Light Amphibious Warship (LAW) Circular of Requirements (CoR) Draft for Preliminary Design RFP (Ver. 0.15 - 11-19-20)
Contents 1
Section 1: Scope ............................................................................................................................................ 4 2
Section 2: Applicable Documents ................................................................................................................. 4 3
Section 3: Requirements ............................................................................................................................... 5 4
000 General Guidance and Administration .............................................................................................. 5 5
042 General Administrative Requirements ........................................................................................... 5 6
050 Design Performance Capabilities ................................................................................................... 6 7
070 General Requirements for Design and Construction ..................................................................... 7 8
071 Access .......................................................................................................................................... 13 9
072 Force Protection ........................................................................................................................... 14 10
073 Noise, Vibration, and Resilient Mounts ....................................................................................... 15 11
076 Reliability, Maintainability, and Availability .............................................................................. 15 12
077 Safety ........................................................................................................................................... 16 13
080 Logistics and Readiness ............................................................................................................... 17 14
096 Mass Properties ............................................................................................................................ 17 15
100 Hull Structure, General .................................................................................................................... 18 16
200 General Requirements for Propulsion Plant .................................................................................... 18 17
202 Machinery Control System ........................................................................................................... 19 18
230 Propulsion Units ........................................................................................................................... 19 19
233 Diesel Engines .............................................................................................................................. 19 20
243 Propulsion, Shafting ..................................................................................................................... 19 21
300 Electric Plant, General ...................................................................................................................... 20 22
310 Electric Power Generation (Generator Sets)................................................................................ 20 23
312 Emergency Diesel Generator ....................................................................................................... 21 24
320 Power Distribution Systems ......................................................................................................... 21 25
324 Switchboards and Power Distribution Equipment ....................................................................... 21 26
331 Lighting Systems ........................................................................................................................... 22 27
400 Command and Surveillance, General (Electronic Systems, General) .............................................. 22 28
402 Cybersecurity ............................................................................................................................... 23 29
407 Electromagnetic Interference Reduction (EMI) ........................................................................... 23 30
420 Navigation Systems ...................................................................................................................... 24 31
430 Interior Communications ............................................................................................................. 25 32
432 Interior Voice Communications ................................................................................................... 26 33
435 Interior Data Communication Networks ...................................................................................... 26 34
440 Exterior Communications Systems .............................................................................................. 26 35
451 Surface Search Radar ................................................................................................................... 26 36
500 Auxiliary Systems, General ............................................................................................................... 26 37
505 General Requirements for Piping Systems .................................................................................. 26 38
512 Heating, Ventilation and Air Conditioning ................................................................................... 27 39
529 Drainage and Ballasting Systems ................................................................................................. 28 40
532 Fresh Water Systems ................................................................................................................... 28 41
541 Fuel Systems................................................................................................................................. 28 42
555 Firefighting ................................................................................................................................... 29 43
556 Hydraulic Oil Systems ................................................................................................................... 31 44
