Revised Work Summary Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_L15PS00485_Amd_000002.pdf | ||
| Specifications_(2).pdf | ||
| Sol_L15PS00485_Amd_000001.pdf | ||
| L15PS00485_SF_1442.pdf | ||
| Sol_L15PS00485.pdf | ||
| Specifications.pdf | ||
| Bidschedule.pdf | ||
| General_Decision_CA150029.pdf | ||
| Drawings.pdf | ||
| presolann.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Summary Sheet
Cosumnes River Preserve Boardwalk Reconstruction
LLCAC08000-01009-Amended1
Boardwalk Reconstruction Notes
Unless otherwise noted below:
1. Clear vegetative matter along boardwalk alignment per Section 02231 – Clearing and
Grubbing.
2. Establish and maintain horizontal and vertical alignment control of boardwalk, concrete trail and viewing platform.
3. Maintain the material staging area in a neat and orderly fashion.
Stationing
Location
Work
Description
Boardwalk Reconstruction
0+00 Project begins at end of existing concrete trail.
0+00 – 2+08 Demolish existing wooden boardwalk. Construct new boardwalk on existing alignment.
0+76 Centerline of existing boardwalk turnout and bench. Construct new turnout and bench of like dimensions and configuration.
0+98 Angle point in boardwalk centerline.
2+08 End section of new boardwalk construction.
2+08 – 4+15 Existing section of concrete trail. No work to be done. The portion of this concrete trail crossing levee road is 12 inches thick.
4+15 – 9+76 Demolish existing wooden boardwalk. Construct new boardwalk on existing alignment.
5+32 Centerline of existing boardwalk turnout and bench. Construct new turnout and bench of like dimensions and configuration.
5+63 Angle point in boardwalk centerline.
6+64 Angle point in boardwalk centerline.
7+29 Centerline of existing boardwalk turnout and bench. Construct new turnout and bench of like dimensions and configuration.
7+60 Angle point in boardwalk centerline.
8+69 Angle point in boardwalk centerline.
9+76 End section of new boardwalk construction.
9+76 – 12+17 Existing section of concrete trail. The portion of this concrete trail crossing levee road is 12 inches thick.
11+40(+/-) Demolish damaged concrete trail and install new concrete trail beginning at trail painted red and continuing for +/- 78 feet.
12+01 – 12+35 Demolish existing concrete trail and boardwalk. Construct new boardwalk on existing alignment and extend boardwalk an additional 20 feet to point of access to new viewing platform.
12+35 Demolish existing wooden viewing platform and concrete footings.
Construct new viewing platform and concrete footings of like octagonal shape and 50% larger dimension. Refer to Specification Section 02822 –
Boardwalk for salient features. Projects ends at new viewing platform.
Sheet 3 of 7 Total
Work Summary Sheet
LLCAC08000-01009-Amended2
New Boardwalk Construction
Stationing
Location
Work
Description
0+00 Project begins at end of existing concrete trail.
0+00 – 0+30 (+/-) Construct new boardwalk on alignment to be determined in the field. End station to be determined in the field.
0+30 (+/-) Construct new viewing platform and concrete footings of like octagonal shape and dimension as the viewing platform at Station 12+35. Refer to
Specification Section 02822 – Boardwalk for salient features. Projects ends at new viewing platform.
Sheet 4 of 7 Total