Summary of KDD Solar RFP Exhibits
This Request for Proposals is issued by the Klamath Drainage District in Oregon to solicit bids from qualified photovoltaic system installers for the design, supply, and installation of a 960 kilowatt AC (1,000 kW DC) canal-covered solar array project located in Klamath County, Oregon. The project involves designing and installing a photovoltaic system to cover a section of the District's North Canal, consisting of approximately 26 standardized 60 kW AC blocks with a total capacity of 2.036 MWdc. The proposed solar array will be installed north of Township Road, spanning approximately 1,560 feet along the canal with a footprint of approximately 1,600 feet by 45 feet. The project is part of the Oregon Community Solar Program and will interconnect at 12.47 kV to Pacific Power's distribution circuit 5L26 at the Merrill substation. The RFP was issued in 2025 with various study and design phases outlined, including execution of an Interconnection Agreement by October 29, 2025, and projected commercial operation by July 18, 2027. The contract will be for professional services including design, procurement, materials, construction, and system commissioning through final project completion and delivery of required documentation.
The conceptual project estimate for the solar array installation is $9,476,666, representing a lump sum estimate that excludes AC/MV electrical materials, equipment, labor, and associated subcontractor costs, along with environmental studies, permitting beyond building permits, and operations and maintenance services. The project is funded through the Clean Water State Revolving Fund (CWSRF), which imposes specific requirements including prevailing wage compliance under both federal Davis-Bacon Act standards and Oregon Bureau of Labor and Industries regulations, American Iron and Steel requirements, and equal employment opportunity provisions. Contractors must submit multiple DEQ CWSRF required forms including bidders lists, prevailing wage agreements, disadvantaged business enterprise outreach documentation, and lobbying certifications. Pacific Power's Facilities Study Report estimates utility interconnection costs at $592,000, with the applicant responsible for design and construction of generating facilities, grounding transformer, compliant inverters, recloser installation, easements, access roads, and property procurement, while Pacific Power handles distribution system modifications, substation upgrades, and metering equipment installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KDD Canal Solar RFP Final.pdf | ||
| KDD_Pricing_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Klamath Drainage District Canal Solar Project
Exhibit A: Site Location
This map compiled by Farmers Conservation Alliance as a visualization tool and not intended for legal purposes. FCA is not liable for damages caused by omissions or errors in data displayed herein.
Map Date: 8/1/2025; Credits: FCA, Esri and Klamath County GIS tax lot download 7-29-25
KDD_CanalSolar.aprx, KDD Solar CUP
0 300150 Feet
´" Proposed electrical box
Proposed electrical line
Proposed solar array location
Tax lot
Klamath Drainage District
Canal Solar
Map tax lot:
4009-03500-00500
Low er K lam ath Lake R oad
Township Road (paved; approximately 25 feet wide)
Access roads with two-way traffic (unpaved; approximately 10-foot-wide gates)
Tax lot is 1,538 feet wide at southern edge
Ta x l o t is
,3 f e e t lo n g a t w e st e rn e d g e
N o rth
C an al
210 feet
Proposed solar array footprint is approximately
1,600 feet by 45 feet
70 feet
Proposed electrical box (10' x 10')
130 feet
Existing solar array (approximately 55' long)
Existing utility connection
Proposed line (approximately
185 feet total)
Exhibit B: Project Documentation Checklist
The Contractor will provide the following documentation to KDD as outlined below, before final payment will be issued. Please return this checklist with the final documentation. Please check the boxes to indicate which documents have been included. If a document is not required for the project or does not apply in the installation location, please initial in the space provided.
Documentation to FACILITY:
Item Initials:
Photovoltaic System Commissioning Checklist _____
Lien Release Affidavit _____
Signed Warranty Letter from GC and all subs _____
Photos of completed system _____
Site Diagrams _____
Electrical Single Line Diagram _____
Electrical Calculations _____
Solar Module Warranty and Operators Manual _____
Solar Module(s) Serial Numbers _____
Inverter Manual _____
Inverter Warranty and Registration Card _____
Inverter Serial Number(s) _____
Monitoring Documentation _____
Electrical Work Permit _____
Approved and signed electrical inspection _____
Building Permit (if necessary) _____
Sealed approval from licensed PE of all mounting or structural designs (if necessary) _____
Any and all other documentation necessary to meet state/local or utility requirements _____
Including: __________________________________
Exhibit C: DEQ CWSRF Required Forms
The successful bidder will be required to complete the following forms as part of the contract award.
Form BC 1: Bidders List Form BC 5: Prevailing Wage Agreement Form BC 6: List of Contacted Disadvantaged Business Enterprises Form BC 7: Certificate of Independent Price Determination Form BC 8: Good Faith Efforts, Contract Administration and Contract Language Form BC 9: Certification Regarding Lobbying Activities Form BC 10: Disclosure of Lobbying Activities
Form BC 1
Updated July 2020
State of Oregon Department of Environmental Quality
Bidders List Contact: Regional Project Officer
The Bidders List applies only to Clean Water State Revolving Fund loans over $250,000, and includes all firms that bid or quote on prime contracts and subcontracts, per CFR Section 33.501. This document should be included in project bid packages.
This list must be kept current as long as the loan recipient receives Clean Water State Revolving Fund dollars for this particular loan. Failure to comply with this requirement is subject to post award remedies, spelled out in Chapter 40 of the Code of Federal Regulations, Section 31.43. The loan recipient must provide a copy of the Bidders List at the request of the DEQ, EPA or an auditor.
Loan Recipient CWSRF Loan Number Project Name Business name and point of contact
Business mailing address, phone number and email address
Procurement on which the entity bid or quoted and bid closing date
Status as
MBE WBE Non-MBE/WBE https://www.oregon.gov/deq/wq/cwsrf/Pages/CWSRF-Contacts.aspx
Form BC 1
Updated July 2020
Loan Recipient CWSRF Loan Number Project Name Business name and point of contact
Business mailing address, phone number and email address
Procurement on which the entity bid or quoted and bid closing date
Status as
MBE WBE Non-MBE/WBE
Alternative formats DEQ can provide documents in an alternate format or in a language other than English upon request. Call DEQ at 800-452-4011 or email deqinfo@deq.state.or.us.
mailto:deqinfo@deq.state.or.us
Form BC5
Updated May 2021 1
State of Oregon Department of Environmental Quality
Prevailing Wage Agreement Contact: Regional Project Office
The loan recipient, prime contractor and subcontractors all must initial and sign this form.
• The prime contractor copy must be submitted as part of the bid/proposal to the loan recipient.
• A copy of this form signed by the loan recipient and the prime contractor must be submitted with the contract copy to DEQ.
• The prime contractor must obtain a signed copy of this form from each subcontractor and retain them in the prime contractor’s contract file.
The undersigned understands that this public works project is funded in whole or in part by the Clean Water State Revolving Fund and is subject to the prevailing wage requirements of Oregon’s Bureau of Labor and Industry and the requirements of the Davis-Bacon Act.
_____ The undersigned agrees that, notwithstanding any other provision of law, all laborers and mechanics employed on the project must be paid wages at rates not less than those prevailing on projects of a similar character in the locality, as determined by the United States Secretary of Labor, or the Commissioner of the Oregon Bureau of Labor and Industries, whichever is higher, per ORS 279C.838; OAR 839-025-0035(2).
When a public works project is subject to both the state and federal prevailing wage rate laws, contractors and subcontractors must pay the higher of either the state or federal prevailing wage rates for the type of work being performed, per ORS 279C.838; OAR 839-025-0035(2).
Davis Bacon (federal law)
_____ Davis-Bacon applies to all treatment works construction projects for the entirety of the construction activities financed by a CWSRF loan through the completion of construction, no matter when construction commences.
_____ The Loan Agreement includes specific Davis-Bacon terms and conditions contract language that must be passed through to the prime contractor and all subcontractors in their contracts over $2,000.
_____ The Secretary of Labor's determination, regarding the prevailing wages applicable in the state of Oregon, are located at: http://www.wdol.gov/ While the solicitation remains open, the sub recipient shall monitor www.wdol.gov weekly to ensure that the wage determination contained in the solicitation remains current. The sub recipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation.
If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the sub recipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the sub recipient.
http://www.wdol.gov/
Updated May 2021 2
If the sub recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the sub recipient, obtains an extension of the 90-day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The sub recipient shall monitor www.wdol.gov on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
_____The loan recipient or the prime contractor on behalf of the loan recipient maintains on-going wage information as a requirement of the CWSRF funding of a project subject to Davis-Bacon. The CWSRF program suggests using the wage matrix tool at this link http://www.deq.state.or.us/wq/loans/constructionForms.htm and instructions for the wage matrix at this link http://www.deq.state.or.us/wq/loans/docs/WageMatrixInst.pdf
_____The loan recipient conducts wage interviews with a representative group of workers during the project construction at 30 percent, 60 percent and 90 percent project completion. The loan recipient must conduct additional interviews if there is any reason to suspect a contractor or their subcontractor is at risk for violating wage requirements. As provided in 29 CFR 5.6(a)(6), all interviews must be conducted in confidence. The loan recipient must use Standard Form 1445 or equivalent documentation to memorialize the interviews.
Oregon Bureau of Labor and Industry (state law)
_____Bureau of Labor and Industry prevailing wage rates apply to projects over $50,000. Oregon prevailing wage rate regulations require every contractor or subcontractor employing workers on a public works project must pay to such workers no less than the applicable prevailing rate of wage for each trade or occupation, as determined by the commissioner, in which the workers are employed. OAR 839-025- 0035.
_____ The wage rates identified by the Commissioner of the Oregon Bureau of Labor and Industry are located at http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx
_____ The prevailing wage rates in effect at the time the bid specifications are first advertised are the Oregon wage rates that apply for the duration of the project. Prevailing wages obtained through the Bureau of Labor and Industry websites must be included in the bid solicitation and incorporated in all contracts resulting from the procurements.
_____All contractors and subcontractors shall file, with the Construction Contractors Board, a $30,000 public works bond with a corporate surety authorized to do business in this state. ORS 279C.836 The bond must provide that the contractor or subcontractor will pay claims ordered by Bureau of Labor and Industry to workers performing labor upon public works projects. It must be filed before starting work on a contract or subcontract for the project.
Payroll/Certified Statement (form WH-38)
Form WH-38 may be used by contractors for reporting their payroll as required by ORS 279C.845 on public works projects subject to the Prevailing Wage Rate Law. This form has not been officially approved by the United States Department of Labor, however it is designed to meet the requirements of the federal Davis-Bacon Act as well. Prevailing Wage Rate Forms.
http://www.deq.state.or.us/wq/loans/constructionForms.htm http://www.deq.state.or.us/wq/loans/docs/WageMatrixInst.pdf http://www.gsa.gov/portal/forms/download/115910 http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx http://egov.oregon.gov/BOLI/WHD/PWR/W_PWR_Forms.shtml
Updated May 2021 3
Signature Date
Title
Company
Alternative formats
Documents can be provided upon request in an alternate format for individuals with disabilities or in a language other than English for people with limited English skills. To request a document in another format or language, call DEQ in Portland at 503-229-5696, or toll-free in Oregon at 1-800-452-4011, ext. 5696; or email deqinfo@deq.state.or.us
Updated May 2019 Page 1
State of Oregon Department of Environmental Quality
List of Contacted Disadvantaged Business Enterprises Contact: Regional Project Officer
Name of Business Certification # Contact Person
Phone Number
Date of Contact Reason for Non-participation
Form BC 6
List of Disadvantaged Businesses Contacted Page 2
Name of Business Certification # Contact Person Phone Number Date of Contact Reason for Non-participation
List of Disadvantaged Businesses Contacted
Alternative formats Documents can be provided upon request in an alternate format for individuals with disabilities or in a language other than English for people with limited English skills. To request a document in another format or language, call DEQ in Portland at 503-229-5696, or toll-free in Oregon at 1- 800-452-4011, ext. 5696; or email deqinfo@deq.state.or.us.
Certificate of Independent Price Determination Contact: Regional Project Officer
The prime contractor must:
• Sign and submit this form as part of the bid/proposal to the loan recipient
• Include a signed copy in their contract
• Retain a signed copy of this form from each subcontractor
Bidder’s Name: _______________________________________________________________________
Address: ____________________________________________________________________________
a. The bid offeror certifies that:
1. The prices in this offer have been arrived at independently without, for the purpose of restricting competition, any consultation, communication or agreement with any other offeror or competitor relating to:
i. Those prices
ii. Intention to submit an offer
iii. Methods or factors used to calculate the prices offered
2. The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law
3. No attempt has been or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
b. Each signature on the offer is considered to be a certification by the signatory that the signatory:
1. Is the person in the offeror's organization responsible for determining the prices being offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) above; or
2. Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above;
3. As an authorized agent, certifies that the principals named below have not participated, and will not participate, in any action contrary to subparagraph (a)(1) through (a)(3) above; and
Form BC 7
4. As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above.
5. If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
Insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization:
Full Name of Person(s) in the Offeror’s Organization
Title Date
Alternative formats DEQ can provide documents in an alternate format or in a language other than English upon request.
Call DEQ at 800-452-4011 or email deqinfo@deq.state.or.us.
Signature of Prime Contractor _______________________________________________
Signature of Subcontractor _______________________________________________
BC8
State of Oregon Department of Environmental Quality
Good Faith Efforts, Contract Administration and Contract Language Regional Project Officer
This form must be completed by the loan recipient, prime contractor and any subcontractor who will further subcontract on the Clean Water State Revolving Fund project within the scope of the loan.
All sections in this attachment must be initialed on the line provided and the form signed.
One completed attachment for the prime contractor must be submitted as part of the bid/proposal to the loan recipient.
One completed attachment for each subcontractor who will further subcontract must be submitted before the contract award.
A copy of those must be included in the contract copy to DEQ, along with one attachment initialed and signed by the loan recipient.
_____ DBE certification All Minority Business Enterprises and Woman Business Enterprises must be certified by Oregon’s Office of Minority, Women and Emerging Small Businesses or by the state in which they are located. This office administers the Disadvantaged Business Enterprise, Minority Business Enterprise/Women Business
Enterprise, and Emerging Small Business programs.
_____ Good Faith Efforts The good faith efforts are required methods to ensure that all DBEs have the opportunity to compete for procurements funded by the Clean Water State Revolving Fund. The loan recipient and their prime contractor are required to:
1. Ensure DBEs are made aware of contracting opportunities to the fullest extent practicable through outreach and recruitment activities. For Indian tribal, state and local government recipients, this will include placing DBEs on solicitation lists and soliciting them whenever they’re potential sources.
2. Make information on forthcoming opportunities available to DBEs and arrange time frames for contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation by DBEs in the competitive process. This includes, whenever possible, posting solicitations for bids or proposals for a minimum of 30 calendar days before the bid or proposal closing date.
3. Consider in the contracting process whether firms competing for large contracts could subcontract with DBEs. For Indian tribal, state and local government recipients, this will include dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by DBEs in the competitive process.
4. Encourage contracting with a consortium of DBEs when a contract is too large for one of these firms to handle individually.
https://www.oregon.gov/deq/wq/cwsrf/Pages/CWSRF-Contacts.aspx http://www.oregon4biz.com/How-We-Can-Help/COBID/ http://www.oregon4biz.com/How-We-Can-Help/COBID/
5. Use the services and assistance of the federal Small Business Administration, Minority Business
Development Agency of the U.S. Department of Commerce, and the state Office of Minority, Women and Emerging Small Business.
6. If the prime contractor awards subcontracts, require the prime contractor to take steps one through five above.
7. Native American provisions 40 CFR, Section 33.304
The recipient agrees to comply with the contract administration provisions of 40 CFR, Section
33.304. Any recipient, whether or not Native American, of an EPA financial assistance agreement for the benefit of Native Americans, is required to solicit and recruit Indian organizations and Indian-owned economic enterprises and give them preference in the award process prior to undertaking the six good faith efforts. If the efforts to solicit and recruit Indian organizations and Indian-owned economic enterprises is not successful, then the recipient must follow the six good faith efforts.
Contract administration _____ The Loan Recipient must require its prime contractor to employ the six good faith efforts even if the prime contractor has achieved its fair share objectives.
_____ If a DBE subcontractor fails to complete work under the subcontract for any reason, the Loan
Recipient must require the prime contractor to employ the six good faith efforts if soliciting a replacement subcontractor.
_____ The Loan Recipient must require its prime contractor to pay its subcontractor for satisfactory performance no more than 30 days from the prime contractor’s receipt of payment from the Loan
Recipient.
_____ The Loan Recipient must require written notification from its prime contractor prior to any termination of a DBE subcontractor for convenience by the prime contractor.
_____ Specific contract language All contracts between the Loan Recipient and prime contractor, and prime contractor and subcontractors must include the following statement required by 40 CFR Part 33:
"The contractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. The contractor shall carry out applicable requirements of 40 CFR part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the contractor to carry out these requirements is a material breach of this contract which may result in the termination of this contract or other legally available remedies."
Updated May 2021 3
The undersigned has initialed the items above and understands the resulting responsibility for each item.
Accessibility Alternative formats DEQ can provide documents in an alternate format or in a language other than
English upon request. Call DEQ at 800-452-4011 or email deqinfo@deq.state.or.us.
Signature Date
Title
Company
Form BC 9
Certification Regarding Lobbying Activities Contact: Regional Project Officer
503-229-LOAN
This form must be signed by the prime contractor and submitted by the loan recipient by the time the contract is award. A copy must be included in the contract copy to DEQ. The prime contractor must obtain a signed copy of this form from each subcontractor, and retain them in the prime contractor’s contract file.
The undersigned certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal Contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form LLL, "Disclosure of Lobbying Activities," in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature Date
Alternative formats DEQ can provide documents in an alternate format or in a language other than English upon request.
Call DEQ at 800-452-4011 or email deqinfo@deq.state.or.us.
Updated May 2019
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 0348-0046
(See reverse for public burden disclosure.)
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial filing
b. grant b. initial award b. material change
c. cooperative agreement c. post-award For Material Change Only:
d. loan year _________ quarter _________
e. loan guarantee date of last report ______________
f. loan insurance
4. Name and Address of Reporting Entity: 5. If Reporting Entity in No. 4 is a Subawardee, Enter Name and Address of Prime:
Tier ______, if known :
Congressional District, if known : Congressional District, if known :
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable: _____________
8. Federal Action Number, if known : 9. Award Amount, if known :
10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address if (if individual, last name, first name, MI): different from No. 10a )
(last name, first name, MI ):
11. Signature:
Print Name:
Title:
Telephone No.: _______________________ Date:
Authorized for Local Reproduction
Standard Form LLL (Rev. 7-97)
Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less that $10,000 and not more than $100,000 for each such failure.
Prime Subawardee
Federal Use Only:
Form BC 10
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3.
4.
5. If the organization filing the report in item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizationallevel below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance
(CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8.
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services, and include full address if different from 10 (a). Enter Last Name, First Name, and Middle Initial (MI).
11. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employeeof any agency, a Member of Congress, an officer or employeeof Congress, or an employeeof a Member of Congress in connectionwith a coveredFederalaction. Completeall items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
Identify the appropriateclassification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previouslysubmitted report by this reporting entity for this covered Federal action.
Enter the full name, address, city, State and zip code of the reporting entity. Include CongressionalDistrict, if known. Check the appropriateclassification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee,e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number;
Invitation for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
According to the PaperworkReduction Act, as amended,no persons are required to respond to a collection of information unless it displays a valid OMB Control Number. The valid OMB control number for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Managementand Budget, Paperwork Reduction Project (0348-0046), Washington, DC 20503.
Exhibit D: DEQ Contract Provisions
31 | P a g e
APPENDIX E: DAVIS-BACON PROVISION
Part 1
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics.
Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in § 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein:
Provided, that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph (a)(1)(ii) of this section) and the Davis- Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
Subrecipients may obtain wage determinations from the U.S. Department of Labor’s web site, www.dol.gov.
(ii)(A) The subrecipient(s), on behalf of EPA, shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The State award official shall approve a request for an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:
(1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
(2) The classification is utilized in the area by the construction industry; and
(3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
32 | P a g e
(B) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the subrecipient(s) agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), documentation of the action taken and the request, including the local wage determination shall be sent by the subrecipient (s) to the State award official. The State award official will transmit the request, to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S.
Department of Labor, Washington, DC 20210 and to the EPA DB Regional Coordinator concurrently. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification request within 30 days of receipt and so advise the State award official or will notify the State award official within the 30-day period that additional time is necessary.
(C) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the subrecipient(s) do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the award official shall refer the request and the local wage determination, including the views of all interested parties and the recommendation of the State award official, to the Administrator for determination. The request shall be sent to the EPA DB Regional Coordinator concurrently. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt of the request and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(D) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs (a)(1)(ii)(B) or (C) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
(2) Withholding. The subrecipient(s), shall upon written request of the EPA Award Official or an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required
33 | P a g e by the contract, the (Agency) may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(3) Payrolls and basic records.
(i) Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
(ii)(A) The contractor shall submit weekly, for each week in which any contract work is performed, a copy of all payrolls to the subrecipient, that is, the entity that receives the sub-grant or loan from the State capitalization grant recipient. Such documentation shall be available on request of the State recipient or EPA. As to each payroll copy received, the subrecipient shall provide written confirmation in a form satisfactory to the State indicating whether or not the project is in compliance with the requirements of 29 CFR 5.5(a)(1) based on the most recent payroll copies for the specified week. The payrolls shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on the weekly payrolls. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the subrecipient(s) for transmission to the State or EPA if requested by EPA , the State, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the subrecipient(s).
34 | P a g e
(B) Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:
(1) That the payroll for the payroll period contains the information required to be provided under § 5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under § 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;
(2) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3;
(3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.
(C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the “Statement of Compliance” required by paragraph (a)(3)(ii)(B) of this section.
(D) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.
(iii) The contractor or subcontractor shall make the records required under paragraph (a)(3)(i) of this section available for inspection, copying, or transcription by authorized representatives of the State, EPA or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the Federal agency or State may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.
(4) Apprentices and trainees--
(i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be
35 | P a g e greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination.
Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(iii) Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of 29 CFR part 30.
36 | P a g e
(5) Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
(6) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR 5.5(a)(1) through (10) and such other clauses as the EPA determines may by appropriate, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5.
(7) Contract termination; debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
(8) Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
(9) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and Subrecipient(s), State, EPA, the U.S. Department of Labor, or the employees or their representatives.
(10) Certification of eligibility.
(i) By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).
(ii) No part of this contract shall be subcontracted to any person or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .