K6447 Ex C Pricing.docx
DOCX document 26 KB Posted
- Solicitation number
- K6447
- Issued by
- Yakima County, Yakima City, Washington
About this file
This is a pricing document for the Washington State Department of Agriculture (WSDA) related to a Japanese Beetle Quarantine Area Yard Debris Sites contract. The document outlines the pricing structure for constructing, staffing, and operating a yard debris collection site within the Japanese Beetle quarantine area in Washington State, which is required to comply with WAC 16-470-717 regulations that prohibit the movement of regulated articles outside the quarantine zone during active flight season. The contract requires the selected contractor to establish and maintain operational capacity at a designated site, with specific staffing levels and collection capabilities to handle yard debris from residents within the quarantine area.
The pricing schedule details the cost components for site construction, operational expenses, and staffing requirements necessary to implement the yard debris collection program. The document specifies itemized pricing for various operational elements including site setup, equipment, labor, and ongoing maintenance costs. This pricing structure allows WSDA to evaluate proposals on a transparent, comparable basis and establish the financial parameters for contract performance and budget allocation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| K6447 Ex B.docx | DOCX document | |
| Grandview.pdf.crdownload | CRDOWNLOAD file | |
| K6447 ExD Contract.doc | DOC document | |
| K6447 Ex A-1.docx | DOCX document | |
| K6447 Ex A-2.docx | DOCX document | |
| K6447 RFQQ.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K6447 EXHIBIT C – PRICING
Provide pricing in USD for line items 1 through 6. Add additional line items if needed and provide a total price, excluding tax. Contractor may modify line items to reflect associated costs.
1. Personnel __________________
2. Equipment __________________
3. Material __________________
4. Services __________________
5. Storage containers __________________
6. Other (List) __________________
Total Price __________________
Include any pricing assumptions below.
File details come from the government source that posted it. Updated .