KISD_BAS_Upgrades_2019_RFP_addendum_1.pdf
PDF 252 KB Posted
- Solicitation number
- RFP KSD 190000002488 3
- Issued by
- Kent County, Michigan
About this file
This is an addendum to a Request for Proposal issued by Kent Intermediate School District's Facilities Office for 2019 Building Automation System (BAS) upgrades. The addendum provides clarification and additional detailed specifications regarding Oakleigh School's control system, which was highlighted in the original RFP document. The project encompasses upgrades across twelve facilities or systems within the district, including the Educational Service Center, Kent Adult and Continuing Education, Kent Career Center, Kent Career and Technical Center (KCTC), Kent Education Center, Kent Technical Center, Maintenance Building, Midwestern Technical Center, Oakleigh School, and a PLC system, plus a server station. The specifications detail existing equipment models, Tridium software versions, communication bus protocols (N2, Bacnet, and Modbus), and quantities of devices requiring upgrades. The KCTC Building is notably the only location with two Jace controllers, while all other facilities have one. Oakleigh School operates on a newer Tridium version (3.8.41.2) and currently is not integrated into the district's BAS network but will be connected as the project progresses.
The addendum provides technical specifications for equipment across multiple bus types and communication protocols, with device quantities ranging from single units to eighty-five devices depending on the system. The document includes tabular information identifying each building's existing model, Baja version compatibility, bus information, and device counts to ensure bidders understand the complete scope of the BAS upgrade requirements across all district facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KISD_BAS_Upgrades_2019_RFP_addendum_2.pdf | ||
| Kent ISD_BAS_Upgrades_2019_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kent Intermediate School District • Facilities Office 1655 East Beltline, NE • Grand Rapids, MI 49525 • (616) 365-2290 • Fax (616) 364-9987 www.kentisd.org
Kent Intermediate School District
REQUEST FOR PROPOSAL
2019 BAS Upgrades
ADDENDUM 1
This addendum provides more complete information about Oakleigh School’s Jace – see the green highlighted cells in the table below. This table is found on the 5th page of the original RFP document.
SPECIFICATIONS
(page 2)
Here is some more detailed information pertaining to each of the 12 upgrades:
* Notice that the KCTC Building (1655 E. Beltline) is the only building with two Jaces, all others have one.
** Oakleigh is not yet tied into our BAS network but will be as this project progresses.
Line # Name in BAS Existing Model Baja Version Bus Info # of Devices 1 ESC NPM6 (JCI FX-60) Tridium 3.8.38 N2 74
1a Modbus 5 2 KAC NPM2 (JCI FX-20) Tridium 3.8.38.10 N2 16 3 KCC NPM6E (JCI FX-60) Tridium 3.8.38.10 N2 24
3a Modbus 2 4 KCTC JVLN (JCI FX-70) Tridium 3.8.38.10 N2-A 33
4a N2-B 49 4b N2-C 60 4c N2-D 46 4d N2-XP 20 5 KCTC_FX60 NPM6 (JCI FX-60) Tridium 3.8.38.10 Modbus 1
5a Bacnet 85 6 KEC NPM6 (JCI FX-60) Tridium 3.8.38 N2 40 7 KTC NPM6E (JCI FX-60) Tridium 3.8.38 N2-A 35
7a N2-B 41 8 MAINT_BLDG NPM2 (JCI FX-20) Tridium 3.8.38 N2 6 9 MTC NPM6E (JCI FX-60) Tridium 3.8.38 Bacnet 3
10 **OAK NPM6E/DISTECH/EC-BOS-6ax Tridium 3.8.41.2 Bacnet 24 11 PLC JVLN (JCI FX-70) Tridium 3.8.41.2 N2 74
11a Bacnet 40 11b Modbus 1 12 ServerStation JCI\FXServer-6.0 Tridium 3.8.38 Niagara Only N/A