This Performance Work Statement (PWS) details groundwater and gas monitoring services for the Fort Detrick Sanitary Landfill in Maryland. The contractor will be responsible for semi-annual groundwater monitoring of an eleven-well network, quarterly gas monitoring, monthly static water table measurements, and annual topographic surveying of the active landfill area. Monitoring requirements include analyzing volatile organic compounds, elements, indicators, and per- and polyfluoroalkyl substances (PFAS) in accordance with Maryland Department of the Environment (MDE) and EPA regulations.

The contract is for one base year with four option years, with reporting requirements continuing up to 120 days beyond the performance period. Key deliverables include semi-annual monitoring reports with comprehensive analytical data, time series analyses, and historical data compilation dating back to October 1993. The contractor must have specialized qualifications, including technical understanding of solid waste disposal regulations, groundwater science, geology, quality assurance/quality control sampling techniques, and experience with similar federal government contracts. Monitoring will be conducted in Area B of Fort Detrick, which encompasses approximately 400 acres and includes an active municipal landfill and former research and disposal areas.

View the file

Other files

File Type Posted
Sources Sought Notice Landfill Monitoring.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

for

GROUNDWATER, and GAS MONITORING -

AREA B SANITARY LANDFILL

FORT DETRICK, MD

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide groundwater, and gas monitoring in

Area B, Fort Detrick Sanitary Landfill. This contract also requires annual topographic surveying at the Fort

Detrick Sanitary Landfill. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform groundwater, and gas monitoring, and topographic surveying in Area B, Fort Detrick Sanitary

Landfill as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: Fort Detrick is an active U.S. Army installation operated under the auspices of the U.S.

Army Installation Management Command. Fort Detrick’s Environmental Management Division is responsible for environmental compliance, conservation, restoration, and pollution prevention programs.

Fort Detrick includes six non-contiguous tracts of land (designated as Area A, Area B, Area C Water

Treatment Plant, Area C Wastewater Treatment Plant, Forest Glen Annex, and Glen Haven Annex. Areas

A, B, and C are located within the city limits of Frederick, Maryland. Area B is located 0.5 miles west of the center of Fort Detrick activity known as Area A. Area B is approximately 400 acres and includes Fort

Detrick’s active municipal landfill, former skeet range, former explosives storage, former waste disposal and test areas associated with former research activities, and open fields.

Fort Detrick is situated on the western side of the Frederick Valley in Maryland. The Frederick Valley is approximately 26 miles long and up to 6 miles wide, trending roughly north-south through the center of

Frederick County and into Pennsylvania. The Frederick Valley comprises the westernmost portion of the

Piedmont physiographic province. The bedrock geology of Area B can be summarized as Cambrian-age limestone of the Frederick Formation (Rocky Springs Station Member) dipping to the East-Southeast, overlain in places by the Triassic-age classics of the New Oxford Formation dipping to the West-

Northwest. The New Oxford Formation is present in the northern portion of Area B. The limestone conglomerate is dominant in Area B, based on drilling and outcrops, with the shale/claystone/sandstone capping the topographic high near Fort Detrick’s active, permitted lined municipal landfill in the northwest.

The Triassic bedrock was deposited over exposed Cambrian bedrock with an unconformity separating the two formations. The nature of the contact is not well known, and the thickness of the Triassic is variable, in part due to pre-dispositional topography of the Cambrian bedrock and in part due to erosion. Wells drilled to date in Area B in the Triassic do not appear to have intersected the underlying Cambrian. The limestones of the Rocky Springs Station Member are susceptible to chemical dissolution as slightly acidic rainfall infiltrates and moves through the rock. Secondary porosity becomes progressively enlarged creating void spaces and conduits for increased groundwater flow. Karst features are present at Area B, expressed both at the surface and in the subsurface. In Area B, groundwater is generally encountered at depths of 20-40 feet below ground surface.

