About this file
This is a reconnaissance report on dike stability prepared by Converse Ward Davis Dixon Geotechnical Consultants for the City of Seattle Engineering Department regarding seismic slope stability analyses at Lake Youngs Reservoir, completed as a supplemental agreement to contract W79-33 in September 1980. The report documents field reconnaissance of the perimeter dikes at Lake Youngs conducted on July 14, 1980, evaluating their susceptibility to failure during a maximum earthquake event of Richter magnitude 7.5 with peak ground acceleration of 0.35g. The study assessed the 6.6-mile length of perimeter dikes constructed in 1933-1934 without modern compaction equipment, determining that all dikes are subject to damage during strong seismic events based on historical performance following earthquakes in 1949 and 1965 that produced spider-web cracking patterns and other damage. The reconnaissance identified five areas where ground surface elevation was lower than the maximum lake level of 494 feet, creating potential paths for water release off the City property in the event of catastrophic dike failure.
The report recommends that provided all dikes have backup embankments to contain released water on the reservation and contingent upon Water Department preparation to incur remedial construction costs, no further geotechnical exploration is required at this time. Specific recommendations include raising the 24-inch Vitrified Clay Drain Roadway at the southwest side to elevation 494 feet minimum with fill material containing at least 15 percent fines compacted to 90 percent of laboratory maximum dry density per ASTM D1557, and refilling a gap in the abandoned dike near the South Dam to the same elevation with anti-seep collars and an outlet pipe with trash grate and flap valve for drainage control. The report also recommends continued dike inspection and maintenance programs, expanded to include all backup dikes and roads on the reservation, and that all new structures near the north end of the lake be constructed above maximum lake level and designed to withstand flooding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ConverseWardDavlsDlxon
SEAITLE WATER DEJ?ARTMt.W
CENTRAL FILES I
REP:)RI' ON DIKE RECONNAISSANCE
Lake Youngs Reservoir Reservoir Seismic Slope Stability Analyses
Supplemental Agreement to W79- 33
Seattle WA San Francisco CA Pasadena CA AnaheimCA Las Vegas NV Cincinnati OH Caldwell NJ
Septenfuer 3), 1980
City of Seattle Engineering Department Seattle Municipal Building - Room 910 600 Fourth Avenue Seattle, Washington 98104
Attention : Mr. Arthur E. Maronek
ConverseWardDavlsDlxon Geotechnical Consultants
79-522::>-17
Acting Director of Engineering
Subject: REroRI' ON DIKE REl:ONNAISSANCE lake Y0llrBs Reservoir Reservoir Seismic Slope Stability Analyses Supplemental Agreement to W79- 33
This letter report presents the results of our field reconnaissance of the perimete r dikes at Lake Youngs with regard to stability during strong earthquakes. The subject study was conducted in accordance with our proposal of July 10, 1980 and was authorized by your letter dated
August 15, 1980.
1. BACKGroUND INFOR'1ATION
'I'wo embankments to enclose the existing Swan Lake were r eportedly con structed in 1921 in accordance with plans dated October 29, 1920. The
South (or Outlet) Dam was apparently constructed in the dry and our explorations indicate the fill is firm. The original Inlet Dam at the east side of the lake was abandoned in 19 31 after construction of the cascades Dam approximately 1600 feet to the west.
cascades Dam was constructed across a wet , marshy area. Foundation excavation was reportedly acccmplished by draglines and depth of removal was limited by the reach of the cranes . Embankment fill material was apparently soil excavated fran the adjacent lake . SOil was placed without significant cCmpactive effort and the fill encountered in our
Converse Ward Davis Dixon, Inc.
100 West Harrison Seattle, Washington 98119 Telephone 206285-5200 .
-2-borings was classified as wet and very lcose to lcose. It is our opin ion that this embankment is subject to liquefaction and slope instabil ity during strong seismic shaking as indicated in our interim report dated August 15, 1980.
Construction of the perimeter dikes has been interpreted to be similar t o that of the Cascades Dam since the date of dike construction, 193~
1934*, nearly coincides with that of the darn and therefore, equipnent and methods wculd have been similar. Because the dikes were built to raise the water elevation in the lake and not necessarily to darn a topo graphic depression, so ft and wet soils were probably left in place with dike fills above the water level receiving limited canpaction fran con struction traffic . These interpretations of dike construction have been verified during conversations with retired Water Department employees
W10 wcrked at the Lake Youngs site.
