KUKUI (WLB 225A) DS SPECIFICATIONS.pdf
PDF 4 MB Posted
- Attached to
- CGC KUKUI DOCKSIDE REPAIRS Federal contract opportunity
- Solicitation number
- 70Z08522QP4505400
About this file
This solicitation document outlines the requirements for dockside repairs to the Coast Guard Cutter KUKUI. The solicitation is seeking bids for work items including cleaning and inspecting various tanks; cleaning, inspecting, and hydrotesting heat exchangers; inspecting and testing hull fittings for mooring and towing; preserving portions of potable water and superstructure surfaces; providing temporary services to the cutter; renewing external watertight doors; and other repair and maintenance tasks. Bids are due by August 15, 2022 and the period of performance for the contract is expected to be from September 2022 through February 2023 at the contractor's facility. The Department of Homeland Security Coast Guard is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00002 - KUKUI DS FY22.pdf | ||
| KUKUI (WLB 225A) DS FQ2 NLR 22R1.pdf | ||
| Combined SynopsisSol KUKUI DS FY22 - Revised 19 Jan 22.doc | DOC document | |
| Amendment 00001 - KUKUI DS FY22.pdf | ||
| KUKUI DS FY22 JA.pdf | ||
| Copy of CGC KUKUI PRICING SHEET.xls | XLS spreadsheet | |
| Attachment - Past Performance Information Form CGC KUKUI.doc | DOC document | |
| Attachment -Request_for_Clarification CGC KUKUI.doc | DOC document | |
| Combined Synopsis Sol KUKUI DS FY22.doc | DOC document | |
| Attachment - USCG Ombudsman Notice KUKUI.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC KUKUI (WLB 203)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2022
Developed By: LT Rollolazo
(Rev-0, 15 September 2021)
USCGC KUKUI (WLB-225A) DOCKSIDE AVAILABILITY FY2022
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics ............................................................................................................................. xvi General Requirements WORK ITEM 1: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 2: Heat Exchangers, Clean, Inspect And Hydro WORK ITEM 3: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 4: Tanks, Potable Water, Preserve, Partial, WORK ITEM 5: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 6: Superstructure, Preserve, Partial WORK ITEM 7: Temporary Services, Provide - Cutter WORK ITEM 8: Watertight Door (External), Renew WORK ITEM 9: Berthing Racks, Lockers, Renew WORK ITEM 10: Crane Cab Window, Repair WORK ITEM 11: Firemain Valves, Overhaul or Renew WORK ITEM 12: Auxiliary Sea Water System Valves, Overhaul Or Renew WORK ITEM 13: MDE & SSDG Exhaust Stack Insulation, Renew WORK ITEM 14: Eliminator Transformer, Renew WORK ITEM 15: MDE Exhaust Mounts Renew WORK ITEM 16: Watertight Hatch (External DC Deck and Below), Renew WORK ITEM 17: Fuel Valve (Pneumatic), Overhaul or Renew WORK ITEM 18: Vent Fans and Motors, Overhaul (Non-Machinery Spaces) WORK ITEM 19: Hydraulic Steering Cooler, Install WORK ITEM 20: SSDG, Heat Exchanger, Modify WORK ITEM 21: VR3/VR6 Voltage Regulator, Replace WORK ITEM 22: Hydraulic Power Unit Cooler, Replace WORK ITEM 23: Thruster Quick Disconnects (QDs), Install WORK ITEM 24: Deck Covering (Interior Wet/Dry), Renew Epoxy Resin WORK ITEM 25: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect WORK ITEM 26: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 27: Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect WORK ITEM 28: Tanks, Potable Water, Clean and Inspect WORK ITEM 29: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 30: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 31: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 32: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning WORK ITEM 33: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning WORK ITEM 34: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 35: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 36: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift . 173 WORK ITEM 37: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 38: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 39: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 40: Commissary Hoist, Inspect and Service WORK ITEM 41: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 42: Sewage Holding Tanks, Clean and Inspect iii (Rev-0)
