This document is a detailed specification for dockside repairs to the U.S. Coast Guard Cutter JOSHUA APPLEBY (WLM 556), a 175-foot Keeper Class vessel home-ported in Pensacola, Florida. The specification outlines 16 specific work items requiring comprehensive maintenance and inspection, including tasks such as fire prevention, potable water tank cleaning, hydraulic system servicing, crane and winch inspections, navigation light foundation renewal, and wind speed system replacement. Key work includes replacing existing equipment like ATON tie-downs, servicing hydraulic chain stoppers and crossdeck winches, renewing handrail stanchions, and installing a new R.M. Young wind speed and direction system.

The technical specification is extremely detailed, providing precise requirements for each work item, referencing multiple Coast Guard drawings and publications, and specifying exact technical procedures, surface preparation methods, testing protocols, and preservation requirements. The specification mandates comprehensive documentation, including Condition Found Reports (CFRs) for various inspections, non-destructive examinations, and operational tests. Government-furnished property is listed for several work items, with specific NSN numbers and estimated costs, indicating a structured approach to equipment replacement and maintenance. The work is to be performed in accordance with Surface Forces Logistics Center Standard Specifications and other technical references, emphasizing strict adherence to maritime engineering standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JOSHUA APPLEBY (WLM 556)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2026

Developed By: Luke R Wassei (Rev-0, 2 June 2025)

TABLE OF CONTENTS

iii

Revisions Record iv

Consolidated List of References viii

Consolidated List of Government-furnished Property xi

Consolidated List of Critical Inspection Items xii

Principal Characteristics - TENDER

General Requirements

WORK ITEM 1: Fire Prevention Requirements «TYPE»

WORK ITEM 2: Tanks, Potable Water, Clean and Inspect

WORK ITEM 3: Hydraulically Operated Cargo Hatch, Inspect and Service

WORK ITEM 4: Hydraulic Inhaul Winch, Inspect And Service

WORK ITEM 5: Mechanical Chain Stoppers, Inspect and Service

WORK ITEM 6: FWD MAST Navigation Light Foundations, Renew.

WORK ITEM 7: Portable Davit Locking Lugs Renewal

WORK ITEM 8: Handrail Stanchions, Renew

WORK ITEM 9: Hydraulic Chain Stoppers, Inspect And Service

WORK ITEM 10: Hydraulic Crossdeck Winches, Inspect And Service

WORK ITEM 11: Hull Fittings (Mooring and Towing), Inspect and Test

WORK ITEM 12: Warping Capstan (Aft), Inspect and Service

WORK ITEM 13: Single Point Davit, Disassemble and Inspect

WORK ITEM 14: Buoy Crane, Inspect And Service

WORK ITEM 15: ATON Tie-down Install

WORK ITEM 16: Wind Speed and Direction System (PC&I)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950 Coast Guard Drawing 175 WLM 549-001, Rev E, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 549-1, Rev E, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 573-001, Rev T, Buoy Deck Arrangement Coast Guard Drawing 175 WLM 573-001, Rev T; Buoy Deck Arrangement Coast Guard Drawing 175 WLM 573-050, Rev A, Hydraulic Piping Installation for Chain Stopper Coast Guard Drawing 175 WLM 573-051, Rev B, Chain Stopper Structural Modifications for Hydraulic Roller Assembly Coast Guard Drawing 175 WLM 582-001, Rev D, Mooring and Towing, A & D Coast Guard Drawing 175 WLM 601-001, Rev R; General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Plans Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175-WLM 634-1, Rev G, Deck Covering Schedule Coast Guard Drawing 175-WLM 549-001, Rev E, Onboard Lubrication Requirements Coast Guard Drawing 175-WLM 549-1, Rev C, Onboard Lubrication Requirements Coast Guard Drawing 175-WLM 573-001, Rev R, Buoy Deck Arrangement Coast Guard Drawing 175-WLM 573-008, Rev C, Aton Tie Downs Coast Guard Drawing 175-WLM 601-001, Rev N, General Arr, Inboard & Outboard Profiles Coast Guard Drawing 175-WLM 601-1, Rev N, General Arr, Inboard & Outboard Profiles Coast Guard Drawing 175-WLM 611-6, Rev F, Portable Davits & Miscellaneous Fittings Coast Guard Drawing 175-WLM 612-001, Rev G, Lifeline, Rails & Stanchions Coast Guard Drawing 175-WLM 631-2, Rev E, Paint Schedule Coast Guard Drawing 175-WLM 635-001, Rev F, Hull Thermal & Acoustic Insulation Schedule Coast Guard Drawing 175-WLM 635-1, Rev F, Hull Thermal & Acoustic Insulation Schedule.

