L23NV310 Various Campuses - Pavement Reconstruction - Full Drawings.pdf
PDF 14 MB Posted
- Attached to
- Various Campuses Pavement Reconstruction
- Solicitation number
- 66160
- Issued by
- Prince William County, Alexandria City, Manassas City, Virginia
About this file
This document appears to be a set of full drawings related to a pavement reconstruction project across various campuses in the state of Virginia. The project is generally described as the reconstruction of various sections of pavement on three campuses located in the jurisdictions of Fairfax County, Prince William County, and Manassas City. The document does not provide additional details on the specific scope of work, item quantities, response dates, due dates, site visits, bidder's meetings and conferences, award dates, or the term of the contract including any renewal options.
The document also does not contain information on pricing terms, set asides, incumbents, current environment, funding requirements and sources, amounts and sources, or any other salient details. The document appears to be strictly the full drawings related to the pavement reconstruction project and does not provide the comprehensive contract opportunity details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHERN VIRGINIA COMMUNITY COLLEGE
Fairfax, VA 22033
P: (703) 246-0028 www.rkk.com
C O
V E
R S
H E
E T
DRAWING NUMBER:DESCRIPTION:
SHEET INDEX
12600 Fair Lakes Circle, Suite 300
SOURCE: U.S.G.S. Quadrangle: Northern, VA
VICINITY MAP
SCALE: 1" = 2000'
Project Locations
VARIOUS CAMPUSES - PAVEMENT RECONSTRUCTION
CONTRACT NO.: VCCS-12212020 1
FOR THE
VIRGINIA COMMUNITY COLLEGE SYSTEM
PROJECT DESCRIPTION:
PROJECT CODE: L23NV310
MARCH 7, 2024
PRIMARY CONTACTS - OWNER:
MANASSAS CONSTRUCTION PLAN
WOODBRIDGE EROSION & SEDIMENT CONTROL PLAN & NARRATIVE
WOODBRIDGE CONSTRUCTION PLAN
ALEXANDRIA EROSION & SEDIMENT CONTROL PLAN & NARRATIVE
ALEXANDRIA CONSTRUCTION PLAN
PAVEMENT MARKING DETAILS
EROSION & SEDIMENT CONTROL DETAILS
ROADWAY DETAILS
GENERAL, SURVEY, AND EROSION & SEDIMENT CONTROL NOTES
LOCATION MAP
COVER SHEET
4(1) - 4(3)
3(1) - 3(3)
2C
2B
2A(1) - 2A(4)
1A
DEQ-CERTIFIED ESC/SWM PLAN REVIEWER
NAME (SIGNATURE) DATE
NAME (PRINTED)
CERTIFICATION # AND EXPIRATION DATE
CERTIFICATION NO:
NAME:
RESPONSIBLE LAND DISTURBER
PHONE: 703-323-3551
ANNANDALE, VA 22003-3796
SUITE 311
CW BUILDING
8333 LITTLE RIVER TURNPIKE
FACILITIES PLANNING & SUPPORT SERVICES
NORTHERN VIRGINIA COMMUNITY COLLEGE
AND PAVEMENT MARKING ADJUSTMENTS.
ADJUSTMENTS, RECONSTRUCTING ONE CURB RAMP,
REPLACING CURB & GUTTER, DRAINAGE INLET TOP
AND MANASSAS. ADDITIONAL IMPROVEMENTS INCLUDE:
COLLEGE (NVCC) CAMPUSES: ALEXANDRIA, WOODBRIDGE,
FOR SITES ON THREE (3) NORTHERN VIRGINIA COMMUNITY
PAVEMENT RECONSTRUCTION IMPROVEMENTS PROPOSED
STORMWATER MANAGEMENT NARRATIVE
REQUIREMENTS.
AND EXEMPT FROM STORMWATER MANAGEMENT
SURFACE, HENCE, IT IS CONSIDERED ROUTINE MAINTENANCE
AN EXISTING ROAD IS BEING POURED WITH AN IMPERVIOUS
MAINTAINS ORIGINAL LINE AND GRADE HYDRAULIC CAPACITY.
PAGE 5 OF THE VCCS AS&S, THIS SITE IMPROVEMENT
MANAGEMENT REQUIREMENTS DO APPLY. HOWEVER, PER
AND STORMWATER MANAGEMENT (VCCS AS&S), THE STORMWATER
AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL
8,267 SF. PER TABLE A-1 IN THE VCCS ANNUAL STANDARDS
ALEXANDRIA - THE DISTURBED AREA AT THIS SITE IS
THERE ARE 3 (THREE) SITES ASSOCIATED WITH THIS PROJECT.
MANAGEMENT REQUIREMENTS DO NOT APPLY.
12,057 SF. PER TABLE A-1 IN THE VCCS AS&S, THE STORMWATER
WOODBRIDGE - THE DISTURBED AREA AT THIS SITE IS
MANAGEMENT REQUIREMENTS DO NOT APPLY.
1,920 SF. PER TABLE A-1 IN THE VCCS AS&S, THE STORMWATER
MANASSAS - THE DISTURBED AREA AT THIS SITE IS
NVCC_Title.dgn
Plotted By: mfohs11:15:06 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
NVCC_Location_Map.dgn
Plotted By: mfohs11:17:06 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
LOCATION MAP
NORTHERN VIRGINIA COMMUNITY COLLEGE
MANASSAS CAMPUS WOODBRIDGE CAMPUS
LEGEND
COUNTY BOUNDARIES
CENTERLINES
ROADWAY
IN
TE
R
STATE
LEESBURG PIKE
ROUTE
IN
TE
RSTATE
CENTERVILLE
ROUTE 50
SEVEN CORNERS
IN
T E
R S
T A
T E
WOODBRIDGE
L O
C A
T
IO
N M
A P
SUDLEY RD
ROUTE 234/
ALEXANDRIA
DALE BLVD
R O
U T E
COUNTY
PRINCE WILLIAM
1A
ALEXANDRIA CAMPUS
CAMPUS D
RIV
E
S U
D L E
Y R
D R
O U
T E
BATTLE
VIEW PKWY
CAMPUS DRIVE
N B
E A
U R E
G A
R D S
T
KIN
G
ST
W B
R A
D D
O C
K R
D
K
IN
G S
T
DAWES
AVE
E C
A M P U S D
R
REED D
RS W
ALTE
R
BRANCH AVE
LIMITS
PAVEMENT RECONSTRUCTION
ALEXANDRIA CAMPUS
R O
U T E
VANTAGE DR
N E
A B S
C O M
IL
L S R
D
C O
L L E
G E D
R
NEABSCO
M
IL
LS
R
D D A L E B
L V
D
IN
T E
R S
T A
T E
LIMITS
PAVEMENT RECONSTRUCTION
WOODBRIDGE CAMPUS
R
ID
G E R
D
IN
F
IN
IT
Y
B A T T L E
V
IE
W P
K W
Y
LIMITS
PAVEMENT RECONSTRUCTION
MANASSAS CAMPUS
FAIRFAX
KING ST
ARLINGTON
MANASSAS
N BEAUREGARD ST
S E
D
IM
E N
T C
O N
T R
O L N
O T
G
N E
R A
L N
O T
E S E
R O
S
IO
N
13.