570 Underway Replenishment (UNREP) Systems ............................................................................... 31 45
573 Cargo handling and Stowage ....................................................................................................... 31 46
575 Military Vehicle Handling and Stowage ....................................................................................... 31 47
581 Anchor Handling and Stowage ..................................................................................................... 31 48
582 Mooring and Towing Systems ...................................................................................................... 32 49
583 Boats, Boat Handling and Stowage Systems ................................................................................ 32 50
588 Aviation Integration ..................................................................................................................... 32 51
589 Crane ............................................................................................................................................ 34 52
593 Environmental Pollution Control ................................................................................................. 34 53
600 Outfitting and Furnishings, General ................................................................................................. 36 54
631 Painting ........................................................................................................................................ 36 55
640 General Arrangements for Habitability (Living Spaces) ............................................................... 36 56
641 Living Spaces for Officers & Chief Petty Officers ......................................................................... 36 57
642 Living Spaces for Enlisted ............................................................................................................. 37 58
645 Leisure and Community Spaces ................................................................................................... 37 59
651 Food Service Spaces ..................................................................................................................... 37 60
652 Medical Spaces ............................................................................................................................. 37 61
661 Offices .......................................................................................................................................... 37 62
665 Laundry Spaces ............................................................................................................................ 37 63
670 Storerooms................................................................................................................................... 37 64
700 Armament, General ......................................................................................................................... 38 65
702 Armament Installations ................................................................................................................ 38 66
703 Weapons Stowage ....................................................................................................................... 38 67
Section 4: Verification ................................................................................................................................. 38 68
Section 5: Requirements Traceability ......................................................................................................... 39 69
Section 6: Appendices ................................................................................................................................. 39 70
Appendix 1 LAW Cargo List and Description ................................................................................... 39 71
Section 1: Scope 74 This Circular of Requirements (CoR) defines the requirements for the Light Amphibious Warship (LAW). LAW 75 will be a new ship designed to support the employment of the Marine Littoral Regiment (MLR) by providing direct 76 conveyance to beaches in order to on-load and off-load expeditionary forces, equipment and supplies. The vessel 77 shall provide mobility of forces from the point of embarkation (beach, marina, harbor, or port) through the littorals, 78 across Open Ocean, and to a point of debarkation (beach, marina, harbor, or port) that affords maritime tactical 79 advantage. 80
Section 2: Applicable Documents 81
Compliance with referenced documents is mandatory even where the referenced document may use terms similar to 82 “recommendation”, “guideline” or “guidance” in their title or text. 83
Order of precedence - First tier references take precedence over sub-tier references in the event of a conflict. 84 Nothing in this document shall supersede applicable laws and regulations unless a specific exemption has been 85 obtained. In case of conflict between ABS Rules or USCG Regulations, and specific requirements of this CoR, the 86 ABS Rules and USCG Regulations take precedence, unless the specific CoR requirements exceed the ABS Rules 87 and USCG Regulations, in which case the specific CoR requirements takes precedence. 88
Silence of one document with respect to details or requirements in another document shall not be considered an 89 inconsistency. 90
Order of Order of Precedence of requirements within the Expanded Ship Work Breakdown Structure Sections of the 91 LAW CoR is as follows: 92
Requirements within a SWBS Section applicable to the entire ship (for example, SWBS Section 070 - 93 General Requirements for Design and Construction) state the broadest requirements and apply to 94 systems and equipment, unless otherwise specified in the more detailed SWBS Sections, in which case 95 the detailed SWBS Section requirements apply. 96
Specific requirements within a lead, 1-digit SWBS Section (for example, a SWBS Section which 97 includes the general or common requirements for a number of similar systems, such as SWBS Section 98 500 - Auxiliary Systems, General) are the next broadest category of requirements, and shall apply to 99 systems and equipment in its grouping as well as other ship systems where applicable, unless otherwise 100 specified in detail system SWBS Sections. 101
Specific requirements within a 2-digit SWBS Section (for example, a SWBS Section which includes 102 the details of a particular system such as SWBS 530, Fresh Water Systems) are the next broadest 103 category of requirements and shall apply to systems and equipment in its grouping, unless otherwise 104 specified in detail system SWBS Sections. 105
Specific requirements within a detailed, 3-digit SWBS Section (for example, a SWBS Section which 106 includes the details of a particular system such as SWBS 533, Potable Water Systems) are the most 107 detailed requirements. Requirements in these detailed system SWBS Sections apply for the system 108 covered in the detailed SWBS Section. 109
The omission in one SWBS Section of details covered in another SWBS Section shall not be 110 considered a conflict. 111
In the event that two or more requirements of equal precedence are found to apparently conflict, the 112 Contractor shall formally identify the conflict to the Government for clarification, or correction of the 113 specifications, as appropriate. 114
Effective issue - Where first tier references, such as industry standards, are referred to, the issue or 115 revision/amendment in effect at Detail Design and Construction Contract Award shall apply. The current version is 116 acceptable only if approved by the government, and is used in its entirety. 117
First Tier and Sub-tier Reference - Any referenced document that is directly cited for use or application by an 118 identifying number or name in this CoR is a first tier reference for each particular use or application for which it is 119 so cited. Any document that is cited in a first tier reference, or in a document referenced therein, is a sub tier 120 reference. A document that is a sub-tier reference in one application may also be a first tier reference in another 121 application when it is cited directly. 122
Type Drawing – A NAVSEA drawing identified as "Type Drawing" which delineates or illustrates design features 123 of systems or components. No departure from any feature identified as "mandatory" shall be made without specific 124 approval. The illustrative features are subject to detail design development to assure full compliance with these 125 specifications. 126
U.S. Navy Design Data Sheets, Design Practice and Criteria (DDS/DPC) - Documents that contain information 127 for guidance in the design and construction of ship features or systems. Design Data Sheets illustrate typical design 128 and calculation methods and procedures which are acceptable to the Government 129
Standard Drawing – A NAVSEA drawing identified as a "Standard Drawing" which delineates arrangements or 130 details of systems, equipment or components. No departure from a standard drawing is permitted without specific 131 written approval of the Contracting Officer. 132
Section 3: Requirements 133
000 General Guidance and Administration 134
042 General Administrative Requirements 135
042a General 136 Marine Vessel Rules (MVR) - The ABS Rules for Building and Classing Marine Vessels 137 encompasses the criteria and verification requirements for approving and certifying the vessel. These 138 rules are referred to herein as “MVR”. The 2020 version of the MVR shall be used in this contract. 139
The phrase “be approved” or “for approval” used herein shall be interpreted to mean approval from the 140 Government Contracting Officer or Contracting Officer’s Representative (COR) in accordance with 141 the terms and conditions of this contract. 142
Where the phrase “No additional requirements” is used herein it means there are no additional 143 requirements beyond those in the MVR and the SOW. 144
Where the phrase “additional requirements” is used herein, it means that these requirements 145 supplement those in MVR. 146
042b Standards 147 Material and equipment under these specifications shall be new and unused. Equipment shall be current production 148 models with existing equipment and repair parts support. ABS “Type Approval” program products identified as 149 product design assessment/certification (PDA), material assessment/certification (MA) and unit certifications shall 150 be required for material, equipment and services, and available for inspection under these specifications by the 151 Government. The contractor shall notify the Government of any model or version changes for selected equipment 152 with its associated updated technical documentation. Materials or equipment referred to by trade or brand name or 153 manufacturer's model or by Federal/National Stock Number represent, to the best knowledge of the Government, the 154 current production models on 3 January 2021. 155
Where a commercial manufacturer's type, model, or other designation is referenced herein, together with the term 156 "or equal", such identification is intended to be descriptive, but not restrictive, and is used to indicate the applicable 157 characteristics as they existed on 3 January 2021. 158
If the term "or equal" does not appear after the requirement of a commercial manufacturer's type, model, or other 159 designation, it shall be read as only the specific commercial manufacturer's type, model, or other designated material 160 or equipment will suffice. 161
Approval shall be obtained from the Contracting Officer prior to the use of other than referenced document(s) in lieu 162 of the requirements of the primary reference cited. This includes superseding documents if applicable. Later 163 versions of product specifications may be used only upon approval from the Contracting Officer. Proposals for 164 substitutions for primary and the above sub-tier references shall be made by letter from the Contractor to the 165 Contracting Officer. To ensure that sufficient information is available to permit evaluation of alternatives, the 166 Contractor shall furnish descriptive information necessary to substantiate that the alternative offered is cost effective 167 and meets the performance, life, safety, interchangeability, maintainability, and reliability of that prescribed by the 168 referenced document(s). 169
Equivalent equipment - Where equipment is specified herein by a reference document, or a product with “or equal”, 170 the Contractor may propose equivalents to these references. 171
In order for the proposed item to be acceptable, an equipment equivalency certificate shall be prepared and be 172 approved. 173
The equivalency certificate shall include, and approval will be based on, the equipment meeting the equivalent 174 certification standards and following equipment attributes: 175
Meet the performance requirements specified herein, and possess similar: 176
Dimension 177 Weight. 178 Power, HVAC, cooling water, and other support services. 179 Suitability for marine service. 180 Material. 181 Reliability and Maintenance features. 182 Vendor furnished training. 183 Vendor furnished service. 184 Data requirements. 185 Maintenance and support costs, expected life, and crew workload. 186 Environmental and Safety characteristics including airborne noise and vibration. 187
To the extent that the above similarities are not met, the Contractor shall explain why they are not essential to the 189 proper functioning and support of the equipment. 190
The equivalency certificate shall identify support, auxiliary, or subsystem equipment or material that would be 191 changed or modified as a result of acceptance of the equivalent equipment. 192
The equivalency certificate shall identify discrepancies with the requirements of these specifications that would 193 result from the acceptance of the equivalent equipment. 194
050 Design Performance Capabilities 195
050a Beaching 196 The craft shall be capable of transiting the surf zone to a beach landing. After a beach landing, the craft shall be able 197 to retract itself from the beach under its own propulsion power with assistance from its kedge anchor(s) (if necessary 198 and provided), whether unloading or loading cargo. 199
The craft shall be able to beach on a 1:40 or shallower beach slope on sand, gravel, shale, or shingle beaches, 200 without boulders or anti-craft obstacles. The fording depth (water depth at the end of the cargo ramp when beached 201 on a 1:40 beach) shall not exceed 42 inches with the craft carrying the 1:40 Beaching Load as defined in Table 3. 202
The ship shall be capable of completing a full beaching, deployment and extraction evolution in under 90 minutes. 203 The beaching evolution starts upon deployment of kedge anchors or entering the surf zone, whichever occurs first. 204
After required deck cargo is deployed/retrieved, the extraction evolution is complete when the kedge anchor(s) are 205 retrieved, if used, or the vessel has exited the surf zone, whichever occurs last. Time to complete a beaching 206 operation does not include time to offload cargo fuel by hose. Required time to offload deck cargo is 30 minutes for 207 a dual lane cargo ramp and 45 minutes for a single lane cargo ramp. 208
050b Cargo Capacity 209 The ship shall have a minimum deck cargo capacity of 715t (648 ST) and a minimum cargo deck area of 744 m² 210 (8000 ft²) 211
The ship shall have a minimum cargo fuel capacity of 340,687L (90,000 gal.) of JP-5 (F-44 aviation fuel) without 212 the need of deck cargo fuel storage. The cargo fuel capacity is in addition to other fuels necessary for ship 213 operations. 214
050c Speed 215 The ship shall be capable of a minimum sustained speed of 14 knots in calm water and clean hull at the ships full 216 load condition defined in Table 3 at 85% of ABS Maximum Continuous Rating (MCR) for any single engine 217 supplying propulsion power or electrical power. 218
050d Range and Endurance 219 The ship shall be capable of 3,500 nautical miles endurance at sustained speed at the ships full load condition 220 without refueling defined in Table 3 without using any cargo fuel in accordance with NAVSEA T9070-AW-DPC-221 010_200-1 222
The ship shall be capable of a sustained speed of 14 knots in the Full Load, calm water, and clean hull using no more 223 than 85 percent of the installed engine rating (maximum continuous rating, MCR) for any single engine supplying 224 propulsion power or electrical power. 225
The ship shall be capable of 11-day missions without replenishment for 40 crew and for 11-day missions 75 Military 226 detachment (MILDET) without replenishment. 227
050e Navigable Draft (Size Constraints or Characteristics) 228 The ship shall have a maximum navigable draft of 12 feet at the full load condition defined in Table 3. 229
050f Ship/Shore Connectivity 230 In accordance with ABS Notation HVSC (Guide for High Voltage Shore Connection) Shore connections shall be 231 located port and starboard shore electric power, and may be housed with other shore connections (fresh water, 232 sewage, oily waste, waste oil, fuel, lube oil). Ship/Shore connection material shall be in accordance with UFC-4-233 150-2. Information technology/communications and electrical power shore connections shall be port and starboard 234 accessible. Connection and operation locations shall not interfere with cargo loading or unloading operations. 235
050h Ramp System 236 The ship shall provide direct conveyance of cargo to the beach over a ramp system. The ramp shall have a minimum 237 width of 144 inches and be able to deploy all of the vehicles in Appendix A. 238
070 General Requirements for Design and Construction 239
070a General 240 Space and Weight Reservations shall be incorporated into the baseline ship design. 241
Where the term "Space and Weight", “Space, Weight and Power (SWAP)”, or “Space, Weight, Power, and Cooling” 242 (SWAP-C) is used with respect to equipment or systems, the Contractor shall provide space, weight, services, and 243 maintenance access reservations for those systems or equipment specified herein. Space and weight items shall be 244 incorporated in the ship design, design analyses, and used in the design and selection of service system components 245 and installation. Unless otherwise specified, services required for the specified equipment and systems shall be 246 safely terminated within compartments affected. Primary power, ductwork, HVAC and cooling water services shall 247 be sized for load, in addition to any other equipment-specific service requirements in the compartment. 248
Where the term "Space Only" is used herein, with respect to equipment or systems, it means that the Contractor shall 249 provide the space reservation specified. The space reservation shall be used in developing space arrangements and 250 shall be carried in the ship design. "Space Only" equipment and systems shall not be carried in other design analyses 251 or used in the selection of service system components nor will they be considered in the design or installation of 252 service systems. 253
Service reservations shall be in addition to any spare capacity requirement specified herein. 254
No other equipment or distributive systems shall be located within the perimeter of the volume designated for 255 “space” or "space and weight" equipment or their maintenance and free airflow envelopes. 256
Develop and submit technical management processes (ex. Configuration management plan, system safety plan, 257 quality control plan, certification plan, and test/evaluation plan. Include ABS type approval program and Service life 258 evaluation program (SLEP) criteria for compare and contrast to US Navy Combatant Design and Specification 259 (NCDS) criteria if known. 260
070b Regulatory Body Requirements (ABS MVR Notation) 261 The ship shall be designed under American Bureau of Shipping (ABS) survey for unrestricted service, and designed 262 to ABS with following Notations A1, Naval Force Projection, NavalSafe(ALL), Passenger vessel, DFD, COMF+, 263 ACCU, PORT, Ⓔ, AMS, SFA(20,WWT), BWE, BWT, CPS, CorrResistant, CRC(SC,SP,RMP), DLA and R2-S+, 264 HAB ++(ACCOM), ERGO (Top, ES, Valve, Maint), MAN-A, NBL, NIBS,PMP-RCMD+, POT, BFP3, HVSC, 265 Power Service, Power Plant, ISQM, PMP-RCMD+, MLC-ACCOM, HSQEEn, AT(thickness ) (BS, IB, LB) WT, 266 HCS). The ship shall be issued a USCG Certificate of Inspection (COI), but shall not be classed by ABS (no ABS 267 Cross Maltese Notation). 268
The ship shall be issued SOVCs for MARPOL, SOLAS, and IMO Convention on the COLREGs for international 269 voyages. 270
The ship shall be built in compliance with the Code of Federal Regulations, Title 46, Subchapter I, and with 271 applicable Federal Regulations. The ship shall be in accordance with the U.S. Supplement to MVR for Vessels 272 Certificated for International Voyages for certification by USCG. In case of conflict between ABS Rules or USCG 273 Regulations, and specific requirements of this CoR, the ABS Rules and USCG Regulations take precedence, unless 274 the specific CoR requirements exceed the ABS Rules and USCG Regulations, in which case the specific CoR 275 requirements takes precedence. 276
The Contractor shall provide the materials, equipment, and outfitting items required for the ship to operate in 277 compliance with 33 Code of Federal Regulations (CFR), as applicable, and with other Regulatory Body 278 requirements contained within this document. 279
070c Units 280 Requirements herein and for deliverables shall be expressed in the International System of units (SI). As a 281 convenience, the Imperial units are accompanied by their approximate customary system equivalents (in 282 parentheses). Angular measure is expressed in degrees unless it is necessary to specify fractions of a degree where 283 radians are used. 284
070d Certifications 285 The LAW shall comply with the requirements and achieve necessary certifications for the following: 286
Panama Canal as defined by the Regulation for Navigation in Canal Waters, promulgated by the 287 Panama Canal Authority in accordance with 46 CFR 69.7. 288
Transit through U.S. waters in accordance with Federal Regulations. 289
Transit through U.S. waters in accordance with local regulations applicable to the place of 290 construction. 291
Transit through International waters in accordance with international regulations for which the United 292 States is a signatory. 293
A “Ship Sanitation Control Exemption/Ship Sanitation Control Certificate” USCG Form CG-5100B. 294 International Regulations for Preventing Collision at Sea, 1972 and subsequent instructions and 295 modifications. 296 Federal Communication Commission regulations. 297 The International Convention for Tonnage Measurement of Ships, 1969, Title 46 CFR Subchapter G, 298
Part 69 applies. 299
070e Environmental Conditions 300 Beaching: All headings in wave heights up to 2m, wave modal periods from 3 to 15 seconds, sustained wind speeds 301 15 knots, and an average current of 1.5 knots. 302
Staging and Strike-down: All headings in sea state 5 (significant wave height of 2.5-4m,wave modal periods from 303
8.3 to 16 seconds, sustained wind speeds of 22-27 knots). 304
Load and unload cargo and stores alongside a pier: All headings in sea State 3 (slight wave height of .5m-1.25m), 305 wave modal periods from 3 to 8 seconds, sustained wind speeds of 11-16 knots). 306
Load and unload cargo and stores at anchor: All headings in sea State 2 (significant wave height of up to 0.5 m, 307 wave modal periods from three (3) to 15 seconds, and sustained wind speeds of up 15 knots with 30 knot maximum 308 gusts). 309
Moored pier side: Headings of 0 deg., 90 deg., and 180deg. in three knots of current and 50 knots of wind both 310 tending to push the ship away from the pier. 311
The vessel shall be designed to operate without degradation for the following temperatures: 312
Ambient air temperature between of -20°C to 49°C, relative humidity through 100 percent 313 Ambient seawater temperature between -2°C and 38°C 314
Equipment and machinery shall operate with dynamic roll of as much as 45° and dynamic pitch of as much as 10° 315 (both single amplitude). 316
Equipment and machinery in exposed locations shall not be installed in areas where it would operate outside its 317 specified limits. 318
070f Fuel & Energy 319 The design of the ship and selection of systems and components shall maximize fuel efficiency and minimize fuel 320 use. The ship’s diesel engines shall normally operate on NATO F-76 marine diesel fuel (DFM), and be capable of 321 operation using JP-5 (F-44 aviation fuel) when operationally essential, whenever practicable without requiring fuel 322 additives. 323
The cargo fuel to be carried shall be JP-5 (F-44 aviation fuel) and shall not be needed for ship operations. 324
070g Service Life and Margins 325 The ship shall have a minimum service life of 20 years. Provide quantitative analysis using functional objectives and 326 performance requirements analyzing input and output data for measurable outcomes. Analysis should consider but 327 not limited to human systems integration, operating environment, environmental conditions, corrosive environment, 328 training, fire safety, and survey/maintenance strategy. 329
Displacement: A service life displacement allowance of 5% of the full load displacement at delivery shall be 330 provided for weight growth of the ship in service without compromise of the ship’s required performance 331 characteristics in 332
Hull Strength 333 Reserve Buoyancy 334 Stability 335
KG: A service life KG allowance of 150mm (inches/feet) in the full load at delivery shall be provided for KG 336 growth of the ship in service. 337
Electric power: Space and weight reservation shall be reserved for an extra power generation plant of at least 400 338 kW. Services required shall be sized appropriately but not run. A service life power generation plant capacity at ship 339 delivery shall include the extra generation plant and a 20% service life growth margin based on the functional kW 340 load (excluding propulsion, steering, and beaching systems) for the worst-case ship operating condition. The service 341 life margin shall also apply to ship service switchboards and distribution system capacity and as additional space 342 reservations in cableways and watertight penetration areas. 343
Auxiliary systems: The chilled water system service life growth margin shall be 10%. 344
Accommodations: The accommodations shall be mixed gender incorporated as 50% female and 50% male for 40 345 ships crew and 125 embarked personnel. The growth margin for berthing and support services shall be in accordance 346 with 347
Margin Design Service Life Allowance (SLA)
Berthing Support Services Berthing Support Services
Officers & CPO 0% 10% 0% 10%
Crew 10% 10% 10% 10%
MILDET 0% 0% 10% 10%
Table 1. These growth margins shall be applied to the total number of accommodations required to support the 348 ship’s manning as determined by the requirements specified herein. 349
Margin Design Service Life Allowance (SLA)
Berthing Support Services Berthing Support Services
Officers & CPO 0% 10% 0% 10%
Crew 10% 10% 10% 10%
MILDET 0% 0% 10% 10%
Table 1 Personnel Margins 350
070h Seakeeping, Maneuvering, and Controllability 351 Seakeeping performance requirements shall be expressed in terms of system safety, mission operability, 352 environmental conditions, and performance indices. 353
The vessel shall be capable of operating, and machinery shall have full functionality through sea state 5. 354
Seakeeping performance shall be assessed using both a mission operability analysis over the range of expected 355 environmental conditions per 070e and a system safety analysis for heavy weather conditions. 356
Seakeeping performance requirements shall be expressed in terms of system safety, mission operability, 357 environmental conditions, and performance indices. 358
Seakeeping system safety criteria are as follows: 359
RMS Roll < 4 degree 360 RMS pitch < 1.5 degree 361 RMS vertical acceleration , 0.15g at Pilot House & foremost manned location on the ship 362 RMS lateral acceleration <0.1g at Pilot House 363
Seakeeping mission operability criteria are as follows: 364
Table 2: Seakeeping Mission Operability Criteria 366
070i Interfaces 367 The vessel shall provide for the transfer of cargo fuel, containerized cargo (quad con or smaller), palletized and/or 368 net-loaded materials and rolling stock as specified in Appendix A. 369
Cargo and container interfaces containing “fiddle board” connections, power (in accordance with Sect 310), and 370 auxiliary services shall be provided on the cargo deck in accordance with INSO 1161:2016 & NSTM 584. There 371 shall be eight (8) total fiddle board locations on the cargo deck sidewall, four (4) port and four (4) starboard. Each 372 fiddle board location shall provide 100 kW, 440v, 3 Phase and 60 Hz. 373
The ship cargo deck shall support lashing USMC/USN tactical vehicles and cargo per Appendix A. The cargo deck 374 shall support securing cargo containers 375
The ship shall be able to launch and recover the ship’s boat in Sea State 3. 376
The ship shall be capable of Vertical Replenishment (VERTREP). The vessel shall be capable Underway 377 Replenishment (UNREP) using the standard tensioned replenishment alongside method (STREAM). 378
The ship shall comply with the Common Control System (CCS) Architecture, Technical Data Package requirements, 379 and passes automated CCS suitability and integration test to support integration of unmanned systems. 380
070j Towing 381 The ship shall be capable of towing a ship of equal towing resistance and of being towed. 382
070k Workmanship 383 The quality of work and work processes is to be undertaken to the satisfaction of the United States Government 384 (USG). The development and/or execution to a recognized and certified integrated management system shall be 385 accepted. The ABS Marine Health, Safety, Quality, Environmental, and Energy management publication provide 386 certification guidance for compliance with an integrated management program and include but are not limited to 387 ISO 45001, ISO 9001, ABS Type approval, facilities accreditation, personnel certifications, record keeping and 388 communication. 389
Weld design shall be in accordance with MVR 2020 and associated publications for aluminum, thick steel, enhanced 390 steel, high ductility steel, shall include ABS notation AT requirements with descriptors as appropriate. The use of 391 intermittent welding methodology shall be reviewed by USG for each submittal. 392
Motion Induced
Interuption, MII/min
Slams, no./hour
B ri d g e
T as k
L o ca ti o n
B ri d g e
T ca ti o n
T ca ti o n
K ee l at
B w an d
S te rn
B o w
T ca ti o n
T ransit 14 All 3 1.25 5.0, 7.5, 14.8 20 4 1.5 0.1 0.2 1 20 30
Transit 14 All 4 2.5 6.1, 8.8, 15.2 27 4 1.5 0.1 0.2 1 20 30
Transit 14 75% 5 4 8.3, 9.7, 15.5 35 4 1.5 0.1 0.2 1 20 30
UNREP 14 25%* 4 2 6.1, 8.8, 15.2 27 2.2 2.2 0.2 0.5 0.5
Craft L&R Best 25%* 3 1.25 5.0, 7.5, 14.8 20 4 1.25 0.1 0.1
Survival Best Best 7 9 11.8, 15.0, 18.5 55 Maintain primary structural integrity and mobility
