Kai Ruin PIT C and S SOW.pdf
PDF 156 KB Posted
- Attached to
- 127EAX22R0018 - Ruin Crush & Stockpile
- Solicitation number
- 127EAX22R0018
About this file
This document outlines a federal contract solicitation for a ruin pit crush and stockpile project. The USDA Forest Service, Kaibab National Forest is seeking a contractor to mobilize, clear, grub, drill, blast, sample, test, survey stockpiles for quality control, and crush and stockpile aggregate material in accordance with provided plans and specifications. The contract will be a firm-fixed-price construction contract awarded using best value tradeoffs. The requirement is set aside for small businesses only in NAICS code 212319 with a size standard of 500 employees or less. The deadline for submission of proposals is June 7, 2022. Organized site visits will be held on May 11, 2022 at the Coconino National Forest Headquarters and Coyote Pit locations. Questions regarding the solicitation are due by May 17, 2022.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
C.1 – STATEMENT OF WORK
Ruin Pit Crush and Stockpile Project: This project will include mobilization, clearing and grubbing, drilling, blasting, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of an aggregate material in accordance with the plans and specifications.
Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
SUBMITTAL/NOTIFICATION TIMELINES
Required Submittal/Notification
Deadline for Receipt by the Government
Applicable Specification
Work Schedule At Pre-Work Meeting 151 - Mobilization
Hazardous Spill Plan Before beginning any work 107 – Legal Relations & Responsibility to the Public
Contractor Quality Control Plan
Before beginning any work 153.02 Contractor Quality Control Plan
Equipment Mobilization Notification
1 week prior to moving equipment onto Coconino National Forest
151 - Mobilization
Traffic Control Plan 14-days prior to prework conference
156-Public Traffic
Aggregate Gradation*** During aggregate production FSSS 703 Soil Erosion Control Plan 14-days prior to prework conferenc.
157-Soil Erosion Control
Plan of Operations 14-days prior to prework conference.
FSSS 314
Blasting Plan 14-days prior to drilling and blasting operations
205 – Rock Blasting; FSSS 205
*** Items to be tested:
1. Gradation (AASHTO T 11)
2. Gradation (AASHTO T 27)
3. Liquid Limit (AASHTO T 89)
4. Plastic Limit (AASHTO T 90)
5. LA Abrasion (AASHTO T 96)
6. Sodium Sulfate Soundness (AASHTO T 104)
7. Durability (AASHTO T 210)
8. Fractured Faces (ASTM D 5821)
9. Specific Gravity and Absorption of Course Aggregate
C.2 – LOCATION OF PROJECT
The project is located on the Williams Ranger District of the Kaibab National Forest located in Coconino County, Arizona.
FROM FLAGSTAFF, AZ:
COCONINO NATIONAL FOREST SUPERVISOR'S OFFICE
1824 S THOMPSON ST, FLAGSTAFF, AZ 86001
TAKE I-40 BL (W HISTORIC RTE. 66) TO I-40 WEST, MERGE ONTO I-40 3.4 MI
FOLLOW I-40 W TO EXIT 167 S GARLAND PRAIRIE ROAD 23.6 MI
TAKE S GARLAND PRAIRIE ROAD TO FSR 141, CONTINUE ON FSR 141 TO FSR 109 7.9 MI
TAKE FSR 109 TO FSR 12, TURN LEFT ONTO FSR 12 6.4 MI
TAKE FSR 12 TO FSR 12D, PROCEED TO GATE AND RUIN PIT 3.8 MI
FROM WILLIAMS, AZ:
KAIBAB NATIONAL FOREST SUPERVISOR’S OFFICE
PROCEED TO S 6TH ST 0.2 MI
TURN RIGHT W HANCOCK AVE, TURN RIGHT ONTO S 4TH ST 0.2 MI
CONTINUE ONTO S PERKINSVILLE RD (CR 73), TURN LEFT ON FSR 110 7.8 MI
CONTINUE ON FSR 110 TO FSR 12 9.5 MI
CONTINUE ON FSR 12 TO FSR 12D 1 MI
TURN LEFT ONTO FSR 12, PROCEED TO GATE AND RUIN PIT 0.5 MI
File details come from the government source that posted it. Updated .