L3. Price Proposal - CLT Storage Building.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- CLT Storage Building Installation Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00180
About this file
This document contains a price proposal spreadsheet and details of a federal contract opportunity posted by the Federal Aviation Administration. The FAA requires installation of a storage building at the Charlotte Douglas International Airport air traffic control tower in Charlotte, North Carolina. Interested offerors must register in the System for Award Management and submit a proposal in accordance with the solicitation instructions by the due date in March 2022. The site visit details and contact information for questions are also provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00180 0001.pdf | ||
| J1a 2021 08 05 CLT-STG-Design08.05.2021.pdf | ||
| L1. BidBond.pdf | ||
| J3 Wage Rate NC20220037 02.25.22.pdf | ||
| L2. CLT Past Performance Questionnaire.pdf | ||
| 697DCK-22-R-00180.pdf | ||
| J1 2021 08 05 CLT ATCT STG Specs IFB.pdf | ||
| J2 COVID-19 Contractual Requirement Rev 1 8-26-20.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC
| COST PROPOSAL | DATE | SHEET 1 OF 1 | |||
| PROJECT | BASIS FOR ESTIMATE | ||||
| CLT Storage Building | STANDARD DESIGN | ||||
| LOCATION | DRAWING REF. NO. | PROJECT DESIGN | |||
| Charlotte, NC | OTHER (SPECIFY) | ||||
| PREPARING ORGANIZATION | SPEC. REF. NO. |
CLASS OF WORK ESTIMATOR CHECKED BY
| ITEM | QUANTITY | MATERIAL COST ($) | LABOR COST ($) | EQUIPMENT COST ($) | TOTAL | ||||
| UNIT | NO. | PER | PER | PER | ITEM | ||||
| MEAS. | UNITS | UNIT | TOTAL | UNIT | TOTAL | UNIT | TOTAL | COST ($) |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| Overhead | 0% | $0.00 | $0.00 | $0.00 | $0.00 |
| Profit | 0% | $0.00 | $0.00 | $0.00 | $0.00 |
| Bond | $0.00 | $0.00 | $0.00 | $0.00 |
TOTAL COSTS $0.00 $0.00 $0.00 $0.00
File details come from the government source that posted it. Updated .