KTCGate_Tabulation.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Electric Gate Installation
- Solicitation number
- S-KS2410-00014467
- Issued by
- Marion County, Oregon
About this file
The document is a Pricing Submittal Form for a state or local government procurement opportunity, likely in Oregon based on the OregonBuys reference. The form provides a structured template for vendors to submit pricing for various line items, with options for a base bid and potential alternates. The form allows bidders to provide lump sum pricing for different quantities and units of measure, including line items measured in lump sum (LS), square yards (SY), tons, and linear feet (LF). The document includes provisions for unit pricing, which can be used for potential contract modifications and changes to the work scope.
The pricing submittal instructions emphasize the importance of completing all required information accurately, warning that incomplete submissions may result in bid rejection. The form includes space for bidders to detail total costs for up to six items, with the ability to add unit prices for specific work modifications. A key requirement is that unit prices must be provided, and failure to do so could lead to offer rejection. The document appears to be part of a competitive bidding process that allows for flexible pricing structures and potential adjustments to the project scope through pre-established unit pricing mechanisms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| [Insert OregonBuys Number] |
| PRICING SUBMITTAL FORM |
| PRICING SUBMITTAL INSTRUCTIONS: |
| Offerors shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addendum, Offerors shall use the Addendum form to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addendum, Offerors shall follow the instructions in the Addendum for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form, as modified by subsequent Addenda, may result in Bid rejection as non-responsive. |
| (AGENCY) selects one of the following: |
| BASE BID: To include all Work described in the ITB, Plans, Specifications and any issued Addenda. |
| LUMP SUM: $_________________________ |
| OR |
| BASE BID and ALTERNATES: To include all Work described in the ITB, Plans, Specifications and any issued Addenda. |
| BASE BID - LUMP SUM: $_________________________ |
| ALTERNATE [Insert alternate number and if ADD or DELETE] |
| [Insert alternate description] |
| LUMP SUM: $_________________________ |
| ---------------------------------------------------------------------- |
| [Add additional alternate's if necessary] |
| TOTAL BASE BID AND ALL ALTERNATES: $__________________________ |
| OR |
| [Number of items dependent upon solicitation needs] |
| Item Description Quantity/Unit Unit Total |
| Cost Cost |
| 1. ____________ 1 / LS __________ |
| 2. ______________ 1 / LS __________ |
| 3. ________________________ # / SY _________ __________ |
| 4. _________________________ # / Ton _________ __________ |
| 5. ___________________________ # / LF _________ __________ |
| 6. _________________________ # / LS _________ __________ |
| TOTAL ITEMS 1 - 6 _____________ |
| [The following unit price provisions are added on an as-needed basis with either of the above. These provisions establish fixed unit pricing for the identified changes to the Work.] |
| The “unit price” addressed in this section is an amount offered by Offerors as a price per unit of measure specified in any unit price item(s) listed below for materials or services added or deducted from the Contract sum by appropriate Contract modifications. These unit prices will be used in conjunction with the General Conditions, Section D, for changes to the Work, as required by the Owner. The Work described below in the unit price items is part of the Base Bid, Alternates or Items listed above. The unit price is being established only for Work added or deducted from the Base Bid, Alternates or Items listed above. |
| Offerors shall provide unit pricing for the following items. These unit prices will not be used in the method of award, except in the event of a discrepancy between extended prices and unit prices, in which case the unit prices shall prevail. Failure of the Offeror to provide these unit prices shall result in Offer rejection. |
| ====================================================================== |
| UNIT PRICE NO. 1: [Identify the item to be supplied and delivered and identify and other requirements for the item]. |
| PRICE PER [Insert unit of measure]: $____________________________ |
| ====================================================================== |
| [Add additional items if necessary] |
| BIDDER NAME: |
File details come from the government source that posted it. Updated .