KEYS_Bid_2026_Addendum_1.pdf Summary

This is an addendum document issued by Keys Energy Services (KEYS), the municipal electric utility for the City of Key West, Florida, regarding a sealed proposal solicitation for distribution transformers. The procurement encompasses pole-mounted transformers rated at 13,800/7,970 volts single-phase in 25, 50, and 75 kVA configurations, as well as pad-mounted single-phase transformers (25-333 kVA) and pad-mounted three-phase transformers (45-1,000 kVA). Sealed proposals are due October 16, 2026 at 10:00 a.m. via VendorLink, DemandStar, or paper submission to KEYS at 6900 Front Street Extended, Key West, Florida 33040. Vendor questions must be submitted by October 2, 2026 at noon, with virtual bid opening scheduled for October 16, 2026 at 10:00 a.m. The contract term is two years from execution or until the original order is accepted, whichever is later, with KEYS retaining extension rights at the same unit price. Delivery is F.O.B. to the KEYS Stock Island Warehouse, Monday through Friday between 7:30 a.m. and 3:30 p.m., with 48 hours' notice required.

Award determination utilizes a Total Owning Cost (TOC) evaluation formula calculated as T.O.C. = Price + (NL Watts × 8.380) + (LL Watts × 2.258), with an equivalency band of 2.5% of the lowest TOC. Lead times are an additional evaluation criterion for transformers with short-term needs. All units must be assembled and have major components manufactured in the United States, comply with applicable IEEE and ANSI standards, feature 304/304L stainless steel construction for exposed hardware and tanks, and use non-PCB mineral oil or biodegradable coolant with certified test reports showing actual no-load and load losses. A 1-year warranty from installation date or 18-month warranty from shipment date applies, whichever occurs first. Bid prices must remain firm for 120 days minimum, and a Supply Bond equal to 100% of the total contract amount is due within ten days of award notification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYS BID 20-26 SPECIFICATIONS FOR PURCHASE OF TRANSFORMERS

Addendum 1

This Addendum forms a part of the Contract Documents and modifies the original Bid Documents issued for KEYS Bid 20-26. All Bidders shall acknowledge receipt of this Addendum in their proposal submission.

QUESTIONS & ANSWERS:

1. What is the %Z and transformer efficiency information? Are there required specifications for the transformer efficiency of the pad or pole mounts listed in bid 20-26? I was unable to locate that specification in the document provided.

Please see on page 2 “Bid Specifications” and page 4 “Manufacturer’s Proposal Transformer Parameters” regarding impedance and efficiency.

2. Aroi LLC is reviewing KEYS 14-26 and 20-26 as a prospective prime administrator using qualified field subcontractors or a manufacturer/supply partner. For 20-26, may the bidder demonstrate supply capability and similar-contract history through an expressly identified manufacturer/distributor and its commitments, without representing those projects as Aroi's own history? Please confirm any bidder-specific minimum history and whether a performance/payment bond applies to this goods purchase.

Bidders may identify and provide qualifications, experience, and supporting information for their proposed manufacturer, distributors, or suppliers. Any such experience shall be clearly identified as the experience of that entity and shall not be represented as the Bidder’s own experience.

KEYS does not specify a minimum number of years of bidder-specific experience; however, bidders must meet that responsibility requirements set forth in the General Terms and Conditions, including demonstrating adequate resources, satisfactory financial status, and a history of performance on similar contracts acceptable to KEYS.

A Supply Bond is required in accordance with the General Terms and Conditions. The successful Bidder shall provide the required security within ten (10) days after notification of award.

3. Would KEYS consider issuing an addendum permitting Korean-manufactured transformers, with disclosed major-component origins, provided they meet all other technical requirements and the U.S. bidder assumes full contractual responsibility for delivery, warranty, and the required Supply Bond?

We intend to bid through ISAAC GRIDIAN, Corp., a U.S. legal entity, offering transformers manufactured and assembled in the Republic of Korea.

This approach would give KEYS an additional qualified supply option to evaluate for delivery and total owning cost, while retaining a U.S. contracting counterparty.

KEYS BID 20-26 SPECIFICATIONS FOR PURCHASE OF TRANSFORMERS

Our proposal would provide supporting technical, manufacturing, sourcing, and delivery information for KEYS’ review.

As context for your consideration, Florida Statutes §255.0993(2)(d) excludes electrical equipment from that section’s U.S.-produced iron and steel requirement.

We recognize that KEYS’ specifications and any other applicable requirements would still need to be addressed.

We would appreciate your consideration of this limited change to the manufacturing-location and component-origin requirements.

No Addendum will be issued at this time. All other terms, conditions, and specifications of KEYS Bid 20-26 shall remain unchanged and in fill force and effect.