* minimum of 2 forward and 2 aft of beam
W in d s p ee d k ts
R o ll d eg
R M
S
P it ch d eg
R M
S RMS Long'l and
Lateral Acceleration, g
RMS Vertical
Acceleration, g
Wetness, instances/hr
M is si o n
S p ee d k n o ts
H ea d in g t o w av es d eg
S ea
S ta te
S ig n if ic an t W av e h ei g h t, m
M o d al w av e p er io d se c
A weld history record for traceability of critical pipe joint/s or structural weld joint/s shall be maintained and 393 available for USG inspection. 394
The design of treaded fasteners shall be in accordance with SAE J429 (Mechanical and material requirements for 395 externally threaded fasteners) and/or SAE J995 (mechanical and material requirements for steel nuts) Material, 396 number, type, size, and method of tightening should be in accordance with recognized design code. Studs and bolts 397 should be of sufficient length so that, when nuts are tightened to their appropriate torque values, at least 1 thread is 398 exposed. Where practicable, the number of threads exposed shall not exceed five (5); however, in no case shall the 399 thread exposure exceed 10 threads. 400
The design shall evaluate the need for locking devices on mechanical fasteners where the loss of the fastener would 401 cause a critical failure. Generally, a locking device should provide a positive locking action, be simple to install, and 402 should lend itself to easy inspection without disturbing the locking feature. If the locking device does not meet the 403 above guidance, or is unique in design, the design shall include sufficient information to justify the safety and 404 integrity of the device. The justification shall include recommended inspection procedures and acceptance standards. 405 If locking devices are not practical, critical fasteners shall be marked with a "torque stripe" identifying the relative 406 locations of parts under proper torque. 407
070l General Requirements for Equipment, Machinery, and Materials 408 The ship shall have a level of inherent seaworthiness including ship motions tolerable by equipment, machinery and 409 materials. Equipment, machinery, and materials shall be approved in totality via approved plans consisting of this 410 circular of requirements and references as cited within. 411
070m Watertight boundaries and Tightness 412 The main vertical fire zone boundary, which is a transverse physical boundary, shall be designed to retard the 413 passage of heat, flame and smoke. 414
The main transverse watertight bulkheads, longitudinal watertight bulkheads, the shell, and the Main Deck shall 415 constitute the watertight envelope and subdivisions, which enable the ship to maintain watertight integrity and 416 survive extensive underwater damage. 417
Main transverse bulkheads shall be constructed watertight to the Main Deck. 418
Other watertight bulkheads, longitudinal and transverse, which form boundaries of vital spaces or tanks. 419
The following decks and platforms shall be watertight as described: 420
The Main Deck, as weather and bulkhead deck, shall be watertight for its full length. 421 The Second Deck, as damage control deck, shall be watertight for its full length except in way of the 422 deck opening in the engine room, where it shall be watertight only to the extent necessary to prevent 423 leakage of water and will have open hatchways or nontight hatches. 424
The First Platform shall be watertight throughout, except over tanks where it shall be oil tight. 425 Portions of this platform, which do not form boundaries of vital spaces, will be watertight only to the 426 extent necessary to prevent leakage of water, and will have open hatchways or nontight hatches. 427
The Second Platform, as lowest horizontal subdivision, shall be watertight throughout except over oil 428 tanks where it shall be oil tight. 429
All superstructure levels shall be watertight. Those not exposed to the weather shall be watertight only 430 to the extent necessary to prevent leakage of water, and will have open hatchways as shown on the 431 drawings. 432
Decks, levels, or platforms forming boundaries of vital spaces, if not already watertight for reasons 433 above, shall be watertight. 434
The number of closures in ventilation ducts, which penetrate main watertight bulkheads or the bulkhead deck shall 435 be kept to as a few as practicable. 436
Cross flooding provisions.-Means shall be provided to ensure that water admitted to spaces on one side of the ship 437 as a result of damage shall readily flow to spaces opposite those damaged. 438
Watertight integrity of spaces designated as vital shall not be violated by cross flooding. 439
Structural ducts, or pipes, providing for cross flooding shall be watertight and capable of withstanding a head of 440 water to the main deck at side. 441
Void spaces served by cross flooding provisions shall be adequately vented so that the average backpressure head 442 shall not exceed 1 foot of water. 443
Where a cross flooding opening is specified in a longitudinal bulkhead or deck which is a boundary of a storeroom, 444 the opening shall be protected by a basket guard to avoid stowage of stores which could impede the free flow of 445 flooding water. 446
Maximum distance between fire zone boundaries shall be 130 feet. 447
Fire zones shall be aligned between decks. The main deck shall be a vertical fire zone boundary. 448
Fire zone boundaries shall be classified at least A-30. 449
Boundaries of flight deck and vehicle stowage areas are required to be N-0, except N-30 is required where adjacent 450 to a non-weather space. 451
Boundaries of magazines shall be N-30. 452
An N-30 boundary shall be provided on the underside of the Damage Control deck. 453
Fire zone boundaries shall be an integral part of the principal structure of the ship. Fire zone boundaries shall be of 454 fume tight construction. Fire zone boundaries shall be constructed of steel. The fire integrity of fire zone 455 boundaries shall be maintained in way of access penetrations, cable penetrations, ventilation penetrations, and piping 456 systems. Fittings on fire zone boundaries, except gaskets for watertight and oil tight closures, shall be of non-457 combustible material. 458
070n ELECTRO-MAGNETIC INTERFERENCE 459 Shipboard systems and equipment shall comply with the EMI requirements of Sect. 407. 460
070o CYBERSECURITY 461 Shipboard systems and equipment shall comply with the cybersecurity requirements of Sect. 402. 462
071 Access 463 Unless otherwise specified clear headroom, from the top of the finished deck, shall not be less than 199 cm (78in), 464 except for the Damage Control deck, which shall be 244 cm (8 ft.). Machinery, piping, lighting fixtures, wireways, 465 ducts, operating rods, brackets, tracks and other items shall be kept clear of normal routes of access. For exceptions, 466 which shall be subject to approval, suitable guards or padding shall be installed. 467
The clear walkway width for normal two-way traffic in primary passageways (i.e. inter-space passageways), or any 468 means of egress that leads to an exit or entrance shall be at least 91.5cm (36 in). The clear walkway width for one 469 person in other areas (including intra-space passageways) shall be at least 76.2 cm (30 in). For passageways where 470 queues will form (i.e., for messing), the passageway shall be at least 137cm (54 in) in clear, unobstructed width. 471 Passageways intended for pallet and forklift trucks shall be free of obstructions for a width of not less than 183cm 472 (72 in). 473
Hatches shall be aligned vertically. 474
Work area and space shall be provided to enable the disassembly, repair, test, and checkout of systems and 475 equipment to be repaired in place without dismantling other machinery, piping, or structure. 476
Equipment shall have provisions for suitable lifting points such as eyebolts, pad eyes or be provided with slinging 477 arrangements for lifting and transporting. Protective devices such as covers, cases, or spreader bars shall be 478 provided for use as required. 479
Walkways that interfere with such access shall be made portable. 480
Weight handling systems, such as padeyes, staples, chain hoists, and loose cargo gear and equipment, shall be 481 provided for required equipment maintenance, and for transporting equipment being replaced or repaired to facilitate 482 handling and reduce maintenance time. 483
Maintenance envelopes, equivalent or greater to the OEM’s recommendations, shall be provided around equipment. 484
A minimum maintenance envelope of 114cm (45 in) shall be provided around sides and free ends of the engines and 485 generators. 486
071a Access for Equipment Removal 487 Access Routes Criteria – Prearranged egress and ingress access routes for equipment and components weighing 488 over 46 kg (100 lb.) shall be provided. 489
Where the size of items or components to be shipped or unshipped exceeds door or hatch sizes, access routes shall 490 be arranged to be clear of piping, wireways, ducts and other obstructions such that structure can be readily removed 491 and components shipped or unshipped. 492
Access includes clear vertical and horizontal passage from machinery and equipment space locations to weather 493 deck pick-off points for off-ship repair and to onboard shops, the provision of non-obstructed Bolted Equipment 494 Removal Plate (BERP) and Welded Equipment Removal Plates (WERP), and provisions for the employment of 495 equipment handling and lifting devices. 496
The selection of a BERP or WERP shall be based on anticipated need for removal for maintenance as follows: 497
FREQUENCY ACCESS CLOSURE
Less than 2 years Door or Hatch
2 – 6 years BERP
6 – 10 years WERP
Greater than 10 years Removal Route Plan Only
072 Force Protection 499 The ship shall provide 360-degree protection, in accordance with classified Annex, from HMG in the pilothouse, 500 30mm handling spaces, and regularly manned spaces during General Quarters. 501
A Small Arms Magazine and Ship Armory shall be provided to secure weapons and ammunition in accordance with 502 Section 760. Six permanently installed machine gun (with ballistic shielding) mounts and ready service lockers 503 shall be provided in accordance with Section 702. 504
A vessel safety (damage control) workstation shall be provided on the Navigation Bridge. This location shall be 505 designated Damage Control Central (DCC). DCC shall be for the purpose of providing a central display area for fire 506 and smoke detection, flooding detection, watertight and fire door position indication, and security alarm data. 507 Controls for firefighting equipment and ventilation system shutdown in accordance with regulatory body 508 requirements shall be included. 509
Two Damage Control Repair Lockers (DCRLs), with a net area of 18.6 m2 (200.21 ft2) per locker, shall be 510 provided. DCRL doors shall have a minimum width of 1 m (3.28 ft.). DC repair lockers shall be located on the Main 511 Deck with interior access and located on opposite ends of the vessel. Exterior access directly from the weather shall 512 be provided in the vicinity of each locker. 513
A Secondary DCC shall be located in the damage control locker most remote from the primary DCC and shall be 514 equipped to take over all DCC functions, as required. Provisions shall be made to stow a duplicate set of damage 515 control documentation in the Secondary DCC. 516
A CBR-D locker shall be provided and have a minimum of 11.6 m2 (124.86 ft2) of deck area. Secure stowage shall 517 be provided for the allowance of radiation, chemical, and biological detection devices. 518
Stowage for CBR-D Personal Protective Equipment (PPE) Kit Bag shall be provided for each sleeping berth on 519 board. 520
Stowage for an erectable Decon station shall be provided. 521
073 Noise, Vibration, and Resilient Mounts 522 Develop Noise and vibration analysis method/s using design as input data (excitation, stiffness, freq. ratio, and 523 damping) and calculate noise and vibration levels at points of interest. Identification of noise and vibration sources, 524 modeling for source-path-receiver phenomenon, calculation of exciting forces for total ship (structural) with 525 concentrated efforts for berthing, operational and administrative workspaces, engineering spaces, machinery, and 526 equipment with and without OEM supported data shall be included. 527
073a Airborne Noise 528 Areas that exceed 110 dB (A) shall be labeled “DANGER, NOISE HAZARD AREA – DOUBLE HEARING 529 PROTECTION MUST BE WORN.” Labeling shall comply with ASTM…