KNMD209087EgressDrawings.pdf
PDF 25 MB Posted
- Attached to
- Construct Egress Maintenance Facility, F-22
- Solicitation number
- W50SLF26X1BWH
- Issued by
-
Department of the Army National Guard
About this file
This file contains egress drawings for a construction project at Joint Base Pearl Harbor-Hickam, Hawaii. The drawings support the pre-solicitation notice for constructing a new 3,201 square foot Egress Maintenance Facility for F-22 aircraft operations under solicitation number W50SLF26X1BWH. The project is being pursued by the Department of the Army National Guard through the USPFO for Hawaii.
The drawings illustrate the facility design incorporating specialized structural and safety requirements including micro-pile foundation systems, elevated construction to meet tsunami and flooding criteria per DoD Unified Facilities Criteria, anti-explosive electrical components, comprehensive lightning and grounding protection, and site improvements such as asphalt pavements for facility access, a concrete Aerospace Ground Equipment Ready Pad, and a concrete Gas Oxygen canopy shelter pad. Utility infrastructure requirements depicted include connections for water, sanitary sewer, storm sewer, telecommunications, and electrical systems. All construction work must comply with DoD antiterrorism and force protection standards, DoD, Air Force, and base design standards, and utilize local materials and construction techniques where cost effective.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sources_sought_knmd209087.pdf | ||
| Sources Sought Information Request Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
ISSUE DATE:
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s /1
.0
H
IA
N G
F -2
P lu s -U p P ro je c ts
/K N
M D
E
S
A R
C H
.r v t
/1
/2
:3 :5
P
M
G-001
C O
V E
R S
H E
E T
J O
IN
T
B A
S E
P E
A R
L H
A R
B O
R -H
IC
K
A M
O
A H
U H
A W
A
II
F Y
H
A W
A
II
A
IR
N
A T
IO
N
A L G
U A
R D
H
IA
N
G
F -2
P
L U
S -U
P E
G R
E S
S M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y H
O N
O L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R O
A H
U H
A W
A
II
R
IM
A R
C H
IT
E
C T
S M
E R
C H
A N
T S
T R
E E
T S
U
IT
E
H O
N O
L U
L U
H
I
J V
A N
N
K P
A N
A N
G A
N A
N
J V
A N
N
O
C T
O B
E R
W A
F
HONOLULU DISTRICT
15 OCTOBER 2025
JOINT BASE PEARL HARBOR-HICKAM, OAHU, HAWAII
FY22 HAWAII AIR NATIONAL GUARD (HIANG) F-22 PLUS-UP
EGRESS MAINTENANCE FACILITY
REVISED FINAL SUBMITTAL
W A
D
PROJECT AREA
N
PROJECT SITE
N
PROJECT SITE
PROJECT VINCINITY MAP
SHEET LIST
SHEET
NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES, ABBREVIATIONS
G-003 MOUNTING HEIGHTS & DOOR CLEARANCES
CIVIL
V-101 EXISTING CONDITIONS
B-101 BORING LOCATIONS
B-102 BORING LEGEND AND LOGS
C-001 CIVIL NOTES
C-002 EROSION AND SEDIMENT CONTROL NOTES
C-003 UTILITY NOTES
C-004 PHASING NOTES
C-101 HAUL ROUTE
C-102 PHASING PLAN - PHASE 1
C-103 PHASING PLAN - PHASE 2
C-104 EROSION AND SEDIMENT CONTROL INITIAL PLAN
C-105 EROSION AND SEDIMENT CONTROL
INTERMEDIATE PLAN
C-106 EROSION AND SEDIMENT CONTROL FINAL PLAN
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS401 ENLARGED SITE PLAN
CG101 GRADING PLAN
CG301 SITE SECTIONS
CG401 ENLARGED GRADING PLAN
CU101 UTILITY PLAN
CU201 UTILITY PROFILES
C-501 EROSION AND SEDIMENT CONTROL DETAILS
C-502 SITE DETAILS
C-503 SITE DETAILS
C-504 UTILITY DETAILS
C-505 UTILITY DETAILS
C-506 UTILITY DETAILS
C-507 PHASING DETAILS
C-508 PHASING DETAILS
C-509 PHASING DETAILS
C-801 EROSION AND SEDIMENT CONTROL INITIAL PLAN
(BID OPTION)
C-802 EROSION AND SEDIMENT CONTROL
INTERMEDIATE PLAN (BID OPTION)
C-803 EROSION AND SEDIMENT CONTROL FINAL PLAN
(BID OPTION)
C-804 DEMOLITION PLAN (BID OPTION)
C-805 SITE PLAN (BID OPTION)
C-806 ENLARGED SITE PLAN (BID OPTION)
C-807 GRADING PLAN (BID OPTION)
C-808 SITE SECTION (BID OPTION)
C-809 ENLARGED GRADING PLAN (BID OPTION)
C-810 UTILITY PLAN (BID OPTION)
C-811 UTILITY PROFILES (BID OPTION)
C-812 UTILITY DETAILS (BID OPTION)
STRUCTURAL
S-001 STRUCTURAL NOTES
S-002 STRUCTURAL NOTES
S-101 FOUNDATION PLAN
S-102 ROOF FRAMING PLAN
S-201 BUILDING ELEVATIONS
S-301 BUILDING SECTION
S-501 TYPICAL MICROPILE DETAILS
S-502 TYPICAL CMU WALL DETAILS
S-503 TYPICAL CONCRETE WALL DETAILS
S-504 SECTIONS AND DETAILS
S-505 SECTIONS AND DETAILS
S-506 SECTIONS AND DETAILS
S-507 SECTIONS AND DETAILS
S-508 TYPICAL CONCRETE PAD DETAILS
S-801 PLAN AND DETAILS
S-802 SECTION AND DETAIL
E E
B E
R T
SHEET LIST
SHEET
NUMBER SHEET NAME
ARCHITECTURAL
A-001 AIR BARRIER FLOOR PLAN
A-002 AIR BARRIER BUILDING SECTIONS
A-101 FLOOR PLAN
A-102 ROOF PLAN
A-103 REFLECTED CEILING PLAN
A-104 SIGNAGE PLAN
A-201 ELEVATIONS
A-202 ELEVATIONS
A-301 BUILDING SECTIONS
A-401 PARTITION TYPES
A-402 WALL SECTIONS
A-411 SECTOR A - ENLARGED PLAN AND REFLECTED
CEILING PLAN
A-412 SECTOR A - INTERIOR ELEVATIONS
A-413 SECTOR B - ENLARGED PLAN AND REFLECTED
CEILING PLAN
A-414 SECTOR B - INTERIOR ELEVATIONS
A-501 ROOF DETAILS
A-502 CEILING & SIGNAGE DETAILS
A-503 DOOR DETAILS
A-504 LOUVER DETAILS
A-601 DOOR AND LOUVER SCHEDULES
A-602 FINISH AND SIGNAGE SCHEDULE
A-801 GOX CANOPY SHELTER PLANS AND ELEVATIONS
A-802 GOX CANOPY SHELTER SECTIONS AND DETAILS
FIRE PROTECTION
F-001 BUILDING CODE SUMMARY
F-101 CODE COMPLIANCE SITE PLAN
F-102 FLOOR PLAN - LIFE SAFETY
FA101 FLOOR PLAN - FIRE ALARM-MASS NOTIFICATIONS
FA501 FIRE ALARM-MASS NOTIFICATION DETAILS
FA601 FIRE ALARM-MASS NOTIFICATION SYSTEM
SEQUENCE OF OPERATIONS AND RISER DIAGRAM
FX001 FIRE PROTECTION NOTES, SYMBOLS AND
ABBREVIATIONS
FX101 FLOOR PLAN - FIRE SPRINKLER
FX501 FIRE SPRINKLER DETAILS
PLUMBING
P-001 PLUMBING LEGEND
P-101 PLUMBING PLAN - SANITARY
P-102 PLUMBING PLAN - DOMESTIC WATER AND
COMPRESSED AIR
P-103 PLUMBING ROOF PLAN
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-701 PLUMBING ISOMETRICS
MECHANICAL
M-001 MECHANICAL GENERAL NOTES, ABBREVIATIONS
M-101 OVERALL MECHANICAL PLAN
M-301 MECHANICAL SECTIONS
M-401 ENLARGED MECHANICAL PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL EQUIPMENT SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 CONTROL DIAGRAM
M-702 CONTROL DIAGRAM
M-703 DDC POINTS LIST
ELECTRICAL
E-001 ELECTRICAL NOTES AND LEGEND
ES101 ELCTRICAL SITE PLAN - EGRESS BUILDING
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
E-101 POWER PLAN
E-102 LIGHTING PLAN
E-103 MECHANICAL POWER PLAN
E-104 LIGHTNING PROTECTION PLAN
E-401 ENLARGED COMM ROOM - POWER PLAN
E-501 LUMINAIRE SCHEDULE
E-502 MISCELLANEOUS DETAILS
E-601 ONE-LINE DIAGRAM
E-701 PANEL SCHEDULES
E-801 EQUIPMENT SCHEDULE
TELECOMMUNICATIONS
T-001 TELECOM NOTES AND LEGEND
T-002 TELECOMMUNICATION LIST, ABBREVIATIONS
TS101 TELECOMMUNICATIONS SITE PLAN - EGRESS
BUILDING
TS501 DUCT SECTION DETAILS
TS502 TELECOM DETAILS
TS503 TELECOM MAINTENANCE HOLE DETAILS
TS504 TELECOM DETAILS
TS505 TELECOMMUNICATIONS DETAILS
TS506 TELECOMMUNICATIONS - EXIST 3428 EAST
ELEVATION AND DETAIL PLAN
TS601 TELECOM GROUNDING DIAGRAM
T-101 TELECOMMUNICATIONS AND SECURITY PLAN
T-401 ENLARGED TELECOMMUNICATION ROOM -
EGRESS BUILDING
T-402 ENLARGED TELECOMMUNICATION ROOMS -
EXISTING B3428 TELECOM ROOM 141
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOMMUNICATIONS DETAILS
T-504 TELECOMMUNICATIONS DETAILS
T-505 TELECOMMUNICATIONS DETAILS
T-506 TELECOMMUNICATIONS DETAILS
T-507 TELECOMMUNICATIONS DETAILS
T-601 TELECOMMUNICATIONS RISER DIAGRAM
T-602 SECURITY RISER DIAGRAM
T-603 TELECOMMUNICATIONS DETAILS
T-604 TELECOMMUNICATIONS DETAILS
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
GENERAL NOTES
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS / DRAWING
SYMBOLS
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES
ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER)
BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL
FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED
PLASTIC
FRTW FIRE RETARDANT TREATED
WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING
CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION
TAG
NORTH ARROW W/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SOAP DISPENSER
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL SHEET METAL (FLASHING)
FLASH
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SND SANITARY NAPKIN DISPENSER
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TSCD TOILET SEAT COVER DISPENSER
TTD TOILET TISSUE DISPENSER
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
A
PLAN
NORTH
PLAN GENERAL NOTES:
1. ALL DIMENSIOSN ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE.
2. PATCH AND REPAIR ALL DAMAGED INTERIOR CONCRETE AND CMU
WITHIN THE SCOPE OF WORK.
3. ALL CONCRETE AND CMU NOT OTHERWISE FINISHED OR COVERED
SHALL BE PAINTED.
4. UNO, LOCATE EDGE OF DOOR OPENING 3" FROM ADJACENT WALL.
5. FOR NEW ACCESSIBLE TOILET INSTALLATION THE CENTERLINE OF
ACCESSIBLE TOILET IS TO BE 17" FROM THE SIDE WALL OR PARTITION.
REFLECTED CEILING PLAN GENERAL NOTES:
1. ALL UTILITIES AT CEILING (LIGHTING FIXTURES, ELECTRICAL CONDUIT
AND EQUIPMENT, COMMUNICATIONS CONDUIT AND EQUIPMENT, CABLE
TRAYS, MECHANICAL DUCTS AND EQUIPMENT) SHALL BE INSTALLED TO
MAINTAIN A MINIMUM OF 7'-6" AFF TO BOTTOM OF ALL SUCH UTILITIES
AND UTILITY HOUSING.
2. ALL UTILITIES AT CEILING SHALL BE INSTALLED TIGHT TO THE SLAB OR
BEAMS/GIRDERS - CONTRACTOR SHALL COORDINATE UTILITY
CROSSINGS TO PROVIDE MAXIMUM HEADROOM CLEARANCE AND
AVOID ENTERING/CROSSING STAIR ENCLOSURE.
PAINT OUT ALL EXPOSED CLG MOUNTED UTILITIES, CONDUIT - EXCEPT FIRE
SPRINKLER HEADS
BUILDING SUMMARY
THE EGRESS SHOP/GOX CANOPY SHELTER/AGE READY PADS (CLIN 0008) IS
PART OF THE A/E TASK ORDER IN SUPPORT OF THE HIANG F-22 MISSION.
SCOPE OF WORK:
PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES TO CONSTRUCT AN
EGRESS MAINTAINENCE FACILITY. THE PLANNED LOCATION FOR THIS NEW
FACILITY IS ADJACENT TO THE MAINTENANCE BACK-SHOPS OF SQUADRON
OPERATIONS FACILITY B3428. PROJECT INCLUDES ASPHALT PAVEMENTS TO
PROVIDE ACCESS TO THE NEW FACILITY. PROJECT INCLUDES A CONCRETE
AGE READY PAD (3 LOCATIONS).
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s /1
.0
H
IA
N G
F -2
P lu s -U p P ro je c ts
/K N
M D
E
S
A R
C H
.r v t
/1
/2
:3 :5
P
M
G-002
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
J O
IN
T
B A
S E
P E
A R
L H
A R
B O
R -H
IC
K
A M
O
A H
U H
A W
A
II
F Y
H
A W
A
II
A
IR
N
A T
IO
N
A L G
U A
R D
H
IA
N
G
F -2
P
L U
S -U
P H
O N
O L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R O
A H
U H
A W
A
II
R
IM
A R
C H
IT
E
C T
S M
E R
C H
A N
T S
T R
E E
T S
U
IT
E
H O
N O
L U
L U
H
I
J V
A N
N
K P
A N
A N
G A
N A
N
J V
A N
N
O
C T
O B
E R
W A
F
R E
V
IS
E D
F
IN
A L S
U B
M
IT
T A
L
W A
D
E E
B E
R T
M
IN
MIN.
1' - 6"
M
IN
CLOSER LATCH
1' - 0" IF DOOR HAS
M
IN
Y
M
IN
X
M
IN
IF Y THEN 3' - 6" MIN.
IF X THEN 3' - 0" MIN.
M
IN
MIN.
4' - 6"
M
IN
MIN.
1' - 6"
4' - 11"
M
IN
IF
D
O O
R H
A S
C
L O
S E
T C
H
FRONT APPROACH FRONT APPROACH
HINGE SIDE APPROACH HINGE SIDE APPROACH
LATCH SIDE APPROACH LATCH SIDE APPROACH
IF
D
O O
R H
C
O
S E
H
E N
M
IN
MIN.
2' - 0"
M
IN
CLEAR FLOOR SPACE
AT SERIES OF DOORS
PULL SIDE
CLEAR FLOOR SPACE
DOORS
1. CONTRACTOR TO NOTIFY ARCHITECT OF ANY CONFLICT BETWEEN THIS SHEET AND THE DRAWINGS OR
SPECIFICATIONS PRIOR TO INSTALLATION.
2. INFORMATION APPEARING ON THIS SHET IS FOR ILLUSTRATION ONLY. CONTRACTOR TO VERIFY CONFORMANCE TO
CONSTRUCTION DOCUMENTS, T.A.S. AND A.D.A. NOTIFY ARCHITECT IF CONFLICT OCCURS.
3. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ACTUAL DESIGN AND CONFIGURATIONS.
4. ALL DIMENSIONS ON THIS SHEET ARE TO FACE OF FINISH.
NOTES
TOILET ROOMS
1' - 6"
CONTROL
AT WIDE
SIDE OF
STALL
TOILET PLANS TOILET ELEVATION
t o
M
IN
3' - 0"
LAVATORY ELEVATION
T O
B O
T T
O M
O F
M
IR
R O
R
NOTE:
INSULATE ALL EXPOSED
HOT WATER AND DRAIN
PIPES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s /1
.0
H
IA
N G
F -2
P lu s -U p P ro je c ts
/K N
M D
E
S
A R
C H
.r v t
/1
/2
:3 :5
P
M
G-003
M O
U N
T
IN
G H
E
IG
H T
S
D O
O R
C L E
A R
A N
C E
S
J O
IN
T
B A
S E
P E
A R
L H
A R
B O
R -H
IC
K
A M
O
A H
U H
A W
A
II
F Y
H
A W
A
II
A
IR
N
A T
IO
N
A L G
U A
R D
H
IA
N
G
F -2
P
L U
S -U
P H
O N
O L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R O
A H
U H
A W
A
II
R
IM
A R
C H
IT
E
C T
S M
E R
C H
A N
T S
T R
E E
T S
U
IT
E
H O
N O
L U
L U
H
I
J V
A N
N
K P
A N
A N
G A
N A
N
J V
A N
N
O
C T
O B
E R
W A
F
R E
V
IS
E D
F
IN
A L S
U B
M
IT
T A
L
W A
D
E E
B E
EXIST PV ARRAY
STA 115
HUB W/ TACK
ELEV = 3.61
N: 55505.71 E: 1656922.89
STA 5154
"Y" CUT
ELEV = 5.11
N: 55506.24 E: 1656839.41
STA 129
PAINTED "Y"
ELEV = 6.73
N: 55461.42
E: 1656727.97
STA 116
MAG NAIL
ELEV = 6.39
N: 55744.99
E: 1656741.28
STA 316
"Y" CUT
ELEV = 6.41
N: 55796.65 E: 1657096.00
EXIST DRAIN INLET
GRATE: 5.44'
INV: 2.49'
EDGE OF ASPHALT
SHOULDER
261° 42' 49" 358.47'
0°
5'
8.
090° 21' 58"83.49'
068° 05' 15"
120.12'
2°
1'
4"
3.
EXIST DRAIN INLET
GRATE: 5.47'
INV: 2.74'
EXISTING
STORMWATER
QUALITY
BASIN
EXIST FIRE
HYDRANT
EXIST
COMMUNICATION
CONDUIT
EXIST STORAGE
CONTAINER
EXIST SEWER
MANHOLE
EXIST FIRE
HYDRANT
FUTURE DRIVEWAY
INSTALLED BY OTHERS
NOT IN CONTRACT
3 IRRIGATION
BOXES
EXIST ELEC PANEL
ON CONCRETE
PAD
EXIST AC
PAVEMENT
EXIST
CONCRETE
PAVEMENT
EXIST
CONCRETE
PAVEMENT
EXIST DRAIN INLET
GRATE: 6.35'
INV: 2.40'
EXIST PIPE
OUTFALL
INV: 2.02'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C O
FF
M
AN
E
N G
IN
EE
R S
FO
R
T
ST
R
EE
T, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
O C
T
, 2
AN
SI
D
JO
IN
T
BA
SE
P
EA
R
L H
AR
BO
R -H
IC
KA
M , O
AH
U
, H
AW
AI
I
FY
H
AW
AI
I A
IR
N
AT
IO
N
AL
G U
AR
D
(H
IA
N G
) F -2
PL
U S
U P
AD
D
E G
R
ES
S
SH
O P
M . U
N
TE
N
T.
C
R
IS
T
J.
L
O W
E
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H O
N O
LU
LU
D
IS
TR
IC
T
FO
R T
SH
AF
TE
R
, H
AW
AI
I
R
EV
IS
ED
F
IN
AL
S
U
BM
IT
TA
L
W
A2
2F
W
A1
9D
PLAN
NORTH
30' 60'0A1 SCALE 1" = 30'
EXISTING CONDITIONS
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
V-101
LEGEND:
EXISTING CONTOUR
EXISTING COMMUNICATIONS LINE
EXISTING WATER LINE
EXISTING STORM LINE
EXISTING SEWER LINE
SURVEY TRAVERSE CLOSURE
EXISTING RIPRAP
EXISTING SEWER MANHOLE
EXISTING SEWER COVER
EXISTING DRAIN INLET
EXISTING FIRE HYDRANT
EXISTING ELECTRICAL BOX
EXISTING WATER VALVE
EXISTING IRRIGATION CONTROLLER BOX
EXISTING IRRIGATION BOXES
EXISTING FLOOD LIGHT ON PEDESTAL
EXISTING TREE
4.0
UGC
AutoCAD SHX Text smh
AutoCAD SHX Text top 6.60
AutoCAD SHX Text inv. 1.73
AutoCAD SHX Text smh
AutoCAD SHX Text top 6.65
AutoCAD SHX Text inv. 4.05(6")
AutoCAD SHX Text inv. 2.29
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text flood light on
AutoCAD SHX Text conc. pedestal
AutoCAD SHX Text wv
AutoCAD SHX Text top 6.66
AutoCAD SHX Text ts
AutoCAD SHX Text elec. box
AutoCAD SHX Text top 6.29
AutoCAD SHX Text wv
AutoCAD SHX Text top 5.52
AutoCAD SHX Text ts 3.06
AutoCAD SHX Text d.i.
AutoCAD SHX Text top 5.67
AutoCAD SHX Text inv 3.12
AutoCAD SHX Text a.c. pav't.
AutoCAD SHX Text f.h. #570
AutoCAD SHX Text smh
AutoCAD SHX Text top 4.07
AutoCAD SHX Text a.c. pav't.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2-elec. panels
AutoCAD SHX Text storage container
AutoCAD SHX Text on conc. pad
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text ramp
AutoCAD SHX Text (plugged)
AutoCAD SHX Text bot. (-)4.83
AutoCAD SHX Text inv. (-)4.58
AutoCAD SHX Text inv. (-)5.31
AutoCAD SHX Text inv. (-)5.21
AutoCAD SHX Text inv. (-)1.92 (8"drop)
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
HANGAR 3428
AutoCAD SHX Text T A X I W A Y
AutoCAD SHX Text T O W W A Y
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text X
AutoCAD SHX Text D
AutoCAD SHX Text X
AutoCAD SHX Text
AGE PAD
(BID OPTION)
EGRESS BLDG
H
AN
G
AR
STA 115
HUB W/ TACK
ELEV = 3.61
STA 5154
"Y" CUT
ELEV = 5.11
STA 129
PAINTED "Y"
ELEV = 6.73
STA 116
MAG NAIL
ELEV = 6.39
STA 316
"Y" CUT
ELEV = 6.41
EXIST PV ARRAY
GOX CANOPY SHELTER
(BID OPTION)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C O
FF
M
AN
E
N G
IN
EE
R S
FO
R
T
ST
R
EE
T, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
O C
T
, 2
AN
SI
D
JO
IN
T
BA
SE
P
EA
R
L H
AR
BO
R -H
IC
KA
M , O
AH
U
, H
AW
AI
I
FY
H
AW
AI
I A
IR
N
AT
IO
N
AL
G U
AR
D
(H
IA
N G
) F -2
PL
U S
U P
AD
D
E G
R
ES
S
SH
O P
M . U
N
TE
N
T.
C
R
IS
T
J.
L
O W
E
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H O
N O
LU
LU
D
IS
TR
IC
T
FO
R T
SH
AF
TE
R
, H
AW
AI
I
R
EV
IS
ED
F
IN
AL
S
U
BM
IT
TA
L
W
A2
2F
W
A1
9D
PLAN
NORTH
30' 60'0A1 SCALE 1" = 30'
BORING LOCATIONS
BO
R
IN
G
L O
C
AT
IO
N
S
B-101
APPROXIMATE BORING LOCATION
AC PAVEMENT
CONCRETE
B-402
B-401
LEGEND:
AutoCAD SHX Text smh
AutoCAD SHX Text top 6.60
AutoCAD SHX Text inv. 1.73
AutoCAD SHX Text top 6.65
AutoCAD SHX Text inv. 4.05(6")
AutoCAD SHX Text inv. 2.29
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text flood light on
AutoCAD SHX Text conc. pedestal
AutoCAD SHX Text wv
AutoCAD SHX Text top 6.66
AutoCAD SHX Text ts
AutoCAD SHX Text elec. box
AutoCAD SHX Text top 6.29
AutoCAD SHX Text wv
AutoCAD SHX Text top 5.52
AutoCAD SHX Text ts 3.06
AutoCAD SHX Text d.i.
AutoCAD SHX Text top 5.67
AutoCAD SHX Text inv 3.12
AutoCAD SHX Text a.c. pav't.
AutoCAD SHX Text f.h. #570
AutoCAD SHX Text smh
AutoCAD SHX Text top 4.07
AutoCAD SHX Text a.c. pav't.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2-elec. panels
AutoCAD SHX Text storage container
AutoCAD SHX Text on conc. pad
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text ramp
AutoCAD SHX Text (plugged)
AutoCAD SHX Text bot. (-)4.83
AutoCAD SHX Text inv. (-)4.58
AutoCAD SHX Text inv. (-)5.31
AutoCAD SHX Text inv. (-)5.21
AutoCAD SHX Text inv. (-)1.92 (8"drop)
AutoCAD SHX Text
HANGAR 3428
AutoCAD SHX Text T A X I W A Y
AutoCAD SHX Text T O W W A Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C O
FF
M
AN
E
N G
IN
EE
R S
FO
R
T
ST
R
EE
T, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
O C
T
, 2
AN
SI
D
JO
IN
T
BA
SE
P
EA
R
L H
AR
BO
R -H
IC
KA
M , O
AH
U
, H
AW
AI
I
FY
H
AW
AI
I A
IR
N
AT
IO
N
AL
G U
AR
D
(H
IA
N G
) F -2
PL
U S
U P
AD
D
E G
R
ES
S
SH
O P
M . U
N
TE
N
T.
C
R
IS
T
J.
L
O W
E
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H O
N O
LU
LU
D
IS
TR
IC
T
FO
R T
SH
AF
TE
R
, H
AW
AI
I
R
EV
IS
ED
F
IN
AL
S
U
BM
IT
TA
L
W
A2
2F
W
A1
9D
BO
R
IN
G
L
EG
EN
D
A N
D L
O G
S
B-102
ML
SW-
SM
CH
GP-GM
GM
SP
75/5"
25/1"
Sieve
- #200 = 10.3%
Direct Shear
Sieve
- #200 = 10.1%
Sieve
- #200 = 16.4%
Brown with multi-color mottling SANDY SILT with some gravel, stiff, moist (fill)
Tan GRAVELLY SAND (CORALLINE) with a little silt (coralline), medium dense, moist (fill)
Brown with multi-color mottling SANDY CLAY with a little gravel, medium stiff, moist (alluvium w/coral debris)
Tan SANDY GRAVEL (CORALLINE) with a little silt (coralline), loose (lagoonal deposit)
Grayish white SILTY GRAVEL with some sand, loose to medium dense (lagoonal deposit)
Whitish tan GRAVELLY SAND (CORALLINE) with traces of silt, dense (weathered sandstone)
Tan CORAL, closely fractured, slightly weathered, hard (coral formation)
Log of Boring
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
O th er T es ts
Plate
Po ck et P en
(ts f)
CME-55D
4" Solid-Stem Auger 140 lb. wt., 30 in. drop
G ra ph ic
Drill Rig:
Drilling Method:
Driving Energy:
Pe ne tra tio n R es is ta nc e (b lo w s/ fo ot
Approximate Ground Surface Elevation (feet ): 4 *
Sa m pl e
M oi st ur e C on te nt
B-401
D ry
D en si ty
(p cf
) Description
Laboratory
R Q
D
C or e R ec ov er y
July 22, 2022 July 22, 2022 B. Aiu 63 feet 8426-00
U
SC
S
D ep th (f ee t)
Water Level:
Field
A - 8.1 (Energy Transfer Ratio = 77.2%)
GEOLABS, INC.
Geotechnical Engineering
FY22 HAWAII AIR NATIONAL GUARD F-22 PLUS-UP
JOINT BASE PEARL HARBOR-HICKAM
HAIKU, OAHU, HAWAII
BO
R
IN
G
_L O
G
6-
.G
PJ
G
EO
LA
BS
.G
D T
0/
/2
3.5 ft. 07/22/2022 0956 HRS
GC
SM
ML
75/5"
50/2"
UC
Sieve
- #200 = 18.1%
Grayish tan CLAYEY GRAVEL (CORALLINE) with some sand (coralline), medium dense (weathered limestone)
Whitish tan SILTY SAND (CORALLINE) with a little gravel (coralline), loose (coralline detritus)
Dark brown SANDY SILT, stiff (weathered volcanic tuff)
Boring terminated at 63 feet
* ***Elevations estimated from the Add Egress Shope Grading and Drainage Plan downloaded from Rim Architects Sharepoint Site on October 3, 2022.
Log of Boring
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
O th er T es ts
Plate
Po ck et P en
(ts f)
CME-55D
4" Solid-Stem Auger 140 lb. wt., 30 in. drop
G ra ph ic
Drill Rig:
Drilling Method:
Driving Energy:
Pe ne tra tio n R es is ta nc e (b lo w s/ fo ot
Sa m pl e
M oi st ur e C on te nt
B-401
D ry
D en si ty
(p cf
) Description
Laboratory
R Q
D
C or e R ec ov er y
(Continued from previous plate)
July 22, 2022 July 22, 2022 B. Aiu 63 feet 8426-00
U
SC
S
D ep th (f ee t)
Water Level:
Field
A - 8.2 (Energy Transfer Ratio = 77.2%)
GEOLABS, INC.
Geotechnical Engineering
FY22 HAWAII AIR NATIONAL GUARD F-22 PLUS-UP
JOINT BASE PEARL HARBOR-HICKAM
HAIKU, OAHU, HAWAII
BO
R
IN
G
_L O
G
6-
.G
PJ
G
EO
LA
BS
.G
D T
0/
/2
3.5 ft. 07/22/2022 0956 HRS
ML
SM
Sieve
- #200 = 23.6%
Brown with multi-color mottling SANDY SILT with some gravel, stiff, moist (fill)
Tan SILTY SAND (CORALLINE) with a little gravel (coralline), medium dense, moist
Boring terminated at 5 feet
Log of Boring
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
O th er T es ts
Plate
Po ck et P en
(ts f)
CME-55D
4" Solid-Stem Auger 140 lb. wt., 30 in. drop
G ra ph ic
Drill Rig:
Drilling Method:
Driving Energy:
Pe ne tra tio n R es is ta nc e (b lo w s/ fo ot
Approximate Ground Surface Elevation (feet ): 4 *
Sa m pl e
M oi st ur e C on te nt
B-402
D ry
D en si ty
(p cf
) Description
Laboratory
R Q
D
C or e R ec ov er y
July 20, 2022 July 20, 2022 B. Aiu 5 feet 8426-00
U
SC
S
D ep th (f ee t)
Water Level:
Field
A - 9 (Energy Transfer Ratio = 77.2%)
GEOLABS, INC.
Geotechnical Engineering
FY22 HAWAII AIR NATIONAL GUARD F-22 PLUS-UP
JOINT BASE PEARL HARBOR-HICKAM
HAIKU, OAHU, HAWAII
BO
R
IN
G
_L O
G
6-
.G
PJ
G
EO
LA
BS
.G
D T
0/
/2
3.0 ft. 07/20/2022 1320 HRS
A-0.3
ROCK DESCRIPTIONS
Plate
BRECCIA
CLINKER
COBBLES
CORAL
BASALT
ROCK DESCRIPTION SYSTEM
Greater than 24 inches apart
12 to 24 inches apart
6 to 12 inches apart
3 to 6 inches apart
Less than 3 inches apart
Rock shows no sign of discoloration or loss of strength.
Slight discoloration inwards from open fractures.
Discoloration throughout and noticeably weakened though not able to break by hand.
Most minerals decomposed with some corestones present in residual soil mass. Can be broken by hand.
Saprolite. Mineral residue completely decomposed to soil but fabric and structure preserved.
The following terms describe general fracture spacing of a rock:
The following terms describe the chemical weathering of a rock:
ROCK FRACTURE CHARACTERISTICS
DEGREE OF WEATHERING
HARDNESS
BOULDERS
VOID/CAVITY
TUFF
SILTSTONE
LIMESTONE
Unweathered:
Slightly Weathered:
Moderately Weathered:
Highly Weathered:
Extremely Weathered:
Very Hard:
Hard:
Medium Hard:
Soft:
Very Soft:
SANDSTONE
Massive:
Slightly Fractured:
Moderately Fractured:
Closely Fractured:
Severely Fractured:
Rock Log Legend
The following terms describe the resistance of a rock to indentation or scratching:
Specimen breaks with difficulty after several "pinging" hammer blows.
Example: Dense, fine grain volcanic rock
Specimen breaks with some difficulty after several hammer blows.
Example: Vesicular, vugular, coarse-grained rock
Specimen can be broked by one hammer blow. Cannot be scraped by knife. SPT may penetrate by ~25 blows per inch with bounce.
Example: Porous rock such as clinker, cinder, and coral reef
Can be indented by one hammer blow. Can be scraped or peeled by knife. SPT can penetrate by ~100 blows per foot.
Example: Weathered rock, chalk-like coral reef
Crumbles under hammer blow. Can be peeled and carved by knife. Can be indented by finger pressure.
Example: Saprolite
CONGLOMERATE
GEOLABS, INC.
Geotechnical Engineering
LO
G
L
EG
EN
D
F O
R R
O C
K
6-
.G
PJ
G
EO
LA
BS
.G
D T
/3
0/
A-0.1
UNCONSOLIDATED UNDRAINED TRIAXIAL
COMPRESSION (ksf)
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON
NO. 4 SIEVE
50% OR MORE OF
COARSE FRACTION
PASSING
THROUGH NO. 4
SIEVE
MORE THAN 50%
OF MATERIAL
RETAINED ON NO.
