirements Review Report (DI-20) in accordance with the Preliminary Circular of Requirements Review Form (Attachment J-6).
The Contractor shall provide a comprehensive and fully integrated review of the Preliminary Circular of Requirements (Attachment J-1) and provide the following:
1. Expansion of detail addressing design solutions, system configuration, and hardware selections required to meet Preliminary Circular of Requirements (Attachment J-1) and applicable regulatory body requirements contained therein, including system descriptions and salient characteristics.
2. Errors, omissions, and inconsistencies shall be identified.
3. Additional recommendations that may be considered beneficial shall be identified.
The Contractor shall work with the Government throughout CS/PD to fully develop the Preliminary Circular of Requirements into a complete and mature Circular of Requirements. The Government may release incremental updated versions of the Preliminary Circular of Requirements (Attachment J-1) throughout the CS/PD phases. All changes to the Preliminary Circular of Requirements will be released to all involved Contractors in a subsequent updated version, unless the change was the result of a unique design characteristic proposed by a Contractor without Government involvement. Unique designs to meet requirements in the Preliminary Circular of Requirements shall only be contained in the final Circular of Requirements issued in the Detail Design phase.
At the completion of PD, the Contractor shall deliver the Circular of Requirements (DI-21) which is comprised of the matured Circular of Requirements and the Contractor’s build specification.
C.2.12 MASTER EQUIPMENT LIST
The Contractor shall prepare, maintain, and update a Master Equipment List (DI-22). The MEL shall include the items identified as Non-Critical Equipment and Critical Equipment. The equipment selections shall be annotated as Non-Critical or Critical.
The following items shall be identified by the Contractor by make and model number, if available, and shall be considered Non-Critical Equipment:
1. Air Conditioning (A/C) plants
1. Refrigeration Plants
1. Watermakers
1. Purifiers
1. Oil Water Separator
1. Oil Content Monitor
1. Line Shaft, Thrust and Waterborne Bearings (if provided)
1. Pumps and fans
1. VCHT
1. Sewage Treatment Plant
1. Anchor Systems
1. Life rafts
1. Rescue Boat and Davit (if provided)
1. Ship Mooring Winches and Capstans
1. Uninterruptible Power Supply Units
1. Waste Management and Pollution System
1. Impressed Cathodic Protection System
1. Thruster(s) (if provided)
1. Thruster Motor(s) (if provided)
1. Crane
1. Ramp(s)
1. Dynamic Positioning System (DPS) (if provided)
1. Hydraulic Pumping Units (HPU)
1. Radars
1. Communications Equipment
1. Galley Equipment
1. Laundry Service Equipment
The following items shall be identified by the Contractor by make and model number, if available, and shall be considered Critical Equipment:
1. Machinery Control System (MCS) Major Components and Consoles
1. Propulsion System
1. Propellers
1. Steering System
1. Electrical Generation and Distribution System
1. Integrated Bridge System Major Components and Consoles
C.2.13 LIFE CYCLE FUEL ESTIMATE AND LIFE CYCLE COST SAVINGS STUDY REPORT
The Contractor shall prepare a Life Cycle Fuel Estimate and Life Cycle Cost Savings Study Report (DI-23) identifying planned design features, including equipment selection and their potential savings regarding energy efficiencies, fuel consumption and maintenance, and operational features based on the operating profile provided in the Preliminary Circular of Requirements (Attachment J-1).
The Contractor shall consider employing Energy Saving Devices (ESDs) and/or energy saving measures to reduce the ship’s fuel consumption as compared to similar type vessels. The ESDs and/or energy saving measures shall be readily available for integration and be non-developmental items.
The Contractor shall consider maintenance and operational features such as reliability, including corrosion control, to reduce maintenance and manpower effort required, ensuring maximum operational readiness.
C.2.14 INTEGRATED ENVIRONMENTAL, SAFETY, AND HEALTH PLAN
The Contractor shall prepare an Integrated Environmental, Safety, and Health Plan (DI-24) including the strategy for meeting Integrated Environmental, Safety, and Health (IESH) requirements for the construction of the ship. The plan shall address meeting specific requirements identified in the Preliminary Circular of Requirements (Attachment J-1).