Our preliminary conclusion that the perimeter dikes and Cascades Dam are lcose or underlain by loose rraterials and therefore are subject to darrage during earthquakes, is verified by reports of darrage to the dikes and darn during rrajor earthquakes on April 13, 1949 and April 29, 1965.
Discussions with veteran Water Department errployees have revealed that
"spider-web" patterns of cracks were observed in several places on the surface of the dikes and Cascades Dam after the 1949 earthquake. A detailed record of the l=ation of these cracks was not available. The cracks were reportedly repaired by excavating the cracked , surficial soil and replacing it with canpacted granular fill from on-site borrow pits.
Damage to the perimeter dikes and Cascades Dam from the 1965 earthquake was reported in an intra-department memorandum dated April 3J, 1965
(copy enclosed) . In addition to cracks in the Cascades embankment , two areas of cracking in the perimeter dikes were noted near Mile Post 2 and
6 as indicated on the Site Plan, Drawing 1. Width of cracks varied from hairline to one fect. Copies of the photographs Which accorrpanied the rrerrorandum are also enclosed . Remedial construction reportedly consist ed of excavation of the cracked soil and replacement with canpacted granular fill from on-site borrow pits.
*~~illiams, Mary, Seattle Water Department History 1854-1954, p. 88.
Converse Ward Davis Dixon, Inc.
-3-
Perimeter dikes are currently at approximately elevation 494 to 496, are al:out ;;n feet wide at the top, and are maintained as access roads by
"later Deparbrent personnel and equiprrent.
2. S1'UDY APPROACH
It was not considered practicable for this level of study to =nduct subsurface investigation of the entire 6.6- mile length of dikes. After discussion with project personnel fran both the Water and Engineering
Deparbrents, the approach of this re=nnaissance was as follows:
A. Based on construction techniques employed and performance of the dikes as described in section 1 of this report, it was =nservatively assumed that all perimeter dikes at Lake
Youngs are susceptible to failure during the maximum earthquake selected for errbankment evaluation during this project : Richter magnitude 7.5 event with peak ground acceleration of O. 35 g.
B. In the event of dike failure, it was assumed Water Depart ment operating personnel VIOuld draw dONn the lake level by activating bypass lines or by shutting off flow to lake
Youngs at landsburg. Department crews could then pr=eed with re=nstruction of the dikes.
C. Available plans and topographic maps were reviewed to determine if water released during dike failure could flow off the lake Youngs reservation onto adjacent properties.
Questionable areas were field checked during the re=nnais sance and surveyed .
D. Reccmrendations for backup dikes to =ntain water on the reservation were developed for those areas determined to be low enough to provide a flow path off City property.
-4-
3. FlEW OBSERVATIONS
On July 14, 1980, a field reconnaissance of the Lake Youngs perimeter dikes and adjacent areas was completed by Messrs . Dean Ryden (Converse
Hard Davis Dixon), Jack Herold (City of Seattle Hater Department), and
Al Rice (City of Seattle Engineering Department) . As expected, observa tion of the dikes did not reveal areas of instability since these em bankments are continuously maintained. Therefore, surrounding areas were observed to identify possible paths Where water could escape from the reservation after catastrophic dike failure . Questionable areas identified during this reconnaissance were subsequently field checked for elevations by City Engineering Department surveyors.
Five areas were observed in Which the ground surface between the dikes!
dams and the reservation property line was lONer than the maximum lake level of 494 feet (City datum). These potential paths of water release are shaded on the enclosed Site Plan , Drawing 1, and are discussed belON.
North End of Lake
Although the ground surface to the north of the north dike is s~at lONer than the maximum lake elevation, the area of potential flooding appears to be confined well inside of the property line by the Tunnel
Road and the eIIDankrnent over Bypass Line No.5.
The top of the dike rrounded over the bypass line was measured to range from elevation 500 at the east end of the potential area of flooding to a minimum of elevation 497.1 at a point approximately 35 feet west of the valve well along the outlet tunnel. If Bypass Line No. 5 became damaged by flooding , it is our understanding that water to the lake could be shut off at Landsburg or diverted through Bypass Line No.4.