200 SIEVE
50% OR MORE OF
MATERIAL PASSING
THROUGH NO. 200
SIEVE
TORVANE SHEAR (tsf)
(2-INCH) O.D. STANDARD PENETRATION TEST
(3-INCH) O.D. MODIFIED CALIFORNIA SAMPLE
INORGANIC SILTS AND VERY FINE SANDS,
ROCK FLOUR, SILTY OR CLAYEY FINE SANDS
OR CLAYEY SILTS WITH SLIGHT PLASTICITY
POORLY-GRADED GRAVELS, GRAVEL-SAND
MIXTURES, LITTLE OR NO FINES
CLAYEY GRAVELS, GRAVEL-SAND-CLAY
MIXTURES
WELL-GRADED SANDS, GRAVELLY SANDS,
LITTLE OR NO FINES
POORLY-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
SILTY SANDS, SAND-SILT MIXTURES
CLAYEY SANDS, SAND-CLAY MIXTURES
LIQUID LIMIT
50 OR MORE CH
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
MH
SILTS
AND
CLAYS
SILTS
AND
CLAYS
LIQUID LIMIT
LESS THAN 50
USCS TYPICAL
DESCRIPTIONS
GW
MORE THAN 12%
FINES
WATER LEVEL OBSERVED IN BORING OVERNIGHT
HIGHLY ORGANIC SOILS
SILTY GRAVELS, GRAVEL-SAND-SILT
MIXTURES
OL
PEAT, HUMUS, SWAMP SOILS WITH HIGH
ORGANIC CONTENTS
INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY, GRAVELLY CLAYS, SANDY
CLAYS, SILTY CLAYS, LEAN CLAYS
Soil Log Legend
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS
SC
Plate
GM
FINE-
GRAINED
SOILS
COARSE-
GRAINED
SOILS
CLEAN SANDS
SANDS WITH
FINES
SP
SANDS
GRAVELS
WELL-GRADED GRAVELS, GRAVEL-SAND
MIXTURES, LITTLE OR NO FINES
ML
CL
OH
LESS THAN 5%
FINES
GRAVELS WITH
FINES
CLEAN
GRAVELS
GRAB SAMPLE
PLASTICITY INDEX (NP=NON-PLASTIC)
TV
LEGEND
WATER LEVEL OBSERVED IN BORING AT TIME OF
DRILLING
WATER LEVEL OBSERVED IN BORING AFTER DRILLING
SM
MAJOR DIVISIONS
GP
MORE THAN 12%
FINES
PT
LESS THAN 5%
FINES
UNIFIED SOIL CLASSIFICATION SYSTEM (USCS)
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
SW
GC
INORGANIC SILT, MICACEOUS OR
DIATOMACEOUS FINE SAND OR SILTY
SOILS
INORGANIC CLAYS OF HIGH PLASTICITY
PI
LL
TXUU
UNCONFINED COMPRESSION
OR UNIAXIAL COMPRESSIVE STRENGTH
CORE SAMPLE
SHELBY TUBE SAMPLE
LIQUID LIMIT (NP=NON-PLASTIC)
UC
GEOLABS, INC.
Geotechnical Engineering
LO
G L
EG
EN
D F
O R
S O
IL
6-
.G
PJ
G
EO
LA
BS
.G
D T
/3
0/
A-0.2
7 - 18
18 - 55 55 - 91
> 91
Medium Dense
Coarse Sand
(with deviations from ASTM D2488) Soil Classification Log Key
*Soil descriptions are based on ASTM D2488-09a, Visual-Manual Procedure, with the above modifications by Geolabs, Inc. to the Unified Soil Classification System (USCS).
accessory descriptions compose of the following:
with some: >12% with a little: 5 - 12% with traces of: <5% accessory descriptions are lower cased and follow the Primary and Secondary Constituents (i.e., SILTY GRAVEL with a little sand)
Dry: Absence of moisture, dry to the touch
Moist: Damp but no visible water
Wet: Visible free water
Medium Sand Fine Sand
#4 to #200 (4.75-mm to 0.075-mm) #4 to #10 (4.75-mm to 2-mm)
> 12 inches (305-mm)
3-inch to #4 (75-mm to 4.75-mm)
Sieve Number and / or Size
Gravel
#10 to #40 (2-mm to 0.425-mm) #40 to #200 (0.425-mm to 0.075-mm)
3 to 12 inches (75-mm to 305-mm)
Description
PP Readings (tsf)
2.0 - 4.0
> 4.0
N-Value (Blows/Foot)
MCS
0 - 4
RELATIVE DENSITY / CONSISTENCY
GRAIN SIZE DEFINITION
ABBREVIATIONS
N-Value (Blows/Foot)
0 - 7
WOH: Weight of Hammer
WOR: Weight of Drill Rods
SPT: Standard Penetration Test Split-Spoon Sampler
MCS: Modified California Sampler
PP: Pocket Penetrometer
4 - 7
7 - 15 15 - 27
27 - 55
SPT
0 - 2
> 55> 30
4 - 8
15 - 30
MOISTURE CONTENT DEFINITIONS
SPT
0 - 4
4 - 10
10 - 30 30 - 50
> 50
MCS
Loose
EXAMPLE: Soil Containing 60% Gravel, 25% Sand, 15% Fines. Described as: SILTY GRAVEL with some sand
Plate
GRANULAR SOIL (- #200 <50%)
2 - 4
8 - 15
Relative Density
Very Loose
Dense Very Dense
COHESIVE SOIL (- #200 50%)
PRIMARY constituents are composed of the largest percent of the soil mass. Primary constituents are capitalized and bold (i.e., GRAVEL, SAND)
PRIMARY constituents are based on plasticity. Primary constituents are capitalized and bold (i.e., CLAY, SILT)
SECONDARY constituents are composed of a percentage less than the primary constituent. If the soil mass consists of 12 percent or more fines content, a cohesive constituent is used (SILTY or CLAYEY);
otherwise, a granular constituent is used (GRAVELLY or SANDY) provided that the secondary constituent consists of 20 percent or more of the soil mass.
Secondary constituents are capitalized and bold (i.e., SANDY GRAVEL, CLAYEY SAND) and precede the primary constituent.
SECONDARY constituents are composed of a percentage less than the primary constituent, but more than 20 percent of the soil mass. Secondary constituents are capitalized and bold (i.e., SANDY CLAY, SILTY CLAY, CLAYEY SILT) and precede the primary constituent.
Sand
Boulders Cobbles
Coarse Gravel 3-inch to 3/4-inch (75-mm to 19-mm) Fine Gravel 3/4-inch to #4 (19-mm to 4.75-mm)
GEOLABS, INC. CLASSIFICATION*
Granular Soils Cohesive Soils
Consistency accessory descriptions compose of the following:
with some: >12% with a little: 5 - 12% with traces of: <5% accessory descriptions are lower cased and follow the Primary and Secondary Constituents (i.e., SILTY CLAY with some sand)
Very Soft
Soft
Medium Stiff Stiff
Very Stiff
Hard
< 0.5
0.5 - 1.0
1.0 - 2.0
SO
IL
_C
LA
SS
_L
O G
_K
EY
6-
.G
PJ
G
EO
LA
BS
.G D
T
/3 0/
GEOLABS, INC.
Geotechnical Engineering
BORING NOTES:
1. THE LOGS OF BORINGS INDICATE THE SUBSURFACE
AND GROUNDWATER CONDITIONS ENCOUNTERED
ONLY AT THE LOCATIONS WHERE THE BORINGS
WERE DRILLED AND AT THE TIMES DESIGNATED ON
THE LOGS, AND MAY NOT REPRESENT CONDITIONS
AT OTHER LOCATIONS OR AT OTHER TIMES.
2. SUBSURFACE AND GROUNDWATER CONDITIONS MAY
DIFFER FROM THE LOGS DUE TO THE PASSAGE OF
TIME, IMPROVEMENTS CONSTRUCTED AT THE SITE,
PATTERNS, AND OTHER CHANGES.
3. THE BORING LOGS ARE FURNISHED FOR THE
CONVENIENCE OF THE BIDDER. NO ASSURANCE IS
GIVEN THAT THE SUBSURFACE OR GROUNDWATER
CONDITIONS SHOWN ON THE BORING LOGS ARE
REPRESENTATIVE OF THE CONDITIONS TO BE
ENCOUNTERED DURING CONSTRUCTION. THE
BIDDER IS SOLELY RESPONSIBLE FOR ALL
ASSUMPTIONS, DEDUCTIONS, OR CONCLUSIONS
WHICH ARE MADE OR DERIVED FROM EXAMINATION
OF THE SUBSURFACE INFORMATION AND DATA
FURNISHED HEREIN.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C O
FF
M
AN
E
N G
IN
EE
R S
FO
R
T
ST
R
EE
T, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
O C
T
, 2
AN
SI
D
JO
IN
T
BA
SE
P
EA
R
L H
AR
BO
R -H
IC
KA
M , O
AH
U
, H
AW
AI
I
FY
H
AW
AI
I A
IR
N
AT
IO
N
AL
G U
AR
D
(H
IA
N G
) F -2
PL
U S
U P
AD
D
E G
R
ES
S
SH
O P
M . U
N
TE
N
T.
C
R
IS
T
J.
L
O W
E
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H O
N O
LU
LU
D
IS
TR
IC
T
FO
R T
SH
AF
TE
R
, H
AW
AI
I
R
EV
IS
ED
F
IN
AL
S
U
BM
IT
TA
L
W
A2
2F
W
A1
9D
C
IV
IL
N
O
TE
S
C-001
A AREA
AC ASPHALT CONCRETE
AGG AGGREGATE
BFP BACKFLOW PREVENTER
BLDG BUILDING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CU FT CUBIC FEET
DEG DEGREE
DI DRAIN INLET
DIA DIAMETER
EG EXISTING GRADE
ELEC ELECTRICITY
ELEV ELEVATION
EP EDGE OF PAVEMENT
EQ SP EQUALLY SPACED
EXIST EXISTING
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FOD FOREIGN OBJECT DEBRIS
FT FEET
GALV GALVANIZED
IN INCHES
INV INVERT
IRRIG IRRIGATION
LF LINEAR FEET
MAX MAXIMUM
ME MATCH ELEVATION?
MIN MINIMUM
O.C. ON CENTER
PCC PORTLAND CEMENT CONCRETE
PV PHOTOVOLTAIC SOLAR PANEL
SMH SEWER MANHOLE
SQ FT SQUARE FEET
STA STATION
TS TOP OF STOOP
TYP TYPICAL
WQ WATER QUALITY
WV WATER VALVE
SCALE 1" = 30'
SHEET TITLE
TRUE NORTH
A1 NOT TO SCALE
SECTION OR DETAIL
VIEW IDENTIFICATION NUMBER
(VIEW APPEARS IN "ROW A,
COLUMN 1" OF SHEET)
ABBREVIATIONS
TITLES AND VIEW MARKERS
PLAN
NORTH
GENERAL CIVIL NOTES:
1. EXISTING TOPOGRAPHY, STRUCTURES, AND SITE FEATURES ARE SHOWN
SCREENED AND/OR LIGHT-LINED. NEW FINISH GRADE, STRUCTURES, AND
SITE FEATURES ARE SHOWN HEAVY-LINED.
2. SURVEY DATUM REFERENCE IS NAD 83 ZONE 3. HAWAII STATE PLANE
COORDINATES.
SURVEYOR: KN SURVEYING, LLC
500 ALAKAWA STREET, #100A
HONOLULU, HI 96817
SURVEY DATE: 15 MAR 2022
ELEVATION REF : BRASS DISK "HICKAM 15"
HICKAM BASE CONTROL
ELEV: 3.90-FT
3. MAINTAIN, RELOCATE, OR REPLACE EXISTING SURVEY MONUMENTS,
CONTROL POINTS, AND STAKES WHICH ARE DISTURBED OR DESTROYED.
PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE
ORIGINAL MONUMENT(S) IN A TIMELY MANNER, AND AT THE CONTRACTOR'S
EXPENSE.
4. COORDINATES AND DIMENSIONS SHOWN FOR ROADWAY IMPROVEMENTS
ARE TO EDGES OF PAVEMENT.
5. STAGING AREA MUST BE FOR CONTRACTOR'S EMPLOYEE PARKING,
CONTRACTOR'S TRAILERS AND ON-SITE STORAGE OF MATERIALS. THE
CONTRACTOR IS RESPONSIBLE FOR FENCING AND/OR OTHERWISE
SECURING STAGING AREA.
6. ELEVATIONS GIVEN ARE TO FINISH GRADE UNLESS OTHERWISE NOTED.
7. SLOPE UNIFORMLY BETWEEN SPOT ELEVATIONS SHOWN.
8. WHERE INDICATED ON THE DRAWINGS, AREAS MUST BE PAVED OR COVERED
WITH BROKEN CONCRETE (RIP RAP). ALL OTHER AREAS DISTURBED BY THE
CONTRACTOR MUST BE SEEDED WITH GRASS PER SPECIFICATIONS. (SEE
GRASSING SPECIFICATION SECTION 32 92 19).
9. CONTRACTOR MUST BE RESPONSIBLE FOR IMPLEMENTING AND
MAINTAINING EROSION CONTROL DEVICES DURING CONSTRUCTION.
10. CONTRACTOR MUST COMPLY WITH ALL FEDERAL, STATE, AND LOCAL
REQUIREMENTS FOR EROSION AND SEDIMENTATION CONTROL AND TAKE
ALL OTHER MEASURES TO POSITIVELY PRECLUDE EROSION MATERIALS
FROM LEAVING THE SITE. CONTRACTOR MUST SUBMIT AN EROSION
CONTROL PLAN AND RECEIVE APPROVAL FROM THE CONTRACTING OFFICER
AND THE 154 CES/CEV ENVIRONMENTAL MANAGEMENT PRIOR TO BEGINNING
ANY CONSTRUCTION ACTIVITIES.
11. CONTRACTOR MUST SUBMIT A TRAFFIC CONTROL PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL. ALL ROADS MUST BE OPEN TO
TRAFFIC. THE TRAFFIC CONTROL PLAN MUST BE PREPARED IN
ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD), AND LOCAL STANDARDS.
12. BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST FORM AF IMT FORM
103 AND JBPHH DIG PERMIT REQUEST FOR JBPHHINST 11013.1 ARE TO BE
COMPLETED PRIOR TO THE START OF ANY WORK. UPON COMPLETION,
CONTRACTOR MUST CALL HAWAII ONE CALL (HOC) UTILITY LOCATING
SERVICE. HOC WILL MARK UTILITIES IN 5 WORKING DAYS. CONTRACTOR
MUST SCHEDULE APPROPRIATELY TO ALLOW HOC TO COMPLETE UTILITY
MARKING PRIOR TO CONTRACTOR BEGINNING EXCAVATION OR TRENCHING.
13. CONTRACTOR MUST COORDINATE THE REMOVAL AND INSTALLATION OF
UTILITY SERVICES WITH SUBCONTRACTORS AND CONTRACTING OFFICER IN
ORDER TO MINIMIZE THE DISRUPTION TO ADJACENT FACILITIES.
14. CONTRACTOR IS CAUTIONED THAT THE WORK WILL BE IN AREAS OF UTILITY
CONGESTION, INCLUDING, BUT NOT LIMITED TO: WATER, SANITARY SEWER,
STORM SEWER, COMMUNICATIONS, AND ELECTRICAL. UTILITIES DAMAGED
BY CONTRACTOR MUST BE REPAIRED AT NO ADDITIONAL EXPENSE TO THE
GOVERNMENT.THE CONTRACTOR MUST REPORT ANY UTILITY CONFLICTS TO
THE CONTRACTING OFFICER
15. CONTRACTOR MUST LOCATE UTILITIES IN ACCORDANCE WITH ASCE/UESI/CI
38-22 “STANDARD GUIDELINE FOR INVESTIGATING AND DOCUMENTING
EXISTING UTILITIES”. THE CONTRACTOR MUST COMPLETE A UTILITY QUALITY
LEVEL “A” SURVEY. THE CONTRACTOR MUST REPORT ANY CONFLICT TO THE
CONTRACTING OFFICER.
16. CONTRACTOR MAY ENCOUNTER GROUND WATER DURING EXCAVATION AND
TRENCHING OPERATIONS, AND MUST DEWATER AS REQUIRED FOR PROPER
CONSTRUCTION OF STRUCTURES OR UTILITIES. CONTRACTOR MUST
DISPOSE OF GROUNDWATER IN ACCORDANCE WITH WITH ALL FEDERAL,
STATE, AND LOCAL REQUIREMENTS AND IN A MANNER APPROVED BY THE
CONTRACTING OFFICER.
17. CONSTRUCTION ACTIVITY DEWATERING WATER IS EXPECTED TO BE
RETAINED ON SITE OR DISPOSED OF OFF SITE. IF THE CONTRACTOR ELECTS
TO DISCHARGE TO STORM DRAIN, CONTRACTOR SHALL PROCURE THE
APPLICABLE NPDES PERMIT (APPENDIX G) AT NO ADDITIONAL COST TO THE
GOVERNMENT.
18. CONTRACTOR MUST COMPLY WITH APPLICABLE SPECIFICATION SECTIONS
FOR ACCESS, SAFETY, AND MAINTENANCE OF HAUL ROUTES. (SEE
TEMPORARY CONSTRUCTION FACILITIES AND CONTROL SPECIFICATIONS
SECTION 01 50 00).
19. UNLESS INDICATED OTHERWISE, BORROW SITES ARE NOT AVAILABLE ON
THE BASE.
20. UNLESS INDICATED OTHERWISE, DISPOSAL AREAS FOR RUBBLE AND
EXCESS SOIL MATERIALS ARE NOT AVAILABLE ON BASE. DISPOSAL MUST BE
PROVIDED BY CONTRACTOR AT LAWFUL SITES OFF GOVERNMENT
CONTROLLED LANDS. REMOVAL OF DIRT AND/OR CONSTRUCTION DEBRIS
REQUIRES APPROVAL BY THE CONTRACTING OFFICER AND THE 15TH CEVQ.
21. CONTRACTOR MUST STOP WORK IMMEDIATELY AND CONTACT THEIR
INSPECTION REPRESENTATIVE IF A UTILITY LINE IS DISTURBED.
22. CONTRACTOR MUST KEEP ALL PUBLIC ROADS AND STREETS CLEAN OF
CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR MUST USE
A WET VACUUM STREET SWEEPER TO CLEAN STREETS, TAXIWAYS, AND
TAXILANES AT LEAST TWICE PER DAY OR AS DIRECTED BY CONTRACTING
OFFICER. CONTRACTOR MUST PROVIDE EQUIPMENT AND PERSONNEL TO
CLEAN ANY STREETS AS REQUESTED BY THE CONTRACTING OFFICER.
CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING
AREAS, AND BASE OR GOVERNMENT PROPERTY DAMAGED BY ITS
CONSTRUCTION ACTIVITIES.
ENVIRONMENTAL NOTES:
1. ENVIRONMENTAL PROTECTION
1.1. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE
DURATION OF THE CONTRACT. COMPLY WITH FEDERAL, STATE AND
LOCAL REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION,
INCLUDING WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND
SUBSTANCES, SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.
1.2. COMPLY WITH ALL REQUIREMENTS SPECIFIED IN 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS AND 01 74 19 CONSTRUCTION WASTE
MANAGEMENT AND DISPOSAL.
1.3. PREPARE AND SUBMIT ALL NECESSARY ENVIRONMENTAL PROTECTION,
HAZARDOUS MATERIALS/CONTAMINATED SOIL ABATEMENT PLANS AS
INDICATED IN THE SPECIFICATIONS TO THE CONTRACTING OFFICER FOR
REVIEW AND APPROVAL BY THE GOVERNMENT.
1.4. OBTAIN ALL NECESSARY CONSTRUCTION AND ENVIRONMENTAL
PERMITS (I.E. AIR PERMIT FOR GENERATOR, NPDES, ETC.). ONSITE
CONSTRUCTION MUST NOT BEGIN UNTIL ALL PERMITS HAVE BEEN
OBTAINED. DO NOT CONTACT THE REGULATORY AGENCIES WITHOUT
PRIOR COORDINATION WITH THE GOVERNMENT ENVIRONMENTAL
OFFICE VIA CONTRACTING OFFICER.
1.5. SPILLS ARE PROHIBITED. PREPARE SPILL RESPONSE KITS. IF
INADVERTENT SPILLS OCCUR, TAKE IMMEDIATE ACTIONS INCLUDING
NOTIFICATION TO THE CONTRACTING OFFICER, NATIONAL RESPONSE
CENTER, AND/OR STATE AGENCIES. THE CONTRACTOR IS RESPONSIBLE
FOR THE SPILL CLEAN-UP AT NO COST TO THE GOVERNMENT.
2. CULTURAL AND NATURAL RESOURCES MANAGEMENT:
2.1. THE PROPOSED PROJECT IS LOCATED IN AN AREA OF LOW POTENTIAL
OF ENCOUNTERING ARCHAEOLOGICAL RESOURCES. SHOULD HUMAN
REMAINS OR POSSIBLE ARCHAEOLOGICAL ARTIFACTS BE
INADVERTENTLY DISCOVERED DURING THE PROJECT, ALL WORK IN
THAT AREA SHALL STOP, AND THE CONTRACTING OFFICER WILL BE
IMMEDIATELY NOTIFIED.
3. WASTE HANDLING AND DISPOSAL:
3.1. TREATED WOOD UTILITY POLES WILL BE DEMOLISHED. THE WOODEN
POLES MAY BE REUSED AS THE ORIGINAL PURPOSE. IF REUSING IS NOT
FEASIBLE, THE WASTE SHALL BE DISPOSED OF AT A PERMITTED
DISPOSAL FACILITY. CHIPPING OF TREATED WOOD MATERIALS TO USE
THEM AS MULCH OR OTHER GROUND COVERS WILL NOT BE PERMITTED.
4. WORKER SAFETY
4.1. PROVIDE HAZARD COMMUNICATION AND TRAINING TO THE WORKERS
AND SUBCONTRACTORS. SITE WORKERS MUST BE INFORMED OF THE
PRESENCE OF HAZARDOUS MATERIALS (LEAD, CADMIUM, AND
CHROMIUM CONTAINING MATERIALS). ANTICIPATE SILICA HAZARDS FOR
CONCRETE WORK.
4.2. COMPLY WITH ALL APPLICABLE FEDERAL AND STATE HEALTH AND
SAFETY REGULATIONS AND SECTION 01 35 26 GOVERNMENTAL SAFETY
REQUIREMENTS. ALL WORK INVOLVING HAZARDOUS MATERIAL/WASTE,
FUGITIVE DUST, AND SILICA MUST BE CONDUCTED IN A CONTROLLED
MANNER PROTECTIVE OF THE WORKERS, BASE PERSONNEL, AND THE
ENVIRONMENT.
4.3. IF THE CONTRACTOR BRINGS HAZARDOUS MATERIALS OR CHEMICALS
TO THE SITE, SUBMIT A LIST AND QUANTITIES OF HAZARDOUS
MATERIALS AND SAFETY DATA SHEETS TO THE CONTRACTING OFFICER.
DO NOT BRING HAZARDOUS MATERIAL OR CHEMICALS WITHOUT
APPROVAL FROM THE CONTRACTING OFFICER. SAFETY DATA SHEETS
ARE TO REMAIN ON SITE AFTER APPROVAL BY CONTRACTING OFFICER.
SECURITY NOTES:
1. THE CONTRACTOR IS REQUIRED TO HAVE WORK PLANS ACCEPTED BY
CONTRACTING OFFICER FOR ALL RELATED ACTIVITIES PRIOR TO
COMMENCING WITH ANY WORK ADDRESSED ON THESE DRAWINGS.
2. THE CONTRACTOR SHALL OBTAIN GOVERNMENT ACCEPTANCE OF
APPROPRIATE DETAILED SCHEDULE(S) PRIOR TO COMMENCING WITH ANY
WORK ADDRESSED ON THESE DRAWINGS.
3. THE CONTRACTOR WORK PLANS AND SCHEDULES SHALL PRIORITISE
MINIMIZING THE AMOUNT OF TIME THAT TEMPORARY AND/OR UNDESIRABLE
CONDITIONS ARE PRESENT.
4. CONTRACTOR WORK PLANS, MEANS AND METHODS SHALL MINIMIZE THE
DEGREE TO WHICH TEMPORARY CONDITIONS VARY FROM STANDARDS.
5. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES, INCLUDING
SHORING AND DEWATERING, TO PREVENT GROUNDWATER FROM
ADVERSELY IMPACTING ITS WORK AND SURROUNDING IMPROVEMENTS.
MUNITIONS FACILITY ACCESS
1. THE CONTRACTOR SHALL MANAGE ITS WORK IN A MANNER THAT MINIMIZES
DISRUPTION TO THE MUNITIONS FACILITY.
2. THE CONTRACTOR SHALL WORK CLOSELY WITH THE CONTRACTING OFFICER
TO IMPLEMENT A PLAN FOR TEMPORARY BARRICADES WITHIN THE
MUNITIONS FACILITY AS SHOWN IN THESE DRAWINGS.
3. THE CONTRACTOR SHALL WORK CLOSELY WITH THE CONTRACTING OFFICER
TO IMPLEMENT A PLAN FOR PULLING BACK EQUIPMENT AND WORKERS IF
NECESSARY BY MISSION REQUIREMENTS.
FENCE
1. FENCE AND GATE WORK SHALL PROCEED IN A MANNER THAT PROVIDES
CONTINUOUS SECURITY FOR THE CONTRACT DURATION.
2. TEMPORARY FENCES AND GATES SHALL BE TIED TO EXISTING FENCES
AND/OR EXISTING BUILDINGS PRIOR TO COMMENCING WITH ANY WORK
ADDRESSED ON THESE DRAWINGS.
3. THE CONTRACTOR SHALL OBTAIN WRITTEN GOVERNMENT ACCEPTANCE OF
TEMPORARY FENCES, GATES, AND RELATED SECURITY ITEMS PRIOR TO
COMMENCING WITH ANY WORK ON THIS DRAWING.
4. CONTRACTOR PROVIDED LOCKS SHALL BE APPROVED BY THE BASE.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C O
FF
M
AN
E
N G
IN
EE
R S
FO
R
T
ST
R
EE
T, S
U
IT
E
H
O N
O
LU
LU
, H
AW
AI
I 9
O C
T
, 2
AN
SI
D
JO
IN
T
BA
SE
P
EA
R
L H
AR
BO
R -H
IC
KA
M , O
AH
U
, H
AW
AI
I
FY
H
AW
AI
I A
IR
N
AT
IO
N
AL
G U
AR
D
(H
IA
N G
) F -2
PL
U S
U P
AD
D
E G
R
ES
S
SH
O P
M . U
N
TE
N
T.
C
R
IS
T
J.
L
O W
E
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H O
N O
LU
LU
D
IS
TR
IC
T
FO
R T
SH
AF
TE
R
, H
AW
AI
I
R
EV
IS
ED
F
IN
AL
S
U
BM
IT
TA
L
W
A2
2F
W
A1
9D
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L N
O
TE
S
C-002
EROSION PREVENTION / SEDIMENT CONTROL NOTES:
1. THE CONTRACTOR MUST FOLLOW THE GUIDELINES IN THE CITY AND COUNTY
OF HONOLULU'S "RULES RELATING TO WATER QUALITY".
2. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS MUST BE IN
PLACE BEFORE ANY EARTHWORK IS INITIATED.
3. REGULARLY INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT
CONTROLS TO ENSURE CONTINUED PERFORMANCE.
4. TEMPORARY STABILIZATION
TEMPORARY STABILIZATION TEMPORARY STABILIZATION IS REQUIRED ON
DISTURBED AREAS WHICH ARE AT FINAL GRADE OR WHEN THE DISTURBED
AREA WILL NOT BE WORKED FOR 14 CONSECUTIVE DAYS OR MORE.
5. PERMANENT STABILIZATION
ALL DISTURBED AREAS MUST BE PERMANENTLY STABILIZED USING
VEGETATIVE COVERING, PAVEMENT, OR EQUIVALENT, PRIOR TO REMOVING
EROSION AND SEDIMENT MEASURES. TRAPPED SEDIMENT AND AREAS OF
DISTURBED SOIL WHICH RESULT FROM THE REMOVAL OF THE TEMPORARY
MEASURES MUST BE IMMEDIATELY AND PERMANENTLY STABILIZED.
6. PRESERVE EXISTING VEGETATION
CLEARLY MARK THE AREAS TO BE PRESERVED WITH FLAGS OR TEMPORARY
FENCING. WHERE TEMPORARY FENCING IS USED, FENCING MUST BE
ADEQUATELY SUPPORTED BY POSTS AND MAINTAINED IN AN UPRIGHT
POSITION.
7. MINIMIZE SOIL COMPACTION
AREAS WHERE FINAL STABILIZATION OR INFILTRATION PRACTICES WILL BE
INSTALLED MUST BE PROTECTED FROM EXCESSIVE COMPACTION DURING
CONSTRUCTION. VEHICLE AND EQUIPMENT USE MUST BE RESTRICTED OR
TECHNIQUES TO CONDITION THE SOILS SUPPORT VEGETATION MUST BE
IMPLEMENTED IN THE AREAS THAT HAVE BEEN COMPACTED AND ARE
DESIGNATED TO REMAIN VEGETATIVE OR POST-CONSTRUCTION
INFILTRATION AREAS. CLEARLY MARK THE AREAS TO BE AVOIDED WITH
FLAGS OR TEMPORARY FENCING. WHERE TEMPORARY FENCING IS USED,
FENCING MUST BE ADEQUATELY SUPPORTED BY POSTS AND MAINTAINED IN
AN UPRIGHT POSITION.
8. PERIMETER CONTROLS
PERIMETER CONTROLS ARE REQUIRED DOWNSLOPE OF ALL DISTURBED
AREAS. MAINTAIN DOWNSTREAM VEGETATED BUFFER AREA.
9. INLET PROTECTION
9.1. ALL STORM DRAIN INLETS ONSITE AND THOSE OFFSITE WHICH MAY RECEIVE
RUNOFF FROM THE SITE MUST USE AN INLET PROTECTION DEVICE UNLESS
THEY ARE DIRECTED TO A SEDIMENT BASIN.
9.2. SEDIMENT LEVELS MAY NOT EXCEED ONE THIRD OF THE HEIGHT OF A
SEDIMENT BARRIER OR INLET PROTECTION DEVICE AT ANY POINT ALONG THE
LENGTH OF THE SEDIMENT BARRIER OR THE INLET PROTECTION DEVICE.
9.3. SEDIMENT BARRIERS AND INLET PROTECTION DEVICES MUST BE UNCLOGGED
AND CLEANED WHEN PERFORMANCE IS COMPROMISED. TORN, WEATHERED
OR SAGGING SEDIMENT BARRIERS OR INLET PROTECTION DEVICES MUST BE
REPAIRED OR REPLACED IMMEDIATELY.
10. TRACKING CONTROL
10.1. MINIMIZE SEDIMENT TRACK-OUT ONTO OFF-SITE STREETS, OTHER
PAVED AREAS, AND SIDEWALKS FROM VEHICLES EXITING THE
CONSTRUCTION SITE BY RESTRICTING VEHICLE TRAFFIC TO PROPERLY
DESIGNATED AREAS AND USING ADDITIONAL CONTROLS TO REMOVE
SEDIMENT FROM VEHICLE TIRES PRIOR TO EXITING THE SITE.
10.2. VEHICULAR PARKING AND MOVEMENTS ON PROJECT SITES MUST BE
CONFINED TO PAVED SURFACES OR PREDEFINED PARKING AREAS AND
VEHICLE PATHS, WHICH MUST BE MARKED WITH FLAGS OR BOUNDARY
FENCING.
10.3. ALL POLLUTANTS AND MATERIALS THAT ARE DROPPED, WASHED,
TRACKED, SPILLED, OR OTHERWISE DISCHARGED FROM A PROJECT SITE
TO OFF-SITE STREETS, OTHER PAVED AREAS, SIDEWALKS OR THE MS4
MUST BE CLEANED USING DRY METHODS SUCH AS SWEEPING OR
VACUUMING.
10.4. WASHING POLLUTANTS AND MATERIALS THAT ARE DISCHARGED FROM
THE PROJECT SITE TO THE MS4 INTO DRAIN INLETS OR CATCH BASINS IS
PROHIBITED UNLESS THE MATERIAL IS SEDIMENT AND THE INLETS ARE
DIRECTED TO A SEDIMENT BASIN OR SEDIMENT TRAP.
11. BEST MANAGEMENT PRACTICES (BMPS) MUST NOT BE REMOVED UNTIL FINAL
STABILIZATION IS COMPLETE FOR THAT PHASE.
12. REFER TO CITY AND COUNTY OF HONOLULU BEST MANAGEMENT PRACTICES
MANUAL-CONSTRUCTION, FOR MORE INFORMATION ON BMPS.
13. PRACTICE GOOD HOUSEKEEPING MEASURES THROUGHOUT THE DURATION
OF CONSTRUCTION.
14. REGULARLY INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT
CONTROLS TO ENSURE CONTINUED PERFORMANCE.
15. INSPECTIONS WILL BE PERFORMED WEEKLY.
PROJECT SEQUENCE:
1. INSTALL CONSTRUCTION INGRESS /EGRESS, PERIMETER CONTROLS, BUFFER
AND INLET PROTECTION, CLEARING AND GRUBBING AS…
This is the start of the file's text. The full file is on GovTribe.