C.2.15 NOISE CONTROL CONSULTANT
The Contractor shall select and obtain the services of a Noise Control Consultant no later than the first DR. The Contractor is prohibited from acting as the Noise Control Consultant. The Noise Control Consultant shall have a minimum of five (5) years corporate experience in U.S. Naval ship noise analysis and the development of the acoustic designs and treatments. The acoustic designs and treatments will address minimizing ship's noise, including airborne and structure borne noise impacting habitability, vibration, and radiated noise.
C.2.16 HUMAN FACTORS
The Contractor shall prepare the Human Factors Report (DI-25) explaining the approach to satisfying human engineering requirements in accordance with the Preliminary Circular of Requirements (Attachment J-1). Human engineering is the application of human capabilities and limitations to system or equipment design and development to achieve efficient, effective, and safe system performance at minimum cost and manpower, skill, and training demands. Human engineering assures that the system or equipment design, required human tasks, and work environment are compatible with the sensory, perceptual, mental, and physical attributes of the personnel who will operate, maintain, control, and support it. The factors include, but are not limited to, how the ship’s crew use systems, interface with the systems, and move about the ship.
C.2.17 HABITABILITY
The Contractor shall prepare a Habitability Report (DI-26) to describe the capabilities of the design to meet habitability requirements of the Preliminary Circular of Requirements, (Attachment J-1).
C.2.18 SYSTEM INTEGRATION
The Contractor shall perform as an experienced Systems Integrator. If the Contractor is unable to integrate systems, the Contractor shall select and obtain the services of experienced system integrator(s) no later than the second DR. If services are obtained, the system integrator(s) shall have a minimum of five (5) years corporate experience in the design and integration of marine ship control network systems, and navigation and communication systems integration. The Contractor, or integration services obtained, shall perform control system (and any associated networks) and navigation system integration.
C.2.18.1 SHIP CONTROL NETWORK SYSTEMS INTEGRATION
Ship Control Network Systems integration refers to the design and integration of marine integrated electrical propulsion plants and controls, including passive/active filters. The Contractor, or services obtained, shall have experience in propulsion, steering, and electrical control system equipment for this type of application, The Ship Control Network Systems Integrator shall address DPS and Pilot House Main Console (PHMC) operations and interfaces in the design.
The Network Systems integration includes integrating into the overall design the following:
1. Main propulsion engines, drives, propulsion controllers (including passive/active filters) and interconnecting cabling.
2. Thruster motors/engines, drives, motor controllers and interconnecting cabling (if provided)
3. Propulsors.
4. Generator sets, emergency generator sets, and controls.
5. Switchboards, major load centers, transformers, motor generators, and isolation transformers.
6. Ramp Control System
7. Dynamic Positioning System (if provided)
8. Roll Stabilization System (if provided)
9. Anchor Systems
10. Machinery Alarms and Sensors
11. Machinery Centralized Control System (MCCS), including the Main Control Console (MCC) and Ship Control Console (SCC) controls, displays and mimics, including propulsion bridge wing consoles (if provided)
12. Condition Based Monitoring (CBM) systems.
13. Automation Control and Monitoring Systems (if provided)
14. Integrated Bridge System
15. Any other HM&E System proposed by the Contractor as an element of their design.
The Contractor shall prepare a Network Systems Integration Report (DI-27-01) describing the Contractor’s understanding, management, and integration of the network integration efforts throughout the CS/preliminary design period. If an outside integrator is used, the report shall include management of the integrator.
C.2.18.2 NAVIGATION AND COMMUNICATION SYSTEMS INTEGRATION
Navigation and Communication Systems integration refers to the design and integration of marine integrated navigation systems interfacing with GFE. The Contractor, or services obtained, shall have experience in electrical control system equipment for this type of application. The Navigation and Communication Systems integrator shall address DPS and Pilot House Main Console (PHMC) operations and interfaces in the design. The Navigation and Communications System shall be stand-alone, separate enclaves from the Machinery (Ship Control) network. Interfaces (boundaries) between Navigation and Communications networks shall be minimized.