Coast Guard Drawing 175-WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175-WLM 930-001, Rev K, Hull Block 930 Panels Coast Guard Drawing 175-WLM 960-001, Rev M, Hull Block 960 Panels Coast Guard Drawing 175-WLM 970-1, Rev K, Hull Block 970 Panels Coast Guard Drawing 175-WLM-320-001, Rev AU, 2024, Electrical One-Line Diagram Coast Guard Drawing 175-WLM-423-004, Rev G, 2023, 1SG38-CGECDIS(V) WLM-175 Installation Block Wiring Diagram and Details Coast Guard Drawing 175-WLM-423-005, Rev E, 2020, 1SG38-CGECDIS(V)WLM-175 Wiring Data (COED) Coast Guard Drawing 175-WLM-437-010, Rev 1, MMA Wind Speed System Modification Details Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-1/4" Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1 Coast Guard Fleet Drawing FL-2605-029, Rev L, Chain Stopper System – Rising Sheave Assembly

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model No. D-WK-787 Coast Guard Technical Publication (TP) 3630, Section 573-A, Mar 2014, Manufacturer's Instruction Book-SWBS Group 573, Buoy Crane Coast Guard Technical Publication (TP) 3630, SWBS 573, Section A (573A), Jun 2015, Manufacturer's Instruction Book-SWBS Group 573, Buoy Crane Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463 Coast Guard Technical Publication (TP) 3632, March 2014, Chapter 583, Section C, Technical Manual for Slewing Arm Davit Model D6000CT Coast Guard Technical Publication (TP) 3632, Section 582-A, March 2014, Manufacturer's Instruction Book-SWBS Groups 582-583, Aft Capstan Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper Coast Guard Technical Publication (TP) 3939, SWBS 573-A, Apr 2007, Rising Sheave Chain Stopper Fire Prevention and Response NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details NAVSEA Dwg 2803-980209, Plates, Label Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2020, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes.

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC Electrical Motors Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, And Installation Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Preserve Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structure Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (AN) Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment Electric Plant Installation Standard Methods for Surface Ships and Submarines, MIL-STD-2003 (Series) IEEE Recommended Practice for Electric Installations Aboard Ships, IEEE-STD-45-2002 MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric) MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-2003-3A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships & Submarines (Penetrations) NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP), and Safety, MIL-STD-1310 (Series) The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

4
N
Roller bearing Unit
NSN: 3130-01-504-4363
2 ea.
4,012.00
4
N
Grease seal
NSN: 5330-01-462-5544
4 ea.
79.25
4
N
Level wind pivot bushing
NSN: 3120-01-621-2293
1 ea.
1,139.00
4
N
Level wind thrust bearing
NSN: 3120-01-621-2300
2 ea.
483.30
4
N
Rexroth DCV
NSN: 4810-01-507-0037
1 ea.
208.29
4
N
Rexroth Sandwich Flow Control
NSN: 4810-01-505-9289
1 ea.
250.00
4
N
Sun Sandwich Relief Valves
NSN: 4820-01-439-2451
2 ea.
900.00
4
Y
Level Wind Hydraulic Cylinder
NSN: 3040-01-441-3721
1 ea.
7,423.00
4
N
3:1 Pilot Ratio, Vented Counterbalance Valve Assembly
NSN: 4820-01-563-5841
1 ea
98.70
4
N
Fully Adjustable Needle Valve
NSN: 4820-01-416-0579
1 ea
48.75
4
N
Wire Rope Assembly
NSN: 4010-01-646-6972
1 ea.
500.00
4
Y
**Hydraulic Motor
NSN: 4320-01-445-2248
1 ea
23,998
4
N
**Pump, Hydraulic Ram, Hand Driven
NSN: 4320-01-286-4065
1 ea.
419.77
4
N
**Cylinder Pin
NSN: 5315-01-515-9847
1 ea
500.00
4
N
**Cylinder Pin
NSN: 5315-01-515-9912
1 ea
520.00
5
N
Hardware Kit, Pins
NSN: 2030-01-485-7209
2 ea.
528.47
5
N
Hardware Kit, Mechanical
NSN: 2030-01-485-7215
2 ea.
538.91
9
N
Repair Kit Assembly
NSN: 2040-01-496-9418
2 ea.
1,968.67
9
N
Rod Seal Repair Kit (FL-2605-29 PC#37)
NSN: 2040-01-496-9422
2 ea.
3,030.07
9
N
Repair Kit, Cable Chain (Includes Pads) (FL-2605-29 PC#36)
NSN: 3020-01-538-0684
16 ea.
257.99
9
N
Cylinder Assembly Actuating, Linear
NSN: 3040-01-496-9424
2 ea.
1,969.24
10
N
Hydraulic Brake Assembly
NSN: 2530-01-550-7474
4 ea.
460.69
10
Y
Winch Gear Box Assembly
NSN: 3010-01-F16-4570 PN: SK9052AZ-SAEB-31.4-H1 (Nord Gear Corp) or YMD-7914 (Appleton Marine Inc)
4 ea.
7,060.09
10
N
Hydraulic Motor
NSN: 4320-01-470-8467
4 ea.
478.90
10
N
Wire Rope
NSN: 4010-01-620-9604
4 ea.
577.95
10
N
Counter Balance Valve
NSN: 4820-01-324-4269
8 ea.
107.50
10
N
Shuttle Valve
NSN: 4820-01-317-2748
8 ea.
34.78
10
N
Needle Valve
NSN: 4820-01-329-0051
4 ea.
38.00
10
N
**Directional Control Valve
NSN: 4810-01-543-3252
4 ea.
4,959.95
10
N
Electrical Connector, Hirshmann
NSN: 5935-01-640-6747
8 ea.
32.00
13
N
Swing Brake Seal Kit
NSN: 2030-01-351-2820
2 ea
138.80
13
N
Swing Brake Disc & Bearing Kit
NSN: 2030-01-349-9486
2 ea
937.70
13
N
Wire Rope Assembly, Single Leg
NSN: 4010-01-602-8365
1 ea.
234.00
13
Y
**Winch Assembly
NSN: 2030-01-505-1581
1 ea.
17,454.50
14
N
Wire Rope, Crane Aux Fall
NSN: 3950-01-617-1692
1 ea
522.54
14
N
Wire Rope, Crane Main Fall
NSN: 3950-01-617-1700
1 ea
1,275.49
14
N
Luff Cylinder Seal kit
NSN: 5330-01-433-6307
1 ea
357.99
14
N
Holding Valve
NSN: 4810-01-353-0586
2 ea
67.33
14
N
Shuttle Valve
NSN: 4820-01-317-2748
2 ea
24.32
14
N
Needle Valve
NSN: 4820-01-329-0051
1 ea
38.11
14
Y
Valve Assembly, Manifold
NSN: 4810-01-506-7738
1 ea.
19,892.60
14
N
Bushing, Heel
NSN: 5365-01-F12-2920
4 ea
67.00
14
N
**Hydraulic swivel seal kit
NSN: 4730-01-566-2864
1 ea
1,298.00
14
N
**Pin, Heel
NSN: 5315-01-500-6931
2 ea
2,463.45
14
N
**Hand pump w/ Stainless Steel Option, P18
NSN: 4320-01-517-1444
1 ea
1,724.57
14
N
**Plate, Backing, Brake (Item 231 and 234)
NSN: 3040-00-119-9848
2 ea
1,500.40
14
N
**Plate, Brake (Item 232)
NSN: 3040-01-068-7647
1 ea.
377.00
14
N
**Driver Plate (Item 233)
NSN: 3040-01-F14-3994
1 ea.
138.34
14
N
Packing Assortment, Preformed
NSN: 5330-01-191-2622
1 ea.
10.94
14
N
Disc-Friction, Brake
NSN: 3040-01-051-3606
1 ea.
15.74
14
N
**Spring, Helical, Comp
NSN: 5360-01-268-0044
12 ea
12.12
14
N
PD12C Seal kit
NSN: 2590-01-398-5741
1 ea
147.76
14
N
**Disc, Steel
NSN: 2530-01-066-9585
1 ea
38.38
14
N
**Master brake rebuild kit
NSN: 5330-01-F16-4572 PN: 98-015-3001 (Eskridge Inc)
3 ea
556.39
14
N
Aux Hoist Hook (Overhaul Ball)
NSN: 4030-01-572-3945
1 ea
2,800.00
14
N
Block, Tackle
NSN: 3940-01-566-2929
1 ea
5,229.07
14
N
**Relief Valve Cartridge
NSN: 4820-01-481-7116 PN: RPIC-LAN (Sun Hydraulics Inc)
1 ea
117.35
14
N
**Control Stand Selector Valve Assembly
NSN: 4730-01-507-3516
1 ea
1,247.94
14
N
**Bushing, Luff Cylinder
NSN: 3120-01-363-7629
4 ea
89.53
14
N
**Pin, Luff Cylinder
NSN: 5315-01-F12-2922 PN: MMD-2232
2 ea
2,432.30
14
Y
**Valve Assembly, Directional Control
NSN: 4810-01-F17-5027
1 ea.
14,806.50
15
N
Coast Guard (C-G) CGDR50TDRASS01 Flush Pad-eye Assembly: Coast Guard (C-G) (CGDR50T01) D-Ring (rated load 12,300 lbs.), welded strap, fabricated bowl.
NSN# 2020-01-682-7587
51

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
3
Hydraulically Operated Cargo Hatch, Inspect and Service
4
Hydraulic Inhaul Winch, Inspect And Service
5
Mechanical Chain Stoppers, Inspect and Service
10
Deck Preservation
11
Hydraulic Chain Stoppers, Inspect And Service
12
Hydraulic Crossdeck Winches, Inspect And Service
14
Warping Capstan (Aft), Inspect and Service
15
Single Point Davit, Disassemble and Inspect
17
Buoy Crane, Inspect And Service

Principal Characteristics - TENDER

175' WLM, BUOY TENDER

Physical

Length overall
174' 8"
Length between perpendiculars
155' 1"
Depth
14' 8"
Maximum beam
36' 0"
Designed draft
8' 0"
Mast height (above 8' waterline)
58' 8"
Frame spacing
20"
Full load displacement
855.15 Long Tons SW
Light load displacement
719.78 Long Tons SW
Minimum op condition displ
852.19 Long Tons SW

HULL

Hull material
Steel

Machinery

Main propulsion
Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM

Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM

Reduction gears
Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio
Shaft seal
John Crane Type ND
Shaft bearings
Five pedestal mounted, Cooper split roller bearings
Number of propellers
2
Number of blades
4
Diameter
57.1"
Rudders
None; Z-drive
Ship's service generators
Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800 RPM
Emergency diesel generator
One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM

Tank Capacities

Diesel oil capacity (100%)
16,385 gal
Fresh water capacity (100%)
7,339 gal
Lubricating oil (100%)
86 gal

00000_0824_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121) General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.

3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.

3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, with the contract bid.

note NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents. Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken. Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

· ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

· ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm. For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet; for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

· SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

· SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 Plans and permits. The CG Facility has unit specific permits including the following:

· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

· Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (Frame References)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/AMPP No. 2
(
SSPC-SP WJ-2/AMPP WJ-2
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/AMPP No. 2
(
SSPC-SP WJ-2/AMPP WJ-2
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils)

Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/AMPP Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

4.2 Tank and Void Assessment form.

55500_ACC_0323_IBCT

WORK ITEM 1: Fire Prevention Requirements «TYPE»

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to minimize shipboard fire risk and to clarify the Contractors’ role in fire prevention and response.

Note This work item is not separately priced. Factor fire prevention and response costs into bid of affected work items.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response Other References None

3. REQUIREMENTS

3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance SFLC Std Spec 5550. The Contractors Fire Plan must address Fire Protection and Response specifics as required in this Work Item.

3.1.1 The availability’s specific Fire Plan must always address the following:

· material condition and fire protection boundary obstruction mitigations

· inoperable fittings log

· fire alarms

· firefighting equipment disposition

3.1.2 The Fire Plan must also address the following:

· fire protection system status

· communication links

· temporary services

· power disconnects

· fire prevention and safety inspections

3.2 Fire Prevention Responsible Party. The Contractor must appoint a Fire Prevention Responsible Party (FPRP) who acts as the Contractor’s Responsible Person for fire prevention concerns during the entire availability.

3.3 Fire Prevention and Response Conference. The Contractor must participate in the Fire Prevention and Response Conference as required in Std Spec 5550, paragraph 3.12. The participants must address the contents of SFLC Std Spec 5550, paragraph 3.12.1, as applicable.

3.4 Fire Responsibility Familiarization Tour and Initial Inspection. The Contractor must participate in the Fire Responsibility Familiarization Tour and Initial Inspection as required in Std Spec 5550, paragraphs 3.12.2 through 3.12.4.

3.5 Material Condition and Fire Protection Boundary Obstruction Mitigation Requirements. The Contractor must conform to all material condition and fire protection boundary obstruction mitigation requirements detailed in SFLC Std Spec 5550, paragraph 3.2.

3.6 Inoperable Fittings Log Requirements. The Contractor must conform to all inoperable fittings log requirements detailed in SFLC Std Spec 5550, paragraph 3.3.

3.7 Fire Prevention Service Particulars. The Contractor must conform to the below listed fire prevention service requirements, in accordance with SFLC Std Spec 5550.

TABLE 1 – Fire Prevention Service Selection

*SUB-PARAGRAPH
TITLE
y/n
3.4
Fire prevention system status
N
3.4.1
Temporary firefighting system proposal
N
3.4.2
Emergent firefighting system inoperability approval and notification
N
3.4.3
“Disabled equipment” signage for disabled initial responder equipment
N
3.4.4
Firefighting system inoperability allowance for removed hazards
N
3.4.5
Maintain sprinkling zone operability
N
3.4.6 including all subparagaphs
Hazard mitigation for maintenance of fixed extinguishing systems
N
3.4.7
Procedure implementation for enabling/disabling fire suppression systems
N
3.4.8
Portable water pumping requirement for vessels w/o installed capability
N
3.4.9
Limitations on operation of major machinery while firefighting systems are offline
N
3.4.10
Liquid fuel pumping requirement for operational permanent or temporary firefighting systems
N
3.4.11
Mechanical AFFF equipment must be available to initial responders in compartments with risk of flammable/combustible liquid spillage
N
3.4.12 including all subparagraphs
Portable fire extinguisher requirements
N
3.4.13
Hose and reel protection
N
3.4.14 including all subparagraphs
Drydock firefighting requirements
N
3.4.15
Fire protection system status in Fire Plan
N
3.5
Fire response related communication links in Fire Plan
N
3.6
Fire response related temporary services in Fire Plan
N
3.6.1
Minimize downtime of fixed extinguishing systems
N
3.6.2 through 3.6.10
Firemain and related equipment requirements
N
3.6.11
Permanent lighting requirements
Y
3.6.12 including all subparagraphs
Temporary lighting requirements
Y
3.6.13
Electrical power, firefighting water, and lighting source location and testing identified in Fire Plan
N
3.7 including all subparagraphs
Fire alarm requirements
Y
3.8
Shore power manual disconnect locations identified in Fire Plan
Y
3.9
Other power manual disconnect locations identified in the Fire Plan
Y
3.10 including subparagraph
Vessel firefighting equipment placement and disposition info in Fire Plan
Y
3.11
Fire prevention and safety inspections in Fire Plan
Y
3.11.1
Initial and daily inspection requirements
Y
3.11.2
Additional details in fire inspection reports
Y

*Each sub-paragraph number relates directly to the identical sub-paragraph number in SFLC Std Spec 5550.

3.5 Extended fire prevention services. If the performance period of the contract is extended by the KO, the contractor must continue to provide all fire prevention services as specified herein for the extension period.

4. NOTES

This section is not applicable to this work item.

12314_ESD_0423_FLT

REC_12314_FLT175’ WLM (ALL) (0611)

WORK ITEM 2: Tanks, Potable Water, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

Table 1 - Tanks

TYPE OF TANK
LOCATION
CAPACITY - 95%

(gallons)

LOW SUCTION

(gallons)

Potable Water
1-94-0-W
2,167
68
Potable Water
2-36-1-W
5,172
163

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Plans Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950 Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Other References American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:

· Fluid contents

· Piping

· RO system components

· Deck grating.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.

· TLI

3.3 Plug log. The Contractor must keep a written record of all plugs put in any tanks vents. A separate list must be kept for each tank being entered.

3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

3.4 Tank content removal. The Contractor must remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations. The Contractor must notify the Dockmaster prior to filling or draining the potable water tank(s), when this item is being executed in a drydock availability. The Contractor must refer to Coast Guard drawings 175 WLM 601-003 and 175 WLM 533-006 for guidance.

3.5 Tank cleaning. The Contractor must remove tank cover(s); clean tank interior surfaces free of all foreign materials, such as sediment, sludge and bacterial growth. Remove all persistent residues, taking care not to damage any tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.

3.6 Inspection. The Contractor must visually inspect…