AND PAVEMENT HAS BEEN PLACED WITH THE PROPER NUMBER OF LAYERS AND THICKNESS AND COMPACTED IN ACCORDANCE
WITH THESE PLANS.
THE OWNER RESERVES THE RIGHT TO HIRE A LICENSED MATERIALS TESTING AGENCY, SUPPORTED BY A REGISTERED
PROFESSIONAL ENGINEER TO PROVIDE ON SITE INSPECTION, CONCRETE TESTING, AND VERIFY IN THE FIELD THAT ALL BACKFILL
12. ALL WORK SHALL BE DONE PER THE REFERENCED STANDARDS/SPECIFICATIONS AND DETAILS PROVIDED ON THESE PLANS.
11. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
9.
VICINITY OF THE SUSPECT MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL NOTIFY THE AE AND OWNER
IMMEDIATELY SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.
IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE ENCOUNTERED DURING EXCAVATION
AND CONSTRUCTION ACTIVITES BASED ON VISUAL, OLFACTORY, OR OTHER EVIDENCE, THE CONTRACTOR SHALL STOP WORK IN THE
8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
7.
AT NO TIME MAY THE CONTRACTOR BLOCK BOTH LANES OF THE ACCESS DRIVES. INCIDENTAL TO THIS PROJECT, THE CONTRACTOR
CONTROL IN A CONSTRUCTION ZONE. FIRE DEPARTMENT ACCESS SHALL BE MAINTAINED AT ALL TIMES.
SHALL PROVIDE FLAG MEN, CONES, SIGNS, BARRIERS, AND OTHER MATERIALS TO COMPLY WITH VDOT STANDARDS FOR TRAFFIC
CONTRACTOR SHALL COMPLY WITH VDOT STANDARDS FOR TRAFFIC CONTROL AROUND CONSTRUCTION AREAS AND SHALL SUBMIT
TO THE NVCC PROJECT MANAGER A TRAFFIC CONTROL PLAN BEFORE STOPPING TRAFFIC ON EITHER LANE OF THE ACCESS DRIVES.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITES SHALL BE IN ACCORDANCE
WITH OSHA STANDARDS AND LOCAL REQUIREMENTS.
3.
CAREFULLY, AND TO REQUEST EXACT FIELD LOCATION OF PUBLIC AND PRIVATE UTILITIES.
THE CONTRACTOR SHALL CALL 811 (MISS UTILITY) AT LEAST 3 WORKING DAYS IN ADVANCE COMMENCEMENT OF THE PLANNED
WORK TO ALLOW TIME FOR MARKING, THAT THE MARKS BE RESPECTED AND PROTECTED, THAT EXCAVATION BE COMPLETED
2. ALL CONSTRUCTION SHALL COMPLY WITH VDOT AND VCCS STANDARDS AND SPECIFICATIONS FOR MATERIALS AND CONSTRUCTION.
1. ONSITE NVCC PROJECT CONTACT: NORTHERN VIRGINIA COMMUNITY COLLEGE FACILITIES PLANNING AND SUPPORT SERVICES
S-1. VERTICAL CONTROL IS BASED ON NAVD 88 DATUM.
S-2. HORIZONTAL CONTROL IS BASED UPON THE VIRGINIA STATE PLAN COODINATE SYSTEM, NAVD 83.
S-4. THIS SURVEY DOES NOT INTEND TO DEPICT ANY WETLANDS, HAZARDOUS WASTE AND ENVIRONMENTAL FEATURES THAT MAY
AFFECT THE PROPERTIES SHOWN HEREON EXCEPT AS SHOWN.
S-5. PIPE MATERIAL TYPES ARE DETERMINED BY OBSERVATIONS TO THE BEST OF OUR ABILITY. PMI DOES NOT WARRANT THE
MATERIAL TYPE OF PIPES LOCATED IN CONFINED OR INACCESSIBLE SPACES.
EROSION & SEDIMENT CONTROL NOTESGENERAL NOTES
SURVEY GENERAL NOTES
6.
ACCORDANCE WITH STANDARD & SPECIFICATION 3.32.
AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS SURFACES (PAVEMENTS, WALKS, ETC.) SHALL
FOLLOW DETAILS PROVIDED BY VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK FOR SITE SPECIFIC SEEDING MIXTURES IN
E-1
SPECIFICATIONS OF THE "VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" (VESCH), VIRGINIA
EROSION AND SEDIMENT AND CONTROL REGULATIONS (9VAC25-840-60).
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION & SEDIMENT CONTROL
PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND
E-2
PRIOR TO THE FINAL INSPECTION.
THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION
CONFERENCE, TWO WEEKS PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND TWO WEEKS
E-4
A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN
APPROVING AUTHORITY.
PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT
E-3 ALL EROSION AND SEDIMENT CONTROL MEASURE SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN
CLEARING.
E-5 INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED TO PREVENT SEDIMENT LADEN RUNOFF
FROM LEAVING THE SITE, AND AS DETERMINED BY THE PLAN APPROVING AUTHORITY OR ENGINEER.
E-6 ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURE AT ALL TIMES DURING
LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
E-7 DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
E-8
MAINTAIN THE EFFECTIVENESS OF THE EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MADE
FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR.
IMMEDIATELY. RECORDS OF ALL INSPECTIONS AND REPAIRS MADE TO EROSION AND SEDIMENT CONTROL
THE CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL FACILITIES PERIODICALLY AND
AFTER EACH RUNOFF - PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO
E-9
DAILY DURING PROLONGED RAINFALL, AND WEEKLY WHEN NO RAINFALL EVENTS OCCUR.
THE RESPONSIBLE LAND DISTURBER SHALL INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND
MEASURES FOR PROPER INSTALLATION AND DEFICIENCIES IMMEDIATELY AFTER EACH RAINFALL; AT LEAST
E-10 STORE EXCAVATED TOPSOIL IN TOPSOIL STOCKPILES WITHIN THE LIMITS OF DISTURBANCE WITH SILT FENCE
ON THE DOWN SLOPE SIDE IN ACCORDANCE WITH VESCH (LATEST EDITION).
E-12 SEED AND MULCH ALL SOIL STOCKPILES AND MATERIALS LEFT UNDISTURBED IN ACCORDANCE WITH VESCH
(LATEST EDITION).
E-11 ALL DISTURBED AREAS NOT OTHERWISE HARDSCAPED AND STABLIZED ARE TO BE SEEDED IN ACCORDANCE
WITH THE SPECIFICATIONS AND THE VESCH (LATEST EDITION).
E-13 STORM DRAIN INLET PROTECTION MUST REMAIN IN-PLACE FOR THE DURATION OF THE PROJECT.
E-14
ACTIVITIES, INCLUDING BUT NOT LIMITES TO, ON-SITE OR OFFSITE BORROW, ON-SITE OR OFFSITE
FOR WHICH THE PLANS DO NOT SPECIFICALLY ADDRESS EROSION AND SEDIMENT CONTROL AND
STORMWATER MANAGEMENT, THE CONTRACTOR SHALL CONTACT ENGINEER TO DETERMINE WHAT E&SC AND
SWM MEASURES ARE NECESSARY. THE CONTRACTOR SHALL COMPLETELY SATISFY ALL REQUIREMENTS OF
THE DIVISION OF SOIL AND WATER CONSERVATION INCLUDING PROVIDING A DESIGNATED, CERTIFIED
STOCKPILING OR DISPOSAL OF WASTE MATERIALS. BEFORE UNDERTAKING ANY LAND DISTURBING ACTIVITY
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ANY AND ALL EROSION AND SEDIMENT
CONTROL (E&SC) AND STORMWATER MANAGEMENT (SWM) REQUIREMENTS FOR ANY LAND DISTURBING
"RESPONSIBLE LAND DISTURBER" BEFORE CONTINUING WITH THE CONCERNED ACTIVITY.
