Kiefer_Rd_Pipeline_Design_and_Construction_Services_RFP.pdf
PDF 1 MB Posted
- Solicitation number
- 2025-GEN-0008
- Issued by
- Sacramento County, San Francisco City, California
About this file
The document is a Request for Proposal (RFP) issued by the Sacramento County Water Agency (SCWA) for consulting services related to the Keifer Road Transmission Main Design and Construction Support Services project. The RFP seeks engineering firms to manage, design, and provide construction support for a proposed transmission main extending approximately 2.8 miles from Sunrise Boulevard to Excelsior Road, with pipe sizes ranging from 16 to 30 inches. An additional 0.6-mile 12-inch pipe section will connect to the existing Mather system. The project aims to provide redundancy and operational flexibility for Mather Housing. The RFP was published on January 23, 2025, with questions due by February 20, 2025, and proposals due by March 13, 2025. The anticipated project timeline includes consultant selection by March 27, 2025, contract approval by June 3, 2025, and construction expected to start in July 2026.
Compensation for the project will be on a time and expenses basis, with consultants required to provide a detailed cost proposal including hourly rates for project team members. The project will be task order-based with a not-to-exceed total payment amount. The consultant will be responsible for various technical aspects, including preliminary design, environmental documentation under CEQA, project management, permitting, and technical support during bidding and construction. The project will involve coordination with multiple agencies, including the City of Rancho Cordova, Sacramento County Department of Transportation, and the Bureau of Reclamation. The consultant will need to address potential road access considerations and utility crossings, including an existing utility bridge near the Folsom South Canal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Community Services Agency Sacramento County Water Agency
Request for Proposal for Consulting Services
Keifer Road Transmission Main Design and Construction Support Services
RFP publish date: January 23, 2025
Closing date for questions: February 20, 2025
Proposals due date: March 13, 2025
10151 Florin Rd Sacramento, CA 95829
Kiefer Pipeline RFP
Contents 1 Introduction
1.1 Purpose of RFP
1.2 Background
1.3 Scope of work
1.4 Scope of Services
2 General Rules
2.1 RFP overview
2.2 Estimated timeline and extension of time
2.3 Proposal format and content
2.4 Proposal submission
2.5 Questions and communication
2.6 Addenda
2.7 Agency’s right to withdraw, cancel, suspend and/or modify RFP
2.8 Proposer’s right to edit or cancel proposal
2.9 Proposals will not be returned
2.10 Public disclosure of proposal documents
2.11 Proposer’s costs
2.12 Proposer’s ideas
2.13 Collusion
2.14 Conflict of interest
3 Evaluation and Selection
3.1 Proposal evaluation and recommendation for selection
3.2 Evaluation of responsiveness
3.3 Evaluation of responsibility
3.4 Evaluation panel and evaluation criteria
3.5 Interviews
3.6 Execution of contract
4 Attachments
1 Introduction
1.1 Purpose of RFP
The Sacramento County Water Agency (“SCWA”), is soliciting proposals from engineering firms (Consultant) to provide professional services to manage, design, and provide support during construction for a proposed transmission main in Keifer Blvd (Project), extending from Sunrise Blvd to Excelsior Road (see Attachment 1).
1.2 Background
The Sacramento County Water Agency (SCWA) was formed in 1952 by a special legislative act of the State of California. The purposes of SCWA are carried out through benefit zones. Zone 40 was created in 1985 to acquire funding and construct facilities for the production and distribution of groundwater and surface water for the beneficial use of the inhabitants within the zone. Zone 40 does not own, operate, nor maintain assets; it merely facilitates the construction of water supply facilities and acquires surface water contracts.
SCWA’s Zone 41 was created to operate and maintain public water systems in various locations throughout Sacramento County, including some areas within the cities of Elk Grove and Rancho Cordova. SCWA administers capital improvement and facility retrofit projects to expand and improve its water supply facilities to meet the needs of new growth, new regulations, and/or equipment condition. The Sacramento County Department of Water Resources, Water Supply Design section implements these water facility design and construction projects.
1.3 Scope of work
The Project includes approximately 2.8 miles of Transmission main (sizes vary from 16-inch to 30-inch) that will connect to an existing 24 inch transmission main in Sunrise Blvd, and follow the Keifer Blvd alignment west to Excelsior Road. The project will also include a 0.6 mile section of 12-inch pipe in Excelsior Road which will connect to the existing Mather system. This pipeline will provide redundancy and operational flexibility for various areas of Mather Housing. A portion of this alignment is paved while some undeveloped.
Depending on the timing of future development, it may be determined that an all weather access road is necessary over the top of the pipe. Consultant will coordinate with planning staff as well as development community to coordinate appropriate timing and ultimate status of the road.
Consultant will be taking a lead role in the design of the Project and will provide engineering support during the construction in coordination with SCWA staff.
Sacramento County Construction Management and Inspection Division (CMID) will provide inspection during construction. Due to staffing constraints, SCWA staff will rely on the Consultant to move the project forward independently, checking in at regular intervals with SCWA staff.
Consultant will coordinate with SCWA Planning staff to confirm pipe sizing, alignment, connection to existing facilities and location of future connections.
Consultant will coordinate with City of Rancho Cordova regarding the timing of Sunrise Blvd widening and connection to Project.
Consultant will coordinate with Sacramento County Department of Transportation regarding the two creek crossings as well as the Bureau of Reclamation for the crossing of the Folsom South Canal. An existing utility bridge is located in the vicinity, Consultant will determine if it’s capacity is adequate for additional pipelines, or if an additional crossing will be necessary.
1.4 Scope of Services
The work that is to be performed by the consultant will include the following:
1. Provide preliminary design services. These services may include but are not limited to gathering information and reporting on preliminary project data such as geotechnical information, roadway design data (existing and future), surveys, improvement plans, and identifying and addressing utility conflicts and preliminary cost estimates. Provide easement and right of way acquisition support.
2. Provide technical studies to support preparation of appropriate documentation under the California Environmental Quality Act (CEQA).
Technical studies may include, but not limited to, a biological resources report, cultural resources report, wetland delineation, and arborist report.
Coordinate with the Department of Community Development, Division of Planning and Environmental Review (PER) to review prior, relevant CEQA documents as appropriate. Submit Request for Environmental document to PER. SCWA will pay for all fees due to PER, but the Consultant will provide coordination and any necessary studies. Extensive environmental analysis has been or is in the process of being completed for adjacent developments. The pipeline is anticipated to be included in those reports.
3. Provide project management services. This includes but is not limited to conducting meetings during all phases of the project, preparing monthly invoices, developing a project schedule, and coordinating with agencies affected by the projects.
4. Provide design services for water pipeline installation projects. These design services include but are not limited obtaining necessary permits, preparing corrosion study reports, providing design recommendations and/or calculations, developing traffic control plans and sequence of work, developing detailed drawings and applicable specifications using AutoCAD in accordance with SCWA guidelines (Attachment 2), Sacramento County Improvement Standards as well as Construction Specifications, and developing detailed cost estimates.