Fort Detrick’s Area B has historically been used as a waste disposal area. There are a number of former disposal sites that were capped under the Army’s Installation Restoration Program. The municipal landfill was constructed in 1991. The municipal landfill liner partially covers a former disposal site known as B-3

West. The portion of B-3 West landfill that is not covered by the active landfill has been capped.

Fort Detrick’s municipal landfill permit issued by the Maryland Department of the Environment (MDE) requires groundwater and gas monitoring in accordance with (IAW) Code of Maryland Regulations

(COMAR) 26.04.07.08B(17) and 26.04.07.09F, and the U.S. Environmental Protection Agency (EPA)

Title 40 CFR, Part 258, Solid Waste Disposal regulations. These regulations require water quality data collected to be adequate to draw conclusions regarding the potential impact of the regulated facility on human health and the environment.

1.3. Objectives: To monitor groundwater, potential methane gas production and PFAS parameters at the

Fort Detrick Area B Municipal Landfill in accordance with the Fort Detrick municipal landfill permit, COMAR 26.04.07.08B(17) and 26.04.07.09F, and EPA Title 40 CFR, Part 258, Solid Waste Disposal regulations. To perform a field topographic survey to produce a topographic map to accurately describe the topographic elevations at the permitted landfill area. The map must be signed and sealed by professional land surveyor and drawn to a scale of 1” = 40’.

1.4. Scope: Permitted Landfill area – Area B Fort Detrick - to provide groundwater, gas and PFAS monitoring at the Fort Detrick Sanitary Landfill. The groundwater monitoring well network around the sanitary landfill typically consists of eleven (11) monitoring wells, identified as: MW-2, MW-4, MW-36, MW-41, MW-42, MW-48 (up gradient / background well), MW-49, MW-62, MW-76, MW-80, MW-81R

(Technical Exhibit 1). See Technical Exhibit 1, entitled Fort Detrick Municipal Landfill, Area B, for a site map showing the ground water monitoring wells. The gas monitoring well network around the sanitary landfill consists of six (6) monitoring wells, identified as: DGM-1, DGM-2, DGM-3, DGM-4, DGM-5, DGM-6 and two (2) buildings identified as GM Bldg. 1225, GM Bldg. 1254 (Technical Exhibit 1). A site map showing the eight (8) gas monitoring sampling points is noted in Technical Exhibit 1. Provide services associated with creating an annual topographic map of the active landfill area.

1.4.1 PFAS Testing: The Maryland Department of the Environment (“Department”) has provided notice as to a change in monitoring and reporting requirements. As of July 1, 2024, the Department will require all facilities conducting monitoring regulated under Code of Maryland Regulations (COMAR) 26.04.07.09, 26.04.07.17, 26.04.07.20 and/or 40 CFR Part 258 to analyze for PFOA, PFOS, PFHxS, PFNA, PFBS, and

HFPO-DA (commonly referred to as a GenX Chemical). This requirement applies to all the monitoring wells and surface water points in the network, and sampling of leachate being collected at your facility on the same frequency. The sampling will use one or more of the following: EPA Methods used are 533, 537.1, 8327, and/or 1633. The analysis used shall meet a practical quantitation limit of 2 ppt for all PFAS parameters. The enclosed Table I and Table II shall replace the existing Table I and Table II in the current facility permit.

1.5 Period of Performance The period of performance shall be for one (1) base year plus four (4) option years.

Reporting requirements will continue for up to 120 days beyond the end of period of performance.

1.6 General Information

1.6.1. Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection

Requirements).

1.6.2. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the

Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) workdays from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.4 Recognized Holidays:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Juneteenth Day Christmas Day

Independence Day

1.6.5. Hours of Operation: The contractor is responsible for conducting business, between the hours of

0800 and 1630 Eastern Time Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.6. Place of Performance: The work to be performed under this contract will be performed at the Fort

Detrick Sanitary Landfill in Area B, Fort Detrick Maryland.