The tunnel road as surveyed ranged f r crn elevation 507.9 at a point 'Z75 feet out (northwest) from the lake dike to a minimum of elevation 498.5 at the valve well.
The Chlorine Building could be surrounded by shallON water during a flood but the fl=r and controls are reportedly above the maximum lake level.
-5-
McEThoe Bay to South Dam
A potential path of water release off the property was observed at the southwest portion of the lake as indicated on Drawing 1. An access road, referred to as the 24" vit Clay Drain Foadway, is between the lake and the property line in this area. The surface of this road was measured to range fran approximately elevation 490 to elevation 493.
Therefore, since the maximum lake level is higher than the surrounding ground and road in this area, it is a potential path for release of water off-site in the event of dike failures.
Several small embankments Which were constructed concurrently with the
South Dam have been abandoned since construction of the newer, inboard perimeter dikes currently in use. These enbankments were observed in the field and appeared to be intact except for one gap Which was report edly excavated to allCM drainage of water collected between the old embankment and new dike. The presence of this gap provides a potential path for release of water off City property in the event of perimeter dike failure.
Cascades and South Dams
Obviously because of their purpose, these two locations have significant
1= areas outside of the dams Which would all= release of water off the reservation. These two dams will be addressed in separate reports under terms of our original agreement.
4. CCOCUlSIONS AND REXXMMENDATICNS
Based on field observations, review of available drawings, and discus sions with Water Department personnel, our conclusions and recomnenda tions from this reconnaissance level study are summarized belCM.
A. The perimeter dikes at lake Youngs were constructed in 1933 and 1934 without modern construction equipnent. The under lying soft, saturated soils at the lake's edge apparently were not removed prior to filling and the fill received mirlimal C011f>3.ction. Surface cracking of the dikes was reported after both the 1949 and 1965 earthquakes. It is
- 6-concluded that all of the perimeter dikes at lake Youngs are subject to damage during the maximum earthquake con sidered in this study ( 7. 5 Richter magnit ude with peak ground acceleration of 0.35 g).
B. provided all dikes have at least one backup embankment to contain released water on the reservation , and based on the indication that the Water Department is prepared to incur rerredial construction costs to repair earthquake damage, no further geotechnical exploration of the lake Youngs peri meter dikes is recanrrended at this time.
C. All new structures and roads near the north end of the lake should be constructed to an elevation above the maximum lake level and should be designed to withstand flooding .
D. The potential path of water release identified at the southwest side of the lake should be enclosed by raising the 24" Vit Clay Drain Roadway to at least elevation 494 .
Fill material for this construction should include at least
15 percent fines (silt or clay size particles f i ner than
No. 2)0 sieve) . Published geologic maps indicate the area adjacent to the west side of the lake is a glacial moraine which contains glacial till. Till typically contains the recommo-Dded percentage of fines. Therefore , it is suggest ed that the siltier material in the established rorrON pits on the west side of the lal(e be considered for fill mate rial . A determination of the quantity of suitable material in these pits was beyond this scope of work. Fill should be canpacted in horizontal layers to at least 90 percent of the laboratory maximum dry density as defi ned by ASTM D1557 method D. All organics should be removed fran areas to be filled . A typical cross section schemati c is illustrated on Drawi ng 2. The embankment could be provided with a six inch gravel wearing surface.
E. The gap in the abandoned dike near the South Dam should also be refilled t o at least elevati on 494. All organics
Converse Ward Davis Dixon, lnc.
-7-should be rerroved fran surfaces t o receive fill and the sides of the existing gap should be sloped back to 5H:lV
(horizontal to vertical). Fill material and canpaction should be as reccrnnended in itan D above. An illustration of the recammended fill cenfiguratio n is enclosed as
Drawing 3.
It is urKlerstood that sane drainage through this existing gap area is desired under normal cenditions. An outlet pipe ceuld be installed through the rebuilt dike for this purpose. The pipe should be provided with two anti-seep cellars as shown on Drawing 3. The inlet end of the pipe should be provided with a trash grate and a flap valve to stop flON in the event of a flood (it is assumed that the
=rent drainage through the gap and off the property is acceptable) . Periodic inspections should be cenducted to clear deb ris fran the inlet. The embankment should be protected fran erosion at the inlet by a cellar, rip rap or other means.
F. It is recanrnended that the Water Department continue their program of dike inspection and maintenance and that these activities be expanded to include all backup dikes and roads on the reservation.
5. LIMITATIONS
The findings, recanrnendations, and professional opinions in this report are presented, within the limits prescribed by the client, after being prepared in accerdance with generally accepted professional engineering principles and practice. There is no other warranty, either express or implied . t~<" ' ..
c~ WARD DAVIS DIXON, INC.
Dean E. Ryden Senior Engineer
DER/ kpp Converse Ward Davis Dixon, Inc.
REFERENCE:l. Topography from ·SWAN LAKE & VICINITY·, 1"-400' contour map by Seattle Waterwork's, May 1917.
2. Roadways from ·LAKE YOUNGS RESERVATION", 1"-400', file 68-3 serial 2782, by City of Seattle Water ri : 'l \ , \ o 800 1600
SCALE IN FEET
PROPERTY LINE
LEGEND:
APPROXIMATE AREA OF WATER
RELEASED BY FAILURE OF MAJOR
EMBANKMENT
APPROXIMATE AREA OF WATER
RELEASED BY FAILURE 'OF PERIMETER
DIKE
OBSERVED CRAcKS IN DIKE
(APRIL 30, 1965)
PATH OF WATER RELEASE WITHOUT
_ • BACKUP DIKE ---
'----'------'Del}-artm-e-n1- date-d- April 1967.
_ _ c~ _____________ ~_
SITE PLAN
LAKE YOUNGS RESERVOIR-SEISMIC STABILITY ANALYSIS
King County, Washington for City of Seattle Engineering Department
@ ConverseWard DaVIS Dixon Geotechnical Consultants
Scale
NOTED
Project No .
Date SEPT 1980 79-5220-17
Prepared by BH Drawing No .
Checked by
DER 1
Approved by DER c .2 .2 :0 ,
c. , .2 c.
c.
n n C a z , " a
New compacted fill placed in horizonta l layers
6" gravel wearing surface elev. 494
Exi sting Road / '
/ Embankme nt
Benc hes exca va into existing emba nkment
Existing surface stripped of vegetation, topsoil and organics
CROSS SECTION
not to sca le
TYPICAL FILL CONFIGURATION FOR RAISING EXISTING ROAD
LAKE YOUNGS RESERVOIR - SEISMIC STABI LITY ANALYS IS
King County, Washington for City of Seattl e Engineering Department
® ConverseWard DavIs Dixon Geotechnical Consultants
Project No.
79- 5220-17
Drawing No.
o z > • o
West ~--------------~-- min. elev. 494 East (Lake)
Anti-seep co ll ar (typica l )
./ Erosion protection / at inlet
Excavation to c l ean~ bottom of existing channel
Tra sh screen & shut off va l ve
Outlet pipe
CROSS SECTION ALO NG CENTERLINE OF PIPE
not to scale
Refi ll excavation with compacted fill in horizontal layers
Excavate ex i sting dike to receive new fill Outlet pipe with ant i seep co llars
Excavate bottom of existing channel to remove soft, saturated soi l s and organi cs
PROFILE ALONG EXISTING DIKE
not to scale
RECOMMENDED FILL CONFIGURATION FOR RESTORATION OF SOUTH OUTLET DIKE
LAKE YOUNGS RESERVOIR - SEIISMIC STAB ILITY ANALYSIS
King County, Wash ington for City of Seattle Engineering Department
® ConverseWard DaVIS Dixon Geotechnical Consultants
Project No.
79 - 5220-17
Drawing No.
"- ~ .' ., . '. _a. _ .... "IiiW'"
;BJECT:
) MR.
~OM
WATER DEPARTMENT
CITY OF SEATTLE
INTRA-DEPARTMENT CORRESPONDENCE
ADril 30. 1965 i , Ec.::-ta C;':'cZo D"~";;() Aooo::lI:!:':O:lt rat ',later Dovo.rt:;;on~ Inotalla.tionD-
J. ~y lic~th, Suporinto~c0nt of Water
Jo:)oa C. l1Cl:l0Y. \-luter O;Joro.tiono Director j
I
1. Loo ~a:li:: - One tic rca in uDDor hal£ of tcrJ: Dupport1nc structuro (no~ It::ddor) bro!to~
.I
2. Poy Standpipo .. Cr~c~G in anGlo iron at baeo of otandp1~o. ~
3. Hoodl~cl Perk Stnndp1:po .. ~cn of tho t'.tonty bold-do'.,rn bol to b:'oko nt tho nuto. ':i.'horc;:Juining ton ",'oro strotched (~e~~~ontly dofol~cd).
4. De~con 2e~e~/oir. South - Tho undor-drain f1o~ increaoed e,pro~:i.!::w.toly 5~. ~ho undor-drain flow hod roturnod to nOlQa].
by b: co J>.l.j J,p."il ;0 t 1965.
5. Bitter Luko lleoorvoir - Tho ~~der-dro.in flow inoro2ood oppro",4Qutoly lOP. ':i.'hiD incrouco in !lo~ 10 otiil continuinG ~~U will bo chQckcd rOL~larly.
G. Dc'" Lc1:a Ec~crvoir - Pi't'0lin;) 0;':':."813 cc.uooc1 by quzilic cllovcd b~l in air velva to G~Op ru,a it did not ro-ac~t corroctly. '1ho rcc'.ll tin:~ lOD.~~::!Go p<!rti~lly floodou.· tho gato t:,::",d cquiIl;:;oat ch;:.;::lbc!". Coz"dit:,oD WUD cor-roctod but 80:::13 eloctrioal c~ui~wout vaG v~tor duwnsod rulu vill re~uiro ropair.
7. 33::-0. Ava S'J l:; SW :::;l~ob:--no ?u;:!p St(lt1o~ - Brick chippod and ~~or frncturoc. DO~f,pout fall down. D~:::c.so 10 conor ned the buildinS Gufforcd no c~aco otr~e~u4~ly.
2. C~"~c::a in c.li::o m'ou."1cl Ln1:c Yoz;:c: i:1 3 Tllneeo (ell l1uro.llcl \Jit~ G!~c~o2ino). 01~O oori()o just Gou-cil of cpill\;,c.y; o~o o~rioo ;;00 icc~ r.orth 0:1: ::ila ?ont }2, c:pp;:o:·:i~,~tcly 1 ~O feot 10",£;;:
o~o co:!."iOG ll;,:to:1Jb::; iro;;! ;:'00 foo";; couta of r':ilo PO.Jt 6'6 to 2,00:) feot r:o::-th of oru:JO. Crcc1:o variod i'ro:.l ll~!irl1no to 3" i:::. \/iC:~:l. 110 oi/l'ill'ont d':l.:::l<li:;o to vr.tor iDr-cund1ng oup:lbili tio!)
of clil:o.
1 •
:1 l' , I .'i i t t • , l , , WATER DEPARTMENT ell 'I' elF S EATT LE
IN7R~- D;::rARTMENT C ORRES?O NDENCE j () !\~ ?.
f ROM
1 . :/~ ';Z:'~ .i .. l~· '/ 8 1vr; p!:. 30.';' :" : ;k~ E-ese!' vo :'r!.or: nit" Va lve, on the cc-~:~3 ctic:J b,;::";\"3~~ ~~fJ SO'I ;.J ':\' : .. . ~,. :: ~)l;, -; !i:'".e 3 :',(! tl":'e 48" ~'ie st s'-e'3. :. tle p~ r, ~ l!:-,e . eb· , 't ~':!red fs!10U~':l to ft 'c:y !.;'~e ~e~ t of air v t:=. lve.
1 ' t~s ~9 8 t i' ,1 bal l ~il l be renl~ced fir3~ :.tin~ in tha corning c:-:" ~/ .... VJ/ 3:'1 2 . ':r. "~':;? .; 7 ::!: ·:. co:-,j s:..·.':J;·! r· ::':l~ B:;~ ·'.):-::: 8 l ~s.k ~~oo :feet Nc-r th 'cr the c~· : :, · :· .:~ i ~ ;! ,:7' F' '- :: : '0 'o!~l ~ :', :~oC\.·j. ::-'h~3 pipe is .~p~! !'oxiitJstly . 12 f1 out ,""' : -:-' (\!l;"'"; ; · ,~tt~ ~s p.;.l.:1 t. r f'r,er ,; ';)e~' io.j ,0: 2 0:" 3 hrs. this le r 1--' dried up
O\,.; ~ ';: , 'i'. :: ,: ~c :.-;:: :·. e :-. ,"::: f'er~.!.r ~.
c:, : =' :3 1 ~ t~~ ~a~e Yovngs dike .
. ",: ':,.: .. ~ " : c:: c.~·J....:lo:)r:0 : :1 t Le :-ctad S:l~' .i :· :.:e .
of l 071gi tu~bm l
F< 3 ':Fj !' e~t ~;o:'t~ o~ r-:tle r' f.3~ # ~~ ;'o?" [;.pp!",0 .hirr: ~ tl:; 1 50 f ee t.
,."; .. F .... · .... 5~,C f ~~ .. ;t. SC .. 1~t of ! : '~l':; !"'ost -:; 6 to ?O·'}0 .fe~t ~orth .
: 'r-:~~-:- ;"·~<: ·r3 -J :~· r ir;;d i!l '.'1",-j~:-. f r~;: ,'7; ::;~:'e c~"'P,=-1-~ -to :.t. i nche s . in width.
~~; .:-' : -:: '':- J·: 1: C.t ;;-1 1.::: r~)~t 'f .. ~ T. :~;t.!:j. s UT'ed ~¥itb :? ":;11. 7. f00t r ;:le find i~3 u~ ~ bl~ 1,0 re~ct t~l e bct~Q~ ~ .f t~e G~~ck ..
tr~m,iss:<)n li nes ' . .,.,,3 In .-d e 1=ei!ia.t~ly
7 C . ~ .... ~:,-y: n;:: t:>:; 5£:rt'r:. o.'.;.~}:~ .. :~bf.! r; ~ tt [' r·\.:~~ ~nspect~on V'l f.· S !Dade ~~ p~:.:"[. t~~l:'.i!'"";C ·: Ctl . t ·~·. ~ . p i. iJe l !. r.~ 9 fro~ Lancaburg to BoVi'
!.J;':~ .:~ !", ~ 5er"J c:.·:. I' J t\'..:t~'!3t;-, 3~ . S- ·· : · ~ bOU3e. , il~e~?er Islr-:.nd, and 145- Pl Sl-!:
f . ;.J :.;':' l Er: . St ., Sr-lj 2'!::38.!.!orl :f:l~ ;'~3er·Jo: l".
.• ,~ • .' - . '<:C: ')' '}'
MAY 31965
Eqrtlt Y/./'1;7e LZd?~f}e
MAP Nok.Je.%~&!..i416' 77>(
DATE TAKEN .. 1.2.~.:f.s:-_.- TIME TAKEN .. ~::?~..l.1!.-._._ TAKEN BY .. £, .. lledp.f: .. _ .
lOCATlON . .J.i!..f.i.. ... ~~.!:?l Sp//M/"'/
/?dON Is () /7 /k!L ........ __ .
--EXPLANAiTOif OF MCTURE
.. j3aor s/d'e 01 ~je - Ua~f 2dtJ' /tJIJJ - e"l" 6"wlj~- b ~r -?n ore d&ep - 771010'/<1) /td5
Sell /"i? col c;" /" ;'
MAY 31965
,Ebrhf c;;JVQtfe /tf,/ffOpe
MAP NO .. I.d.-f.~.%¥£?:f£. ~ fe '$- '> I DATE TAKEN .... ~.,2'~_..cf.s..~ _ TIME TAKEN .j~!.<?~ . .J_6:~ ... _.
TA KEN BY ..... £llx?.e&L LOCP.TI ON.!.Y.tl.~.j~.,r!... __ ':~
EXPLANATION OF PICTURE
i 01 dtA-e ;,~!",,.e /N./ /'17,1 :3" /.{) ,d .. _ ~'d<,,6' or 7J"1JJr(f'
.Eori0 ()"g4'c:!? f)Qn'1"ft::.
MAP NO .'!'~,j6'...~f(.(?&./. .. !Jje ;nr
DATE TAKEN ... 4.:: .. ~.9..: __ ~ .. ~.::-
TIME TAKENJG1.~:.~q.l~ TAKEN By .. 6.~ .. U::.~.~.&:,::
LOCATION .. ~s..t ... £Q.., ... ~l.I'~ / II w a t' 3.ffprr.:trr·6fi"j)-f-pfcfD·RE· .. ··
8at!',f Sldl!' 0/ C;;',.{e- t!/Wt/- 2()/
IN?$' 2"1t,~"w,de- &'orrPdre d~e! p.- -mqlu'/~ / ,J-t?.s Sell/eel
&" To I'
MAP NO!..t?.~Z!L1JL!d!6' 'Y:>(
DATE TAKEN ... l.'.::.-2E:::.~.§=-
TIME TAKEN .. /q:~qt:!..-1.:
TAKEN BY .... & __ [}.t!.~!..~.C LOCATION __ !1i(I(. ... !J~/.z:...~ ..
EXPLANAT:ON Of P! (;'iURE
1- 0l'dt',fe !/';svre- /"'Ct) , IMj
II '/ '
.3 ahat:' G &1f>€P r!Jr ')??ore ij,,{ 3 191)S
MAP NO.!?'!& !!~ .. 4j6' '0.3 (
DATE TAKEN .. ::1.:3c1 -6".s-.. ~--.---.-.----... ----
TIME TAKm/1~~._d_~~ ____ _
TAKEN B'( .. _.£/J--<N!~r ... _ .. _ ......... -.. _-_ lOCt.TI ON .. /~t7f' __ '~.dl.o..I.. ~/<" I:sf G
· ---EXPiXN"i\TiliN-oT'P-ici'iiR"C·-
Jq~e .s /Qe, <)1 r::'J& $"~tJ W/;'ti /5Svrt? I - W/tlt> Z~~ . /"'"CJ f?arTI7 Se 11/6'd oPtJ,d .2' (/
MAY 8 1965
.Eo~T/J qvo/re itbmt7ye
MAP No_ifif' &K<?.fS AAe /J(
DATE TAKEN 4-2'<1" ~f
TIME TAKEN __ '!'L1.£L-:Z~._
TAKEN By ___ J-2_§.r..Qf1.L e
• LOCATlON .. _!.~~~:'&.:..tt_.ql ¥~ ~06'
--EXiiLANATiOirOr--picrUii(---
;/Ieor t d I d/ it 6' / ' t~ ",. t?
3M' / "' /Tfl Z " w ,de 6' d .. ep
~ Ie' S .6:; .E, /?--(%',I" ,--
YAY 3 IU5
for7lt C;;"q/(e ,& "'Iff" j fi,t
MAP NO.kfe 1#u.!!.#-£..l-J,fr$ ;? 3 (
DATE TAKEN __ 4 - ~()-, ~ -_ ... __ ._. __
TIME TAKEN __ 1~!:~Q 1-;Y
TAKEN BL.&.. Fro~J;;---- -
-.-_ .............. _ __ • _ _ • "'0
I
LOCAT10N __ !.if.~.£ ... ~dp._.f"1 1'/./., ~s-l6
EXPLANAi'ioifoTiici'D'iiC'-
.-:Z:j-e 4/d'e c;/ d/lre. 4j,ou//l/£y
/ / ssvrt!? ~ne /-t, v .l/de 204' /0/1'1 ,,;?qr/I? .s/I.f"?e~ Qt>",vT :2 I (/
W\y 31965
7n--k ,Eq;,/h q'hlA-e Jt/WQf/ e
MAP NO /".f %d««gu~;f4
DATE TAKEN 4-Z<J-6S-
TIME TAKEN 3j3d P/,/ -.- -'-'~""'-... --'--- TAKEN BL.a._:I.!.<?~!..e .~
LOCATIONAW.q. __ ~c~_.f?,-. ,.r,J~ ~sJ ~
| Lake Youngs-Dike Reconnaissance Seismic Slope Stability_1980 |
| 1 Background Info |
| 2 Study Approach |
| 3 Fiel Observations |
| 4 Conclusions & Recommendations |
| 5 Limitations |
| Figures |
| Correspondence |
| Photos |
File details come from the government source that posted it. Updated .