5. Provide technical services to Water Agency staff during bidding and construction. This includes but is not limited to responding to bidder questions, providing addenda and written clarifications when necessary, producing conformed sets of plans and specifications for construction, responding to contractor Requests for Information (RFI’s), reviewing contractor submittals to assure conformance with the construction specifications and drawings, attending project related meetings, addressing problems and deficiencies, and providing surveying services for design and construction staking.
Project Schedule
Activity Date* RFP Due March 13, 2025 Consultant Selection Made March 27, 2025 Consultant Contract Approved by Board June 3, 2025 Kick-off Meeting VSWTP June 12, 2025 Provide 100% Plans and Specifications Ready for Bid February 10, 2026
Project Design Meetings and Milestones Design Review Meetings (min) 2
Board Agenda for Approval to Bid-Advertise March 2026 Start Construction July 2026
*Subject to change.
Basis for Compensation
Compensation for services rendered shall be paid on a time and expenses basis. Please include the hourly rate schedule for project team members. Refer to section 2.3 - Cost Proposal / Information.
2 General Rules
2.1 RFP overview
This Request for Proposals (“RFP”) is an invitation for Proposers to submit a proposal to the Agency. This RFP does not commit the Agency to award a contract to any respondent/proposer. Submission of a proposal shall neither obligate nor entitle a Proposer to enter into a contract with the Agency.
2.2 Estimated timeline and extension of time
Please refer to the OpenGov Procurement project page for information on timelines. These dates are subject to revision or cancellation by the Agency in its sole and absolute discretion. Time is of the essence.
Consultant shall complete work in the time negotiated at the commencement of the contract.
2.3 Proposal format and content
When submitting a proposal, Proposers must follow the format and contents detailed below. Failure to do so will likely prolong the evaluation process and could result in a proposal not being considered.
Contents
Project overview Provide a narrative description of how Consultant and individual team members can create the requested work products and answer the identified questions. The Contract will be Task Order-based with a not to exceed amount over a defined period. DWR will assess your understanding of all aspects of the project based on the overview.
Project approach Provide a general description of your proposed approach towards the successful and timely completion of the project. Identify any and all proposed changes to the task items that are included in the Scope of Work section of this RFQ/RFP. Identify critical issues or potential problems and discuss how your firm will address them. Include a description of all work that will be subcontracted to others. Include your expectations of work to be performed by Agency staff. Summarize your anticipated level of effort for identified milestones and/or major tasks. The level of effort can be
Section Contents
Cover Letter
Transmittal
A Project overview
B Project approach
C Related experience
D Consultant team
E Anticipated Schedule (optional)
F Conflicts of interest
G Propriety information
H Insurance
I Staff estimate and rates for proposed team members
J References
K Solicitation of sub-consultants, subcontractors, other service providers and suppliers
L Employment Practices
M Exceptions to Contract Terms and Conditions presented in terms of estimated number of hours or by percentage of time for each of your primary project team members. Provide proposed schedule for completion of design services. Please do not include cost information in this section of the proposal.
Related experience Provide 2-page (maximum) summary describing the experience of the team in implementing similar water supply analyses in the Sacramento region. The description should include the year(s) during which the work was performed, the firm's role and the proposed team member’s role in the project.
Consultant team The proposed consultant team shall be identified including project manager, and project engineer. Key tasks and the associated personnel shall be identified. The percentage of time devoted to this project for these key personnel shall be stated and guaranteed. A consultant team organization diagram shall be included. Anticipated schedule of service.
Provide the firm’s ability to commit adequate resources for performing the subject and successfully completing the project in a timely manner.
Conflicts of interest Firms submitting proposals in response to this RFP must disclose to DWR any actual, apparent, direct or indirect, or potential conflicts of interest that may exist with respect to the firm, management, or employees of the firm or other persons relative to the services to be provided under the Agreement for engineering services to be awarded pursuant to this RFP. If a firm has no conflicts of interest, a statement to that effect shall be included in the Proposal.
Proprietary information The Consultant submitting proposals to this RFP must provide a statement that nothing contained in the submittal proposal will be proprietary.
Insurance Provide a summary of the firm's (and subcontractor's) present and proposed insurance coverage, including public liability, property damage, worker's compensation, automobile, and professional liability for the duration of the project. Minimums must meet DWR criteria as shown in Attachment B of the attached sample agreement.
Staff estimates and rates for proposed team members Provide staff estimates and 2024-2025 rates for project management and day to day support services. Provide sufficient information to permit SCWA to determine the key personnel and the number of management, engineering, technical, drafting and support personnel envisioned.
References Provide a minimum of three contacts for which your firm and consultant team members have provided similar services. The name, address and telephone number of the owner’s representative shall be provided.
Solicitation of subconsultants, subcontractors, other service providers and suppliers If the prime consultant intends to solicit subproposals and/or quotes for certain tasks on this project from qualified subconsultants, subcontractors, other service providers and suppliers, DWR expects the prime consultant to solicit qualified firms in the local business community for such services and supplies. The solicitation conducted should be as broad as possible to reasonably provide opportunities for and encourage relationship building with qualified minority and women-owned firms, and small and local businesses in the Sacramento community. The prime consultant shall not illegally discriminate in the solicitation process.
Substitution of any subconsultants, subcontractors, other service providers, and suppliers identified in the proposal upon which the agreement is based shall not be made without the written consent of
DWR.
Employment practices Provide a summary of your firm’s employment policies and procedures, including any equal employment opportunity and affirmative action policies. Also, include a brief summary outlining the present composition of your work force.
Exceptions to contract terms and conditions
Provide a list of any exceptions to contract terms and conditions which the Consultant will seek from the standard DWR contract language.
Cost Proposal/Information
In a separate sealed envelope provide a detailed estimate of costs to complete the work items related to this contract. This detail should incorporate the “level of effort” information provided in the Project Approach/Work Plan section of your proposal. It should include sub-totaled costs for your major task items in addition to the estimated total cost for the completed project. List costs for subcontracted work separately. Show name of subcontractor, type of work, unit and total charges for each type of work. Also provide your fee schedule that shows all of the hourly rates and fees that will be applied for all work and deliverables related to this contract.
2.4 Proposal submission
Proposals must be received by the submission deadline in OpenGov Procurement via the solicitation link at https://procurement.opengov.com/portal/saccounty/projects/142081
Failure to submit a proposal on time may be grounds for rejection of the proposal; however, the Agency reserves the right, in its sole and absolute discretion, to accept proposals after the proposal due date.
2.5 Questions and communication
Questions concerning this RFP must be submitted to this solicitation’s Question & Answer page in OpenGov Procurement.
Questions received via phone or e-mail to direct points of contact for this RFP will not be considered nor responded to. The County shall respond to questions properly submitted as described above via addenda.
2.6 Addenda
The Agency reserves the right to modify the RFP at any time prior to the proposal due date. The Agency will modify the RFP only by formal written addenda. Proposer’s proposal should be based on this RFP document and any formal written addenda. Proposers should not rely on oral statements.
