Lagoon Drive Water Line Replacement - Bid Tab.pdf
PDF 30 KB Posted
- Attached to
- Lagoon Drive Townhomes Water Line Replacement
- Solicitation number
- TOF_W_2025_LAG
- Issued by
- Sedgwick County, Colorado
About this file
This is a bid schedule document for the Lagoon Drive Water Line Replacement project. The project involves comprehensive water infrastructure replacement including removal and installation of water lines, traffic control management, pavement replacement, and site restoration work. The base bid contains 40 line items covering mobilization, construction surveying, traffic control (5 days management, 2 days inspection, 90 hours flagging), utility work including 455 linear feet of 6" water line and 40 linear feet of 8" water line with associated valves and hydrants, pavement removal and replacement (1,700 SF concrete, 4,700 SF asphalt), and restoration activities. An additional Bid Alternative 1 offers complete project re-paving with 6 additional items including expanded subgrade preparation (2,300 SY), increased pavement replacement (5,800 SF concrete), and additional aggregate base course work.
The document presents a unit price bid format with estimated quantities for each item but does not include actual pricing, total amounts, or funding information. Key infrastructure components include ductile iron pipe (DIP) water lines with V-Bio Polywrap coating, gate valves, fire hydrant assembly, cathodic protection systems, and a design/build timber retaining wall replacement. The scope encompasses significant excavation and material handling with requirements for hauling and offsite disposal of removed materials. Environmental considerations include dust abatement, erosion control measures with silt fencing and excelsior logs, and revegetation of 2,000 square feet of disturbed area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid
Item Bid Item - Base Bid
Unit of
Measure
Estimated
Quantity Unit Price Total Price
1 Mobilization LS 1
2 Construction Surveying LS 1
3 Traffic Control Management DAY 5
4 Traffic Control Inspection DAY 2
5 Flagging HOUR 90
6 Temporary Traffic Control Sign EACH 5
7 Type 3 Barricade EACH 2
8 Channelization Device (Drum/Cone) EACH 20
9 Portable Message Sign Panel DAY 30
10 Pothole Utilities HOUR 40
11 Clear and Grub SF 1,000
12 Sawcut Existing Pavement (Asphalt/Concrete) LF 700
13 Remove Concrete Pavement w/ Haul and Offsite Disposal SF 1,700
14 Remove Asphalt Pavement w/ Haul and Offsite Disposal SF 4,700
15 Remove Water Line and Appurtenances w/ Haul and Offsite Disposal (DIP/Copper) LF 300
16 6" Water Line (DIP) (V-Bio Polywrap) LF 455
17 8" Water Line (DIP) (V-Bio Polywrap) LF 40
18 6" Water Line Gate Valve and Valve Box EACH 6
19 8" Water Line Gate Valve and Valve Box EACH 4
20 Fire Hydrant Assembly EACH 1
21 Reconnect Existing Fire Hydrant EACH 1
22 Pipe Bollard (Fire Hydrant Protection) EACH 6
23 Reconnect 1" Copper Water Service Line, Saddle and Corp, Stop EACH 10
24 1" Copper Service Line LF 100
25 Concrete Encase Sanitary Sewer Joint EACH 6
26 Magnesium Anode Bag EACH 6
27 Cathodic Protection Test Station EACH 2
28 Timber Retaining Wall Removal and Replacement (Design/Build) LS 1
29 Reset Project Sign EACH 3
30 Subgrade Preparation SY 700
31 Excavation to Export (to Pavement Subgrade/Trench Stabilization) CY 100
32 Import Structural Fill (North Drive Realignment/Trench Stabilization) CY 10
33 Aggregate Base Course (Class 6)(6" Depth) TON 250
34 Concrete Pavement (Replace Existing in Kind) SF 1,700
35 Asphalt GR SX 4" Section TON 120
36 Topsoil CY 15
37 Revegetation SF 2,000
38 12" Excelsior Erosion Log LF 100
39 Silt Fence LF 200
40 Dust Abatement (Water Truck) HOUR 20
Base Bid Total
Bid
Item
No.
Bit Item - Bid Alternative 1
(Complete Project Re-Paving)
Unit of
Measure
Estimated
Quantity Unit Price Total Price
41 Construction Surveying LS 1
42 Subgrade Preparation SY 2,300
43 Excavation to Export (to Pavement Subgrade) CY 300
44 Aggregate Base Course (Class 6)(6" Depth) TON 750
45 Concrete Pavement (Replace Existing in Kind) SF 5,800
46 Asphalt GR SX 4" Section TON 400
Bid Alt. 1 Total
Lagoon Drive Water Line Replacement