WORK ITEM 43: Grey Water Piping, Clean and Flush WORK ITEM 44: Sewage Piping, Clean and Flush WORK ITEM 45: Tanks (Grey Water Holding), Preserve “Partial” WORK ITEM 46: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 47: Potable Water Pump Room Deck, Preserve WORK ITEM 48: Bow Thruster Machinery Room Upper Deck, Preserve WORK ITEM 49: Compartment Decks, Preserve WORK ITEM 50: Single Point Davit, Inspect and Service WORK ITEM 51: Weather Deck Plating, Repair iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing (225B-WLB-320-001 REV.AN), ELECTRICAL ONE-LINE WIRING DIAGRAM
Coast Guard Drawing (225-WLB-202-007), VOLTAGE REGULATOR REPLACEMENT FOR THE
SHIP SERVICE AND EMERGENCY GENERATORS
Coast Guard Drawing (225-WLB-310-001), DIGITAL VOLTAGE REGULATOR INSTALLATION
INTO THE SHIP SERVICE AND EMERGENCY GENERATOR SWITCHBOARDS
Coast Guard Drawing (225-WLB-310-002), VOLTAGE REGULATOR REMOVAL MODELS
VR3/VR6 FROM THE SHIP SERVICE AND EMERGENCY GENERATOR SWITCHBOARDS
Coast Guard Drawing (225-WLB-324-201), SHIP SERVICE SWITCHBOARD
Coast Guard Drawing (225-WLB-324-202), EMERGENCY SWITCHBOARD
Coast Guard Drawing 225 910-001, Rev E, Hull Block 910, Panels
Coast Guard Drawing 225 WLB 573-001, Rev K, Buoy Handling System Arrangement
Coast Guard Drawing 225 WLB 167-001, Rev W, Structural Closures
Coast Guard Drawing 225 WLB 180-002, Rev G, Foundations, Block 910
Coast Guard Drawing 225 WLB 201-001, Rev G, Machinery Spaces Arrangement
Coast Guard Drawing 225 WLB 256-001, Rev U, Seawater Cooling System Diagram
Coast Guard Drawing 225 WLB 259-001, Rev D, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225 WLB 259-005, Rev D, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225 WLB 259-006, Rev E, Combustion Intake & Exhaust A&D Hull Blocks 970 &
Coast Guard Drawing 225 WLB 262-001, Rev K, Lube Oil System Diagram
Coast Guard Drawing 225 WLB 262-005, Rev K, Lube Oil System A/D – Hull Blocks 910, 930, 940, 950
& 970
Coast Guard Drawing 225 WLB 512-001, Rev G, HVAC Diagrammatic
Coast Guard Drawing 225 WLB 512-007, Rev E, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225 WLB 528-001, Rev H, Plumbing and Interior Deck Drains
Coast Guard Drawing 225 WLB 528-002, Rev E, Weather Deck Drains Diagram
Coast Guard Drawing 225 WLB 541-001, Rev L, Fuel Oil System Diagram
Coast Guard Drawing 225 WLB 541-005, Rev F, FUEL OIL TRANSFER SYS A&D FRAME 66 FWD, HULL BLOCKS 910, 920, 930
Coast Guard Drawing 225 WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank vi (Rev-0)
Coast Guard Drawing 225 WLB 541-020, Rev -, Mods To Fuel Oil Cooling System and Associated
Piping
Coast Guard Drawing 225 WLB 549-001, Rev F, Onboard Lubrication Requirements
Coast Guard Drawing 225 WLB 551-001, Rev K, Compressed Air System Diagram
Coast Guard Drawing 225 WLB 551-202, Rev-, Starting Air Receiver
Coast Guard Drawing 225 WLB 551-203, Rev-, Whistle Air Receiver
Coast Guard Drawing 225 WLB 551-204, Rev-, Service Air Receiver
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
Coast Guard Drawing 225 WLB 556-003, Rev C, Forward Hydraulic System A&D
Coast Guard Drawing 225 WLB 568-202, Rev N, Stern Thruster Assembly (Model 125 Fixed Pitch)
Coast Guard Drawing 225 WLB 573-002, Rev D, Weight Handling System Arrangement