Addenda will be posted in OpenGov Procurement. It is the responsibility of each prospective Proposer to assure receipt of all addenda.
2.7 Agency’s right to withdraw, cancel, suspend and/or modify RFP
The Agency reserves the right to withdraw, cancel, suspend, and/or https://secure.procurenow.com/login https://secure.procurenow.com/login modify this RFP for any reason and at any time with no liability to any prospective Proposer for any costs or expenses incurred in connection with the RFP or otherwise.
2.8 Proposer’s right to edit or cancel proposal
Proposers may edit or cancel their proposal in OpenGov Procurement prior to the due date.
2.9 Proposals will not be returned
Upon submission, proposals will not be returned.
2.10 Public disclosure of proposal documents
The Agency will treat all information submitted in a proposal as available for public inspection once negotiations with the selected party have been completed. If copies of proposals are included with Board materials, the Agency will make proposals available for public inspection once staff has made a recommendation for award.
If a Proposer believes protected data is included in its proposal, the Proposer shall clearly identify the data and provide the legal basis in support of the asserted classification. Proposer must present such information separately as part of its proposal OR type in bold red letters the term “CONFIDENTIAL” on that specific part or page of the Proposal which Proposer believes to be confidential. Classification of data as trade secret data will be determined pursuant to applicable law, and, accordingly, merely labeling data as “trade secret” does not necessarily make the data protected as such under any applicable law.
In order for the Agency to assert the confidentiality of any such information in the event a Public Record Act request is received, the Proposer must request, execute and submit a Agency-prepared written agreement to defend and indemnify the Agency for any liability, costs and expenses incurred in asserting such confidentiality as part of the proposal. A copy of that written agreement is attached as Attachment 4.
The final determination of whether the Agency will assert a Proposer’s claim of confidentiality shall be at the sole discretion of the Agency.
Any information determined to be non-confidential shall be considered public record. If the Agency determines that your information does not meet the criteria for confidentiality, you will be notified of the Agency’s intent to release the public record pursuant to any Public Records Act request.
The Proposer agrees, as a condition of submitting its proposal, that the Agency will not, as between the parties, be liable or accountable for any loss or damage, which may result from a breach of confidentiality related to the proposal. The Proposer agrees to indemnify and hold the Agency, its officials, agents, and employees harmless from all claims arising out of, resulting from, or in any manner attributable to any violation of any provision of the California Public Records Act, including legal fees and disbursements paid or incurred to enforce this provision.
2.11 Proposer’s costs
The Agency shall not be responsible for any costs incurred by Proposer in connection with this RFP. Proposer shall bear all costs associated with proposal preparation, submission, and attendance at interviews, or any other activity associated with this RFP or otherwise.
2.12 Proposer’s ideas
To the extent permitted by law, the Agency reserves the right to use any or all ideas, concepts, or other information provided in any proposals. Selection or rejection of the Proposal does not affect this right. All material submitted which has not been clearly designated as proprietary information becomes the property of SCWA and may be returned only at SCWA’s option. Proposals submitted become the property of SCWA and may be reviewed and evaluated by any persons at the discretion of SCWA. Materials marked proprietary shall be returned (without copies made). This material must be clearly marked “PROPRIETARY INFORMATION”.
2.13 Collusion
If the Agency determines that collusion has occurred among Proposers, none of the proposals of the participants involved in the collusion shall be considered. The Agency’s determination shall be final.
2.14 Conflict of interest
The Proposer affirms that to the best of its knowledge the submission of its Proposal, or any resulting contract, does not present an actual or perceived conflict of interest. The Proposer agrees that should any actual or perceived conflict of interest become known, it will immediately notify the Agency and will advise whether it will or will not avoid, mitigate, or neutralize the conflict of interest.
The Agency may make reasonable efforts to avoid, mitigate, or neutralize a conflict of interest by a Proposer. To avoid a conflict of interest by a Proposer, the Agency may utilize methods including disqualifying a Proposer from eligibility for a contract award or cancelling the contract if the conflict is discovered after a contract has been issued. The Agency may, at its sole and absolute discretion, waive any conflict of interest.
3 Evaluation and Selection
3.1 Proposal evaluation and recommendation for selection
The Agency reserves the following rights, to be exercised in the Agency’s sole and absolute discretion: 1) to determine whether any aspect of a proposal satisfactorily meets the criteria established in this RFP; 2) to seek clarification or additional information from any Proposer; 3) to negotiate, sequentially or simultaneously, pricing and/or terms with any Proposer or vendor; 4) to reject any or all proposals with or without cause; 5) to waive any irregularities or informalities in a proposal; 6) to cancel or amend by addenda this RFP, in part or entirely; 7) to award multiple contracts to Proposers; and/or
8) award a contract to a vendor that did not submit a proposal.
Evaluation of proposals by a selection committee, evaluation panel, Agency staff, a technical advisory committee, or by another group, individual or entity is advisory only. The Sacramento County Water Agency Board of Directors or its designee may consider or reject such evaluation(s) for any or all proposals. Such evaluations are for the sole benefit of the Sacramento County Water Agency Board of Directors or its designee, and as such, they are not binding upon the Agency, nor may they be relied upon in any way by a Proposer.
3.2 Evaluation of responsiveness
The Agency will consider all the material submitted by the Proposer to determine whether the Proposer’s offer is in compliance with the terms and conditions set forth in this RFP. Proposals that do not comply with the provisions in this RFP may be considered nonresponsive and may be rejected.
3.3 Evaluation of responsibility
To determine whether a Proposer is responsible, the Agency will consider the Proposer’s general qualifications to perform the requested services in a satisfactory manner; financial responsibility; integrity;
skill; past performance; and ability. Proposals from Proposers considered non-responsible will be rejected.
3.4 Evaluation panel and evaluation criteria
A technical review panel, composed of SCWA staff will evaluate, score and rank each proposal based on the items listed below (see Table 2).
Table 2. Evaluation Criteria
Criteria Weight Scores a
Weighted Scores b
Responsiveness to the RFP 15%
Firm’s Qualifications 15%
Team Member’s Experience with Relation to Requested Services
20%
Project Understanding / Approach
30%
Teams Resource Availability 10%
Staff Estimate 10%
Total 100% a Each criteria will be assigned a score of 1 to 100.
b Scores will be multiplied by the weights and totaled to yield the total points on the proposal.
Final negotiations as to scope and cost will take place after selection of the firm. An award of contract shall be made to the responsible Consultant who provides the best overall response to the requirements of this RFP. SCWA may select whichever proposal it determines will best serve its interests. The successful Consultant will be selected in accordance with the Proposal Evaluation criteria identified above.
SCWA’s goal is to have a final selection made no later than February 27, 2025, subject to final approvals. Written notification of the outcome of the selection process will be emailed to all Consultants who submitted a proposal.
After review of each responsive proposal, the Agency may award a contract to a successful Proposer based on the evaluation criteria, or it may establish a short list of Proposers for further consideration. The short list of Proposers may be asked to provide additional information.
The short list of Proposers may also be asked to attend an in-person or telephone interview/presentation, as determined by the Agency in its sole discretion.
3.5 Interviews
After review of each responsive proposal, the Agency may award a contract to a successful Proposer based on the evaluation criteria, or it may establish a short list of Proposers for further consideration. The short list of Proposers may be asked to provide additional information, or an interview/demonstration as determined by the Agency in its sole discretion.
3.6 Execution of contract
The selected proposer shall execute an agreement with the County of Sacramento, using the standard consulting agreement (Attachment 3).
Any requested revisions, deletions, or additions, to the language in the attached sample agreement shall be clearly set forth in the proposal for the County’s consideration.
Before a contract becomes effective between the County and any proposer, the contract must be reviewed by County Counsel and the contract award must be approved by the County Board of Supervisors or its designee. If for any reason the County Board of Supervisors or its designee does not ratify and sign the contract, then there are no binding obligations whatsoever between the County and the proposer relative to the proposed contract.
4 Attachments Attachment 1 – Kiefer Pipeline Alignment - Preliminary Attachment 2 – SCWA AutoCad Standard DWG Configurations Attachment 3 – Sacramento County Water Agency Standard Consulting
Agreement Attachment 4 – Written Agreement to Indemnify for Release of
Propriety Information
Contract XXXXX
Attachment 1 – Keifer Pipeline Alignment - Preliminary
Department of Water Resources Mat Sotow, Director
Including service to the cities of Elk Grove and Rancho Cordova
SACRAMENTO COUNTY
WATER AGENCY
Main: 827 7th St., Rm. 301, Sacramento, CA 95814 • (916) 874-6851 • fax (916) 874-8693 • www.scwa.net Facilities Operations & Admin.: 3847 Branch Center Rd. #1, Sacramento, CA 95827 • (916) 875-RAIN • fax (916) 875-6884
“Managing Tomorrow’s Water Today”
9/4/2024
To Whom It May Concern:
Please find enclosed the latest version of the Sacramento County Water Agency’s computer aided drafting standards. Also included are the plan status submittal requirements (hard copy and electronic) as well as file transfer protocols. Although this office solely uses Autodesk products, these standards herein most likely are applicable to other drafting software used. The Agency requests that all consulting engineers strictly abide to these standards to facilitate collaboration of any design drawings. Any deviation from these standards shall be discussed with the CAD manager prior to project initiation.
SCWA Plan Submittal Requirements and Drafting Standards
INDEX
Title Page
Drawing File Naming Conventions Drawing and Specification Submittal Requirements Data Transfer Protocol Pen Settings Text Style Standards Layering Convention
Attachment 2 - SCWA AutoCad Standard DWG Configurations http://www.scwa.net/
SCWA CAD Standards Revision Date: 03/08/13
DRAWING FILE NAMING CONVENTIONS
File naming convention to be used for Project Contract Drawings: ??####%%%.dwg
?? #### %%% .dwg
NOTE: The Base Drawings of any set will be named: ??####BS.DWG
(BS = BASE)
EXAMPLE :
Civil drawing number 1 of a project at Dwight Road Facility OWT1 under Contract No.
5445 would be labeled T15445C01.dwg.
1Upon initiation of production drawings the consulting engineer is to contact SCWA for the appropriate
Facility Code. The purpose of the Facility Code is to help identify which major facility the project will be serving.
2 The prefix of the Drawing Number should correlate to the discipline of the drawing (C = Civil, S = Structural, etc)
Facility Code1
Contract Number
Drawing Number2
SCWA CAD Standards Revision Date: 03/08/13
DRAWING AND SPECIFICATION SUBMITTAL REQUIREMENTS
Unless otherwise specified in the project contract, the consultant is to provide progress drawings (specifications and drawings) at the 20% (A-Plan), 50% (B-Plan) and 90% (C-Plan) stages as well as subsequent Bid Set, Construction Set, and As-Built submittals. In addition to addendums, these submittals shall be provided to SCWA as follows:
20% (A-Plan), 50% (B-Plan) & 90% (C-Plan) Progress Submittals Specifications:
• Digital file formatted in Microsoft Word or PDF format Drawings:
• Status Stamp: located as shown in Figure 1
• PDF files for all sheets
Bid Set Same as the 20 – 90% progress requirements.
Addendums (provide copies of just those sections / drawings affected) Same as the 20 – 90% progress requirements except:
• Place appropriate symbol, description and date in the title block
• No status stamp
Construction Set Same as the 20 – 90% progress requirements except:
• No status stamp
• Place text “CONSTRUCTION SET” under the engineer’s stamp
Remove all addendum symbols from drawings and ensure Specification include any revised sections.
• Digital CAD files including all pertinent XREF, .CTB and image files
Record Drawings
• No status stamp
• Place text “RECORD DRAWINGS” under the engineer’s stamp
• Digital CAD files including all pertinent XREF, .CTB and image files as well as
PDF file.
SCWA CAD Standards Revision Date: 03/08/13
All design specifications will incorporate existing Agency specifications for new water facilities. All drawings will be produced using AutoCAD 2010 or later version in accordance with the guidelines provided herein.
DATA TRANSFER PROTOCOL
All digital information is to be delivered in either the following manners:
• CD or DVD1
• FTP Site2
1Provide appropriate labeling on CD or DVD based upon the status of the files being submitted.
2Consultant is to provide all necessary passwords and usernames upon first status submittal. File structure is to have a logical naming convention based upon the status of the files uploaded.
Figure 1
B-PLANS STATUS SHOWN HERE.
SCWA CAD Standards Revision Date: 03/08/13
PEN SETTINGS
AUTOCAD PEN/COLOR COLOR PEN WIDTH (IN)
1 RED 7 0.0050
2 YELLOW 7 0.0070
3 GREEN 7 0.0160
4 CYAN 7 0.0195
5 BLUE 7 0.0210
6 MAGENTA 7 0.0310
7 WHITE 7 0.0150
8 GREY 7 0.0020
251 251 0.0100
253 253 0.0100
Notes:
1. All pens after pen no. 8 will plot in color unless reassigned at user’s discretion.
2. Please provide .CTB files as necessary as specified in the Submittal
Requirements.
SCWA CAD Standards Revision Date: 03/08/13
TEXT STYLE STANDARDS
STYLE PLOTTED HEIGHT FONT LAYER COLOR TEXT WIDTH
L80 0.08” Simplex or Romans 0.007-Red 0.80
L100 0.10” Simplex or Romans 0.010-Yellow 0.80
L120 0.12” Simplex or Romans 0.010-Yellow 0.80
L125 0.125” Simplex or Romans 0.010-Yellow 0.80
L140 0.14” Simplex or Romans 0.012-Green 0.80
L175 0.175” Simplex or Romans 0.014-Cyan 0.80
L200 0.20” Simplex or Romans 0.020-Blue 0.80
L240 0.24” Simplex or Romans 0.020-Blue 0.80
L290 0.29” Simplex or Romans 0.024-Magenta 0.80
L350 0.35” Simplex or Romans 0.024-Magenta 0.80
Notes:
1. Colors should always be by-layer. Layer color refers to recommended color of layer on which text is to be placed.
2. Other .TTF or .SHX files used for logos etc. shall be provided as per Submittal
Requirements.
SCWA CAD Standards Revision Date: 03/08/13
LAYERING CONVENTION
LAYER COLOR LINETYPE DESCRIPTION
A-DOOR 2(yellow) CONTINUOUS DOORS
A-EQPT 2(yellow) CONTINUOUS EQUIPMENT
A-FND 3(green) CONTINUOUS FOUNDATION
A-FURN 1(red) CONTINUOUS FURNITURE
A-GRTE 1(red) CONTINUOUS GRATES
A-HTCH 1(red) CONTINUOUS HATCHING
A-NOTE 2(yellow) CONTINUOUS ARCH. NOTES
A-RAIL 1(red) CONTINUOUS RAILING
A-ROOF-RAL 1(red) CONTINUOUS ROOF RAIL
A-ROOF-FSCA 2(yellow) CONTINUOUS ROOF FASCIA
A-ROOF-JOST 2(yellow) CONTINUOUS ROOF JOIST
A-ROOF-PYWD 1(red) DASHED PLYWOOD ROOFING
A-ROOF-RDGE 1(red) DASHED2 ROOF RIDGE LINE
A-ROOF-STHG 1(red) HIDDEN ROOF SHEATHING
A-ROOF-VLEY 1(red) DASHED2 ROOF VALLEY LINE
A-WALL 3(green) CONTINUOUS WALLS
A-WALL-PART 2(yellow) CONTINUOUS WALL PARTITION
A-WALL-TOP 3(green) CONTINUOUS TOP OF WALL
A-WNDW 2(yellow) CONTINUOUS WINDOW
C-BDRY-CITY 4(cyan) DASHDOT CITY BOUNDARY
C-BDRY-CITY-HTCH 1(red) CONTINUOUS CITY BOUNDARY HATCHING
C-BDRY-CNTY 4(cyan) DASHDOT COUNTY BOUNDARY
C-BOLL 1(red) CONTINUOUS BOLLARD
C-BRNG 2(yellow) CONTINUOUS PL BEARING/DISTANCES
C-BSLN 3(green) CONTINUOUS BASELINE
C-BSLN-STA 3(green) CONTINUOUS BASELINE STATIONING
C-CONC-PAD 3(green) CONTINUOUS CONCRETE PAD
C-CONC-PAD-CONS 1(red) CONTINUOUS CONCRETE PAD CONSTRUCTION
JOINT
C-CONC-PAD-EXPAN 1(red) DASHED CONCRETE PAD EXPANSION JOINT
C-DETL 3(green) CONTINUOUS DETAIL
SCWA CAD Standards Revision Date: 03/08/13
LAYER COLOR LINETYPE DESCRIPTION
C-DETL-DIM 1(red) CONTINUOUS DETAIL DIMENSIONS
C-DETL-HTCH 1(red) CONTINUOUS DETAIL HATCHING
C-DETL-REBAR 1(red) CONTINUOUS DETAIL REBAR
C-DETL-TEXT 1(red) CONTINUOUS DETAIL TEXT AND DIMENSIONS
C-DETL-TITL 3(green) CONTINUOUS DETAIL TITLE TEXT
C-DIM 1(red) CONTINUOUS DIMENSIONS
C-DRWY-ACCS 2(yellow) DASHED ACCESS PERIMETER DRIVE SPACE
C-EASE-DRAINAGE 2(yellow) DASHED DRAINAGE EASEMENTS
C-EASE-UTILITY 2(yellow) DASHED UTILITY EASEMENTS
C-EASE-SEWER 2(yellow) DASHED SEWER EASEMENTS
C-EASE-WATER 2(yellow) DASHED WATER EASEMENTS
C-ELEV-LIP 1(red) CONTINUOUS LIP ELEVATION
C-ELEV-PAD 1(red) CONTINUOUS PAD ELEVATION
C-ELEV-TBC 1(red) CONTINUOUS TOP BACK OF CURB ELEVATION
C-ELEV-TBW 1(red) CONTINUOUS TOP BACK OF WALK ELEVATION
C-ELEV-SPOT 1(red) CONTINUOUS SPOT ELEVATION
C-ELEV-WALL 1(red) CONTINUOUS WALL ELEVATION
C-FNCE 1(red) DASHED FENCE
C-GRAD-BREAK 1(red) PHANTOM2 GRADE BREAK
C-GRAD-DETL 2(yellow) CONTINUOUS GRADING SPECIFIC DETAIL
C-GRAD-DTCH 2(yellow) DIVIDEX2 GRADING DITCH
C-GRAD-NOTE 2(yellow) CONTINUOUS GRADING NOTES
C-GRAD-RDGE 2(yellow) DASHEDX2 GRADE BREAK OR RIDGE
C-GRAD-SECT 3(green) CONTINUOUS GRADING SECTION
C-GRAD-SLPE 1(red) CONTINUOUS GRADE SLOPE
C-GRAD-SPOT 2(yellow) CONTINUOUS GRADING SPOT ELEVATION
C-GRAD-TEXT 2(yellow) CONTINUOUS GRADING TEXT
C-HTCH 1(red) CONTINUOUS HATCH
C-NRTH 4(cyan) CONTINUOUS NORTH ARROW
C-PRLN 4(cyan) PHANTOM PROPERTY LINE
C-PROF-CONC 3(green) CONTINUOUS PROFILE CONCRETE
C-PROF-ELEV 2(yellow) CONTINUOUS PROFILE GRID ELEVATIONS
C-PROF-GRID 250(grey) CONTINUOUS PROFILE GRID LINES
C-PROF-GRND 2(yellow) CONTINUOUS PROFILE GROUND LINE
SCWA CAD Standards Revision Date: 03/08/13
LAYER COLOR LINETYPE DESCRIPTION
C-PROF-GRND-HTCH 1(red) CONTINUOUS PROFILE GROUND HATCH
C-PROF-MTLN 4(cyan) PHANTOMX2 PROFILE MATCHLINE
C-PROF-NOTE 3(green) CONTINUOUS PROFILE NOTES
C-PROF-SEWR 2(yellow) CENTER PROFILE SANITARY SEWER
C-PROF-STA 3(green) CONTINUOUS PROFILE STATIONS
C-PROF-STA 3(green) CONTINUOUS PROFILE STATIONS
C-PROF-STRM 2(yellow) CENTER2 PROFILE STORM DRAIN
C-PROF-TEXT 2(yellow) CONTINUOUS PROFILE TEXT
C-PROF-WATR 3(green) CONTINUOUS PROFILE WATER
C-PUMP 3(green) CONTINUOUS BOOSTER PUMP
C-PUMP-PCAN 2(yellow) CONTINUOUS BOOSTER CAN
C-RIVR 1(red) CONTINUOUS RIVER
C-RMVE 2(yellow) CONTINUOUS TO BE REMOVED
C-ROAD-ACDK 2(yellow) CONTINUOUS A.C. DIKE
C-ROAD-BARR 3(green) CONTINUOUS BARRICADE
C-ROAD-CNTR 1(red) CENTER ROAD CL
C-ROAD-EOPV 2(yellow) CONTINUOUS ROAD EDGE OF PAVEMENT
C-ROAD-GRVL 1(red) DASHED GRAVEL ROAD
C-ROAD-GUFL 1(red) CENTER ROAD GUTTER FL
C-ROAD-HWAY 2(yellow) CONTINUOUS HIGHWAY
C-ROAD-HWAYSIGN 1(red) CONTINUOUS HIGHWAY SIGN
C-ROAD-LIP 2(yellow) CONTINUOUS ROAD LIP OF GUTTER
C-ROAD-PRIM 1(red) CONTINUOUS PRIMARY STREET
C-ROAD-PRIM-TEXT 1(red) CONTINUOUS PRIMARY STREET TEXT
C-ROAD-RAMP 1(red) CONTINUOUS ROAD RAMP
C-ROAD-RWLN 3(green) PHANTOM ROAD RIGHT OF WAY
C-ROAD-SCND 1(red) CONTINUOUS SECONDARY STREET
C-ROAD-SCND-TEXT 1(red) CONTINUOUS SECONDARY STREET TEXT
C-ROAD-TBCB 2(yellow) CONTINUOUS ROAD TOP BACK OF CURB
C-ROAD-TBWK 2(yellow) CONTINUOUS ROAD TOP BACK OF SIDEWALK
C-ROAD-TEXT 2(yellow) CONTINUOUS ROAD NAME
C-RRW 1(red) CONTINUOUS RAILROAD RIGHT OF WAY
C-RTN-WALL 2(yellow) CONTINUOUS RETAINING WALL
C-SND-WALL 2(yellow) CONTINUOUS SOUNDWALL
LAYER COLOR LINETYPE DESCRIPTION
C-SECT 4(cyan) PHANTOM SECTION
C-SBL 1(red) PHANTOM SETBACK LINE
C-SEWR-BOAT 3(green) CONTINUOUS SEWER BOAT
C-SEWR-CNTR 2(yellow) CENTER SEWER CL
C-SEWR-CNTR-OFFS 2(yellow) CENTER SEWER CL OFFSITE
C-SEWR-CO 2(yellow) CONTINUOUS SEWER CLEAN OUT
C-SEWR-MH 2(yellow) CONTINUOUS SEWER MANHOLE
C-SEWR-MAIN 3(green) CENTER SEWER MAIN
C-SEWR-SERV 2(yellow) CONTINUOUS SEWER SERVICE
C-SHBD 5(blue) CONTINUOUS BORDER
C-SHBD-APPV 4(cyan) CONTINUOUS APPROVALS
C-SHBD-GRID 8(grey) GRID1 PRIMARY PROFILE GRID
C-SHBD-MTLN 4(cyan) PHANTOMX2 MATCH LINE
C-SHBD-NOTE 3(green) CONTINUOUS SHEET NOTES
C-SHBD-REV1 2(yellow) CONTINUOUS SHEET REVISION 1
C-SHBD-REV2 2(yellow) CONTINUOUS SHEET REVISION 2
C-SHBD-REV3 2(yellow) CONTINUOUS SHEET REVISION 3
C-SHBD-REV4 2(yellow) CONTINUOUS SHEET REVISION 4
C-SHBD-REV5 2(yellow) CONTINUOUS SHEET REVISION 5
C-SHBD-REV6 2(yellow) CONTINUOUS SHEET REVISION 6
C-SHBD-SCWA 2(yellow) CONTINUOUS SCWA LOGO
C-SHBD-SCWA-APPV 2(yellow) CONTINUOUS SCWA APPROVAL
C-SHBD-SCWA-TEXT 2(yellow) CONTINUOUS SCWA TITLE
C-SHBD-STMP 3(green) CONTINUOUS PLAN SET STATUS STAMP
C-SHBD-STMP-11X17 1(red) CONTINUOUS REDUCED PLAN SET STATUS STAMP
C-SHBD-TEXT 3(green) CONTINUOUS BORDER TEXT
C-SHBD-TITL 4(cyan) CONTINUOUS BORDER TITLE
C-SHBD-TRIM 1(red) CONTINUOUS SHEET TRIM LINE
C-SHBD-ZONE 2(yellow) CONTINUOUS SHEET ZONES
C-SITE-APN 1(red) CONTINUOUS ASSESSORS PARCEL NUMBERS
C-SITE-MTLN 4(cyan) PHANTOM2 SITE MATCHLINE
C-SITE-PAVE 2(yellow) CONTINUOUS SITE PAVING
C-SITE-TITLE 4(cyan) CONTINUOUS SITE TITLE
C-SIZE 1(red) CONTINUOUS VALVE SIZE
SCWA CAD Standards Revision Date: 03/08/13
LAYER COLOR LINETYPE DESCRIPTION
C-SRVY 2(yellow) CONTINUOUS SURVEY RELATED INFORMATION
C-SRVY-BRGS 3(green) CONTINUOUS PROPERTY LINE BEARINGS /
DISTANCES
C-SRVY-BSLN 3(green) CONTINUOUS BASELINE
C-SRVY-EASE 2(yellow) DASHED EASEMENTS LOCATED BY SURVEY
C-SRVY-EOPV 1(red) CONTINUOUS SURVEY EDGE OF PAVEMENT
C-SRVY-MNTS 2(yellow) CONTINUOUS SURVEY MONUMENTS
C-SRVY-NOTE 2(yellow) CONTINUOUS SURVEY RELATED NOTES
C-SRVY-PRLN 3(green) CONTINUOUS SURVEY PROPERTY LINES
C-SRVY-RWLN 2(yellow) CONTINUOUS RIGHT OF WAY
C-SRVY-RWLN-CNTR 1(red) CENTER RIGHT OF WAY CL
C-SRVY-SRFFLT 7(white) CONTINUOUS SURVEY GENERATED TIN
C-SRVY-SRFVIEW 7(white) CONTINUOUS SURVEY GENERATED TIN VIEW
C-SRVY-TOPO-FENCE 1(red) CONTINUOUS SURVEYED FENCE
C-SRVY-TOPO-INDX 2(yellow) CONTINUOUS SURVEY CONTOURS INDEX
C-SRVY-TOPO-INTR 1(red) CONTINUOUS SURVEY CONTOURS INTERMEDIATE
C-SRVY-TOPO-PNTS 1(red) CONTINUOUS SURVEY TOPO POINTS
C-SRVY-TOPO-PNTS-DRWY 1(red) CONTINUOUS SURVEY TOPO DRIVEWAY POINTS
C-SRVY-TOPO-PNTS-LIP 1(red) CONTINUOUS SURVEYED LIP OF GUTTER
C-SRVY-TOPO-PNTS-TBCB 1(red) CONTINUOUS SURVEYED TOP BACK OF CURB
C-SRVY-TOPO-PNTS-TBWK 1(red) CONTINUOUS SURVEYED TOP BACK OF WALK
C-SRVY-TOPO-TEXT 2(yellow) CONTINUOUS SURVEY TOPO TEXT
C-SRVY-TOPO-WALL 1(red) CONTINUOUS SURVEY TOPO POINTS
