LAP_Cert_of_Capacity_w52501046_v001_(1).pdf

PDF 104 KB Posted

Attached to
Construction of the O. C Phillips Road Over Brushy Creek Bridge Replacement- LAP Project
Solicitation number
PD 24-25 - 045
Issued by
Escambia County, Florida

About this file

This is a Certification of Current Capacity form submitted by the Florida Department of Transportation (FDOT) for the O.C. Phillips Road Over Brushy Creek Bridge Replacement LAP Project (FPID: 430468-1) in Escambia County, Florida. The form certifies that the bidding firm's proposal amount does not exceed the firm's current capacity, defined as the maximum capacity rating less total uncompleted work. The certification requires the bidder to provide a detailed Status of Contracts on Hand report that lists all prime contracts and subcontracts, whether in progress or awarded but not yet begun. The report must be prepared as of the 15th day of the month preceding the letting date if the letting occurs before the 25th of the month, or as of the 15th day of the month of the letting if it occurs after the 25th. All new contracts and subcontracts awarded within five days before the letting date must be included in the report and charged against the firm's total rating. The form requires the bidder to itemize all projects by owner, location, and description; provide contract amounts; identify amounts sublet to others; calculate the balance of work to be performed; and specify the uncompleted amount. Contractors may consolidate contracts individually representing no more than 3% of total capacity and aggregating less than 20% of total capacity as a single line item.

The certification document serves as verification of contractor capacity for a project with a contract duration of 530 consecutive calendar days, including 500 days for substantial completion and 30 days for final completion. The pre-bid meeting is scheduled for July 17, 2025, with sealed bids due September 2, 2025, at 10:00 am via Microsoft Teams. Contractors must be FDOT pre-qualified in debris removal, drainage, grading, flexible paving, guardrail, bridge construction, and pile driving, with minimum qualifications including at least three years in business and completion of three similar projects within the past five years. The project requires performance and payment bonds for 100% of the contract amount and is subject to liquidated damages of $2,667 per calendar day of delay. The county encourages small business, minority/women-owned business, and disadvantaged business enterprise participation with a 10.54% overall DBE participation goal. The project is federally funded and subject to Buy America regulations requiring all manufacturing processes for iron and steel products to occur in the United States.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

LAP CERTIFICATION OF CURRENT CAPACITY

525-010-46

PROGRAM MANAGEMENT

09/20

CONFIDENTIAL per Ch 337.14(1) F.S.

For bids to be received on (Letting Date)

Fill in your FDOT Vendor Number

VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this day By:

of , 20 Title

STATUS OF CONTRACTS ON HAND

525-010-46

PROGRAM MANAGEMENT

09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00

File details come from the government source that posted it. Updated .