About this file
This is Addendum #1 to a sealed bid solicitation issued by the Jefferson Parish Department of Purchasing for the Department of General Services. The addendum provides clarifications, revisions, and responses to pre-bid questions for a three-year labor-only contract to perform various roof and gutter repairs parish-wide. The scope of work comprises 18 line items covering different roofing and gutter repair labor classifications with estimated hours for each service type. The pre-bid conference was held on September 14, 2026, at the West Bank Purchasing Department in Gretna, Louisiana, with sealed bids due September 29, 2026, at 2:00 p.m. through the Jefferson Parish e-procurement portal. Public bid opening is scheduled for 2:30 p.m. on September 29, 2026. The contract will be awarded to the lowest responsible bidder for a three-year term with no renewal options specified.
Bidders must acknowledge receipt of this addendum by number on their bid submission, and failure to do so will result in bid rejection. Line Item #18 for parts and materials is non-biddable and must be marked "No Bid"; however, Jefferson Parish may issue an additional purchase order not to exceed $10,000.00 to the successful bidder for necessary parts to complete repairs. No prevailing wage requirements apply to this contract, and no bid bonds are required. The Builder's Risk Insurance requirement previously stated in Section 6.0 has been removed. Travel time is included in the hourly labor rate, and contractors may determine appropriate crew size based on project scope with owner permission, obtainable during site inspection. All line-item descriptions have been updated to include service times, and extended pricing will be calculated by multiplying unit price by quantity for each line item, with the lowest overall total determining the award. Jefferson Parish encourages participation from small businesses, minority-owned businesses, women-owned business enterprises, and veteran-owned businesses but does not impose set-asides or mandatory participation goals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JPP-BidEvent#107.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jefferson Parish Department of purchasing
Megan grantham
DIRECTOR
general government building - 200 derbigny st – suite 4400 – Gretna, la 70053 - po box 9 – Gretna – la 70054 office 504.364.2678 EMAIL: Purchasing@jeffparish.gov website: www.jeffparish.gov
Cynthia Lee Sheng Parish President
September 24, 2026
ADDENDUM #1
Bid Event No: 107 Bid Opening Date: September 29, 2026
BID TITLE: Three (3) Year Labor Only Contract to Perform Various Roof and Gutter Repairs for the Department of General Services Parish-Wide
Clarification Bidders must select “No Bid” for Line Item #18, which is for parts/materials and is a non-biddable item. In the event of excessive downtime, Jefferson Parish may provide an additional purchase order, not to exceed $10,000.00, to the successful bidder to obtain the necessary part(s) to complete the repair work.
Bidders must select “No Bid” for Line Item #18
Revision All line-item descriptions have been updated to include additional detail with the times of service for each line item, except for Line Item 17, which remains unchanged.
Question and Answers:
Question #1: Will Jefferson Parish provide or identify the complete electronic pricing schedule showing each required labor classification and the normal- hours, before/after- hours, and weekend rates?
Answer: The requested information is a matter of public record and may be obtained by submitting a public records request through the parish website.
Question #2: Will any work performed under Bid Event # 107 be subject to Davis - Bacon or another prevailing- wage requirement? I f yes, which projects, funding sources, or types of work trigger it?
Answer: No, this bid will not be subject to prevailing wage requirements.
Question #3: When a roofing or gutter helper is needed, what is the process for obtaining Jefferson Parish approval?
Can approval be obtained during the site inspection?
Answer: Yes, approval can be obtained during the site inspection.
mailto:Purchasing@jeffparish.gov http://www.jeffparish.gov/ general government building - 200 derbigny st – suite 4400 – Gretna, la 70053 - po box 9 – Gretna – la 70054
Question #4: The specifications include transportation/travel time in the hourly rate. I s travel time billed at the same hourly rate as on- site labor?
Answer: Travel time is to be included in your hourly rate, please reference the bid specifications, Section 5.0.
Question #5: How will emergency and after- hours roof and gutter repairs be dispatched, and what response time is expected from the contractor?
Answer: This is not an emergency contract. During the site inspection, if the work needs to be performed after hours or over a holiday to avoid impacting the daily operations of a facility, this will be determined at that time.
Question #6: Since there is no minimum call- out or service time, may the contractor bill actual time in increments such as 15 minutes, 30 minutes, or one hour?