C-STRM-BOAT 3(green) CONTINUOUS STORM DRAINAGE BOAT
C-STRM-CNTR 1(red) CENTER2 DRAINAGE CL
C-STRM-CNTR-OFFS 1(red) CENTER2 DRAINAGE CL OFFSITE
C-STRM-CULVERT 2(yellow) CONTINUOUS STORM DRAINAGE CULVERT
C-STRM-DI 2(yellow) CONTINUOUS STORM DRAINAGE INLET
C-STRM-MH 2(yellow) CONTINUOUS STORM DRAINAGE MANHOLE
C-STRM-PIPE 3(green) CENTER2 STORM DRAINAGE PIPING
C-STRM-SWALE 2(yellow) CONTINUOUS STORM DRAINAGE SWALE
C-TANK-BWSH 3(green) CONTINUOUS BACKWASH TANK
C-TANK-FUEL 2(yellow) CONTINUOUS FUEL TANK
C-TANK-SCRB 3(green) CONTINUOUS SCRUBBER
SCWA CAD Standards Revision Date: 03/08/13
LAYER COLOR LINETYPE DESCRIPTION
C-TANK-STOR 3(green) CONTINUOUS STORAGE TANK
C-TANK-STOR-CNTR 1(red) CENTER2 STORAGE TANK CL
C-TANK-STOR-CPAD 1(red) DASHED STORAGE TANK PAD
C-TANK-STOR-RWAL 2(yellow) CONTINUOUS STORAGE TANK RINGWALL
C-TANK-STOR-TEXT 2(yellow) CONTINUOUS STORAGE TANK TEXT
C-TEXT 3(green) CONTINUOUS PLAN SHEET TEXT
C-UTIL-CABL 2(yellow) CENTER2 CABLE TV CL
C-UTIL-FIRE 2(yellow) CENTER2 FIRE CL
C-UTIL-NGAS 2(yellow) CENTER2 NATURAL GAS CL
C-UTIL-TELE 2(yellow) CENTER2 TELEPHONE LINE
C-UTIL-VAULT 2(yellow) CONTINUOUS UTILITY VAULT
C-VESS-FILT 3(green) CONTINUOUS FILTER VESSEL
C-VESS-FILT-CNTR 1(red) CENTER FILTER VESSEL CL
C-VESS-REAC 3(green) CONTINUOUS REACTION VESSEL
C-VESS-REAC-CNTR 1(red) CENTER REACTION VESSEL CL
C-VESS-SCRB 3(green) CONTINUOUS SCRUBBER VESSEL
C-WATR 3(green) HIDDEN BURIED WATER PIPE LINE
C-WATR-ABOVE 3(green) CONTINUOUS ABOVE GROUND WATER PIPE LINE
C-WATR-ABOVE-CNTR 1(red) CENTER2 ABOVE GROUND WATER PIPE CL
C-WATR-ABOVE-CNTR-SYM 1(red) CONTINUOUS ABOVE GROUND WATER PIPE SYMBOL
C-WATR-BO 3(green) CONTINUOUS BLOW OFF
C-WATR-BOAT 3(green) CONTINUOUS BOAT
C-WATR-BW-TANK 3(green) CONTINUOUS BACKWASH TANK
C-WATR-BW-TANK-CNTR 1(red) CENTER2 BACKWASH TANK CL
C-WATR-CNTR 1(red) CENTER2 BURIED WATER PIPE CL
C-WATR-CNTR-SYM 1(red) HIDDEN2 BURIED WATER PIPE SYMBOL
C-WATR-CNTR-OFFS 3(green) CENTER2 BURIED WATER PIPE CL OFFSITE
C-WATR-CNTR-OFFS-SYM 3(green) HIDDEN2 BURIED WATER PIPE OFFSITE SYMBOL
C-WATR-DIP 3(green) HIDDEN BURIED DUCTILE IRON WATER PIPE
C-WATR-DIP-CNTR 1(red) CENTER2 BURIED DUCTILE IRON WATER PIPE
C-WATR-DIP-CNTR-SYM 1(red) HIDDEN2 BURIED D.I. WATER PIPE SYMBOL
C-WATR-FIRE 2(yellow) CONTINOUS FIRE HYDRANT
C-WATR-OFFS 3(green) HIDDEN BURIED WATER PIPE LINE OFFSITE
C-WATR-MAIN 3(green) CONTINUOUS DISTRIBUTION MAIN
LAYER COLOR LINETYPE DESCRIPTION
C-WATR-PCAN 3(green) CONTINUOUS POTABLE BOOSTER PUMP CANS
C-WATR-PCAN-BASE 2(yellow) CONTINUOUS POTABLE BOOSTER PUMP CAN BASE
C-WATR-RAW-BO 2(yellow) CONTINUOUS RAW WATER BLOW OFF
C-WATR-RAW-BOAT 2(yellow) CONTINUOUS RAW WATER BOAT
C-WATR-RAW-MAIN 2(yellow) CONTINUOUS RAW WATER MAIN
C-WATR-RAW-VALVE 2(yellow) CONTINUOUS RAW WATER VALVE
C-WATR-SERV 3(green) CONTINUOUS WATER SERVICE
C-WATR-TBLOCK 2(yellow) CONTINUOUS WATER PIPE THRUST BLOCKS
C-WATR-VALVE 3(green) CONTINUOUS WATER VALVE
C-WATR-VAULT 2(yellow) CONTINUOUS WATER VALVE VAULT
C-WATR-VAULT-LID 1(red) CONTINUOUS WATER VALVE VAULT LID
C-WATR-VAULT-SUMP 1(red) HIDDEN2 WATER VALVE VAULT SUMP
C-WATR-VAULT-SUMP-PMP 2(yellow) CONTINUOUS WATER VALVE VAULT SUMP PUMP
C-WATR-WELL 3(green) CONTINUOUS WATER WELL
DEFPOINTS 7(white) CONTINUOUS [LAYER DOES NOT PLOT]
E-NOTE 3(green) CONTINUOUS ELECTRICAL NOTES
E-POWR-OVER 2(yellow) CONTINUOUS OVERHEAD POWER LINES
E-POWR-UNDR 2(yellow) HIDDENX2 UNDERGROUND ELECTRICAL CABLES
E-ROAD-LIGHT 2(yellow) CONTINUOUS STREET LIGHT
E-CNDT 2(yellow) HIDDEN2 CONDUIT
E-TEXT 2(yellow) CONTINUOUS ELECTRICAL TEXT
E-XFMR 2(yellow) CONTINUOUS ELECTRICAL TRANSFORMER
L-EASE 2(yellow) DASHED LANDSCAPE EASEMENT
REVCLOUD 4(cyan) CONTINUOUS REVISION CLOUD
THESE LAYERING CONVENTIONS FOLLOW THE TYPICAL AIA LAYERING STYLE. SHOULD NEW
LAYERS NEED TO BE CREATED, PLEASE FOLLOW THIS LAYERING CONVENTION.
FOR EXISTING FACILITIES:
USE LAYERS SHOWN ABOVE WITH AN “X” IN FRONT OF DISCIPLINE. IE: XEPOWEROVER
(DENOTES EXISTING OVERHEAD ELECTRICAL POWER LINES).
Contract No.
Attachment 3 –SCWA Standard Consulting Agreement
SACRAMENTO COUNTY WATER AGENCY
AGREEMENT FOR
XXXXXXXXXXXXXXXX
THIS AGREEMENT is made and entered into on _______________________, by and between the SACRAMENTO AGENCY WATER AGENCY, a statutorily created district operating under the authority of and pursuant to the provisions of the Sacramento AGENCY Water Agency Act (California Water Code-Appendix, Chapter 66, commencing at Section 66-1 et seq.) (hereinafter “AGENCY”) and <name of contracting party and nature of entity> (hereinafter “CONSULTANT.”)
RECITALS
NOW, THEREFORE, in consideration of the mutual promises hereinafter set forth, AGENCY and CONSULTANT agree as follows:
1. SCOPE OF SERVICES
CONSULTANT shall provide services in the amount, type and manner described in Exhibit A, which is attached hereto and incorporated herein.
2. TERM
This Agreement shall be effective and commence as of the date first written above and shall end on _____________. AGENCY’S Director is authorized to amend this Agreement with CONSULTANT to extend the term.
3. NOTICE
Any notice, demand, request, consent, or approval that either party hereto may or is required to give the other pursuant to this Agreement shall be in writing and shall be either personally delivered or sent by mail, addressed as follows:
TO AGENCY:
Attn: Project Manager Address
TO CONSULTANT:
Attn:
Firm Name Address
Either party may change the address to which subsequent notice and/or other communications can be sent by giving written notice designating a change of address to the other party, which shall be effective upon receipt.
4. COMPLIANCE WITH LAWS
A. CONSULTANT shall observe and comply with all applicable Federal, State, and County laws, regulations and ordinances.
B. Economic Sanctions: Pursuant to California State Executive Order N-6-22 (Order) imposing economic sanctions against Russia and declaring support of Ukraine, COUNTY shall terminate any contract with any individual or entity that is in violation of the Order or that is subject to economic sanctions therein, and shall not enter a contract with any such individual or entity while the Order is in effect.
C. [if over $5M] CONSULTANT shall provide a written report to COUNTY within 60 days of the effective date of the contract or 60 days upon request regarding compliance with economic sanctions and steps taken in response to Russia’s action in Ukraine, including but not limited to, desisting from making new investments in, or engaging in financial transactions with Russia or Russian entities, and directly providing support to Ukraine, while the Order is in effect. The COUNTY shall keep the report on file as evidence of compliance with the Order.
5. GOVERNING LAWS AND JURISDICTION
This Agreement shall be deemed to have been executed and to be performed within the State of California and shall be construed and governed by the internal laws of the State of California. Any legal proceedings arising out of or relating to this Agreement shall be brought in Sacramento County, California.
6. LICENSES, PERMITS AND CONTRACTUAL GOOD STANDING
A. CONSULTANT shall possess and maintain all necessary licenses, permits, certificates and credentials required by the laws of the United States, the State of California, County of Sacramento and all other appropriate governmental agencies, including any certification and credentials required by AGENCY. Failure to maintain the licenses, permits, certificates, and credentials shall be deemed a breach of this Agreement and constitutes grounds for the termination of this Agreement by
AGENCY.
B. CONSULTANT further certifies to AGENCY that it and its principals are not debarred, suspended, or otherwise excluded from or ineligible for, participation in federal, state or county government contracts. CONSULTANT certifies that it shall not contract with a subcontractor that is so debarred or suspended.
7. PREVAILING WAGES
CONSULTANT shall comply with the provisions of the California Labor Code, specifically, but not limited to, Chapter 1, commencing at Section 1720, of Part 7 of Division 2 (payment of prevailing wages). The prevailing rates for per diem wages shall be those rates determined by the Director of the California Department of Industrial Relations.
8. PERFORMANCE STANDARDS
CONSULTANT shall perform its services under this Agreement in accordance with the industry and/or professional standards applicable to CONSULTANT’S services.
9. OWNERSHIP OF WORK PRODUCT
All technical data, evaluations, plans, specifications, reports, documents, or other work products developed by CONSULTANT provided hereunder shall be the exclusive property of AGENCY and shall be delivered to AGENCY upon completion of the services authorized hereunder. CONSULTANT may retain copies thereof for its files and internal use. Publication of the information directly derived from work performed or data obtained in connection with services rendered under this Agreement must first be approved in writing by AGENCY.
AGENCY recognizes that all technical data, evaluations, plans, specifications, reports, and other work products are instruments of CONSULTANT’S services and are not designed for use other than what is intended by this Agreement.
10. STATUS OF CONSULTANT
A. It is understood and agreed that CONSULTANT (including CONSULTANT’S employees) is an independent contractor and that no relationship of employer-employee exists between the parties hereto. CONSULTANT’S assigned personnel shall not be entitled to any benefits payable to employees of AGENCY. AGENCY is not required to make any deductions or withholdings from the compensation payable to CONSULTANT under the provisions of this Agreement; and as an independent contractor, CONSULTANT hereby indemnifies and holds AGENCY harmless from any and all claims that may be made against AGENCY based upon any contention by any third party that an employer-employee relationship exists by reason of this Agreement.
B. It is further understood and agreed by the parties hereto that CONSULTANT in the performance of its obligation hereunder is subject to the control or direction of AGENCY as to the designation of tasks to be performed, the results to be accomplished by the services hereunder agreed to be rendered and performed, and not the means, methods, or sequence used by CONSULTANT for accomplishing the results.
C. If, in the performance of this Agreement, any third persons are employed by CONSULTANT, such person shall be entirely and exclusively under the direction, supervision, and control of CONSULTANT. All terms of employment, including hours, wages, working conditions, discipline, hiring, and discharging, or any other terms of employment or requirements of law, shall be determined by CONSULTANT, and the AGENCY shall have no right or authority over such persons or the terms of such employment.
D. It is further understood and agreed that as an independent contractor and not an employee of AGENCY, neither the CONSULTANT nor CONSULTANT’S assigned personnel shall have any entitlement as an AGENCY employee, right to act on behalf of AGENCY in any capacity whatsoever as agent, nor to bind AGENCY to any obligation whatsoever.