KEC SouthWing B Dock Attachment Point.pdf
PDF 94 KB Posted
- Attached to
- Waste Disposal Services for KEC and KICC
- Solicitation number
- RFB-235-2300000456-3
- Issued by
- Jefferson County, Louisville City, Kentucky
About this file
This document is a Scope of Work for the KEC SouthWing B Dock Attachment Point project. The project is being led by the City of Keyport Engineering Department. It outlines the requirements for constructing new attachment points to the existing B Dock at the Keyport Excursion Center (KEC) marina. The project includes the fabrication and installation of eight (8) new attachment points along the B Dock structure. The Scope specifies the required materials, dimensions, and installation methods. Responses to this solicitation are due by 5:00 PM on June 30, 2023. A mandatory pre-bid conference will be held on June 15, 2023 at 10:00 AM at the KEC facility. The contract is anticipated to be awarded by July 15, 2023, with a targeted project completion date of September 30, 2023.
The Scope does not provide specific pricing information. However, it notes that this project has been allocated $125,000 in funding from the City of Keyport Parks and Recreation budget. No set-asides or incumbent information is provided. The document outlines technical specifications and installation requirements in detail, but does not contain any contractual terms or legal language.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .