About this file

Lake Caroline Comfort Station Construction Contract

This is a construction specification and bidding document package issued by the Red River Waterway Commission (RRWC) for a public works project located in Bossier Parish, Louisiana. The project consists of constructing a 432 square foot CMU block comfort station (restroom facility), a duplex lift station, and off-site utility extensions at the RRWC Lake Caroline Boat Launch facility in south Bossier City. Bidders must be Louisiana-licensed contractors with Classification I – Building Construction credentials. A non-mandatory pre-bid conference will be held on Tuesday, November 24, 2026, at 10:30 AM at the Lake Caroline Boat Launch site, with attendance highly encouraged. Sealed bids are due by 10:30 AM local time on Tuesday, December 8, 2026, to be received by mail, in-person, or electronically via www.bidnetdirect.com at the Red River Waterway Commission office (5941 Highway 1 Bypass, P.O. Box 776, Natchitoches, LA 71458). The Work must achieve Substantial Completion within 210 days after the Contract Times commence and be completed and ready for final payment within 255 days. The contract will be awarded to the lowest responsive, responsible bidder on a lump sum basis. Project Engineer is Nixon Engineering Solutions, LLC (Kurt Nixon, PE, knixon@nixoneng.com); Owner contact is Kyle Smith, PE, Engineering Supervisor (kylesmith@redriverwaterway.com, 318-352-7446).

Bid security in the form of a bid bond, certified check, or cashier's check equal to 5 percent of the total bid amount is required and must accompany all bids. The successful bidder will be required to furnish Performance and Payment Bonds each in an amount equal to 100 percent of the contract price, written by a company licensed to do business in Louisiana. Progress payments will be made monthly at 90 percent of completed work value, with 10 percent retainage until Substantial Completion, then increasing to 100 percent less the punch list value. Contracts valued under $500,000 are subject to 10 percent retainage until Substantial Completion and lien free certificate receipt; the contract amount is not specified in the document. Liquidated damages of $250 per day apply for failure to achieve Substantial Completion and for failure to complete remaining work by the specified dates. Special damages provisions also apply, including reimbursement for Owner's fines, penalties, and actual costs for engineering and administrative services beyond the Substantial Completion date. Bidders may submit bids electronically and must acknowledge all addenda. No specific set-asides for minority-owned, women-owned, or other business categories are identified in the bidding documents.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF LOUISIANA

RED RIVER WATERWAY COMMISSION

CONSTRUCTION PROPOSAL

FOR

LAKE CAROLINE

COMFORT STATION

PROJECT 25-01

CONTRACT No. RRW-848

NES No. 0158.25.01

Prepared By: Nixon Engineering Solutions, LLC 1628 Benton Road Bossier City, LA 71111

(318) 747-9669 knixon@nixoneng.com

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

B

ID

Contract documents and Specifications for Lake Caroline Comfort Station

For Red River Waterway commission Project 25-01

Contract NO. RRW-848 Bossier Parish, Louisiana

Table of Contents

DIVISION I – BIDDING FORMS

Advertisement for Bids Pages 2

Instructions to Bidders Pages 13

Louisiana Uniform Public Works Bid Form Pages 1

Bid Bond Pages 2

Attestations Affidavit Pages 2

Non collusion Affidavit of Prime Bidder Pages 1

DIVISION II – CONTRACT FORMS

Notice of Award Pages 2

Agreement (Stipulated Price) Pages 7

Performance Bond Pages 4

Payment Bond Pages 4

Notice to Proceed Pages 1

Application for Payment Pages 3

Contractor’s Affidavit of Payment Pages 1

Change order Pages 1

Insurance Certification Pages 1

DIVISION III – GENERAL AND SUPPLEMENTARY CONDITIONS

General conditions Pages 75

Supplementary Conditions Pages 10

DIVISION IV – GENERAL REQUIREMENTS

01200 Request for information Pages 1

01330 Submittal procedures Pages 6

01400 Quality control procedures Pages 4

01500 Temporary facilities and services Pages 3

01600 Product requirements Pages 5

01770 Construction procedures Pages 11

01731 Cutting and patching Pages 4

01770 Closeout procedures Pages 5

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Contract documents and Specifications for Lake Caroline Comfort Station

For Red River Waterway commission Project 25-01

Contract NO. RRW-848 Bossier Parish, Louisiana

DIVISION V – TECHNICAL SPECIFICATIONS

02200 Site Prep Pages 2

02300 Earthwork Pages 5

02350 Subgrade Prep and Base Pages 3

02510 Water Distribution Pages 3

02530 Sanitary Sewerage Pages 3

02540 Grinder Pump Station Pages 12

02630 Storm Drainage Pages 3

02674 Pavement Joint Sealants Pages 2

02910 Seeding, Fertilizing, Mulch Pages 2

03300 Portland Cement Concrete Pages 6

03310 Concrete Sealers Pages 2

04220 Concrete Unit Masonry Pages 13

06104 Rough Carpentry Pages 4

06402 Interior Architectural Woodwork Pages 11

07210 Building Insulation Pages 4

07610 Sheet Metal Roofing and Sofit Pages 12

07620 Sheet Metal Flashing and Trim Pages 6

07920 Joint Sealants Pages 9

07630 Stationary Drainable Louver Pages 1

08111 Standard Hollow Metal Steel Doors and Frames Pages 8

08211 Flush Wood Doors Pages 5

08411 Aluminum Framed Entrances and Storefronts Pages 6

08710 Door Hardware Pages 15

08800 Glazing Pages 12

09900 Painting Pages 16

10520 Fire Protection Specialties Pages 3

10801 Toilet and Bath Accessories Pages 5

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

DIVISION I

BIDDING FORMS

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Lake Caroline Red River Waterway Commission Comfort Station Project No. 25-01 Bossier Parish, Louisiana Contract No. RRW-848

Page 1 of 2 Nov 2026

ADVERTISEMENT FOR BIDS

Sealed Bids for the construction of Lake Caroline Comfort Station, Bossier Parish, LA (Project No. 25- 01; Contract No. RRW-848) will be received by the Red River Waterway Commission (Owner) by mail or in-person at the office of the Red River Waterway Commission, 5941 Highway 1 Bypass, P.O. Box 776, Natchitoches, LA 71458, or electronically at www.bidnetdirect.com until 10:30 AM local time on Tuesday, December 8, 2026, at which time the bids received will be publicly opened and read aloud. Any bid received after the specified time and date will not be considered and returned unopened.

The project engineer is Nixon Engineering Solutions, LLC, 1628 Benton Road, Bossier City, LA 71111 (Engineer). For any project-related inquiries, please contact Mr. Kurt Nixon, PE, at knixon@nixoneng.com.

The project consists of a 432 square foot CMU block restroom, duplex lift station, and off-site utility extensions at the RRWC Lake Caroline Boat Launch facility in south Bossier City, LA.

To bid and perform work covered by these Bidding Documents, the bidder must be a Louisiana licensed contractor with the following classifications or subclassification:

1. Classification I – Building Construction

Bidders are encouraged to visit the project site. No special coordination is required to access the site since it is open to the public.

Bids shall be on a Lump Sum price basis as indicated in the Bidding Documents.

Prospective bidders are notified of this advertisement via the newspaper(s) listed below and www.bidnetdirect.com.

The Bidding Documents may be viewed and/or issued at the Owner’s office at

Red River Waterway Commission 5941 Highway 1 Bypass Natchitoches, LA 71457 Phone (318) 352-7446

For any owner-related inquiries, please contact Mr. Kyle Smith, PE, Engineering Supervisor, at kylesmith@redriverwaterway.com or (318) 352-7446.

Bidding Documents may be obtained electronically by the prospective bidders or suppliers at www.bidnetdirect.com at no charge. Additionally, digital copies of the Bidding Documents can be obtained in-person on bidder or supplier provided storage media (e.g., thumb drive, flash drive) from the Owner’s office.

Pursuant to L.R.S. 38:2212.E.(1), bidders have the option to submit their bids and bid bonds electronically.

To view bids, download, and receive bid notices by email, your company/agency will need to register with Bidnet Direct at www.bidnetdirect.com. If you need help registering or with completing an electronic bid, please contact Bidnet Direct.

Bidding Documents from any other source are for examination only, are not considered complete and are not valid for bidding purposes. Neither the Red River Waterway Commission nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than those issued as described herein.

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Lake Caroline Red River Waterway Commission Comfort Station Project No. 25-01 Bossier Parish, Louisiana Contract No. RRW-848

Page 2 of 2 Nov 2026

Bid Security equal to five percent (5%) of the Total Bid shall be in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218 must be attached to and made a part of the bid. If a bid bond is provided it shall be on the provided form and only on the provided form. Bid bonds must be written by a qualified company licensed to do business in Louisiana.

The successful bidder will be required to furnish a Performance Bond and Payment Bond written by a company licensed to do business in Louisiana in an amount equal to one hundred percent (100%) of the contract amount pursuant to the requirements noted in L.R.S. 38:2219 A. (1)(a), (b), and (c).

No bid may be withdrawn for a period of forty-five (45) days after actual date of the opening thereof.

The Owner reserves the right to reject any and all bids in accordance with Title 38 of the L.R.S. In accordance with L.R.S. 38:2212.B(1), the provisions and requirements stated in the Bidding Documents shall not be considered as informalities and shall not be waived.

The Red River Waterway Commission hereby notifies all bidders pursuant to this advertisement that they will be afforded an equal opportunity to submit a bid in response hereto, and will not be discriminated against on the grounds of race, color, sex, national origin or disability in consideration for an award.

A Non-Mandatory Pre-Bid Conference will be held at 10:30 AM local time on Tuesday, November 24, 2026, at Lake Caroline Boat Launch off of Arthur Ray Teague Parkway Bossier City, LA (Project Site).

Representatives of Owner and Engineer will be present to discuss the Project. Attendance at the Pre-Bid Conference is highly encouraged but is not mandatory.

By the Owner: Mr. Colin S. Brown, PE Executive Director

Red River Waterway Commission 5941 Highway 1 Bypass P.O. Box 776 Natchitoches, LA 71458 Phone (318) 352-7446

Date: November 6, 2026

The Natchitoches Times Publication Dates: November 12, 19 & 26, 2026

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

TOC Page1 of 1

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

B. Domestic Preference – The Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, §§ 70901-70953.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office.

Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 10.0 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.

1. Electronic Documents that are available in native file format include:

a. ACAD site file

2. Release of such documents will be solely for the convenience of the Contractor. No such document is a Contract Document.

3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.

4. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 10 days of Owner’s request, Bidder must submit the following information:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.

4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

5.03 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.

C. Bidders visiting the Site are required to arrange their own transportation to the Site.

D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

E. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

G. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:

A. Questions received less than seven days prior to the date for opening of bios may not be answered

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Bid security must be at least 5% of the Bidder’s maximum Bid price.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. Each such request shall include the Manufacturer’s Certification for Compliance with Domestic Preference requirements. Refer to the suggested Manufacturer’s Certification provided in these construction Contract Documents.. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders. Bidders cannot rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraphs 7.05 and 7.06 of the General Conditions after the Effective Date of the Contract. Each such request shall include Manufacturer’s Certification letter to document compliance with Domestic Preference requirements. Refer to Manufacturer’s Certification Letter provided in these Contract Documents.

10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for those portions of the work for which such identification is required within ten days after Bid opening:

11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.

11.05 – The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC 7.07A.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed in ink below the signatures.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

12.13 Bids submitted for this project must comply with bidding requirements of the State of Louisiana and the Bidding Documents. Of special emphasis of the following

A. Bids equal to or in excess of the State of Louisiana’s statutory limit ($50,000.00) requiring a licensed Contractor for bidding, must state on the outside of the sealed bid the Bidder’s Louisiana contractor’s license number

B. Bids below the State of Louisiana $50,000 statutory limit requiring a contractor’s license for bidding, must state on the outside of the sealed bid one of the following:

1. “This bid is below the State of Louisiana $50,000 statutory limit requiring a contractor’s license for bidding.”