1.6.7. SECURITY REQUIREMENTS.

1.6.7.1. Information Security: IAW AR 380-5, if this is a classified contract, contractor personnel will execute the Non-Disclosure Agreement (NDA) through their company and not through the sponsoring DA command. Non-U.S. Government personnel, who have been hired under Civil Service procedures as consultants to the Department of the Army (DA), and granted a DA security clearance or access authorization, in accordance with AR 380-67, will follow the same procedure, for execution of the SF 312, as civilian personnel. Classified or Unclassified contract all information will be protected at all times, IAW

DoD 5200. 01, Vol3, and AR 380-5 either by storage in an approved security container or having it under the personal observation and physical control of an authorized individual.

1.6.7.2. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.

1.6.7.3. Gate Access Requirements: IAW Army Directive 2014-05 all personnel desiring unescorted access to Fort Detrick will enter the installation through an authorized Access Control Point (ACP) and be vetted using the National Crime Information Center (NCIC) interstate Identification Index (III). The

Installation Commander will, in the absence of a waiver deny uncleared contractor, subcontractor and visitors unescorted access to the installation based on the results of the NCIC-III check that contains credible derogatory information. Such derogatory information includes, but is not limited to the following:

• The NCIC III contains criminal arrest information about the individual that causes the installation Commander to determine that individual present a potential threat to the good order, discipline, or health and safety on the installation.

• The Installation is unable to verify the individual’s claimed identity in the attempt to gain access.

• The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

• The individual is currently barred from entry or access to a federal installation or facility.

• The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production, or possession of child pornography trafficking in humans, drug possession with the intent to sell or drug distribution.

• The individual has a US conviction for espionage, sabotage, treason, terrorism, or murder.

• The individual is a registered sex offender.

• The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

• The individual has been convicted of a felony firearms or explosives violation.

• The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

• The individual is identified in the Terrorist Screening Database (TSDB) as known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

• Individual is barred from Fort Detrick.

1.6.7.3.1. Access Denial Waiver Process: In case where unclear contractor, subcontractor is denied access based on derogatory information obtained from an NCIC or NCIC III check, the Installation Commander shall offer an Access Denial Wavier Application packet only if the individual request a waiver.

1.6.7.4. Access to Secure Facilities: N/A

1.6.7.5. Key Control: Contractor shall establish and implement methods for ensuring all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the

Government shall be duplicated. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer

1.6.7.5.1. In the event keys are lost or duplicated the Contractor shall, upon direction of the Contracting

Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.

1.6.7.5.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.5.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.7.6. Anti-terrorism Security Requirements: The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security

Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.7.6.1. Anti-Terrorism Level (1) One Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT

Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. All contractor employees must complete annual AT Level 1 awareness training. Annual training is to be conducted in the anniversary month it was initially completed. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I training is now conducted on the Joint Knowledge Online (JKO) site. For those that have a CAC, AT Level I can be accessed via https://jkodirect.jten.mil.

For those personnel that do not have a CAC they can utilize the below instructions to complete, i.e.

contractors etc.

1. Google JKO and begin the process from there. http://jko.jten.mil

Clicks:

2. No DOD CAC.

3. I am a US mil, government civil servant or contract employee.

4. I've been directed to take required training on JKO.

5. Courses.

6. I do not have a .MIL, .GOV, or NDU.EDU address or I am a Multi-National Student.

7. Fill out the contact sheet and email to sponsor (In my opinion this is the COR)

8. Sponsor will email to the JKO help desk. (Again, in my opinion this is the COR)

Approval

1) Help desk sends non-CAC user an email with User ID.

2) Help desk will send a separate email with an electronic token to register a new password (token is good for 24 hours).

3) New User follows the instructions in the email and enters a new password.

4) User will need to enroll in Course # JS-US007-14 (User has up to 1 year to complete the course)

(Contractors need to follow the requirements outlined in the AT/OPSEC cover sheet and complete it in 30 days).

If training is required in a non-English language, please contact Fort Detrick ATO at usarmy.detrick.usag.mbx.dptms-antiterrorism@mail.mil.

(AT/OPSEC CHECKLIST IS REQUIRED AND MUST BE SIGNED BY RICK DEBEE (OPSEC) AND

RICHARD KING (ATO) IN DPTMS)

1.6.7.6.2. iWatch Awareness Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided in this PWS by the Fort Detrick

ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report on suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR no later than 5 calendar days after completion. All training materials can be found at http://www.detrick.army.mil/ready/iwatch.cfm.

1.6.7.6.3. RAMS and AtHOC. AT Level 1 and iWatch Awareness training assist in informing the contractor that at times Random Antiterrorism Measures (RAMS) may be in effect, where their vehicle may be checked, ID cards validated, security checks done by COR and Police. Gate operations could be affected based on the FPCON or RAM. COR is responsible depending on the length of this contract with signing up at least one contractor for AtHOC messages for weather or incident alerts, that POC will be responsible for notifying the other contractors by phone tree or other means. The COR is also responsible for ensuring if any blueprints that show information outside of the scope of work that they are either collected back at the end of the job or destroyed.

http://jko.jten.mil/ mailto:usarmy.detrick.usag.mbx.dptms-antiterrorism@mail.mil http://www.detrick.army.mil/ready/iwatch.cfm

1.6.7.7. Operational Security (OPSEC) Requirements. Personal information or information considered critical to the installation's operations released intentionally or unintentionally could have direct consequences for military and government personnel as well as our critical operations. Therefore, the contractor shall be responsible for safeguarding personal information and information considered critical to the Fort Detrick's operations. Per AR 530-1, Operations Security (OPSEC), new contractor employees must complete Annual OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. All contractor employees shall adhere to USAG Fort

Detrick OPSEC policies, regulations, and guidance. OPSEC awareness training is required when working with personal information (Social Security Number, date of birth, etc) or on government systems that are considered critical to the installation's operations. Contractor personnel shall not release any personal or operational information to the general public, press, or any other personnel or organizations without prior approval from the USAG Command.

1.6.7.7.1. OPSEC Awareness Training. New contractor employees and subcontractor employees must complete Level I OPSEC awareness training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. Annual training is to be conducted in the anniversary month it was initially completed. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel. (http://www.detrick.army.mil/dptms/pdf/OPSECTrainingContractors.pdf)

1.6.7.7.2. OPSEC SOP: N/A.

1.6.7.8. Industrial Personnel Security: IAW AR 380-67, AR 380-49 and DOD 5200.2-R, all contracts, classified, sensitive but unclassified and unclassified are required to contain a security clause. “IAW Army

Regulations 380-67, 380-5 and 380-49, the Contractor shall ensure all personnel performing under this contract have a completed National Agency Check with Local Checks (NACLC) or Unclassified contracts require a NACI and that it contain no unfavorable information and has been completed by Office of

Personnel Management and/or adjudicated by Defense Industrial Security Clearance Office (DISCO) prior to the start of the contract. The security requirements must be maintained for the life of the contract, and citizenship will be verified by presenting an original birth certificate or a valid US Passport or the original

Naturalization Certificate to the USAG Security Office at the time of in processing for all contract personnel assigned to the contract. In order to maintain the security requirements any derogatory information, to include law enforcement issues, mental health issues, or alcohol/drug related issues discovered during the performance of this contract must be reported to the USAG Security Office.”

THIS INFORMATION MUST BE PROVIDED & VERIFIED BY USAG SECURITY OFFICER

1.6.8 Special Qualifications: The Contractor must exhibit a knowledge of the following:

1.6.8.1 Technical understanding of COMAR 26.04.07.08B(17) and 26.04.07.09F, and EPA Title 40 CFR

258, Solid Waste Disposal regulations and experience with landfill monitoring in the State of Maryland.

1.6.8.2 Groundwater Scientist with a technical understanding of geology and landfill monitoring.

1.6.8.3 Knowledge of taking QA/QC samples, including method blanks, surrogate recoveries, and duplicate and spike duplicate samples.

1.6.8.4 Knowledge of contracts with the Federal government with requirements similar projects.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, will meet periodically, quarterly as a minimum, with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. The Government will provide the http://www.detrick.army.mil/dptms/pdf/OPSECTrainingContractors.pdf)

Contractor with a minimum of two working day notification prior to meetings. These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The

COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of

Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Approval of Work: All correspondence (i.e., letters, phone calls, faxes, emails, contracts, invoices, etc.) shall include the appropriate point of contacts. All correspondence shall be coordinated through the Government for approval prior to leaving Fort Detrick for disposition. The Contractor shall not contact individuals outside Fort Detrick without the approval of the Government representative. All contracts and invoice approvals are to be verified by the Government.

1.6.12 Monthly Status Reports: The Contractor shall submit by the 10th day of each month a monthly progress report summarizing activities of the preceding month (if at least 15 days of contract performance occurred in that month) and planned activities for the following month. The Monthly Status Report can be sent along with the invoice by the 10th day of the month with enough information to serve as the progress report for the voucher.

The Contractor shall provide a concise report and include at a minimum, the following information:

i) Contracting Office, Contracting Officer, Contracting Officer’s Representative

ii) Contract Number, including task and delivery order number.

iii) Beginning and ending dates covered by the report.

iv) Date of the report

v) Contract completion date

vi) Contractor name, address, phone number, email address, identity of contractor employee entering data.

vii) Summary of accomplishments for the report month and planned accomplishments for the following month

viii) Indicate whether you are on or off schedule (and reason for delay, if applicable)

ix) Problems encountered during the period, and indicate whether problem was resolved or still outstanding and list any corrective actions, if applicable

x) Safety reporting including field exposure hours and recordable and/or reportable accidents.

xi) Record of deliverables submitted.

xii) Record of communication, correspondence, and invoices

xiii) Estimate of percentage complete for each task and overall percentage completed.

xiv) Personnel changes

xv) Any updated schedule changes, if applicable

The Contractor shall submit reports to the COR in hard copy as well as electronically via email. Email attachments, if any, shall be in Adobe pdf or MS Word format only. The subject of the email shall be the contract number with task order followed by “Monthly Progress Report” followed by the year and month of the report (e.g., “W912DR-99-D-9999 9999 Monthly Progress Report YYYY MM”).

1.6.13. Key Personnel: The following contractor personnel are considered key personnel by the government. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer by the contract start date. The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract. The contract manager or alternative shall be available between 0800 and 1630 Eastern

Time Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.6.14 Identification of Contractor Employees: When contractor personnel perform the services required in this contract on a Government installation they are required to possess and wear an identification badge that displays his or her name and the name of the Company. The contractor shall ensure that contractor personnel identify themselves as contractors when attending meetings, answering Government telephones, providing any type of written correspondence, or working in situations where their actions could be construed as official Government acts. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.15 Contractor Travel: N/A

1.6.16 Other Direct Costs: N/A

1.6.17 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.18 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent

Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the

Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such

OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.19 Phase In/Out Period: N/A

1.6.20 Safety & Health Requirements. Contractor shall provide a Safety and Health Plan to the COR 15 days prior to commencement of physical on-site work at Fort Detrick. The Government will review the contractor’s proposed Safety and Health Plan, and the contractor shall promptly resolve any comments arising from Government review. Upon the contracting officer’s determination that the Government’s comments (if any) have been satisfactorily resolved, the Government shall approve the Safety and Health

Plan in writing, and the approved Safety and Health Plan will be considered part of this contract. Unless approved in writing by the contracting officer, the contractor shall not commence physical on-site work at

Fort Detrick prior to approval of the Safety and Health Plan. At a minimum, the Safety and Health Plan must include the provisions specified in EM 385-1-1 Appendix A (Section 11) for an Abbreviated Accident

Prevention Plan.

1.6.19. Sustainable Materials Management (Green Procurement): Federal Agencies are required to purchase items designated under the U.S. Environmental Protection Agency’s (EPA) Comprehensive

Procurement Guidelines (CPG) and items designated under the U.S. Department of Agriculture’s (USDA)

Biopreferred program. The items listed under the CPG contain recycled content and the items listed under the Biopreferred program are biobased. Procurement of the above listed types of sustainable products is required by statute, Executive Order, and/or Federal Acquisition Regulations. EPA’s CPG is located at:

http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm. USDA’s Biopreferred program is located at:

http://www.biopreferred.gov/.

1.6.19.1. Green Procurement: Section 6002 of the Resource Conservation and Recovery Act of 1976

(RCRA) requires the use of recycled and recovered products identified in the Environmental Protection

Agency’s Comprehensive Procurement Guidelines. The contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time; at reasonable prices; or the product(s) do not meet technical or performance standards. EPA Guidelines are the minimum requirement.

The contractor is encouraged to use other materials and products not listed but commonly used in industry.

The contractor shall maintain records and submit an annual report to the Contracting Officer along with the annual certification required by FAR 52.223-9 Certification and Estimate of Percentage of Recovered

Material Content for EPA Designated Items upon completion of the basic year and each option year.

1.6.19.2 Biobased Procurement: Section 9002 of the Farm Security and Rural Investment Act (FSRIA) of

2002 requires the use of USDA-designated products with the highest content level per USDA’s biobased content recommendations. The contractor shall use these biobased content products unless they cannot be procured within a reasonable period of time; at reasonable prices; or the product(s) do not meet technical or performance standards. USDA Guidelines are the minimum requirement. The contractor is encouraged to use other materials and products not listed but commonly used in industry. The contractor shall maintain records and submit an annual report to the Contracting Officer along with the annual certification required by FAR 52.223-1 Biobased Product Certification on the product types and dollar value of any USDA-designated biobased products purchased by the contractor upon completion of the base year and each option year.

http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm http://www.biopreferred.gov/

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS

ACOR Alternate Contracting Officer's Representative

AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation

AT Antiterrorism

ATO Antiterrorism Officer

CCE Contracting Center of Excellence CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

EPA U.S. Environmental Protection Agency

FAR Federal Acquisition Regulation

IAW In Accordance With

KO Contracting Officer

LEL Lower Explosive Limit

MDE Maryland Department of the Environment

MW Monitoring Well

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

OPSEC Operations Security

PIPO Phase In/Phase Out

POC Point of Contact PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control QCP Quality Control Program

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Services: The Government will provide documents and other technical information that the contractor will need to complete the tasks specified in this PWS, including historic Fort Detrick Monitoring Plans, historic landfill maps and data, description of landfill limits as originally permitted, and authorization and access to the landfill area. The government will also provide CADD/GIS Standards.

3.2 Facilities: Not applicable.

3.3 Utilities: Not applicable.

3.4 Equipment: Not applicable.

3.5 Materials: Not applicable.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under paragraph 3.1 of this PWS.

4.2. Materials: The contractor shall furnish all materials and services required to perform all activities detailed in this PWS.

4.3. Equipment: The contractor shall furnish all equipment and personnel required to perform all activities detailed in this PWS.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services. The contractor shall provide services for groundwater and gas monitoring and topographic survey at the Fort Detrick Municipal Landfill.

5.2. Groundwater and Gas Monitoring. The contractor shall perform all groundwater and gas monitoring activities under this contract IAW Fort Detrick’s Municipal Landfill Permit issued by MDE and COMAR

26.04.07.08B(17) and 26.04.07.09F, and EPA Title 40 CFR, Part 258, Solid Waste Disposal regulations.

5.2.1. The Contractor shall perform semi-annual monitoring of the sanitary landfill groundwater monitoring well network IAW the Fort Detrick Municipal Landfill Permit and Environmental Monitoring

Plan. Semi-annual Monitoring Reports shall be delivered to COR within 120 days of each sampling event.

Semi-annual monitoring shall be IAW 40 CFR 258.54 plus additional analytical requirements from MDE

(see Technical Exhibit 2).

5.2.2 The Contractor shall perform quarterly gas monitoring of the sanitary landfill IAW 40 CFR 258.23 a and b and 258.29 and the Fort Detrick Municipal Landfill Permit. All gas monitoring data shall be contained within the Semi-annual Monitoring Reports. Gas analyses shall consist of field measurements for percentage of the lower explosive limit (%LEL) for methane and % Oxygen. The contractor shall notify the COR immediately if the reading exceeds regulatory limits.

5.2.3 The Contractor shall perform monthly static water table measurements of the entire thirteen-well network. The entire well network consists of the eleven (11) wells identified in Section 1.4 as well as MW-

36D, MW-3, and MW-5 (See Technical Exhibit 1).

5.2.4 The Contractor shall prepare a ground water contour map to be submitted with each report using 5’ contour intervals based on the static water table measurements performed each month.

5.2.5 The Contractor shall provide an annual written sampling schedule to the COR to submit to MDE two weeks after contract start date. The Contractor shall provide a new written sampling schedule for each option year. The Contractor shall notify the COR of any changes to the sampling schedule.

5.2.6 Technical Report. The Contractor shall perform a statistical analysis after each sampling event to evaluate the water quality data to include in the semiannual report delivered to COR within 120 days of each sampling event. The Contractor shall provide the COR with three (3) hard copies and three (3) electronic copies on three (3) CDs of each semi-annual monitoring report to describe the Contractor’s technical accomplishments. The Contractor shall include the analytical data obtained from the semi-annual monitoring, time series analyses of the data by parameter, and a compilation of historical data obtained from the detection and assessment monitoring dating back to October 1993, to include but not limited to the report text, field records, analytical data tables, cation-anion balances, statistical analyses of the parameters, and the complete analytical laboratory data package. The Contractor shall submit all reports to the COR within 120 days of each sampling event.

The Contractor shall use the following outline for the semiannual reports:

i) Executive summary

ii) Introduction

iii) General site description

iv) Overview of monitoring program and work performed parameters, analytical methods, and reporting limits.

v) Discussion of water level data

vi) Summary of analytical data and statistical test results

(a) Volatile organic compounds

(b) Semi volatile organic compounds

(c) Total metals

(d) General chemistry parameters

(e) Radionuclides

(f) Quality assurance/quality control samples

(g) Gas monitoring data

vii) Conclusions

viii) Recommendations

ix) Appendices

(a) Field records and procedures

(b) Historical data tables

(c) Cation-anion balances

(d) Computer printout of statistical test results – organic compounds, semi volatile organic compounds, radionuclides, and other parameters as required.

(e) Laboratory results – analytical data packages from the laboratories. Volatile organic compounds, semi volatile organic compounds, metals, inorganics, radionuclides, and other parameters as required.

5.3 Topographic Map. The Contractor shall perform an annual field survey to consist of a topographic map in the months of October, November, or December. The Contractor shall limit the field surveys to the active landfill area only.

5.3.1 Survey Report. Field survey shall occur in October, November, or December. Using control provided by the Government, the contractor shall lay out horizontal and vertical control in the project areas.

The contractor shall reference all control to NAVD88 for vertical and NAD83/91 for horizontal; units shall be in feet. From these control points, the contractor shall acquire field topographic and planimetric information to be used for 40 scale mapping with a two (2) foot contour interval. In addition, the contractor shall show density of field elevations to support at least 1” = 40’ mapping and shall be provided as necessary to show all breaks in grade or changes in terrain. All elevations shall be taken to the tenth of a foot. The Contractor shall collect all horizontal and vertical data by using either total stations or global positioning system. The Contractor shall avoid excessive marking of the ground with paint, flags, or other ground marking methods.

5.3.2 The contractor shall also simultaneously record all data in the field book, to include but not limited to setups, backsights, measure ups, shot numbers, and shot descriptions. The Contractor shall ensure that all angles and distances be recorded for every + 20 shots. The Contractor shall furnish the Government the field files (collection and the edited and compiled field file) along with final coordinate file for all work.

The Contractor shall record vertical control for utilities to be taken with a total station instrument, along with measure downs for the invert elevations. The Contractor shall provide all vertical control for utilities recorded in field along with any sketches required.

5.3.3 The Contractor shall ensure that all computations are to be arranged in a sequential and understandable order, with notes when appropriate so a review can be made with minimum reconstruction.

The Contractor shall furnish the Government computer output of unadjusted bearings, azimuths, distances, and coordinates of all traverse points, and if necessary, the error of closure, both azimuth and positions, shall be shown. The Contractor shall ensure that final data be adjusted by the compass method and will show the adjusted bearings, distances, and coordinates of all points surveyed. The contractor shall provide a final list of coordinates for all points. The Contractor shall ensure that all level lines be reduced and adjusted in accordance with accepted procedures and practices and that all computations shall be fastened into an 8-1/2” X 11” folder separated and labeled to indicate various facets of work (horizontal, vertical)

5.3.4 The contractor shall provide CAD files in both MicroStation and AutoCAD. The Contractor shall provide a digital terrain model (DTM) of the active landfill and complete landfill area to be provided in a format compatible with Fort Detrick’s CAD system. The Contractor shall confer with the Government prior to development of the DTM to determine which format is required.

5.3.5 The Contractor shall provide three (3) hard copies and one (1) electronic copy on CD of the Survey

Report topographic map containing each of the following elements:

• 1” = 40’ scale topographic map to accurately describe the permitted landfill area; signed and sealed by professional land surveyor

• Computer Aided Design files of planimetric and topographic mapping

• The total permitted fill area of the landfill

• The volume of the total permitted landfill capacity within the fill area that has been utilized.

• The remaining landfill capacity within the fill area that is currently constructed.

• Total capacity of existing cells 1A, 1B, 1D & 1E

• Total remaining capacity of existing cells 1A, 1B, 1D & 1E

• Digital terrain model in either Bentley’s InRoads or AutoDesk Land Development Desktop format

• The topographic map shall conform to the existing sheet layout and format in use at Fort Detrick

• Symbology shall follow the CADD/GIS Standards established by Fort Detrick

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

6.1. STANDARD FORMS

FORM

NUMBER

FORM NAME LINK / LOCATION

FD 190-13 Fort Detrick Non-DOD and Non-Federal Employee Visitor’s

Vetting Form

Form will be provided by COR

SF 312 Classified Information

Nondisclosure Agreement

SF 312, Classified Information Nondisclosure Agreement

6.2. REGULATIONS, PUBLICATIONS, MANUALS, AND LOCAL POLICIES & PROCEDURES

REFERENCE MANDATORY /

ADVISORY

LINK OR PRINT

AR 530-1, Operations Security (OPSEC) Mandatory AR 530-1, Operations Security

EM 385-1-1, APP/SSHP Mandatory http://www.usace.army.mil/Safe tyandOccupationalHealth/Safety andHealthRequirementsManual.

aspx

29 CFR 1910, Occupational Safety and

Health Standards

Mandatory http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title29/29c fr1910_main_02.tpl AR 380-5, Security Mandatory AR 380-5, Security

AR 380-67, Personnel Security Program Mandatory AR 380-67, Personnel Security

Program FAR Subpart 9.5 Mandatory FAR Subpart 9.5

40 CFR 258, Solid Waste Disposal

Regulations

Mandatory http://www.gpo.gov/fdsys/pkg/

CFR-2012-title40-vol26/xml/CFR-2012-title40-vol26-part258.xml

COMAR 26.04.07.08B(17) and

26.04.07.09F

Mandatory http://www.dsd.state.md.us/com ar/subtitle_chapters/26_Chapter s.aspx#Subtitle04

Groundwater and Surface Monitoring Plan

(also known as Environmental Monitoring

Plan)

Mandatory Printed from Fort Detrick

Environmental Management

Division. Provided at contract award

Purchasing of any certifications or documentation for the accomplishment of the tasks in the PWS is at the expense of the contractor.

http://armypubs.army.mil/eforms/pdf/S312.PDF http://www.apd.army.mil/AdminPubs/series_range_regs.asp?search=530 http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .