Jonesboro Repump Station Improvements _ RFB L.pdf

PDF 169 KB Posted

Attached to
Jonesboro Repump Station Improvements
Solicitation number
PE-63125-NONST-2024-000000012
Issued by
Clayton County, Georgia

About this file

This document is a Request for Bid (RFB) issued by the Clayton County Water Authority (CCWA) for the Jonesboro Repump Station (RPS) Improvements project. The project includes upgrades to the Jonesboro RPS, such as removing and replacing pumps, piping, valves, motor control center, and electrical distribution equipment. Sealed bids for the construction of this project will be received by CCWA until 2:00 p.m. local time on May 7, 2024, at which time they will be opened and read aloud. A non-mandatory pre-bid conference will be held on April 23, 2024, at 2:00 p.m. local time, and a site visit is scheduled for the same day from 3:00 p.m. to 4:00 p.m. local time. The bid opening will be hosted virtually.

The RFB does not provide any details on pricing terms, set-asides, incumbents, funding requirements, or funding sources. The project is located in Clayton County, Georgia, and is funded by the Clayton County Water Authority.

View the file

Other files

File Type Posted
Addendum 3.pdf PDF
Addendum 1.pdf PDF
Addendum 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BID

JONESBORO REPUMP STATION IMPROVEMENTS

2024-WP-12

MARCH 2024

CLICK THE LINKS BELOW TO ACCESS THE RFB DOCUMENTS

VOLUME 1

VOLUME 2

VOLUME 3

https://www.ccwa.us/wp-content/uploads/2024/03/2024-WP-12_Jonesboro-RPS-Improvements_Volume-1.pdf https://www.ccwa.us/wp-content/uploads/2024/03/2024-WP-12_Jonesboro-RPS-Improvements_Volume-2.pdf https://www.ccwa.us/wp-content/uploads/2024/03/2024-WP-12_Jonesboro-RPS-Improvements_Volume-3.pdf