The Navigation and Communication Systems integration includes integrating into the overall design the following:
1. Radars, controllers, consoles, and interconnecting cabling.
2. Government Furnished Equipment, including weapon systems
3. Navigational Charting and Indicating Systems, including charts, displays (and repeaters), including navigation bridge wing consoles (if provided)
4. Autonomy system (if provided)
5. Radios and Communications equipment (external and internal)
6. Shipboard Network
7. Any other Navigation/Communication System proposed by the Contractor as an element of their design.
The Contractor shall prepare a Navigation and Communication Systems Integration Report (DI-27-02) describing the Contractor’s understanding, management, and integration of the network/communication integration efforts throughout the CS/PD period. If an outside integrator is used, the report shall include management of the integrator.
C.2.19 SHORE BASED SPARES
The Contractor shall prepare a Shore Based Spares List (DI-28) with the recommended shipbuilder, vendor, and manufacturer items to be kept at homeport facilities to ensure maximum operational readiness and support rapid maintenance issue resolution. The Government may add new items, remove items, and increase or decrease the quantity as deemed necessary.
The Shore Based spare list shall include the following data elements, for each item:
1. Part Number
2. Nomenclature
3. Vendor
4. Mean Logistics Delay Time Estimate
5. Space dimensions
6. Weight
7. Quantity
8. Lay Up Maintenance requirements/ time intervals of maintenance (if any)
9. Point of Contact (POC)
10. Comments
C.2.20 BEACHING
The Contractor shall prepare a Beaching Report (DI-29) demonstrating the design’s ability to support beaching operations on gradients and with loads required in the Preliminary Circular of Requirements (Attachment J-1). The report shall include descriptions of hull modifications made for strengthening, hull preservation, propulsion protection, and all other design elements included to support repeated beaching with limited maintenance. The report shall also include descriptions of cargo unloading evolutions on different beach gradients, including the fording depth, at the beaching load with and without service life allowances. Required time to offload deck cargo is 30 minutes for a dual lane cargo ramp and 45 minutes for a single lane cargo ramp.
The Beaching Report shall describe the entire beaching operation beginning with deployment of kedge anchor(s), if used, or entering the surf zone, whichever occurs first., and concluding when the kedge anchor(s) are retrieved, if used, or the vessel has exited the surf zone, whichever occurs last. A description of the method, sequence, systems, and time required to beach LAW and keep it stable while beached shall be included. The description of the sequence of events to beach LAW shall include the vessel’s beach approach speed, trim, and draft. The report shall also provide all loads experienced by the hull from hitting the beach at the beach approach speed plus or minus three knots (±3kts), and while beached. The description of beach removal should list all equipment that must be employed to remove a LAW vessel from the beach, in both the beaching load and unloaded loading conditions. All equipment necessary to keep LAW stable while beached and remove the vessel from the beach must be carried onboard LAW. Calculations which show the required forces to remove a LAW vessel from the beach are also required. If the ship’s propulsion system is being used in beach removal, the required forces from the ship’s propulsion system shall be calculated and provided along with an assessment of the ability of the ship’s propulsion system to generate the necessary force.
The Beaching Report shall include descriptions of all equipment that remain in operation while beached, and how the equipment’s operation is supported while the ship is on the beach. Considerations shall be made for the ship being unable to get off of the beach, and the potential for the need to operate critical equipment without the availability of seawater.
The Beaching Report shall address all environmental conditions, beach gradients, beach coefficients of friction, and recommended beach approach speeds. Analysis shall be done to calculate distance traveled up the beach, force required to get off the beach, and forces experienced by the hull at all of the aforementioned factors, at the beaching load and unloaded conditions.
The Beaching Report shall describe the ramp and ramp deployment systems, in accordance with the Preliminary Circular of Requirements (Attachment J-1).
C.2.21 WEIGHTS
The Contractor shall prepare a Weight Control Plan (DI-30) describing the approach, procedures, and organizational controls to be implemented to ensure compliance with the weight, KG, trim, and list requirements. Weight reporting shall be in accordance with Society of Allied Weight Engineers (SAWE) Recommended Practice No 12/M-1, Issue D, and the Preliminary Circular of Requirements (Attachment J-1).
The Contractor shall prepare a Design Weight Estimate (DI-31) for the ship. The weight estimate shall include weight and KG margins and service life allowance. Total design and building weight and KG margins shall be at least 9% lightship weight (1.4% for use during CS/PD and 7.6% for use during detail design and construction) and 7.8% lightship KG (4.8% for use during the CS/PD and 3.0% for use during detail design and construction). Contract modification margin of 0.7% of lightship weight and 0.5% of lightship KG shall be included in weight estimates. Government Furnished Material (GFM) margin of 0.3% of lightship weight and 0.2% of lightship KG shall be included in weight estimates. The Service Life Allowance shall be at least 5% full load departure weight and one (1) foot KG. The weight estimate shall include the weight and moment estimates for all components and material of the ship and their overall effect on the ship's displacement, centers of gravity, draft, list, and trim. The weight report shall include all cargo loads, loading conditions, ship’s operating loads, and ship’s stores as described in the Preliminary Circular of Requirements, Attachment J-1. If a parent design is being used or a concept design is sufficiently developed, the Design Weight Estimate shall be submitted to the Government in a preliminary state before or by the PAC, and serve as the Preliminary Allocated Baseline Weight Estimate (PABWE) to be updated and further defined during CS/PD. The weight estimates shall be refined and updated throughout the CS/PD effort and shall be reflected in the completed PD.
C.2.22 STABILITY
The Contractor shall prepare an Intact and Damage Stability Report (DI-32) to demonstrate compliance with the Preliminary Circular of Requirements (Attachment J-1) at full load, beaching load, and lightship with and without service life allowances for weight and center of gravity (KG).
C.2.23 HULL FORM, APPENDAGES, AND HYDRODYNAMIC PERFORMANCE
1. The Contractor shall prepare a Hull Lines Drawing (DI-33-01) depicting their proposed hull form. An electronic 3-D model of the hull form shall also be provided. If an existing design is utilized, the Contractor shall identify the origin of the existing design and show the proposed modifications made to meet requirements. The Contractor shall consider the location of the hull mounted sensors during development of the hull form, appendages and hull openings. The Contractor shall prepare an Appendage and Control Surface Drawing (DI-33-02).
1. The Contractor shall perform a speed and power analysis consisting of the powering characteristics of the hull form selected at the full load condition and beaching load condition. The analysis shall demonstrate that the hull form selected can achieve the requirements in the Preliminary Circular of Requirements (Attachment J-1). The analysis shall include calculations of total ship’s resistance and powering characteristics with and without service life allowance. The Contractor shall prepare a Speed and Power Report (DI-33-03) to document the results of the analysis. The calculations shall clearly identify the basis for the calculations.
1. The Contractor shall perform a seakeeping performance analysis using the Visual Ship Motion Program (SMP), or another seakeeping analysis program as approved by the Government, for all criteria and for all loading conditions in accordance with the Preliminary Circular of Requirements (Attachment J-1) including operability indices. The Contractor shall prepare a Seakeeping Performance Report (DI-33-04) to document the results of the analysis. The report shall provide Significant Single Amplitude (SSA) values for pitch, roll, vertical acceleration, and lateral acceleration and provide human performance factors, Motion Induced Fatigue (MIF), Motion Induced Interruptions (MII), and Motion Sickness Incidence (MSI) against the criteria in the Preliminary Circular of Requirements (Attachment J-1). If a roll stabilization system is used, the system and its effectiveness shall be described in the Seakeeping Performance Report.