Coast Guard Drawing 225 WLB 573-11, Rev -, ATON Tie Downs
Coast Guard Drawing 225 WLB 582-001, Rev E, Mooring and Towing A & D
Coast Guard Drawing 225 WLB 593-001, Rev G, Sewage and Waste Water System Diagrams
Coast Guard Drawing 225 WLB 601-001, Rev V; General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 225 WLB 601-002, Rev Y, Booklet of General Drawings
Coast Guard Drawing 225 WLB 635-001, Rev J, Hull, Thermal, & Acoustic Insulation Schedule
Coast Guard Drawing 225 WLB 672-001, Rev F, Storerooms, Cargo Stowage and Ship Store
Arrangement and Details
Coast Guard Drawing 225 WLB 801-005, Rev D, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225 WLB 801-020, Rev A, Tank CAPACITY - 95% Curves (203, 204, 205)
Coast Guard Drawing 225 WLB 901-003, Rev C, Hull Block 901 Block Assembly
Coast Guard Drawing 225B WLB 556-005, Rev D, Aft Hydraulic System A/D, Fr 66 Aft, Block 950, 970
Coast Guard Drawing 225-WLB 162-1, Rev H, Stacks and Uptakes
Coast Guard Drawing 225-WLB 256-203, Rev -; Aux Seawater System & Details (KUKUI)
Coast Guard Drawing 225-WLB 259-6, Rev F, Combustion Intake & Exhaust A&D Hull Blocks 970 &
Coast Guard Drawing 225-WLB 505-1, Rev C; General Requirements for Piping Systems
Coast Guard Drawing 225-WLB 508-1, Rev -, Thermal Insulation for Machinery, Eqpt & Piping
Coast Guard Drawing 225-WLB 509-1, Rev -, Duct, Truck, And Machinery Insulations Details
Coast Guard Drawing 225-WLB 521-1, Rev K, Firemain System Diagram
Coast Guard Drawing 225-WLB 556-1, Rev G, Hydraulic System Diagram
Coast Guard Drawing 225-WLB 556-205, Rev K, Fwd & Buoy Deck Mach HPU
Coast Guard Drawing 225-WLB 556-3, Rev C, FORWARD Hydraulic System A&D, FR 30 Fwd (901 &
910)
Coast Guard Drawing 225-WLB 556-4, Rev D, FORWARD Hydraulic System a & D Frame 66 Aft, Hull
Blocks 920 & 930
Coast Guard Drawing 225-WLB 556-56, Rev A, FORWARD HPU Cooler Replacement
Coast Guard Drawing 225-WLB 561-005, Rev -; Steering Gear Hydraulic Diagram
Coast Guard Drawing 225-WLB 180-010, Rev E; FOUNDATION - GENERATORS
Coast Guard Drawing 225-WLB 256-009, Rev. -, Heat Exchanger Mods for CAT 3508 SSDG
Coast Guard Drawing 225-WLB 310-202, Rev _, SHIP SERVICE DIESEL GENERATOR vii (Rev-0)
Coast Guard Drawing 225-WLB 631-02, Rev B, Painting Schedule, Hulls 202-205
Coast Guard Drawing 225-WLB 634-01, Rev F, Deck Covering Schedule
Coast Guard Drawing 225-WLB 671-001, Rev. H Misc. Stowage Arrangement & Details
Coast Guard Drawing 225-WLB 801-15, Rev D, Scantlings, Decks & Platforms
Coast Guard Drawing 225-WLB 801-17, Rev C, Scantlings, Superstructure
Coast Guard Drawing 225-WLB-201-2, Rev B, Access Removal Routes
Coast Guard Drawing 225-WLB-573-001 Rev P, Buoy Handling System Arrangement
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-
1/4"
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
NAVSEA Drawing 803-6397268, Rev -, Doors WT Quick Acting Arrangement
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B-WLB 512-002, Rev C, Ventilation Schedule
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 10033, SWBS 311, Sep 2015, Digital Voltage Regulator
(CDVR)
Coast Guard Technical Publication (TP) 11101, SWBS 583, Section A (SWBS 583A), Davit, Single Point
Slewing Arm Model - RAD30 - 15.5 (BMD-710)
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3523, SWBS 241-A, Nov 2007, Reduction Gear - Model
96DHCMG-CP
Coast Guard Technical Publication (TP) 3524, SWBS 245-A, May 2009, Propeller System, CPP - Model
Coast Guard Technical Publication (TP) 3530A, 0, MANUFACTURER'S INSTRUCTION BOOK -
SWBS GROUP(S) 310
Coast Guard Technical Publication (TP) 3530B, 0, MANUFACTURER'S INSTRUCTION BOOK -
SWBS GROUP(S) 310
Coast Guard Technical Publication (TP) 3534A, SWBS 324, Mar 2000, SWITCHBOARDS, SHIP
SERVICE AND EMERGENCY DIESEL GENERATOR — MODEL D213041-M1
Coast Guard Technical Publication (TP) 3534B, SWBS 324, Jan 1997, SWITCHBOARDS, SHIP
SERVICE AND EMERGENCY DIESEL GENERATOR — MODEL D213041-M1
Coast Guard Technical Publication (TP) 3536A, SWBS 324, Jun 2003, Switchboard, Main, Emergency, and Thruster
Coast Guard Technical Publication (TP) 3552, Jan 2005, Technical Manual for Ship Fuel and Fuel
Compensating System
Coast Guard Technical Publication (TP) 3553, 07-JAN-97, Manufacturer's Instruction Book-SWBS
Group(s) 551-556
Coast Guard Technical Publication (TP) 3555, Jan 2012, Steering Gear Systems viii (Rev-0)
Coast Guard Technical Publication (TP) 3556, SWBS 568, Section A, Oct 2018, Bow and Stern Thruster
– Model 125 (225 WLB A-Class)
Coast Guard Technical Publication (TP) 3556, SWBS 568, Section E, Oct 2018, Bow and Stern Thruster
– Model 125/3 STAY/FP (225 WLB B-Class)
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section B, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”)
Coast Guard Technical Publication (TP) 3953, SWBS 568, Apr 2012, Bow & Stern Thruster DSD-412
Systems Drive (225’ WLB Class Cutters)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2020, General
Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Preserve Ship
Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2020, Install New
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End ix (Rev-0)
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) A106, 2015, Standard Specification for Seamless Carbon Steel Pipe, for
High-Temperature Service
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, 2015, Standard Practice for Commercial Packaging
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
ASTM International (ASTM) F992, 2011, Standard Specification for Valve Label Plates
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Caterpillar CDVR Manufacturer’s Specification, RENR7941-02, October 2007
CDVR Software Configuration Guide
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
International Standard Organization (ISO) 2953, 2000, Mechanical Vibration, Balancing Machines, Description and Evaluation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves x (Rev-0)
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-DTL-24244, May 2000, Insulation Material, With Special Corrosion, Chloride, and Fluoride
Requirements
MIL-I-16411, Nov 1988, Insulation Felt, Thermal, Glass Fiber
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-Y-1140, Sep 1985, Yarn, Cord, Sleeving, Cloth, And Tape- Glass
MIRUS Eliminator series transformer, Operations and Maintenance Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Technical Publication TP 10512, Section 573, 23 October 2019
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
8 N 26 x 66 inches Quick-
Acting Watertight
Door, Steel, 10-Dog, LH Swing w/ 9 inch diameter fixed light
2 ea. 13,800.00
8 N 36 x 66 inches Quick-
Acting Watertight
Door, Steel, 10-Dog, RH Swing, w/ 9 inch diameter fixed light
1 ea. 13,000.00
9 N Berth Crew, Double
Tier, 3 High, Aluminum, Install light
P/N 330-01-23 each berth head 1-92-1-L
Fl-3306-25 SHT 94 Part
No.640-02-24A
1 1,300.00
9 N Locker, Crew, Right
Hand, Aluminum, Subbase P/N 640-02-
96 and Subbase P/N
640-02-96A 1-92-1-L
Fl-3306-25 SHT 7 TWI P/N
912-8030-2 Part No.640-02-25
3 1,000.00
9 N Locker, Crew, Left
Hand, Aluminum, Subbase P/N 640-02-
96 and Subbase P/N
640-01-96A 1-92-1-L
Fl-3306-25 SHT 7 TWI P/N
912-8030-1 Part No.640-02-
25A
3 1,000.00
9 N Subbase, 4” x 20” x
48” Steel, P/N 640-02-
96, (1) to Mount (2)
P/N’s 25, (1) to Mount
(2) P/N’s 25A
1-92-1-L
TWI P/N 919-5550-96 2 1,000.00
9 N Subbase, 4” x 24” x
40” Steel, P/N 640-02-
96A, to Mount (1) 25
& (1) 25A Back to
Back
1-92-1-L
1 1,000.00
14 N 5-7 Eliminator, Phase
Shifting Auto
Transformer
Model 5/7-480-750-TC 1 ea. 13,500.00
16 N 24 Inches x 36 Inches
C.O., RSD, WTRTT, 4
Dog, Hinged on 36
1 ea. 8,000.00 xii (Rev-0)
Inches RH Side, Hatch
Coaming 6 Inch Height
19 N Heat Exchanger
(37”x12” and 4” thick)
ITT Model P7A-8-TK 2 $10,000.00
19 N Thermostatic Valve AMOT Model CM – Bronze
Body 1-7/8― -12
2 $1,500.00
21 N **Voltage Regulator
Assembly, Digital
(CDVR)
NSN: 2920-01-536-9275
(Caterpillar: 314-7755)
3 ea
21 N Carol Brand Cable AWC P/N: C8101 100 ft
21 Y *Compact Disc:
CDVR PC Software &
TCTO Documents
N/A 1 ea
22 N Tranter Cooler PN:UXP-005-M-6-UI-50 2 $5653.00
38 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
38 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
38 N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
38 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
38 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
38 N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
38 N Sun Sandwich Relief
Valves
NSN: 4820-01-439-2451 2 ea. 900.00
38 Y Level Wind Hydraulic
Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
38 N 3:1 Pilot Ratio, Vented
Counterbalance Valve
Assembly
NSN: 4820-01-563-5841 1 ea 98.70
38 N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
38 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00
38 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
38 N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
38 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
38 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
39 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47
39 N Hardware Kit, Mechanical
NSN: 2030-01-485-7215 2 ea. 538.91
50 N Swing Brake Seal Kit NSN: 5330-01-390-3514 PN:
90-016-2011
2 ea 68.45
50 N Swing Brake Disc Kit NSN: 3010-01-464-1040 PN:
90-016-2131
2 ea 187.20
50 N Swing Holding Valve NSN: 4820-01-466-4918 PN:
CBEA-LHV-YHL (Sun
Hydraulics)
1 ea 251.50
50 N Wire Rope Assembly NSN: 4010-01-620-9604 PN: 1 ea 660.00 xiii (Rev-0)
JWCG062100PL
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Tanks, Dirty Oil and Waste, Clean and Inspect
2 Heat Exchangers, Clean, Inspect And Hydro
4 Tanks, Potable Water, Preserve, Partial, 6 Superstructure, Preserve, Partial
7 Temporary Services, Provide - Cutter
25 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect
27 Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect
28 Tanks, Potable Water, Clean and Inspect
29 Hydraulically Operated Cargo Hatch, Inspect and Service
30 Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean
31 Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean
32 Vent Ducts, Engine And Motor Room, All, Commercial Cleaning
33 Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning
34 Vent Ducts, Laundry Exhaust, Commercial Cleaning
35 Vent Ducts, All Other, Commercial Cleaning
36 Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift
38 Hydraulic Inhaul Winch, Inspect And Service
39 Mechanical Chain Stoppers, Inspect and Service
40 Commissary Hoist, Inspect and Service
41 Grey Water Holding Tanks, Clean and Inspect
42 Sewage Holding Tanks, Clean and Inspect xv (Rev-0)
44 Sewage Piping, Clean and Flush
47 Potable Water Pump Room Deck, Preserve
49 Compartment Decks, Preserve
50 Single Point Davit, Inspect and Service xvi (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (A-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1929.74 Long Tons SW
Light ship displacement 1544.38 Long Tons SW
Minimum operating displacement 1906.70 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0121_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-0) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
7 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
10 (Rev-0)
12317_ESD_0121_FLT
REC_12310_FLT_225’ WLB ‘A’ Class (ALL) (0121)
WORK ITEM 1: Tanks, Dirty Oil and Waste, Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 – TANKS
TYPE OF TANK LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Dirty Oil 3-77-0-F 586
Oily Water 3-74-0-F 937
Waste Oil 4-60-1-F 1,786 113
Waste Oil 4-71-0-F 606 109
Oily Water 4-60-2-F 1,875 142
Sludge 4-74-2-F 200 4
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 601-002, Rev Y, Booklet of General Drawings
Coast Guard Drawing 225 WLB 801-005, Rev D, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225 WLB 801-020, Rev A, Tank CAPACITY - 95% Curves (203, 204, 205)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
11 (Rev-0)
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 The Contractor must remove up to a total of 1000 gallons of waste oil and oily water, to facilitate gas-freeing. Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard
Personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
TLI’s for tank(s) listed in paragraph 1.1 (Intent)
3.4 Plug log. The Contractor must keep a written record of all plugs put in any tanks vents. A separate list must be kept for each tank being entered.
3.4.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.4.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.5 Cleaning requirements. The Contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Use Coast Guard drawings 225 WLB 601-002, 225 WLB 801-005 and 225 WLB 801-020
12 (Rev-0) for guidance. Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.6 Tank content and waste disposal. The Contractor must dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.7 Inspection. The Contractor must visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
Tank level indicator (TLI) and/or float switch condition.
Sounding tube and striker plate condition.
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.8 Tank closing. The Contractor must ensure that the tank(s) remain open for at least 24 hours after completion of all authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.9 Operational test, post repairs. After completion of work and in the presence of the Coast Guard
Inspector, the Contractor must thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition. Submit a CFR.
TLI’s for tank listed in paragraph 1.1 (Intent)
4. NOTES
4.1 The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
13 (Rev-0)
25610_ESD_0121_FLT
REC_25610_FLT_225’ WLB (‘A’ Class: Hulls 201-205) (0610)
WORK ITEM 2: Heat Exchangers, Clean, Inspect And Hydro
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following heat exchanger(s):
TABLE 1 – HEAT EXCHANGERS
DESCRIPTION LOCATION QTY
MDE jacket water 3-61-0-E 2
CPP hydraulic oil 4-66-0-E 1
Reduction Gear lube oil 4-66-0-E 1
SSDG jacket water 3-61-0-E 2
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 201-001, Rev G, Machinery Spaces Arrangement
Coast Guard Drawing 225 WLB 256-001, Rev U, Seawater Cooling System Diagram
Coast Guard Drawing 225 WLB 541-001, Rev L, Fuel Oil System Diagram
Coast Guard Drawing 225 WLB 541-020, Rev -, Mods To Fuel Oil Cooling System and
Associated Piping
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
Coast Guard Drawing 225 WLB 556-003, Rev C, Forward Hydraulic System A&D
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3523, SWBS 241-A, Nov 2007, Reduction Gear - Model
96DHCMG-CP
Coast Guard Technical Publication (TP) 3524, SWBS 245-A, May 2009, Propeller System, CPP -
Model 102
14 (Rev-0)
General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary Hull Accesses
OTHER REFERENCES
Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.3.1 Install blanks on the open ends of piping to prevent any contamination or foreign debris from entering the affected systems.