LAP_Cert_of_Capacity_w52501046_v001_(1).pdf

PDF 104 KB Posted

Attached to
Construction of the O. C Phillips Road Over Brushy Creek Bridge Replacement- LAP Project
Solicitation number
PD 24-25 - 045
Issued by
Escambia County, Florida

About this file

The document is a LAP Certification of Current Capacity form from the Florida Department of Transportation (FDOT), designed for pre-qualified contractors bidding on the O.C. Phillips Road Over Brushy Creek Bridge Replacement LAP Project in Escambia County. The form requires contractors to certify their current contract capacity by detailing uncompleted work, with specific guidelines for reporting contracts based on the letting date. The project involves construction services for bridge replacement, with bidders required to be FDOT pre-qualified in multiple work classes including debris removal, drainage, grading, paving, guardrail installation, bridge construction, pavement marking, and pile driving.

Contractors must have been in business for at least three years, completed a minimum of three similar projects within the past five years, and meet all solicitation requirements. The bidding process will be conducted via Microsoft Teams, with all meetings and communications handled through this platform. Escambia County encourages participation from small businesses, minority/women-owned businesses, and disadvantaged business enterprises, and reserves the right to reject any or all bids. The county emphasizes that no contract will be formed until the final execution by all parties, and special accommodations for disabilities can be arranged by contacting the Purchasing Office at least five working days before the solicitation opening.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

LAP CERTIFICATION OF CURRENT CAPACITY

525-010-46

PROGRAM MANAGEMENT

09/20

CONFIDENTIAL per Ch 337.14(1) F.S.

For bids to be received on (Letting Date)

Fill in your FDOT Vendor Number

VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this day By:

of , 20 Title

STATUS OF CONTRACTS ON HAND

525-010-46

PROGRAM MANAGEMENT

09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00

File details come from the government source that posted it. Updated .