1. The Contractor shall perform a maneuvering performance analysis. The maneuvering analysis shall provide calculations and evaluations of maneuvering characteristics including steady turning diameter, directional stability, and course keeping (zigzags). The Contractor shall prepare a Maneuvering Performance Report (DI-33-05) to document the results of the analysis.
1. If a Dynamic Positioning System is used, the Contractor shall perform a DPS Performance Analysis. The DPS performance analysis shall provide calculations of dynamic positioning characteristics including position keeping and tracklining at the full load condition with service life allowance to show compliance with the Preliminary Circular of Requirements (Attachment J-1). The Contractor shall prepare a Dynamic Positioning System Performance Report (DI-33-06) to document the results of the analysis.
C.2.24 MODEL TESTING
The Contractor shall prepare a Model Test Program Plan (DI-34-01). Model Testing shall be done in accordance with ITTC procedures.
The Contractor shall conduct the following model tests (including construction of all hull and propeller models):
1. Bare hull resistance Effective Horsepower (EHP) tests
2. Bilge keel and propulsion appendage alignment flow tests
3. Appended resistance EHP tests
4. Wake survey tests
5. Stock propulsor(s) self-propulsion Shaft Horsepower (SHP) tests
6. Design propeller open water
7. Design propeller self-propulsion SHP
8. Beaching Simulation
In addition, the Contractor shall perform the following tests:
1. Propulsor Cavitation Performance Tests to verify cavitation performance via scale model tests. The Contractor shall conduct tests at simulated sustained speed conditions, with the propulsor operating within the appropriate wakefield. The Contractor shall obtain photographic and video records and sketches of the variations in blade surface, tip vortex, and hub vortex cavitation (if applicable) as the blades pass through the prescribed wake. In addition, the Contractor shall construct an inception diagram (cavitation bucket) for the propulsor by varying test section speed, test section pressure, and shaft speed to determine the onset (inception) of leading edge pressure and suction side cavitation, as well as back bubble cavitation.
2. Propulsor Cavitation Erosion Tests at simulated conditions corresponding to 100% maximum continuous rating (MCR) and RPM with the ship at its minimum operating draft.
The Contractor shall prepare a Model Test Report (DI-34-02) for each test identified, including but not limited to analysis, findings, and decisions on the hull form, hydrodynamics, appendages, and performance, supported by model testing that will be incorporated into the Preliminary Circular of Requirements Review Report.
The Contractor shall prepare Model Test Video and Photographs (DI-34-03) of the model(s) during model testing.
The Contractor shall maintain and warehouse all models and test articles used in testing until the first ship of the class has been delivered to the Fleet. The contractor shall deliver the LAW ship model to the Government at the completion of their storage requirement. The Contractor shall provide thirty (30) days notification for each model test event.
C.2.25 GENERAL ARRANGEMENTS
The Contractor shall prepare an Area/Volume Report (DI-35-01) for all compartments, tanks, and external working deck areas.
The Contractor shall prepare a General Arrangement Drawing (DI-35-02) including all deck plans, inboard/outboard profiles, fore and aft outboard views, and topside views.
The Contractor shall prepare Compartment Layout Drawings (DI-35-03) showing the compartment arrangement with major equipment and outfitting for each space except tanks, voids, and machinery spaces. The drawings shall depict that foundations and mounts for GFE equipment are provided and support the preliminary space layouts provided in Schedule C- Government Furnished Information (Attachment J-5).
The Contractor shall prepare a Tankage Report (DI-35-04) showing the tank arrangements with tank purpose identified.
C.2.26 TOPSIDE ARRANGEMENT
The Contractor shall prepare a Topside Arrangement Drawing (DI-36-01) depicting all topside equipment including masts, stacks, radars, antennas, navigational lights, lifesaving equipment, boats, deck equipment, tie-down instruments, ramp(s), the 30mm Gun Weapon System, shore power interface location, RAS/FAS station, and the designated aviation integration location. The contractor shall work collaboratively with the government to ensure radar, antenna, and other GFE is located in acceptable locations.