14.
WASTES SHALL BE REMOVED AND DISPOSED OF IN A MANNER CONSISTENT WITH THE HANDLING OF OTHER CONSTRUCTION WASTES.
CONSTRUCTION WASH WATERS AND SHALL NOT BE DISCHARGED TO SURFACE WATERS.
LIQUID CONCRETE WASTES SHALL BE REMOVED AND DISPOSED OF IN A MANNER CONSISTENT WITH THE HANDLING OF OTHER
DIRECT CONCRETE WASH WATER INTO A LEAK-PROOF CONTAINER OR LEAK-PROOF SETTLING BASIN. THE CONTAINER OR BASIN
SHALL BE DESIGNED SO THAT NO OVERFLOWS CAN OCCUR DUE TO INADEQUATE SIZING OR PRECIPITATION. HARDENED CONCRETE
S-3. THE MERIDIAN SOURCE OF THIS TOPOGRAPHIC SURVEY IS BASED ON THE VIRGINIA STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983. THE PROJECT MERIDIAN WAS ESTABLISHED USING GPS METHODS AND THE UNITS ARE U.S SURVEY FEET.
S-6.
MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED.
THE GROUND RUN TOPOGRAPHY WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE AND SUPERVISION OF ROBERTO TORRES, LS. THE FIELD DATA WAS OBTAINED ON 12-04-2023. THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA (INCLUDING METADATA) MEETS
5.
POSSIBLE. NOTE IN SOME LOCATIONS EXISTING GRADES (ROADWAY AND PARKING ENTRANCEWAYS) ALREADY EXCEED ADA LIMITS.
CONTRACTOR TO ENSURE CONCTRETE FORMS ARE ARE REVIEWED FOR ADA COMPLIANCE PRIOR TO POUR.
CURB OPENINGS, LANDINGS, RAMPS AND SIDEWALKS SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE FEDERAL AMERICANS
WITH DISABILITIES ACT AND WITH STATE AND LOCAL LAWS AND REGULATIONS (WHICHEVER ARE MORE STRINGENT), WHEREVER
15. POSITIVE DRAINAGE SHOULD BE CONFIRMED BY THE CONTRACTOR TO ENSURE NO STANDING WATER WILL BE PRESENT AFTER
FINAL CONSTRUCTION.
10.
GOOD HOUSEKEEPING/POLLUTION PREVENTION MANUAL (SEE NVCC WEBSITE FOR LATEST COPY).
CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF SUCH OCCURS. THE CONTRACTOR SHALL BE RESPONSIBLE TO ADHERE TO THE NOVA
NVCC_General_Notes.dgn
Plotted By: mfohs11:18:33 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
R O
A D
W A
Y D
E T
A
IL
2A(1)
NVCC_Roadway Details.dgn
Plotted By: mfohs11:19:02 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
A D
W A
Y D
E T
A
IL
S
2A(2)
NOTES:
1.
WARNING SURFACES, PUBLIC RIGHT OF WAY ACCESSIBILITY GUIDELINES (PROWAG). DETECTABLE WARNING SURFACES
APPLICATION ON EXISTING CONCRETE WALKWAY SURFACES.
HTTPS://WWW.ACCESS-BOARD.GOV/PROWAG/CHAPTER-R3-TECHNICAL-REQUIREMENTS/
#R305-DECTECTABLE-WARNING-SURFACES
SHALL BE SAFETY YELLOW COLORED, MADE OF POLYMER COMPOSITE (OR EQUAL) AND CONFIGURED FOR SURFACE
PROVIDE DETECTABLE WARNING SURFACES AT EVERY LOCATION A PEDESTRIAN WALKWAY TRANSITIONS BETWEEN
SIDEWALK AND STREET. THESE SHALL BE IN CONFORMANCE WITH THE REQUIREMENTS OF R305.1 FOR DETECTABLE
NVCC_Roadway Details 2.dgn
Plotted By: mfohs11:20:22 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
A D
W A
Y D
E T
A
IL
S
2A(3)
NOTES:
1.
2.
NVCC_Roadway Details 3.dgn
Plotted By: mfohs11:20:45 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
PAVEMENT TYPICAL SECTIONS
ALEXANDRIA CAMPUS
1" ASPHALT CONCRETE TYPE SM-9.5E ESTIMATED AT 110 LBS/SY
2.5" ASPHALT CONCRETE BASE COURSE TYPE BM-25.0D
WOODBRIDGE CAMPUS
1" ASPHALT CONCRETE TYPE SM-9.5E ESTIMATED AT 110 LBS/SY
3" ASPHALT CONCRETE BASE COURSE TYPE BM-25.0D
6" AGGREGATE BASE MATERIAL, TYPE I, SIZE NO. 21A
6" AGGREGATE BASE MATERIAL, TYPE I, SIZE NO. 21A
MANASSAS CAMPUS
2.5" ASPHALT CONCRETE BASE COURSE TYPE BM-25.0D
6" AGGREGATE BASE MATERIAL, TYPE I, SIZE NO. 21A
2.25" ASPHALT CONCRETE TYPE SM-9.5E ESTIMATED AT 247.5 LBS/SY
2.25" ASPHALT CONCRETE TYPE IM-19.0E ESTIMATED AT 247.5 LBS/SY
BID TABULATION.
REIMBURSED ON A PER CY BASIS MATCHING THE RATE IN THE
AGGREGATE NEEDS REPLACED, THE CONTRACTOR WILL BE
FIELD CONDITIONS DETERMINE MORE THAN 20% OF THE EXISTING
BID TABULATION AS A CONSTRUCTION UNIT PRICE BID ITEM. IF
REPLACED AT EACH SITE AND IS QUANTIFIED AS SUCH IN THE
20% OF THE EXISTING AGGREGATE SUBBASE MATERIAL WILL NEED
DESIGNER, IN COORDINATION WITH OWNER, IS ESTIMATING ONLY
2020 ROAD & BRIDGE SPECIFICATONS SECTION 310.
PROPOSED PAVEMENT. CONTRACTOR SHALL ADHERE TO VDOT
CONCRETE FACES (E.G EX. CURB & GUTTER) WHEN ABUTTED TO
CONTRACTOR SHALL APPLY TACK COAT TO EXISTING VERTICAL
Crape Myrtle
Handr ail
C o n c . W a lk
Asphalt
Grass
G r a s s
Conc. Grass
NPZ
Grass
M e ta l S ig n
(T y p
30" C&G
30" C&G
F F
E =1 .1
HCR
D it c h
U n d e r d r a in
1 - Sty. F
r. Bldg.
A s p h a lt
C o ll e g e
D r iv e
Asphalt Private
Road
Conc. W alk
Inv. Out=129.78 Rim=133.73 Curb Inlet
Approx . Dir.
13713
.7
.5
.2
.6
.9
.1
.8
.3
7.
.17
.0
.11
.12
.4
.0
.18
.12
.15
7.
.10
.2
.13
.15
.10
.13
WM
Center Inv.=127.68 Rim=135.36 Manhole San. Sewer
P o s s ib le
L a te r a l
R O
A D
W A
Y D
E T
A
IL
S
SCALE
5'' 10'
R=5'
R=5'
L=6'
S =1.7
S=4.5%
S=4.0%
L=6'
S =2 .0
S =7 .2
S =8 .1%
L =9
L =9
S=0.7%
S=2.0%
S =2 .0
S=2%
S=2%
EP=136.85
EP=137.20
EP=137.88
EP=137.50
FC/FL=137.06
FC/FL=137.16
FC/FL=137.46
FC/FL=137.63
FC/FL=137.90
TSW/TC=137.33
TSW/TC=137.47
TSW/TC=138.36
TSW/TC=138.40
TC=138.25
TSW/FC=137.75
TC=137.73
TSW/FC=137.23
FC/FL=136.84
S=5%
ABBREVIATIONS
TSW = TOP OF SIDEWALK (SURFACE)
TC = TOP OF CURB
S = SLOPE
L = LENGTH
FL = FLOW LINE
FC = FACE OF CURB
EP = EDGE OF PAVEMENT
S=0.5%
EP=137.67
EP=137.10
L=6'
2A(4)
8.25' 2.0'
0.5' MIN.
0.5' MIN.
2 1
N: 6910567.6700
E: 11827908.3707
N: 6910569.2132
E: 11827919.8214
N: 6910571.9181
E: 11827902.7532
N: 6910587.6097
E: 11827900.5115
CURB RAMP NOTES:
L =8 .2
L =8 .3
L=6.35'
4" AGGREGATE SUBBASE MATERIAL, TYPE 1, SIZE NO. 21A
4" HYDRAULIC CEMENT CONCRETE SIDEWALK
1.0'
HORIZONTAL DATUM = NAD 83 & VERTICAL DATUM = NAVD 88
REVIEWED FOR ADA COMPLIANCE PRIOR TO POUR
CONTRACTOR TO ENSURE CONCRETE FORMS ARE
BOUNDARIES OF PROPOSED IMPROVEMENTS
GUTTER AND EXISTING SIDEWALK WITHIN
CONTRACTOR SHALL DEMO EXISTING CURB AND
3.
2.
1.
1.0'
NVCC_Roadway Details 4.dgn
Plotted By: mfohs11:25:19 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
WOODBRIDGE CURB RAMP DETAIL
A
A
SECTION A-A
SCALE: N.T.S
LEGEND
TYPICAL
FOR PAVEMENT
SEE SHEET 2A(3)
ST'D. CG-6 REQ'D.
1/2" EXPANSION JOINT FILLER
ST'D. CG-2 REQ'D.
2B
R
O S
IO
N S
E D
IM
E N
T C
O N
T R
O L D
E T
A
IL
TEMPORARY SEEDING PERMANENT SEEDING
L23NV310_02B.dgn
Plotted By: marnone11:08:05 AM
3/22/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
Crape Myrtle
Handr ail
C o n c . W a lk
Asphalt
Grass
G r a s s
Conc. Grass
NPZ
M e ta l S p
30" C&G
F F
E =1 .1
HCR
D it c h
U n d e r d r a in
A s p h a lt
C o ll e g e
D r iv e
Conc. W alk
D
C o n c . W a lk
A s p h a lt
N P
Z
N P
Z
N P
Z
Grass
Grass
Grass
LSA
Gravel
Conc.
C
G
R C P
P a r k in g A s p h a lt
P a r k in g A s p h a lt
D e c id
M e ta l S ig n
(T y p
A s p h a lt
N P
Z
Conc.
B o ll a r d
(T y p
R o ll s to p
C
G
P a r k in g A s p h a lt
P a r k in g A s p h a lt
Guardra il
Gravel
Gravel
C o n ta in e r
S h ip p in g
NVCC_PAVE MARK Details 1.dgn
Plotted By: mfohs11:28:13 AM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
SCALE
5'' 10'
P A
V E
M E
N T M
A R
K
IN
G D
E T
A
IL
S
2C
SCALE
5'' 10'
SCALE
5'' 10'
15'
2.5' SPACING
30 DEGREE SKEW
TYPE B, CLASS 1, WHITE, 6" WIDTH
10' 10'
2.5
WHITE, 6" WIDTH
TYPE B, CLASS 1,
PAVEMENT MARKING NOTES
10' 10'
WHITE, 6" WIDTH
TYPE B, CLASS 1
2' SPACING
45 DEGREE SKEW
12" HEIGHT
8" WIDTH
WHITE
TYPE A
8" WIDTH, 12" HEIGHT
TYPE A, WHITE
CONTRACTOR TO COORDINATE PARKING SPACE LETTERING WITH OWNER3.
(CLASS B, TYPE 1) PER VDOT STANDARDS
ALL MARKINGS, EXCLUDING THE LETTERING, ARE TO BE THERMOPLASTIC2.
- VDOT ROAD AND BRIDGE STANDARDS
- THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
AND ANY REVISIONS HERETO:
PAVEMENT MARKINGS ARE TO BE IN ACCORDANCE WITH THE FOLLOWING1.
NVCC_Alex_Construction_Plan.dgn
Plotted By: mfohs1:02:58 PM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
A L E
X A
N D
R
IA
C
A M
P U
S C
O N
S T
R U
C T
IO
N P
L A
N
LEGEND
SCALE
25' 50'
Pavement Demo
Denotes Asphalt
Pavement Reconstruction
Denotes Full Depth
T E
R R
A C
D
IV
E
BRANCH AVE
C O U R T
T E R R
A
EXTENSION
CAMPUS
CENTER
CONCERT HALL & ARTS
RACHEL M. SCHLESINGER
D R
IV
E
E
C A
M P U
EXISTING DROP INLET
DO NOT DISTURB
LOADING DOCK
LIMITS & LEADING UP TO THE
CURB WITHIN RECONSTRUCTION
REPAINT FIRE LANE YELLOW
CURB FACE REQUIRING REPAIR
APPROXIMATE LOCATION OF CRACKED
CONCRETE PAVEMENT
DO NOT DISTURB EXISTING
VDOT ST'D. CG-6 CURB & GUTTER
EXISTING CURB & GUTTER WITH
REPLACE APPROXIMATELY 70 LF OF
INLET TOP
RESET EXISTING DROP
COORDINATION WITH NVCC
DETERMINED TO BE DEFICIENT IN
ASPHALT SUBBASE WHERE IT'S
903 SY OF ASPHALT AND REPLACE
DEMO & REPLACE APPROXIMATELY
ASPHALT SAWCUT
PROPOSED
APARTMENTS LLC
LARCHMONT VILLAGE
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
359,161 Sq. Ft.
