KEYS_Bid_1726_Specifications_for_Underground_Padmount_Transformer_and_Switchgear_Inspections.pdf

PDF 555 KB Posted

Attached to
Underground Padmount Transformer and Switchgear Inspections
Solicitation number
17-26
Issued by
Monroe County, Florida

About this file

This bid specification document is issued by Keys Energy Services (KEYS), the municipal electric utility operator for the City of Key West, Florida, for detailed inspections of underground padmount transformers and switchgear throughout the Lower Florida Keys. The project scope requires comprehensive inspections of approximately 602 underground padmount transformers and 46 switchgear units, evaluating structural integrity, electrical condition, safety, environmental condition, and general serviceability. Inspections must be performed by or under the direct supervision of a qualified high-voltage electrician meeting OSHA 29 CFR 1910.269 requirements. Sealed proposals are due electronically via VendorLink or DemandStar by 10:00 a.m. on Friday, December 4, 2026, with paper submittals accepted if received by the same deadline at 6900 Front Street Extended, Key West, Florida 33040. The bid opening meeting will occur virtually on December 4, 2026 at 10:00 a.m. The contract term extends from the execution date through September 30, 2027, with potential extension at the same unit price if KEYS desires. Contractor personnel must maintain all appropriate Personal Protective Equipment and minimum approach distances at all times, with inspections performed on energized equipment without de-energizing unless specifically authorized by KEYS. All inspections must be completed within 160 calendar days following the Notice to Proceed, with final deliverables submitted within 30 calendar days thereafter.

Bidders must submit a 5% bid bond or certified check with their proposals, which must remain firm for 120 days minimum. Pricing shall be submitted as per-unit prices for mobilization/demobilization, underground transformers, and switchgear, with actual payment based on quantities inspected and accepted by KEYS. The evaluation criteria include experience with similar projects, range and suitability of services, project management approach, pricing, and references, with KEYS reserving the right to award based on the proposal determined to be in its best interest. Contractor liability includes responsibility for all equipment, materials, site conditions, and environmental compliance, with liquidated damages of $100 per day assessed if work is not substantially complete by 190 calendar days after Notice to Proceed. Payment will be made within 30 days of invoice acceptance with 5% retainage held until 30 days after project completion and final acceptance. Required insurance includes Commercial General Liability ($2,000,000 general aggregate), Business Automobile ($1,000,000 combined bodily injury and property damage), and Workers Compensation ($1,000,000 per accident), with the Utility Board named as additional insured. No set-aside provisions are identified in this procurement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYS BID 17-26 SPECIFICATIONS FOR UNDERGROUND PADMOUNT TRANSFORMER

AND SWITCHGEAR INSPECTIONS

CALL FOR BIDS

THE UTILITY BOARD OF THE CITY OF KEY WEST, FLORIDA, operator of Keys Energy Services (KEYS), hereby gives notice to prospective bidders that sealed proposals will be received by KEYS electronically until 10:00 a.m. on Friday, December 4, 2026 for:

KEYS BID 17-26

SPECIFICATIONS FOR UNDERGROUND PADMOUNT TRANSFORMER AND SWITCHGEAR INSPECTIONS

KEYS has instituted VendorLink and DemandStar systems to provide current information to potential bidders. These systems will allow you to receive bid information quickly and at your convenience 24 hours a day, 7 days a week. Specifications may be obtained from their websites at www.myvendorlink.com or www.DemandStar.com. Registered vendors will be notified automatically of all Requests for Proposals. You may also visit www.KeysEnergy.com for links and download information for all KEYS bid specifications.

It shall be the sole responsibility of each bidder to have their bid electronically delivered on or before the time for opening proposals last announced to bidders. Emailed proposals will not be accepted. Should a vendor not be able to submit via VendorLink or DemandStar, paper submittals will be accepted. Paper submittals must be received prior to the opening date and time in order to be considered. Paper submittals, if applicable, are to be delivered via FedEx, UPS, or in-person to:

Keys Energy Services Bid Opening Committee – KEYS Bid 17-26 6900 Front Street Extended Key West, FL 33040 Note: This address does not receive US Postal Service.

Any proposal received after the time last announced for opening proposals may be retained by KEYS or returned to the bidder, but such proposal may be rejected as not responsive.

Vendors with questions pertaining to this bid specification must submit them in writing via email to purchasing@keysenergy.com no later than Friday, November 20, 2026 at noon. Any questions received after noon on November 20, 2026 will not be addressed.

Each proposal should be accompanied by a Certified Check or Bid Bond payable to the UTILITY BOARD OF THE CITY OF KEY WEST in an amount not less than five (5%) percent of the amount of the proposal as security.

Each proposal should constitute an offer to KEYS, as outlined therein, and should be irrevocable after the time announced for the opening thereof.

At a meeting of the BID OPENING COMMITTEE to be held virtually on Friday, December 4, 2026 at 10:00 a.m. Proposals will be opened and vendor names will be publicly read aloud.

KEYS reserves the right to reject any or all proposals, to waive irregularities and informalities in any or all proposals, and to separately accept or reject any item, items, bid schedule or bid schedules of the proposal which KEYS deems to be in the best interest of the Utility Board.

Tyler Randolph, Purchasing Supervisor http://www.myvendorlink.com/ http://www.demandstar.com/taf/agencycp.taf?_function=list&A=335 http://www.keysenergy.com/ mailto:purchasing@keysenergy.com

KEYS BID 17-26 SPECIFICATIONS FOR UNDERGROUND PADMOUNT

TRANSFORMER AND SWITCHGEAR INSPECTIONS

GENERAL

Keys Energy Services (KEYS) is a municipal electric utility supplying power to residents of the lower Florida Keys. KEYS is located in the extreme southern tip of peninsular Florida, situated in Monroe County, Florida, primarily what is considered the “Lower Keys”, which extends eastwardly from Key West to the west end of the Seven-Mile Bridge. Corporate Offices are located at 1001 James Street, Key West, Florida and the Transmission and Distribution (T&D) Facility is located on Stock Island at 6900 Front Street Extended, Key West, Florida 33040.

KEYS and its representatives have exercised due care in preparing this Request for Proposals (RFP). All information contained herein is believed to be substantially correct. However, bidders should verify information independently if desired. KEYS and its representatives do not warrant the accuracy of information contained herein.

SPECIFICATIONS

SCOPE OF WORK

No switching or load interruption shall be performed by the Contractor under this Contract unless specifically authorized in writing by KEYS.

The Contractor shall furnish all labor, equipment, tools, supervision, transportation, and materials necessary to perform detailed inspections of approximately 602 underground padmount transformers and 46 switchgears located throughout the Lower Florida Keys, from the 7-mile Bridge to Key West, Florida.

Quantities state herein are estimates for bidding and evaluation purposes and are not guaranteed minimum quantities. Payment shall be based on the actual quantities inspected and accepted by KEYS at the applicable unit prices stated in the Bid.

The inspection shall evaluate the structural integrity, electrical condition, safety condition, environmental condition, and general serviceability of each unit, with particular attention to transformer condition, high- and low-voltage terminations, elbows and cables, corrosion, fluid leakage, pest infestation (termites/fire ants), grounding, labeling, vegetation clearance, foundations stability, and thermal anomalies.

All inspections shall be performed without de-energizing equipment unless otherwise specifically authorized by KEYS.

CONTRACTOR QUALIFICATIONS

All inspections shall be performed by or under the direct supervision of a qualified high voltage electrician with documented training and experience inspecting energized electrical equipment, including underground padmount transformers and switchgear. Personnel shall meet applicable OSHA 29 CFR 1910.269 requirements. Proof of qualifications, certifications, and relevant experience shall be submitted with the Bid.

INSPECTION REQUIREMENTS

1) Transformer Enclosure and Body

The Contractor shall:

a) Inspect each tank and cabinet for rust, corrosion, paint deterioration, dents, impact damage, perforation, or other physical deterioration. The severity of corrosion shall be documented.

b) Verify the integrity and condition of penta-head bolts, padlocks, hinges, door latches, and other locking or securing mechanisms. Doors shall be checked for proper operation and weathering sealing.

c) Inspect for evidence of dielectric fluid leakage at the tank, bushings, pressure-relief devices, seams, fittings, or concrete pad.

d) Verify the presence, condition, and legibility of NESC-required external safety and warning labels (e.g., "Danger High Voltage"), equipment identification, and internal schematics/nameplates.

e) Inspect door gaskets and weather seals for deterioration, tears, dry rot, compression failure, or other damage.

2) Pest and Environmental Control (Termites) The Contractor shall:

a) Inspect equipment interiors and surrounding areas for evidence of termite activity, including soil tubes or termite tunnels traveling up the cables or concrete walls.

b) Inspect for fire-ant mounds, termite nests, rodent activity, wildlife intrusion, or other pest conditions within or immediately surrounding the equipment.

c) Identify excessive accumulation of soil, leaves, debris, nests, or other materials that may restrict ventilation, interfere with equipment operation, or cover grounding connections.

d) Inspect cable conduit and sleeve openings to verify that seals are intact and provide adequate protection against pest, rodent, moisture, and debris intrusion.

3) High-Voltage Components Padmount Transformers (Elbows & Cables)

The Contractor shall:

a) Inspect the transformer tank, cabinet, and pad for corrosion, fluid leakage, structural damage, or deterioration.

b) Verify equipment identification, arc-flash labels, and safety signage, warning labels.

(Replace/Install missing, damaged or worn signage). KEYS will provide replacement KEYS-specific labels or stickers when required.

c) Visually inspect the condition of high-voltage and low-voltage terminations and current transformers

d) Perform thermal imagining of elbows, bushings, cable connections, junction points, lightening arrestors, as other applicable electrical connections as present at the location.

e) Verify cable source and load identification and document and missing, damaged, or illegible labeling.

f) Replace batteries in applicable fault indicators when required. Following battery replacement, the Contractor shall test the fault indicator using an appropriate testing device to verify proper operation. All fault indicators shall be tested by using a magnet.

g) Inspect grounding grids, grounding conductors, grounding rods, and bonding connections where visible and accessible.

h) Inspect for indicators of overheating, discoloration, tracking, cracking, insulation deterioration, or other abnormal conditions.

i) Confirm proper clearances and vegetation management compliance.

j) Document observed conditions that are non-compliant with FPSC reliability standards.

k) Inspect oil-absorbent pads and replace deteriorated or contaminated absorbent pads where present.

4) Pad Inspection:

a) Infrared Thermographic Scan (IR) The Contractor shall perform an infrared thermographic inspection of accessible energized equipment.

i) Scan accessible terminations including elbows, bushings, secondary lugs, junctions, and similar connection points.

ii) Identify any component displaying a temperature differential (\(\Delta T\)) greater than [e.g., 10°C] above ambient or referencing phase-to-phase comparison.

iii) Thermal images associated with identified abnormalities shall be included in the final inspection report.

b) Pad-Mounted Switchgear

The Contractor shall:

i) Inspect exterior cabinet for corrosion, structural damage, leakage, intrusion, or deterioration.

ii) Verify proper operation and condition of locking mechanisms and tamper resistance features.

iii) Perform thermal imagining of accessible elbows, connections, junction points, lightening arrestors, and other applicable electrical components.

iv) Inspect accessible interior compartments for contamination, moisture, pest intrusion, or wildlife intrusion.

v) Visually inspect accessible operating mechanisms for wear, damage, lubrication needs, and proper function.

vi) Inspect accessible bushings, elbows, terminations, grounding conductors, and bonding connections.

vii) Document observed conditions that may constitute non-compliance with applicable

FPSC reliability standards.

viii) Verify cable source and load identification and document missing, damage, or illegible labels.

ix) Verify the presence and condition of equipment labels, arc-flash labels, and safety signage. (replace/Install missing, damaged or warn signage). KEYS will provide KEYS specific replacement stickers.

x) Inspect the condition of applicable communication, control, and backup batteries and identify batteries requiring replacement based upon condition, manufacturer-recommended service life, field testing, or other observable deficiency. Note batteries as needing replacement if poor condition or older than 2024

c) Foundation & Structural Integrity The Contractor shall:

i) Inspect concrete, composite, or fiberglass pads for significant cracking, spalling, deterioration, settlement, or structural failure.

ii) Measure and document significant equipment or pad tilt exceeding [e.g., 2 degrees] or differential settling that may affect structural stability or cable terminations.

iii) Inspect for erosion, washout, voids, or undermining beneath or surrounding the pad that may compromise stability.

iv) Identify vegetation, landscaping, fencing, storage, or other obstructions that interfere with required equipment access or working clearance. Verify a minimum clearance of 10 feet in front of doors and 3 feet on sides/rear (or per local utility standards).

REPORTING & DELIVERABLES

The Contractor shall provide KEYS with a complete final inspection report and electronic database documenting all inspected assets.

At a minimum, the deliverables shall include:

a) A searchable database in Microsoft Excel and/or CSV format, compatible with SCADA linking each transformer ID to its GPS coordinates and inspection status.

b) High-resolution photos sufficient to document the condition of each inspected asset.

At a minimum, photographs shall include:

(1) equipment nameplate (for data verification);

(2) general exterior condition;

(3) The open cabinet (showing assessable interior/general arrangement);

(4) Specific "Exceptions" (defects) found (e.g., close-up of termite tubes, leaking bushing, cracked pad).

c) A summary categorizing defects by urgency. Each identified deficiency shall be categorized as follows:

Priority 1- Immediate/Safety Concern:

A condition presenting an immediate or potentially significant safety, reliability, environmental or equipment failure concern.

Immediate hazard examples include oil leaks, red-hot elbow, sever overheating, exposed or damaged electrical components, compromised locking mechanisms, or imminent structural instability.

The Contractor shall immediately notify KEYS’ Project Manager of any Priority 1 condition discovered during inspection.

Priority 2- Corrective Action Recommended A condition requiring maintenance or repair but not considered an immediate hazard.

Requires repair within [X] months. Examples may include corrosion, pest intrusion, deteriorated labels, vegetation interference, minor leakage, or developing structural deterioration.

Priority 3- Minor/Cosmetic Condition A minor condition that does not presently affect equipment safety, reliability, or operation but should be documented for monitoring or routine maintenance.

Examples include minor cosmetic issues.

SAFETY & COMPLIANCE

1) Standards: All work shall be performed in accordance with applicable federal, state, and local laws, regulations, safety requirements, utility requirements, and applicable portions of OSHA 1910.269 regulations (Electric Power Generation, Transmission, and Distribution) and NESC guidelines.

Where requirement conflicts, the more stringent applicable requirement shall govern unless otherwise directed by KEYS.

2) PPE: Contractor shall supply and personnel must wear all appropriate Personal Protective Equipment (PPE), including FR clothing and eye protection, when opening energized cabinets.

Applicable PPE may include, but is not limited to:

• Arc-fated clothing;

• Electrical safety footwear;

• Safety glasses or face protection;

• Voltage-rated gloves where required;

• Hard hats and other PPE required by applicable safety standards or KEYS procedures.

3) Approach Distances: Contractor shall assume equipment is energized unless expressly advised otherwise by KEYS. Inspections are intended to be visual and thermographic only unless otherwise specified. Contractor personnel shall maintain applicable Minimum Approach Distances (MAD) at all times. No switching, electrical isolation, energized electrical work or intrusive testing shall be performed unless specifically authorized by KEYS.

SCHEDULE & COMPLETION

1) The Contractor shall complete all inspections within 160 calendar days following KEYS’ written Notice to Proceed. All required final deliverables shall be submitted within 30 calendar days after completion of inspections, unless otherwise approved in writing by

KEYS.

2) The Contractor shall provide progress updates to KEYS’ Project Manager every two weeks throughout the performance period.

Progress reports shall include, at minimum:

• Number of assets inspected and number of assets remaining;

• Significant deficiencies identified;

• Locations requiring follow-up;

• Schedule status;

• Anticipated completion date.

3) Contractor scheduling shall be coordinated and approved by KEYS.

BID EXCEPTIONS/DEVIATIONS TO SPECIFICATIONS

Any exception, deviations, or proposed modifications to these Specifications or KEYS’ Terms and Conditions, as stated in this document, shall be clearly identified in writing and submitted with the proposal at the time of bid submittal.

If the Bidder takes no exceptions; the Bidder shall affirmatively state: “NO EXCEPTIONS”.

The absence of a written list of deviations at the time of bid submittal or failure to clearly identify an exception or deviation may result in KEYS interpreting the Bid as full acceptance of the requirement of the Bid Documents.

KEYS reserves the right to determine whether an exception or deviation renders a Bid nonresponsive.

PROPOSAL CONTENTS & EVALUATION

The proposal should include a description of the firm’s capabilities and experience with providing the requested services, including a description of any special qualifications which are indicative of working familiarity with similar projects.

The proposals will be evaluated. The evaluation criteria will include a variety of considerations, including, but not limited to:

a. Experience with similar projects;

b. Range and suitability of services provided;

c. Project management approach;

d. Pricing;

e. References.

KEYS reserves the right to award based on the proposal determined to be in the best interest of

KEYS.

BID SUBMITTAL

Proposals shall be submitted electronically via VendorLink or DemandStar prior to the opening date and time. Emailed proposals will not be accepted. Should a vendor not be able to submit via VendorLink or DemandStar, paper submittals will be accepted. Paper submittals must be received before the opening date and time to be considered.

Paper submittals can be sent via FedEx, UPS, or In-Person to:

Keys Energy Services Bid Opening Committee – Bid 17-26 6900 Front Street Extended Key West, Florida 33040 Note: This address does not receive US Postal Service.

Bidders shall submit the following:

1. Bid Bond or Cashier’s Check for 5% of Total Bid amount

2. Proposal Page

3. Insurance Agent’s Statement

4. Bidder’s Statement

5. Safety Compliance Affidavit

6. Drug-Free Workplace Statement

7. Public Entity Crimes Sworn Statement

8. Hourly Rates for Labor and Equipment – to be used should additional work/material outside of the scope of work is required

9. Proof of qualifications, certifications, and relevant experience

KEYS ENERGY SERVICES

GENERAL TERMS & CONDITIONS

ADDITIONS/DELETIONS

KEYS reserves the right to add or delete any item from this bid or resulting contract when deemed to be in the best interest of KEYS.

ALTERATIONS IN PROPOSAL

Except as otherwise provided herein, Proposals which are conditional in any way, or which contain erasures or interlineations not authenticated as provided herein, or which contain items not called for, items not in conformity with applicable laws, changes, additions, recapitulations, alternative Proposals, or any other modifications of the Proposal forms which are not specifically called for in the Contract Documents, will be rejected as not responsive unless specifically agreed to in writing by KEYS. Erasures, interlineations or other corrections shall be authenticated by affixing in the margin immediately opposite the correction, the handwritten initials of each person executing the Proposal.

APPLICABLE LAW

This Contract shall be interpreted in accordance with the law of the State of Florida.

ASSIGNMENT

No contract awarded under these terms, conditions, and specifications, may be sold, transferred or assigned in full or part without the written permission of KEYS. Such written permission shall not relieve contractor from its obligations and liabilities.

ATTORNEY FEES

The prevailing party in any litigation or mediation relating to the contract shall be entitled to recover it reasonable attorney fees and costs from the other party for all matters, including, but not limited to, appeals.

BASIS OF AWARD

A. The award will be made by KEYS on the basis of the Proposal from the lowest responsive* responsible**, Bidder which, in KEYS’ sole and absolute judgment, will best serve the interest of KEYS.

B. KEYS reserves the right to accept or reject any or all Proposals, and to waive any informalities and irregularities in said Proposal.

*Responsive Bidder: Any person, firm, or corporation submitting a bid for the work contemplated whose bid form is complete and regular, free of excisions or special conditions and has no alternative bids for any item unless requested in the technical specifications.

**Responsible Bidder: Any person, firm, or corporation submitting a bid for the work contemplated who maintains a permanent place of business, has adequate manpower and equipment to do the work properly and within the time limit that is established, has adequate financial status to meet his obligations contingent to the work and has a history of performance of like contracts (acceptable to KEYS).

C. Evaluation: The lowest evaluated price shall be determined from an analysis which assesses the impact of the contract price, operational and maintenance costs.

BID BOND/CERTIFIED CHECK

Each proposal should be accompanied by a Bid Bond or Certified Check payable to the UTILITY BOARD OF THE CITY OF KEY WEST, FLORIDA in an amount not less than five (5%) percent of the amount of the proposal as security.

BID PROPOSAL PRICING

All bid proposals must remain firm for 120 days minimum.

BIDDER QUALIFICATIONS

Please provide this information in your bid response.

CITY/COUNTY LICENSING

For the term of the contract, Contractor shall maintain City of Key West and Monroe County licenses and/or other requirements to work within the City or County limits. Contractor should provide KEYS with a copy of all licenses.

COMPLETENESS OF PROPOSAL

A. Each Bidder shall respond to all items on Proposal Page. When quoting on all items including optional items, bidders shall insert the words

“No Bid” in the space provided for any item for which no offer is made. Failure to do so may result in the Proposal being rejected as not responsive.

B. KEYS will consider alternative, additive, or deductive options with no initial pricing.

C. Each Proposal shall include specific acknowledgment of receipt of all Addenda issued during the bidding period. Failure to do so may result in the Proposal being rejected as not responsive.

D. Each Bidder shall furnish information relating to its experience, facilities, material, equipment and business as is required by the Proposal form. Failure to do so may result in the Proposal being rejected as not responsive.

E. Additional technical data furnished by a Bidder, but not required by the Request for Proposal (RFP), may at KEYS’ option be considered part of the Proposal to the extent that it is supplementary to, is consistent with and not contrary to the RFP.

CONTACT REFERENCES

KEYS contact for bidding requirements and technical specifications: Tyler Randolph, Supervisor of Purchasing, Tyler.Randolph@keysenergy.com or purchasing@keysenergy.com.

CONTRACT DURATION

The duration of the base contract shall be from the date of execution by the Utility Board through September 30, 2027. If this contract is for a unit price and estimated quantities and if KEYS desires, KEYS and Contractor can extend the contract at the same unit price. KEYS reserve the right to cancel this contract without cause with 30 days written notice and with cause within 10 days.

CONTRACT CHANGES

No changes, over the contract period, shall be permitted unless prior written approval is given by the Utility Board of the City of Key West, Florida. No Contractor shall assign the contract or any rights or obligations there under without the written consent of KEYS. In the event of such approved subcontracting, contractor agrees to provide KEYS with written documentation relative to the Subcontractor(s) employed in this contract.

CONTRACT COMPLIANCE

All contracts are subject to the terms and conditions of the Fair and Accurate Credit Transactions Act of 2003. The said provisions and compliance therewith are expressly made part of the contract and are binding covenants on the party contracting with KEYS.

CONTRACTOR LIABILITY

In the event of default by Contractor, KEYS reserves the right to utilize the next lowest Bidder as the new Contractor. In the event of this occurrence, the next lowest Bidder, if it wishes the award, shall be required to provide the bid items at the prices as contained on its proposal or bid for this specification.

CONTRACTOR’S RESPONSIBILITIES

A. Contractor shall be responsible for all loss, damage, vandalism, theft, etc. for all equipment, tools, materials, etc. left on the job site.

B. Contractor shall be responsible for maintaining the site in a clean condition during installation. Contractor and KEYS at which time the site should be cleaned up will make a final walk down of the sites.

C. Prior to completion of demobilization, Contractor shall remove all construction materials, waste, demolition debris, excess materials, temporary installation, etc. that have not been specifically turned over and accepted by KEYS.

D. Contractor shall be responsible for any and all costs for cleanup of oil or gasoline spills which result from his equipment or from any work performed as part of this contract.

E. Permit violations or environmental damage caused by contractor shall be mitigated or repaired by contractor, at contractor’s expense, to the satisfaction of the governing authority citing such damage.

F. Items discussed in this section are not intended to be all-inclusive of Federal, State, and Local Laws and Regulations. Information is provided as anticipated minimum requirements. Contractor shall be familiar and comply with all requirements of applicable laws and regulations.

G. Contractor will assume total responsibility for materials, delivery to/from job site, installation, and testing of system.

DELIVERY

A. Delivery, inspection and acceptance - delivery, inspections and acceptance will be at destination, F.O.B. Key West as specified in the RFP, KEYS Warehouse, unless otherwise provided. Until delivery and acceptance and after any rejections, risk of loss will be on the Vendor, unless loss results from negligence of KEYS.

B. Notwithstanding the requirements for any KEYS inspection and test contained in the specifications applicable to this proposal, except where specialized inspections or tests are specified for performance solely by KEYS, contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under this proposal conform to the drawings, specifications and proposal requirements listed herein, including if applicable, the technical requirements for the manufacturer’s part numbers specified herein.

C. Delivery of Excess Quantities – Contractor is responsible for the delivery of each item quantity within allowable variations, if any.

If contractor delivers and KEYS receives quantities of any item in excess of the quantity called for (after considering any allowable variations of quantity) such excess quantities will be treated as being delivered for the convenience of contractor. KEYS may retain such excess quantities without compensating the interests herein. Quantities in excess, will at the option of KEYS, either be returned at contractor’s expense, or retained and paid for by KEYS at the contract unit price.

D. Deliveries – In the event of failure to deliver material of the quality or within the time specified, KEYS may cancel the order and buy elsewhere. Contractor will be responsible for any cost differences encountered in the procurement of materials. Failure of KEYS to exercise this option with respect to any installment shall not be deemed a waiver with respect of future installments, if any.

E. Delivery tickets – All shipments under this agreement shall be accompanied with delivery tickets, or packing slips, in triplicate, which shall contain the following minimum information: name of supplier, purchase order number, date of order, date of delivery or shipment, itemized list of supplies or services furnished, quantity, unit price, and extension of each line item. Upon delivery, the Warehouse will retain a copy of the related delivery ticket.

F. Inspection, Acceptance and Title – Inspection and acceptance will be at destination, unless otherwise provided. Title and risk of loss or damage to all items shall be the responsibility of the contract supplier until accepted by KEYS in writing.

ENTIRE AGREEMENT

The terms, specifications and/or drawings included in a duly executed contract will constitute the entire agreement between the parties. No modification or waiver of terms of this agreement shall be binding, unless in writing, signed by a duly authorized representative of KEYS.

mailto:Tyler.Randolph@keysenergy.com mailto:purchasing@keysenergy.com

ERROR IN BID CALCULATION

In the event there is a mathematical error in the bid, KEYS will recalculate using the line items and correct the total.

EXECUTION OF PROPOSAL

If a Proposal is made by a partnership, it shall contain the name and address of each partner and shall be executed in the partnership name, followed by the handwritten signature of a partner authorized to execute the Proposal for the partnership. If a Proposal is made by a corporation, it shall be executed in the name of the corporation, followed by the handwritten signature of an officer authorized to execute the Proposal for the corporation, and the printed or typewritten designation of the office he holds in corporation. Another partner of the partnership or official of the corporation shall attest to the authority of the person executing the Proposal. KEYS may require any Bidder to furnish certified copies of extracts of the minutes of meetings of the governing body of the Bidder authorizing execution of the Proposal and Contract Documents.