The Contractor shall prepare a Navigation Lights Arrangement Drawing (DI-36-02) depicting the locations of the required navigation lights in accordance with the Preliminary Circular of Requirements (Attachment J-1).
C.2.27 PILOT HOUSE/CHART AREA
The Contractor shall prepare a Pilot House/Chart Area Arrangement Drawing (DI-36-03) depicting the location of windows, consoles, navigation equipment, and communications equipment, in accordance with GFE locations specified by the Government. The drawing shall include the arrangement of the bridge and chart Area.
C.2.28 MACHINERY ARRANGEMENT
The Contractor shall prepare a Machinery Arrangement Drawing (DI-37-01) depicting the machinery arrangements in plan, section, and elevation views of the main and auxiliary machinery rooms, Main Control Station, electrical spaces, and thruster spaces (if provided). The Machinery Arrangement Drawing shall include the equipment manufacturer specified maintenance envelopes.
The Contractor shall prepare an Equipment Removal Drawing (DI-37-02) depicting equipment removal routes, access areas, lifting devices, and take down joints for all major components shown in the Machinery Arrangement Drawing.
C.2.29 STRUCTURES
The Contractor shall prepare drawings presenting the structural arrangement of the ship. The drawings shall show the structural scantlings including material type, plate thickness, stiffener profiles, and transverse frame and longitudinal girder sizes. The structural drawings shall:
| 1. | Be of a scale maximized, to the extent possible, to fit onto the specified drawing size sheet. |
| 2. | Contain whole views (i.e. profile(s); deck plans). Local detailed views shall be used as necessary to show important design features. |
| 3. | Indicate frame numbers and show web frame locations. |
| 4. | Show frame markings on the centerline and baseline of all views. |
| 5. | Indicate Water Tight Bulkheads (WTB), Oil Tight Bulkheads (OTB) and Gas |
| Tight Bulkheads (GTB) on all views. | |
| 6. | Indicate allowable deck loading for all exterior decks. |
Views shall include significant structure, plate thicknesses, bottom, side, decks, platforms, flats, bulkhead and superstructure plate stiffeners, transverse frames, longitudinal, girders, pillars/stanchions, and structural openings, as appropriate to the view.
The Contractor shall prepare the following structural drawings which shall be consistent with weight estimates and requirements:
1. Midship Section Drawing (DI-38-01)
1. Typical Sections Drawing (DI-38-02)
1. Shell Expansion Drawing (DI-38-03)
1. Deck and Platform Drawing (DI-38-04)
1. Superstructure Drawing (DI-38-05)
1. Hull Deck, Platform and Longitudinal Bulkhead Scantling Drawing (DI-38-06)
1. Superstructure Scantling Drawing (DI-38-07)
1. Hull Girder Longitudinal Strength Analysis (DI-38-08)
1. Structural Design Criteria Report (DI-38-09)
The Contractor shall include the structural calculations necessary to substantiate the scantlings and other details within the drawings. Calculations shall be submitted with their associated DI and under its invoked CDRL, as identified in the Preliminary Design Data Requirements List (DRL) (Attachment J-3).
The Contractor shall submit these drawings to the Government for review. Resolution of preliminary review comments shall be reflected in the final submittal of the structural drawings and calculations as applicable.
C.2.30 MAST AND FLAGSTAFF
The Contractor shall prepare a Mast and Flagstaff Drawing (DI-39) depicting the details of the main mast and the flagstaff. The Contractor shall include the structural calculations necessary to substantiate the details within the drawing. The contractor shall work with the Government throughout the PD phase to ensure the mast is sufficiently sized and located to support GFE loadout.
C.2.31 PROPULSION
The Contractor/Propulsion System vendor shall develop the design of the propulsion system and prepare a Propulsion System Report (DI-40-01) with supporting calculations. The Contractor/Propulsion vendor shall perform a preliminary harmonic analysis and subtransient reactance calculations and document the results in the Propulsion System Report.