ACCOUNT #43408000
PARCEL ID #003.04-01-11
ALEXANDRIA, VA 22302
3400 N BEAUREGARD ST
NVCC_Alex_E&S_Plan.dgn
Plotted By: mfohs1:03:54 PM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
IP-B
TSF-B
IP-B
IP-B
PS
TSF-B
IP-B
TSF-A
IP-A
Limits of Disturbance
St'd. EC-6
Inlet Protection Type A or B, St'd. EC-5
Temp. Silt Fence Type A or B, S E
D
IM
E N
T C
O N
T R
O L P
L
N
L E
X A
N D
R
IA
C
A M
P U
S E
R O
S
IO
N
3(1)
SCALE
25' 50'
LEGEND
Existing Property Line
Resource Protection Area
0.361 AC
DA 1
0.334 AC
DA 2
0.134 AC
DA 3
PS Permanent Seeding
EXTENSION
CAMPUS
CENTER
CONCERT HALL & ARTS
RACHEL M. SCHLESINGER
T E
R R
A
IV
E
BRANCH AVE
D R
IV
E
E
C A
M P U
U R T
T E R R
A
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
359,161 Sq. Ft.
ACCOUNT #43408000
PARCEL ID #003.04-01-11
ALEXANDRIA, VA 22302
3400 N BEAUREGARD ST
APARTMENTS LLC
LARCHMONT VILLAGE
596,419 Sq. Ft.
ACCOUNT #43570000
PARCEL ID #003.03-01-12
RICHMOND, VA 23236-3473
300 ARBORETUM PLACE, SUITE 200
STATE BD COMM. COLLEGES
COMMONWEALTH OF VIRGINIA
EQUIPMENT & VEHICLES WILL REGULARLY DRIVE OVER EARTH
NOTE: CONSTRUCTION ENTRACE SHALL BE USED WHERE CONSTRUCTION
FLOW CONTAINING SEDIMENT
DETERMINED TO DRAIN SITE RUNOFF
DRAIN ESC PROTECTION IF IT IS
CONTRACTOR TO PROVIDE TRENCH
NVCC_Alex_ESC_3(2).dgn
Plotted By: mfohs1:18:50 PM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
SOIL ID NUMBERS SOIL SERIES NAME SOIL DRAINAGE
IS THE SITE LOCATED WITHIN NATURALLY OCCURRING ASBESTOS SOILS?
YES NO
HSGEROSION
SOILS TABLE
N.T.S.
SOILS MAP
C
100 C
SOURCE: USDA NATURAL RESOURCES CONSERVATION SERVICE
91C
WELL DRAINED
WELL DRAINED MEDIUM B
3(2)
KINGSTOWNE - SANDY CLAY LOAM VERY HIGH
N/AN/AN/A
VERY HIGHWELL DRAINED
URBAN LAND
SASSAFRAS - MARUMSCO COMPLEX
URBAN LAND - KINGSTOWNE COMPLEX
S E
D
IM
E N
T C
O N
T R
O L N
A R
R A
T
IV
E
A L E
X A
N D
R
IA
C
A M
P U
S E
R O
S
IO
N
SEE COMPLETED CHECKLIST SUBMITTED AS A SEPARATE DOCUMENT.
ESC CHECKLIST
DIRECTION TOWARDS THE NORTHEAST CORNER OF THE PROJECT AREA THAT RISE BETWEEN 2-7%.
OVERLAY DISTRICT (WSPOD). THERE IS ONE LOCATION OF THE PROJECT THAT CONTAINS CRITICAL SLOPES IN THE
THE PROJECT AREA IS OUTSIDE THE FLOODPLAIN, RESOURCE PROTECTION AREA (RPA), AND WATER SUPPLY PROTECTION
CRITICAL AREAS
OF LABOR AND INDUSTRY AND SPECIAL GUIDANCE HAS BEEN ISSUED BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY.
SOILS ARE REQUIRED BY THE OCCUPATIONAL SAFETY AND HEALTH REGULATIONS ENFORCED BY THE VIRGINIA DEPARTMENT
GRIDS ON THE COUNTY WEBSITE. SPECIAL PRECAUTIONS REGARDING THESE SOILS OR FILL ORIGINATING FROM THESE
AREAS THAT MAY CONTAIN NATURALLY OCCURRING ASBESTOS SOILS ARE LOCATED ON THE ORANGE SOILS TAX MAP
AND TABLE ON THIS SHEET.
WHILE GROUP C SOILS DRAIN RATHER SLOWLY WITH A HIGHER RUNOFF POTENTIAL PER NCRS CLASSIFICATION. SEE SOILS MAP
HYDROLOGICAL COMPUTATIONS. SOIL GROUPS A AND B ARE CONSIDERED TO DRAIN WELL WITH LOWER RUNOFF POTENTIAL, THE SOILS ARE CONSIDERED TO BE ASSOCIATED WITH THE HYDROLOGICAL SOIL GROUPS A, B, AND C FOR USE IN
MINIMAL EXCAVATION IS ASSOCIATED WITH THIS PROJECT, THEREFORE GEOTECHNICAL INVESTIGATION WAS NOT WARRANTED.
EXCEEDING EXCAVATION DEPTH NEEDED FOR THE PROPOSED WORK, SO NOT ANTICIPATED AS AN ISSUE FOR THIS PROJECT.
SERVICE ROAD BEHIND RACHEL M. SCHLESINGER HALL. DEPTH OF RESTRICTIVE LAYERS FOR EACH SOIL TYPE IS 0-70 INCHES, IMPROVEMENTS, AND SASSAFRAS - MARUMSCO COMPLEX (MAP UNIT 91C) NORTH AND EAST OF IMPROVEMENTS TO THE
LAND (MAP UNIT 95), URBAN LAND - KINGSTOWN COMPLEX (MAP UNIT 100) LOCATED IN THE PARKING LOT NORTHWEST OF
ACCORDING TO THE NRCS SOIL SURVEY MAPS, THE PROJECT AREA INCLUDES SANDY CLAY LOAM (MAP UNIT 66), URBAN
SOILS
AND/OR DISPOSAL SITES, AND THESE SHALL BE IN ACCORDANCE WITH VDOT REGULATIONS.
PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION OF ACCEPTABLE BORROW
SHOULD DEEM ANY OFF-SITE WORK IS NECESSARY THEN ALL NECESSARY EASEMENTS AND PERMITS ARE TO BE OBTAINED
AND AGRICULTRURAL. THIS PROJECT DOES NOT PROPOSE ANY OFF-SITE WORK. IN THE EVENT THAT THE CONTRACTOR
THE AREAS ADJACENT TO THIS PROJECT ARE RECREATIONAL, SUBURBAN RESIDENTIAL, GENERAL BUSINESS, OFFICE, ADJACENT AREAS
SUPPORT OF DRAINAGE AREAS, NVCC MAINTAINS CAMPUS STORM SEWER MAPPING AVAILABLE UPON REQUEST.
STREET. THIS ROADSIDE CHANNEL THEN DISCHARGES TO FOUR MILE RUN. FOR STORM SEWER INFORMATION IN
EARTHEN CHANNEL THAT DISCHARGES TO THE SOUTH OF THE CAMPUS BOUNDARY ALONG NORTH BEAUREGARD
ULTIMATELY DISCHARGES VIA CAMPUS STORM SEWER (VIA TWO CURB INLETS) AND SUBSEQUENTLY TO AN OPEN
NORTHEAST CORNER OF THE PROJECT AREA THAT RISES BETWEEN 2-7%. THE RUNOFF FROM THE WORK AREA
AREAS ARE VERY MILD, RANGING FROM 0 - 2%, WITH THE EXCEPTION OF THE LAND SLOPING TOWARDS THE
AREAS OF MANAGED GRASS (TURF), EXISTING SIDEWALK AND EXISTING PAVEMENT. SLOPES WITHIN THE WORK
THE PROPOSED WORK IS ALL WITHIN THE NVCC CAMPUS AND INCLUDES THE WORKED DESCRIBED ABOVE IN
EXISTING SITE CONDITIONS
AND SURROUNDING AREAS UPON FINAL CONSTRUCTION.
EXISTING MH/DI WITH 170 LF OF PIPE CLEANOUT. THERE WILL BE NO GRADE CHANGES TO THE PROJECT
CURB RESPRAY, AND REPAIR TO A CRACKED CURB FACE. THERE WILL ALSO BE MODIFICATION TO AN
COLLEGE (NVCC) IN ALEXANDRIA, VIRGINIA, TO INCLUDE 70 LF OF CURB REPLACEMENT, 735 LF OF
THIS PROJECT IS GENERALLY LINEAR IN NATURE, PROVIDING IMPROVEMENTS AT NORTHERN VIRGINIA COMMUNITY
PROJECT DESCRIPTION
NVCC_Alex_ESC_3(3).dgn
Plotted By: mfohs1:06:46 PM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
EROSION AND SEDIMENT CONTROL
I. EROSION CONTROL NARRATIVE
II. EROSION, SEDIMENTATION, AND LAND CONSERVATION NOTES
1. MEASURES TO CONTROL EROSION AND SILTATION SHALL BE PROVIDED PURSUANT TO AND IN COMPLIANCE WITH CURRENT FEDERAL, STATE
AND LOCAL REGULATIONS. THE INFORMATION CONTAINED IN THE CONSTRUCTION PLANS AND/OR THE APPROVAL OF THE PLANS SHALL IN
NO WAY RELIEVE THE CONTRACTOR OR HIS AGENT OF ANY LEGAL RESPONSIBILITY WHICH MAY BE REQUIRED BY THE CODE OF VIRGINIA
2. ALL AREAS, ON OR OFF-SITE, WHICH ARE DISTURBED BY THIS CONSTRUCTION AND WHICH ARE NOT PAVED OR BUILT UPON, SHALL BE
ADEQUATELY STABILIZED TO CONTROL EROSION AND SEDIMENTATION. ACCEPTABLE STABILIZATION SHALL CONSIST OF PERMANENT GRASS
SEED MIXTURE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL SLOPES 2:1 AND OR GREATER SHALL BE SODDED AND
STAKED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE ENGINEER.
3. ANY DISTURBED AREA NOT PAVED, PERMANENTLY SEEDED, SODDED, OR BUILT BY 1ST OF NOVEMBER OR DISTURBED AFTER THAT DATE, IS
TO BE SEEDED WITHIN 14 DAYS WITH OATS, ABRUZZI RYE OR APPROVED EQUIVALENT, AND MULCHED WITH HAY OR STRAW MULCH AT A
RATE OF 2 TONS PER ACRE AND OVERSEED BY APRIL 15. FOR ADDITIONAL DETAILS, REFER TO THE CURRENT EDITION OF VESCH AND
THE PFM.
4. NO ONGOING OR CONTINUOUS ACTIVE AREAS MAY BE LEFT DENUDED FOR A PERIOD LONGER THAN 14 DAYS EXCEPT FOR THAT PORTION
OF THE SITE IN WHICH WORK WILL BE CONTINUOUS BEYOND 14 DAYS.
5. TEMPORARY DIVERSIONS SEEDED AND MULCHED OR STAKED STRAW BALE DIVERSIONS AND OTHER CONTROL MEASURES NECESSARY ARE
TO BE PLACED AS INDICATED ON THE DRAWINGS PRIOR TO OR AS THE FIRST STEP IN EXCAVATION.
6. WHEN IN ACCORDANCE WITH STATE AND FEDERAL JOB SAFETY REQUIREMENTS, ALL EXCAVATED MATERIAL IS TO BE PLACED ON THE
UPHILL SIDE OF TRENCHES. NO MATERIAL IS TO BE PLACED IN STREAMS. ANY STOCKPILED MATERIAL WHICH WILL REMAIN IN PLACE
LONGER THAN 14 DAYS IS TO BE SEEDED FOR TEMPORARY VEGETATION AND MULCHED. WHERE SPOIL IS PLACED ON THE DOWNHILL SIDE
OF TRENCH, IT IS TO BE BACKSLOPED TO DRAIN TOWARD THE TRENCH. WHEN NECESSARY TO DEWATER THE TRENCH, THE PUMP
DISCHARGE HOSE MUST OUTLET IN A STABILIZED AREA OR A SEDIMENT BASIN.
7. WHERE STREAM CROSSINGS ARE REQUIRED FOR EQUIPMENT, TEMPORARY CULVERTS SHALL BE PROVIDED.
8. DURING CONSTRUCTION, ALL STORM SEWER INLETS WILL BE PROTECTED BY SILT TRAPS, MAINTAINED AND MODIFIED AS REQUIRED BY
CONSTRUCTION PROGRESS.
9. ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED OR SODDED WITHIN 5 DAYS AFTER BACKFILL OF THE APPLICABLE TRENCH
SECTION, IN ACCORDANCE WITH THE PROVISIONS CONTAINED IN THE PROJECT SPECIFICATIONS RELATING TO SEEDING AND SODDING.
SPEED IS THE ESSENTIAL LAND CONSERVATION ELEMENT FOR A LINEAR PROJECT.
10. FOR FURTHER REQUIREMENTS AND DETAILS OF TREE PRESERVATION, PLANTING, EROSION AND SEDIMENT CONTROL, REFER TO THE PFM
AND/OR THE VESCH.
11. ALL EROSION AND SEDIMENT CONTROLS SHALL BE REMOVED WITHIN 30 DAYS AFTER THE PROJECT IS STABILIZED.
12. AN EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION IS REQUIRED FOR ALL LAND DISTURBING ACTIVITIES WITHIN VDOT
RIGHT-OF-WAY.
13. THE CONTRACTOR SHALL PROPERLY INSTALL AND MAINTAIN EROSION AND SEDIMENT CONTROLS FOR THE LIFE OF THE PROJECT AND
ROUTINELY CHECK CONTROL DEVICES BEFORE, DURING, AND AFTER STORM EVENTS.
14. AN 80% GERMINATION MUST BE OBTAINED PRIOR TO VDOT PERMIT RELEASE.
15.
ON A SEPARATE SHEET AND SHOULD BE NOTED ON PLAN COVER SHEET.
AREAS AS THEY BECOME STABILIZED. FOR ADDITIONAL DETAILS, REFER TO THE CURRENT EDITION OF THE VESCH AND THE PFM.
7 DAYS AFTER FINAL GRADING. ALL TEMPORARY SEDIMENT CONTROLS AND MECHANICAL DEVICES SHALL BE REMOVED FROM CONTRIBUTING
BE IN CONFORMANCE WITH CURRENT VDOT REQUIREMENTS. SEDIMENT CONTROLS AND MECHANICAL DEVICES SHALL BE REMOVED WITHIN
SPECIFICATIONS OR COUNTY APPROVED ALTERNATE SEED FOR AREAS LOCATED WITHIN THE VDOT RIGHT-OF-WAY, THE SEED MIX SHALL
31 TALL FESCUE AND KENTUCKY BLUEGRASS IN ACCORDANCE WITH DEPARTMENT OF PUBLIC WORKS AND ENVIRONMENTAL SERVICES
APPLIED, SEEDED AND MULCHED. FOR THE AREAS OUTSIDE THE VDOT RIGHT-OF-WAY, THE SEED SHALL CONSIST OF A MATURE KENTUCKY
AND STAKED. AS DISTURBED AREAS, NOT TO BE CONSTRUCTED UPON, ARE FINAL GRADED, THEY SHALL BE PREPARED, LIME AND FERTILIZER
AND SEDIMENT CONTROL HANDBOOK (VESCH). SLOPE AREAS THAT CANNOT BE ADEQUATELY STABILIZED BY SEEDING, SHALL BE SODDED
ALL MECHANICAL AND VEGETATIVE PRACTICES SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN THE VIRGINIA EROSION
PRIOR TO ANY LAND DISTURBING OPERATIONS, THE EROSION CONTROLS, AS SPECIFIED BY THE ENGINEERING PLANS, SHALL BE INSTALLED.
ADDITIONAL LAND CONSERVATION NOTES AND PROJECT SPECIFIC EROSION AND SEDIMENT CONTROL NARRATIVES, IF PROVIDED, WILL BE
OR ANY ORDINANCE ENACTED BY THE COUNTY OF ALEXANDRIA.
III. EROSION CONTROL MINIMUM STANDARDS
III. EROSION CONTROL MINIMUM STANDARDS (CONTINUED) III. EROSION CONTROL MINIMUM STANDARDS (CONTINUED)
h. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
FROM THE FACILITY TO THE RECEIVING CHANNEL.
SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS
REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM
DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
EROSION & SEDIMENT CONTROL MINIMUM STANDARDS (#19 CONTINUED)
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS
RUNOFF RATE FROM A 10-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR
TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK
3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM
APPURTENANCES;
2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE 10-YEAR STORM IS CONTAINED WITHIN THE
STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS;
1) IMPROVE THE CHANNELS TO A CONDITION WHERE A 10-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR
ADEQUATE, THE APPLICANT SHALL:
c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT
OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE
OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE
MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT
NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (B) ALL PREVIOUSLY CONSTRUCTED
2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL
CHANNEL IS 100 TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION;
1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
OR PIPE SYSTEM SHALL BE PERFORMED.
RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE
ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:
CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN
RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS
DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT
SHALL REMOVE ESC MEASURES AND PROVIDE STABILIZATION AS SPECIFIED IN THIS STANDARD.
SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ACTION: THE CONTRACTOR
VCCS. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES
STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STANDARD.
MANNER. ACTION: THE CONTRACTOR SHALL ADDRESS ANY SEDIMENT TRANSPORT FROM THE SITE AS SPECIFIED IN THIS
SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS
END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE
MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
e. RE-STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
PROMOTE STABILIZATION.
d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND
OFF-SITE PROPERTY.
TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR
c. EFFLUENT FROM DE-WATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT
b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
a. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
OTHER APPLICABLE CRITERIA:
UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO15.
COMPLETED. ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS14.
WATERCOURSES SHALL BE MET. ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE13.
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON-ERODIBLE MATERIAL SHALL BE PROVIDED.
WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH12.
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS.
CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING
WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT,11.
CONVEYANCE CHANNEL AND RECEIVING CHANNEL. ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE10.
MEASURES SPECIFIED ON THE ESC PLAN, INCLUDING USE OF SPECIFIED SILT FENCE AND INLET PROTECTION.
TREATED TO REMOVE SEDIMENT. ACTION: THIS STANDARD IS ADDRESSED WITH THE IMPLEMENTATION OF THE ESC
SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE
ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT9.
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 8.
TO THIS PROJECT.
TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. ACTION: THIS STANDARD IS NOT APPLICABLE
CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE7.
3(3)ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH
CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT6.
TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED
THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS
BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN
EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT
SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN ORb.
THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA ANDa.
BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
IMMEDIATELY AFTER INSTALLATION. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED
STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS5.
WHERE APPLICABLE.
SEQUENCE OF CONSTRUCTION ON THIS SHEET, ACTION: THIS STANDARD IS ADDRESSED WITH ADHERENCE TO THE
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP4.
AREAS NOT OTHERWISE PERMANENTLY STABILIZED AS SHOWN ON THE ESC PLAN AND PER THIS STANDARD.
MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. ACTION: PERMANENT STABILIZATION SHALL BE PROVIDED FOR
PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.3.
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
FROM THE PROJECT SITE.
STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED
WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT
DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED2.
ACTION: THIS STANDARD IS NOT APPLICABLE TO THIS PROJECT.
PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS.
GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL1.
SPECIFICALLY FOR THIS PROJECT IN BOLD.
PLAN MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS, AS APPLICABLE AND REFLECTED
THE FOLLOWING NOTES ARE PROVIDED AS REQUIRED BY THE VCCS STANDARDS AND SPECIFICATIONS FOR ESC AND SWM. THE
WHERE APPLICABLE.
ACTION: THIS STANDARD IS ADDRESSED WITH ADHERENCE TO THE SEQUENCE OF CONSTRUCTION ON THIS SHEET, IMPACT ON DOWN-GRADIENT PROPERTIES OR RESOURCES, SATISFYING 9VAC25-870-66.D OF THE VSMP REGULATIONS.
RUNOFF FROM THE INCREASE IN IMPERVIOUS COVER (2,907 SQUARE FEET) DOES NOT DEMONSTRATE POTENTIAL NEGATIVE
WATERWAYS. AS DESCRIBED WITHIN THE ESC NARRATIVE ON THIS SHEET, COMPUTATIONS DEMONSTRATE THE INCREASE IN
ACTION: THE CONTRACTOR SHALL ADHERE TO THIS PLAN THAT PROVIDES PROTECTION TO DOWNSTREAM PROPERTIES AND
MANAGEMENT PROGRAM (VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS SUBDIVISION.
n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER
§ 62.1-44.15:34 C 7 OF THE ACT.
AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT SHALL APPLY, OR (II) ARE EXEMPT PURSUANT TO
OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION, IN WHICH CASE THE FLOW RATE CAPACITY
TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47 OR GRANDFATHERING IN 9VAC25-870-48
ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES (I) ARE IN ACCORDANCE WITH PROVISIONS FOR
REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND
§ 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY
m. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF
OR 62.1-44.15:65 OF THE ACT.
FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54
IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS
VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE
THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF
THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED
ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS
24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE
TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A
RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED
FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW
l. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY
STATE.
IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE
k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES
CALCULATIONS.
HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING
INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT.
COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS.
j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY.
i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL
S E
D
IM
E N
T C
O N
T R
O L N
A R
R A
T
IV
L E
X A
N D
R
IA
C
A M
P U
S E
R O
S
IO
N
ESC STANDARDS IN THIS AREA.
AND SOD. THIS PORTION OF THE PROJECT WILL BE CONSIDERED COMPLETE WHEN SOD HAS BEEN ESTABLISHED TO VIRGINIA
AFTER ALL AREAS HAVE BEEN STABILIZED, REMOVE ESC MEASURES AND RESTORE LOCATION OF SILT FENCE WITH TOPSOILING 7.
PROVIDE NEW ASPHALT PAVEMENT AS SPECIFIED.6.
AS WORK PROGRESSES.
AND PAVEMENT RESTRIPING. PROVIDE TOPSOIL, MULCHING AND SEEDING (OR SOD) AS NEEDED ON AN ONGOING BASIS
COMMENCE WORK ON TO-BE-REPLACED CURB AND GUTTER, CURB AND GUTTER FACE REPAIR, CURB AND GUTTER RESPRAY, 5.
CLEAN OUT EACH SPECIFIED DI/MH AS WELL AS THEIR RESPECTED PIPE CONNECTION.
MODIFY EXISTING DI/MH NORTHEAST OF RACHEL M. SCHLESINGER HALL, AS SPECIFIED, AND ADD NEW DI/MH.4.
SCHLESIGNER CONCERT HALL.
INSTALL SILT FENCE AND INLET PROTECTION AT EXISTING DROP INLETS (DI) NORTH OF THE LOADING BAY BEHIND RACHEL M.3.
STORMWATER MANAGEMENT REGULATIONS FOR MATERIALS USED AND INSTALLATION.
SPECIFICATIONS, VIRGINIA EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS, AND VIRGINIA
ALL CONSTRUCTION SHALL COMPLY WITH VCCS STANDARD SPECS, VDOT ROAD AND BRIDGE STANDARDS AND2.
FIRM. PROVIDE CONSTRUCTION SCHEDULE.
HOLD ONSITE PRE-CONSTRUCTION CONFERENCE WITH REPRESENTATIVE(S) FROM VCCS AND DESIGN ENGINEERING1.
SEQUENCE OF CONSTRUCTION
STANDARDS AND SPECIFICATIONS ESC INSPECTIONS CHECKLIST, LATEST EDITION.
MAINTENANCE SHALL BE PROVIDED CONSISTENT WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH)
- PERIODICALLY AS DEEMED NECESSARY BY THE VCCS (VCCS INSPECTIONS ONLY).
- AT THE COMPLETION OF THE PROJECT; AND
- WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT;
- AT LEAST ONCE DURING EVERY TWO-WEEK PERIOD;
- AFTER THE INSTALLATION OF INITIAL ESC MEASURES;
VCCS STANDARDS AND SPECIFICATIONS FOR ESC AS FOLLOWS:
INSPECTIONS SHALL BE CONDUCTED INDEPENDENTLY BY BOTH VCCS AND CONTRACTOR AT THE FREQUENCY REQUIRED IN THE
INSPECTIONS AND MAINTENANCE
EQUIPMENT.
STD. 3.32 - PERMANENT SEEDING (PS) WILL BE USED AS PERMANENT STABILIZATION IN ALL AREAS DISTURBED BY CONSTRUCTION
PERMANENT STABILIZATION
FIRST AND REMAIN UNTIL WORK SITES ARE STABILIZED.
STD. 3.07 - INLET PROTECTION (IP) IS SPECIFIED TO PREVENT SEDIMENT FROM ENTERING CURB DROP INLETS TO BE PUT IN
ON VERY FLAT TERRAIN WHERE SILT FENCE WOULD SERVE NO PURPOSE.
THE ACCESS ROAD BEHIND RACHEL M. SCHLESINGER HALL. FOR ALL OTHER AREAS, THERE ARE SHEET FLOW CONDITIONS
STD. 3.05 - SILT FENCE (SF) IS SPECIFIED TO PREVENT SEDIMENT FROM LEAVING THE SITE AREA OFF THE EAST SIDE OF
NEEDED.
SURFACE FROM HEAVY EQUIPMENT. SINCE ALMOST ALL OF THE DISTURBANCE IS "REPAVING", THIS IS REQUIRED WHERE
STD. 3.03 - CONSTRUCTION ROAD STABILIZATION (CRS) SHALL BE USED TO PROVIDE STABILIZATION AND PROTECT THE LAND
NEEDED.
AT THE INGRESS/EGRESS LOCATION. SINCE ALMOST ALL OF THE DISTURBANCE IS "REPAVING", THIS IS REQUIRED WHERE
STD. 3.02 - CONSTRUCTION ENTRANCES (CE) ARE SPECIFIED TO REDUCE THE AMOUNT OF MUD TRANSPORTED OFF THE SITE
TEMPORARY SEDIMENT TRAPPING AND STABILIZATION MEASURES
Crape Myrtle
P o s t
S ig n
Handr ail
C o n c . W a lk
C o n c . W a lk
Asphalt
A s p h a lt
Grass
G r a s s
Conc. Grass
N P
Z
N P
Z
N P
Z
N P
Z
NPZ
Grass
Grass
Grass
LSA
M e ta l S p
Conc.
Gravel
Conc.
B o ll a r d
(T y p
R o ll s to p
30" C&G
C
G
30" C&G
F F
E =1 .1
HCR
D it c h
U n d e r d r a in
1 - Sty. F
r. Bldg.
1 - Sty. F
r. Bldg.
R C P
A s p h a lt
C o ll e g e
D r iv e
Asphalt Private
Road
P a r k in g A s p h a lt
P a r k in g A s p h a lt
P a r k in g A s p h a lt
P a r k in g A s p h a lt
Guardra il
Gravel
Gravel
D e c id
M e ta l S ig n
(T y p
C o n ta in e r
S h ip p in g
Conc. W alk
Inv. Out=129.78 Rim=133.73 Curb Inlet
Inv. In=129.36 Rim=133.79 Curb Inlet
Approx . Dir.
CO
S
WV
WM
Center Inv.=127.68 Rim=135.36 Manhole San. Sewer
Po ss ib le L at er al
P o s s ib le
L a te r a l
A p p r o x
D ir
NVCC_Wood_Construction_Plan.dgn
Plotted By: mfohs1:07:54 PM
3/7/2024
PROJECT CODE: L23NV310
Date
Drawn
Checked
Designed
N o
D a te
P u rp o s e o f
D o c u m e n t Is s u e
Sheet No.
P A
V E
M E
N T R
E C
O N
S T
U R
C T
IO
N P
L A
N S
N O
R T
H E
R N V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
RK&K Project No.
21327.07
PERMIT DOCUMENTS
03-07-24
MF
BC
MA
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
VEHICLE
STATE
RESERVED
LEGEND
SCALE
25' 50'
Pavement Demo
Denotes Asphalt
Pavement Reconstruction
Denotes Full Depth
W O
O D
B R
ID
G E C
A M
P U
S C
O N
S T
R U
C T
IO
N P
L A
N
Sidewalk
New Concrete
BUILDING
MAINTENANCE
COMMUNITY COLLEGES
STATE BOARD FOR
COMMONWEALTH OF VA
COMMUNITY COLLEGES
STATE BOARD FOR
COMMONWEALTH OF VA
0.696 Ac.
GPIN: 8291-80-2386
FAIRFAX, VA 22030
3924…