FORCE MAJEURE

KEYS shall not be liable in any way to contractor as a result of an event, circumstance or act of a third party that is beyond a party’s reasonable control (e.g. an act of God, and act of the public enemy, an act of a government entity, strikes or other labor disturbances, hurricanes, earthquakes, fires, floods, epidemics, embargoes, war and riots).

LITIGATION SEARCH

KEYS reserve the right to conduct a litigation search on contractor’s history of past litigation.

LIQUIDATED DAMAGES

In the event the Scope of Work is not substantially complete on or before 190 calendar days following KEYS’ written Notice to Proceed, liquidated damages shall be payable by Contractor to KEYS in the amount of $100.00 per day for each day the Scope of Work is not substantially complete.

The parties recognize that the damages to be incurred by KEYS as a result of delay in completion of the Scope of Work are difficult to estimate at this time and would be difficult for KEYS to prove. The parties intend that the payment of Liquidated Damages set forth above would serve to compensate KEYS for its damages resulting from such delay in completion, and constitutes a reasonable, good faith approximation of such damages. The liquidated damages set forth herein are not intended to, nor shall be construed to, function as a penalty, and shall not preclude other remedies available to KEYS at law or in equity.

MATERIAL

No goods or materials provided pursuant to the proposal shall consist of or contain any equipment which has been manufactured or supplied by persons or entities owned by, controlled by, or subject to the jurisdiction or direction of the government of the People’s Republic of China.

MODIFICATION OF PROPOSAL

A modification of a proposal already received will be considered only if the modification is received prior to the time last announced for opening Proposals. All modifications shall be made in writing, executed and submitted in the same form and manner as the original proposal, fax or E-mail.

Phone modifications will not be considered.

NOTICE TO PROCEED

KEYS will issue the successful bidder a Notice to Proceed after the following activities have been completed: 1) the Performance Bond and Insurance Certificates have been received and approved by KEYS, 2) a meeting has been held and issues regarding environmental, lien releases, payment procedures, safety, security, and use of sub-contractor notification were discussed. The successful bidder will be asked to complete the signature to acknowledge receipt of this notice.

OPENING PROPOSALS

At the time and place last announced for opening Proposals, each Proposal which has been received prior to the time last announced for opening Proposals, except those which have been properly withdrawn, will be publicly opened, irrespective of any irregularities or informalities in such Proposals.

KEYS INSPECTIONS/MEETINGS

KEYS will make inspections and/or meetings as deemed necessary to ensure that all work is being performed in compliance with these specifications and guarantees.

PAYMENT

Payment will be made after acceptance of services and materials and within 30 days after receipt of invoice. KEYS will hold 5% retention until 30 days after project completion and final acceptance. Contractor will complete and submit the provided Contractor’s Request for Payment form, prior to any payment of draw request. Contractor’s request for payment shall be accompanied by a breakdown of material and labor associated with that particular request. KEYS does not pay service charges on late payments.

PENALTIES

KEYS reserves the right to increase or decrease quantities shown without penalties.

PERSONNEL

A. The project supervisor must be capable of communicating fluently in English at all times.

B. On a project, the foreman must be capable of communicating fluently in English.

C. All employees of company must be United States Citizens or legally authorized to reside and work in the United States.

D. KEYS may request at any time throughout the contract the following within eight (8) hours:

- Proof of citizenship for all employees

- Proof of employee’s salary is at or above state and federal minimum requirements

- Proof of eligibility to legally work in the United States

POSTPONEMENT OF OPENING

KEYS reserves the right to postpone the date and time last announced for opening Proposals and such postponement may be made at any time prior to the time last announced for opening Proposals. KEYS will give written notice in the form of an Addendum by email to each party to whom Contract Documents have been issued in addition to posting the Addendum on DemandStar, Vendorlink, and Keysenergy.com websites, stating the change in date and time of any such postponement.

PRICES

A. All prices bid shall be firm unless the conditions of the RFP permit price escalation. If an escalation method or indices are specified, the

Bidder shall indicate in its bid the specific items subject to escalation, and shall give the method and indices to be used in computing the amount thereof.

B. The vendor shall provide the proposal price in U.S. dollars only.

PROPOSAL GUARANTEE

A. The Proposal Guarantee shall be the cashier’s check or Bid Bond required in the Notice to Bidders. A bid bond or cashier’s check in lieu of a surety bond in the amount of (five) 5% of the proposal shall be submitted with all proposals. This bid bond requirement is to be used as security and will be returned to bidder after KEYS enters into a Contract with the successful bidder. This (five) 5% shall be based on the total bid price. The bid bond or cashier’s check shall be valid for a period of no less than 120 days after bid opening date.

B. KEYS may reject all Proposals, and in such event, all cashier’s checks and Bid Bonds will thereupon be returned to the Bidders.

C. When a Proposal is accepted, all checks and Bid Bonds will thereupon be returned to the bidders, except for the approved proposal. The cashier’s check or Bid Bond of the approved Bidder will be returned after completion of the requirements in the following paragraph.

D. Within (ten) 10 days after delivery of Notice of Utility Board Approval, or such additional time as is allowed by KEYS, the Bidder shall furnish satisfactory Performance and Payment Bond, Insurance Certificate and Insurance Policies.

PROTESTS

Any bidder who believes he has been aggrieved in connection with the staff recommendation or award of a contract may protest in writing to the KEYS Purchasing Department. The deadline for filing a protest is prior to the commencement of the Utility Board meeting wherein the award is to be considered. It is the responsibility of the bidder to ascertain the bid award information from DemandStar or VendorLink.

Protests shall specifically describe the subject matter and facts giving rise to the protest.

PUBLIC RECORDS ACT

Pursuant to F.S. 119.0701 of the Public Records Act, any request to inspect or copy public records relating to a public agency’s contract for services must be made directly to the public agency. Contractors is required to comply with public records laws and upon request by the public records custodian, shall provide a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost not to exceed the cost provided in Ch. 119, F.S. or as otherwise provided by law. A contractor who fails to provide the records to the agency within a reasonable time may be subject to penalties as provided in F.S. 119.10

IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF

CHAPTER 119, FLORIDA STATUTES, TO CONTRACTOR’S DUTY TO

PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT

THE CUSTODIAN OF PUBLIC RECORDS AT:

KEYS ENERGY SERVICES

P.O. BOX 6100

Key West, FL 33041-6100

(305) 295-1067

Gricel Owen Email: gricel.owen@keysenergy.com

PUBLIC ENTITY CRIME CLAUSE

Any person submitting a bid or proposal in response to this invitation must execute the enclosed form FOR 094, SWORN STATEMENT UNDER SECTION 287.133 (3) (a), FLORIDA STATUTES ON PUBLIC ENTITY CRIMES, including proper check(s), in the space(s) provided, and enclose it with his bid proposal. If you are submitting as bid or proposal on behalf of dealers or suppliers who will ship commodities and receive payment from the resulting contract, it is your responsibility to see that copies of the form are executed by them and are included with your bid or proposal. Corrections to the form will not be allowed after the bid or proposal opening time and date.

Failure to complete this form may result in immediate disqualification of your bid or proposal.

QUALITY ASSURANCE PROVISIONS

A system of test and inspection shall be used to insure receipt of the quality and quantity of material(s)/service(s) purchased.

Material(s)/service(s) will be promptly inspected and any discrepancies from the purchase order and/or the supplier’s invoice shall be reported immediately.

RELEASE OF LIENS

Contractor is to furnish a release of liens for sub-contractual materials and labor prior to each payment. In addition, contractor is to furnish the standard form of “Statement Concerning Claims.”

REJECTION

The Utility Board reserves the right to reject any or all proposals, to waive irregularities and informalities in any or all proposals, and to separately accept or reject any item, items, bid schedule or bid schedules of the proposal which the Utility Board deems to be in the best interest of the Utility Board.

RETAINAGE

A 5% retainage fee will be applied to all payment requests.

SAFETY/MAINTENANCE OF TRAFFIC (MOT)

Contractor is to provide all required Safety and Traffic Control equipment as required by FDOT, City of Key West, or Monroe County MOT.

Personnel are required to be trained in MOT as required. Contractor is to provide copies of certification of MOT training.

SAFETY AND PROTECTION

Examination of existing facilities: After the Contract is awarded and before commencement of the work, Contractor and KEYS shall make thorough examination of all existing structures and facilities associated with the project.

Safety requirements: Contractor shall do whatever work is necessary for safety and be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during the project period. This requirement shall apply continuously and not be limited to normal working hours.

Safety provisions shall conform to Federal and State Departments of Labor, Occupational Safety and Health Act (OSHA), and other applicable Federal, State, County, and Local Laws, Ordinances, Codes, requirements set forth herein, and regulations that may be specified in other parts of these specifications. Where these are in conflict, the more stringent requirement shall be followed. Contractor shall become thoroughly familiar with governing safety provisions and shall comply with the obligations set forth therein.

Contractor shall develop and maintain for the duration of the project, a safety program that will effectively incorporate and implement required safety provisions of the American Public Power Association (APPA) Safety Manual. Contractor is responsible for obtaining the latest edition of the APPA Safety Manual at their expense from APPA at http://www.publicpower.org/topics/landing.cfm?ItemNumber=38512. Contractor shall appoint a qualified employee who is authorized to supervise and enforce compliance with the APPA safety Manual. It is not the responsibility of KEYS to review or police contractor’s implementation of the APPA Safety Manual’s protocols.

SCOPE OF WORK

While KEYS has tried to anticipate all Work required under and during the term of this contract, the parties understand and agree that the Work required herein may require without notice to contractor, the performance of Extra Work or the omission of Work previously required.

KEYS may at any time and without notice to contractor, require changes in the scope of Work under this contract as KEYS may find necessary or desirable. Such changes may include the omission of Work previously required.

A. KEYS shall notify contractor of the change in scope work via Change Order, which shall become part of the Contract Documents.

If a Change Order directs Contractor to omit Work, contractor shall refrain from performing it.

B. Contractor shall perform Extra Work only pursuant to the issuance by KEYS of Change Order. Records of any Extra Work performed by contractor shall be reviewed daily by contractor and KEYS, duplicate copies of accepted records made and signed by both contractor or his representative and KEYS, and one (1) copy retained by each.

SECURITY/BACKGROUND CHECK

KEYS may require successful bidders to supply a complete listing of all individuals that will perform work at the various sites. KEYS may run DMV and mandatory felony and misdemeanor background checks due to security reasons. The successful bidder must expressly agree to the right for KEYS to run the aforementioned checks.

KEYS reserve the right to perform background checks during the entire duration of the contractual agreement. Contractor will advise KEYS immediately of any employee staff changes before they are permitted on-site. Non-compliance of security/background check portion of the bid specifications will result in rejection of the proposal or termination of awarded contractual agreement.

SEVERABILITY

If any of these General Terms & Conditions is determined to be invalid, illegal or enforceable, the remaining provisions of these General Terms & Conditions remain in full force to the extent permitted by law.

http://www.publicpower.org/topics/landing.cfm?ItemNumber=38512

SUBCONTRACTORS

Each Bidder shall list on the Proposal form the name of each construction subcontractor who will furnish in excess of 10% of the Project. Failure to do so shall entitle KEYS, at its option, to reject the bid.

SUBMISSION OF PROPOSAL

It is the sole responsibility of each Bidder to deliver its Proposal to KEYS at the place designated for receiving Proposals and prior to the time for opening Proposals last announced to Bidders. Any Proposal received after the time last announced for opening Proposals may be retained by KEYS or returned to the Bidder, but such Proposal shall be rejected as not responsive.

No proposal shall contain Personal Information, as defined in Section 501.171, Florida Statutes, unless specifically requested in the Specifications. In the event Personal Information is received, KEYS shall take appropriate precautions to prevent the release of such Personal Information. Notwithstanding the foregoing, to the extent allowed by applicable law, KEYS shall have no liability for the release to any third party of Personal Information included within any proposal.

SUPPLIER DIVERSITY

KEYS is committed to providing equal opportunities to Minority/Women Business Enterprises (M/WBEs) as well as all other Suppliers, Consultants, Contractors and Subcontractors who seek to do business with KEYS. KEYS attempts to ensure that qualified M/WBEs are made aware of, have an opportunity to bid on, and are considered on an equal basis with all other qualified bidders for the provision of supplies and services.

TAX

The prices of materials set forth herein shall not include state sales tax or local option tax. KEYS is generally exempt from state sales tax, (sales tax number 85-8012621609C-2), and local option tax. However; any purchases of materials for construction of new electrical transmission and distribution facilities are subject to state sales tax and local option tax.

TERMINATION OF CONTRACT FOR CONVENIENCE

When deemed to be in the best interest of KEYS, any awards or contracts resulting from this specification may be terminated by KEYS, in whole or in part, without cause by the delivery of thirty (30) days written notice. Upon receipt of the notice of termination Contractor shall, except as otherwise directed by KEYS: (1) stop work as specified in the notice; (2) place no further subcontracts or orders; (3) terminate all subcontracts to the extent they relate to the work terminated; (4) transfer title and deliver to KEYS all completed work and any completed or partially completed items which, if the contract had been completed, would be required to be transferred to KEYS; and (5) take reasonable actions as directed by KEYS to protect and preserve property in which KEYS has an interest. With regard to the portion of the award or contract so terminated, KEYS shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination, plus the reasonable costs of settlement of the work terminated including with limitation the performance of the above items, and expressly excluding the amount of any settlements made by Contractor with any subcontractors. Without waiver of any rights KEYS may have in law or at equity, KEYS and Contractor shall negotiate in good faith to reach a settlement with regard to damages incurred by KEYS as a result of the breach and any outstanding sums which may be owed to Contractor for work performed for which payment has not been received.

TERMINATION OF CONTRACT FOR CAUSE

In the event Contractor fails to perform any provision of the contract or award as specified herein, KEYS may terminate any award or contract resulting from this specification, in whole or in part, by the delivery of 10 days written notice of default. Upon receipt of the notice of termination Contractor shall, except as otherwise directed by KEYS: (1) stop work as specified in the notice; (2) place no further subcontracts or orders; (3) terminate all subcontracts to the extent they relate to the work terminated; (4) transfer title and deliver to KEYS all completed work and any completed or partially completed items which, if the contract had been completed, would be required to be transferred to KEYS;

and (5) take reasonable actions as directed by KEYS to protect and preserve property in which KEYS has an interest. Without waiver of any rights KEYS may have in law or at equity, KEYS and Contractor shall negotiate in good faith to reach a settlement with regard to damages incurred by KEYS as a result of the breach and any outstanding sums which may be owed to Contractor for work performed for which payment has not been received.

WARRANTY

A. Contractor warrants to KEYS that the Material and/ Equipment to be furnished under the Contract shall be designed and fit for the purpose specified when operated in accordance with contractor's specific operating instructions or, in the absence thereof, in accordance with generally accepted operating practices; free from defects in material, workmanship, and title; shall meet all specifications, including those relating to performance, contained or incorporated by reference in the Contract; and that the technical direction of installation on KEYS' premises when furnished by contractor shall be performed in a competent, diligent manner in accordance with generally accepted professional practices.

B. The foregoing warranties, except as to title, shall apply to defects or deficiencies occurring within a period of 1 year from Final Acceptance provided the same is not unreasonably delayed by the KEYS or others. If, however, during the above 1 year warranty period the Equipment is not available for operation due to a failure to meet such warranties, such time of unavailability shall not be counted as part of the warranty period. The condition of any field tests shall be mutually agreed upon, and Contractor shall be notified of and may be represented at all tests that may be made.

C. If the equipment and materials furnished hereunder does not meet the warranties specified above when it has normal and proper use and maintenance, KEYS shall promptly notify contractor and make the Equipment available for correction. Contractor shall thereupon within a reasonable time correct all defects, including nonconformance with the Engineering Specifications, by either repairing or replacing any defective or damaged parts of the Equipment.

The cost of Labor, Materials and Equipment components directly associated with such repair or replacement of the Equipment, including removal, loading and unloading, transportation to and from the repair site and reinstallation, shall be borne by contractor.

D. Any repaired or replacement part furnished under the foregoing warranty shall carry warranties on the same terms as set forth above for 1 year from the date of its Final Acceptance.

E. Contractor shall obtain written warranties from its Subcontractors and suppliers of Materials, Labor and Equipment components where such warranties are obtainable and shall…

This is the start of the file's text. The full file is on GovTribe.