The Contractor shall prepare Endurance Fuel Calculations (DI-40-02) to demonstrate the design meets the endurance requirements of the Preliminary Circular of Requirements (Attachment J-1) with the ship at full load condition including service life allowance.
The Contractor shall prepare a Propeller Drawing (DI-40-03).
C.2.32 STACK GAS FLOW ANALYSIS
The Contractor shall prepare a Stack Gas Flow Analysis Report (DI-41) demonstrating the stacks and exhaust systems are properly designed to ensure stack gas clears the ship under all required ship and environmental operating conditions thereby not interfering with working deck areas, other exterior deck areas, ventilation system intakes, and exterior doorways.
C.2.33 ACOUSTIC NOISE AND VIBRATION CONTROL
The Contractor/Noise Control Consultant shall establish and maintain an overall ship's noise control program. Noise and vibration reports shall identify all noise requirements, quality assurance, inspection, testing, noise surveys and verification procedures that will be utilized during detail design. All treatments and verification procedures shall be specified in the Preliminary Circular of Requirements Review Form (Attachment J-6). The Contractor/Noise Control Consultant shall conduct the following noise and vibration analyses:
1. The Contractor/Noise Control Consultant shall perform an airborne noise analysis for each space for which there is a noise requirement. The Contractor shall identify all noise sources and transmission paths. The Contractor/Noise Control Consultant shall identify noise control measures to be incorporated including acoustic treatments, equipment mounting, and compartment separation. The analysis shall be performed in accordance with SNAME 3-37, Design Guide for Shipboard Airborne Noise Control, and its Supplement. The Contractor shall prepare an Airborne Noise Report (DI-42-01).
1. The Contractor/Noise Control Consultant shall perform an underwater radiated noise analysis to demonstrate the amount of underwater radiated noise produced by the vessel. The Contractor/Noise Control Consultant shall describe the predicted underwater radiated noise levels and describe any treatments to be used for minimizing. The Contractor shall prepare an Underwater Radiated Noise Report (DI-42-02).
1. The Contractor/Noise Control Consultant shall perform a vibration analysis to determine the natural frequencies of the hull, superstructure, and mast and their relationship to shaft and blade rate forces and other impulse forces. The Contractor/Noise Control Consultant shall identify vibration treatments to be used including machinery resilient mounts, piping hangers, flexible hoses, and structural damping. The Contractor shall prepare a Vibration Report (DI-42-03).
Where design detail is insufficient, empirical data and vendor-supplied information may be used to develop the noise control program and related analyses. The Contractor shall include this data in the affected reports.
C.2.34 AUXILIARY SYSTEMS
The Contractor shall prepare an Auxiliary Systems Report (DI-43) to describe and depict the salient features and components of each auxiliary system. The report shall define the overall system configuration, and shall include preliminary supporting calculations for major system components, and system performance capability for each auxiliary system. Drawings shall be prepared for each auxiliary system identifying equipment and components, preliminary piping sizes, and material schedule.
Auxiliary systems are defined below:
1. Seawater Service including Main Seawater
2. Freshwater Service including Chilled Water, Deionized Water, and Centralized Freshwater Cooling
3. Potable Water
4. Fire Extinguishing
5. Firemain
6. Lubricating Oil including Fill, Storage, and Transfer
7. Ballast (if used)
8. Bilge
9. Fuel Oil Fill, Storage, Transfer, Purification , Service, Ship’s Boat Refueling, and Cargo Refueling
10. Steering
11. Hydraulic
12. Anchor Systems
13. Ramp System
14. Replenishment at Sea (RAS) System
15. Fueling at Sea (FAS) System
The Contractor shall prepare a Pollution Control Systems Report (DI-44) to describe and depict the preliminary characteristics for pollution control systems. The report shall define the overall system configuration, and shall include preliminary supporting calculations for major system components and system performance capability for each pollution control system. Drawings shall be prepared for each pollution system identifying equipment components, preliminary piping sizes, and material schedule, as applicable.
Pollution control systems are defined below:
1. Engine…