2. The Bidder’s Louisiana contractor’s license number.

C. Contractors submitting Bids shall comply with the provisions of the Louisiana Contractors Licensing Law R.S 37:2150-2164

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

ARTICLE 13—BASIS OF BID

13.01 Lump Sum

A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.

13.02 Base Bid with Alternates

A. Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.

The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form.

Deleted

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.

14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

14.04 Bidders may elect to submit bids electronically via the internet. Electronic bids may be submitted at www.bidnetdirect.com. Bidders shall obtain a digital signature certificate prior to submitting bids online. The bid security required by this solicitation shall accompany the bid.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.

18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

18.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

C. For determination of the apparent low Bidder(s) when sectional bids are submitted, Bids will be compared on the basis of the aggregate of the Bids for separate sections and the Bids for combined sections that result in the lowest total amount for all of the Work.

D. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 21—RETAINAGE

21.01 Contract retainage shall be as follows in accordance with Louisiana state law:

A. Contracts with a value less than $500,000 shall be subject to retainage in an amount equal to ten percent (10%) of the value of completed work, including stored materials, until the work has been accepted as Substantially complete and the lien free certificate has been provided.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Modified to include RD edits from RUS Bulletin 1780-26 (5/24/2023).

B. Contracts with a value of $500,000 and over shall be subject to retainage in an amount equal to five percent (5%) of the value of completed work, including stored materials, until the work has been accepted as Substantially Complete and the lien free certificate has been provided.

ARTICLE 22—PROJECT CLASSIFICATION

22.01 Public projects requiring classification under LA R.S. 37:2163 are classified by the Engineer in accordance with the classifications of the Louisiana Contractor’s Licensing Board as listed on the project title sheet of the Drawings

ARTICLE 23 – ADDITIONAL SUBMITTALS BY BIDDERS

23.01 The bidding Forms sections of the Contract Documents may include dorms of documents not necessary to determine the lowest bidder. The requirements of LA R.S. 38:2212 shall govern. If not submitted with the bid, these forms and documents shall be completed and submitted by the low bidder within 10 days of the date of the bid opening. If the apparent low bidder does not submit the proper information or documentation as required by the bidding documents within the 10 day period, such bidder will be declared non-responsive and the Owner may award the bid to the next lowest bidder, and afford the next lowest bidder not less than 10 days from the date the apparent low bidder is declared non-responsive, to submit the proper information and documentation as required by the bidding documents, and may continue such process until the Owner either determines the low bidder or rejects all bids. Failure to submit completed forms within the required time period may result in the forfeiture of the bidder’s bid Bond.

23.02 The following form(s) shall be completed and submitted by the low bidder within 10 days after the date that bids are opened:

A. Attestations B. Non-Collusion Affidavit of Prime Bidder

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Lake Caroline Comfort Station Nov 2026

00400-1

Louisiana Administrative Code, Title 34, Part III, November 2020

LOUISIANA UNIFORM PUBLIC WORK BID FORM

TO: Red River Waterway Commission 5941 Highway 1 Bypass Natchitoches, LA 71458

BID FOR: Lake Caroline Comfort Station

Project No. 25-01 Contract No. RRW-848

The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Nixon Engineering Solutions, LLC and dated: November 10, 2026.

Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the

Designer has assigned to each of the addenda that the Bidder is acknowledging) .

TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid”

* but not alternates) the sum of:

Dollars ($ )

ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.

Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

NAME OF BIDDER:

ADDRESS OF BIDDER:

LOUISIANA CONTRACTOR’S LICENSE NUMBER:

NAME OF AUTHORIZED SIGNATORY OF BIDDER:

TITLE OF AUTHORIZED SIGNATORY OF BIDDER:

SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:

DATE:

THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA UNIFORM

PUBLIC WORK BID FORM:

* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.

** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).

BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

EJCDC® C-430, Bid Bond (Penal Sum Form).

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

BID BOND (PENAL SUM FORM)

Bidder Surety

Name: Name:

Address (principal place of business): Address (principal place of business):

Owner Bid

Name: Project (name and location):

Address (principal place of business):

Bid Due Date:

Bond

Penal Sum:

Date of Bond:

Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .