Addendum 1_25-003ITB KTCGate.pdf
PDF 90 KB Posted
- Attached to
- Electric Gate Installation
- Solicitation number
- S-KS2410-00014467
- Issued by
- Marion County, Oregon
About this file
This document is an Addendum #1 to Invitation to Bid (ITB) #25-003 issued by the Salem Area Mass Transit District (SAMTD) for a KTC Electric Gate Installation project. The primary purpose of this addendum is to modify the bid due date, shifting it from September 1, 2025, at 3:00 PM to September 10, 2025, at 3:00 PM. The addendum is being distributed through Oregon Buys and will be incorporated into the final contract, with bidders required to acknowledge the changes on Exhibit 1 when submitting their response.
The addendum explicitly states that all other specifications, terms, and conditions remain unchanged. The document is signed by Kimberly Leeker, a Procurement Contractor for SAMTD, and dated March 21, 2025. No additional details about the specific electric gate installation project are provided in this document beyond the schedule change and procedural information about bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KTC Gate Entry Map.pdf | ||
| KTC Gate Entry_Final072425.docx.pdf | ||
| Addendum 2_25-003ITB KTCGate.pdf | ||
| BiddersList_Walkthrough1 Attendance 8.13.25.pdf | ||
| REQ-DASOBO-00139690_AudioConferencingMO OED Approved DAS.pdf | ||
| KTC Gate - Pictures_1.pdf | ||
| KTC elec drawings.pdf | ||
| KTCGate_Tabulation.xlsx | XLSX spreadsheet | |
| IMG_3706.jpg | JPG image | |
| BiddersList_Walkthrough2 Attendance 8.20.25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALEM AREA MASS TRANSIT DISTRICT
Invitation to Bid ITB# 25-003
KTC Electric Gate Installation
ADDENDUM #1
Salem Area Mass Transit District provides information through Oregon Buys and is making changes / additions / modifications / revisions as an Addendum to ITB 25-003. This Addendum and any exhibits to the Addendum must be acknowledged on Exhibit 1 with the submission of a response and will be incorporated into the final Contract.
The following changes, clarifications and SAMTD responses to questions posed to date are hereby provided to all proposers:
Schedule Change RFP Reference (if applicable)
Response
Bid Due Date 3.B.1 Schedule Dates SAMTD has changed the Bid Due Date
FROM- 9/1/2025 at 3:00 PM
TO- 9/10/2025 at 3:00 PM
All other specifications and terms and conditions remain unchanged.
By: Kimberly Leeker (ctr), B.Sc., CPPB, CPPO, NIGP-CPP
Procurement Contractor
Salem Area Mass Transit District
555 Court Street NE, Suite 5230
Salem, Oregon 97301
3/21/2025