Answer: Time charged to the contract shall be from when personnel arrive on site until the time personnel departs the site, per Section 5.0.
Question #7 When materials or parts are required, will Jefferson Parish issue the purchase order directly to the supplier, or will the contractor purchase them and submit the dealer invoice?
Answer: The purchase order will be issued to the successful bidder of this contract.
Question #8 Because this is a labor- only contract, can Jefferson Parish clarify exactly what Builder’s Risk Insurance is expected to cover under this contract?
Answer: The Builder’s Risk Insurance requirement stated in Section 6.0 will be removed.
Question #9 Can Jefferson Parish confirm which Louisiana contractor license classification is required and whether one qualifying classification is sufficient for this bid?
Answer: Please reference the specifications for this bid, section 3.1.
Question #10 Will Jefferson Parish award this three- year contract to one contractor or to multiple contractors?
Answer: The lowest responsible bidder will be awarded the contract.
Question #11 Can Jefferson Parish provide the historical spending amount, estimated annual expenditure, or other information showing the approximate volume of roof and gutter repair work under a s similar contract?
Answer: The requested information is a matter of public record and may be obtained by submitting a public records request through the parish website.
general government building - 200 derbigny st – suite 4400 – Gretna, la 70053 - po box 9 – Gretna – la 70054
Question #12 Will answers and clarifications given at the pre- bid conference be issued in a written addendum? I f so, when should bidders expect that addendum?
Answer: Yes, all questions submitted will be addressed via addendum.
Question #13 Are there any other requirements, forms, licenses, insurance documents, certifications, or bid submission requirements that bidders should be aware of that are not clearly identified in the bid documents?
Answer: All documents required with submission are attached to this Bid Event #107, including the Bid Signature Page, Corporate Resolution, and Affidavit. Please review all documents and information carefully before submission to ensure everything is complete and accurate.
Question #14 Is a bid bond or any other form of bid security required for Event #107? If so, please confirm the required percentage and method of submission?
Answer: There are no bonds required for bid event #107.
Question #15 Line 17: Please clarify the intended use of Line 17 – Project Estimator (420 hours). Under what circumstances will the separate Project Estimator hourly rate be billable?
Answer: A project estimator can be utilized to quote a project.
Question #16: Line 18: Please clarify the required pricing methodology for Line 18 – Parts/Materials. What value should bidders enter for this line for purposes of bid evaluation?
Answer: Bidders must select “No Bid” for Line Item #18, which is for parts/materials and is a non-biddable item. In the event of excessive downtime, Jefferson Parish may provide an additional purchase order, not to exceed $10,000.00, to the successful bidder to obtain the necessary part(s) to complete the repair work.
Question #17 Please confirm how the 18 line-item prices and listed estimated quantities will be extended or weighted to determine the lowest responsive bidder?
Answer: For each line item, the unit price is multiplied by the quantity to determine the extended total for that line item. The extended totals for all line items are then added together to determine the overall low bidder.
Question #18 Minimum Billable Time / Mobilization: Please confirm whether there is a minimum number of billable labor hours per service call. If there is no minimum, please confirm whether travel, mobilization, or service-call time may be billed separately or?
Answer: There is no minimum, please refer to the specifications, section 5.0.
general government building - 200 derbigny st – suite 4400 – Gretna, la 70053 - po box 9 – Gretna – la 70054
Question #19 When a roofing or gutter technician is dispatched, is a helper required to accompany the technician, or may the contractor determine the appropriate crew size based on the scope and safety requirements of each work order?
Answer: No, a helper is not required. The contractor (project estimator) with owner permission can determine if a helper is needed based on the size and scope of the project.
*** PLEASE REMEMBER TO ACKNOWLEDGE ADDENDUM BY NUMBER WITH BID SUBMISSION ***
Sincerely, Sean Dumas, Purchasing Specialist II Jefferson Parish Purchasing Department
Bidders must acknowledge all addenda on the bid form. Bidder acknowledges receipt of this addendum on the bid form by indicating the addendum number listed above. Failure to list each addenda number on the bid form will result in bid rejection.
This addendum is a part of the contract documents and modifies the original bidding documents and specifications.
The contents of this addendum shall be included in the contract documents. Changes made by this addendum shall take precedence over the documents of earlier date.
| September 24, 2026 |
| ADDENDUM #1 |