- Solicitation number
- 24-466MIL-ARNFF-B-38969
- Issued by
- Cook County, Illinois
About this file
This document is a proposal from Ampol Group Inc. to provide comprehensive services, including labor, materials, equipment, and supervision, to fabricate and install a new boiler exhaust system for the Jones Armory located at 5200 S Cottage Grove Ave, Chicago, IL 60615. The proposal details the specific scope of work, including the fabrication of various components of the exhaust system such as pipes, flanges, and an exhaust cap, as well as the installation of the new system. The total cost for the project is $98,264.15.
The document outlines the terms and conditions of the agreement, including payment terms, changes and additional costs, contract cancellation, finance charges, and the jurisdiction under which the contract is finalized. The proposal emphasizes Ampol Group's extensive insurance coverage for workmen's compensation, public liability, and property damage to provide added protection and peace of mind for the client.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Terms and Condition V.23.2a~95.pdf | ||
| standard-illinois-certifications-v.23.1~3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
521 Santa Rosa Drive Des Plaines, IL 60018 Phone: (773) 462-0033 Fax: (872)713-6044
WWW.AMPOLGROUP.COM
Initials_____
Ampol Group Inc 521 Santa Rosa Dr Des Plaines, IL 60018
(773) 462-0033 08/31/2023
Project:
Jones Armory Boiler Stack 5200 S Cottage Grove Ave Chicago, IL 60615
Ampol Group International Inc has conducted a thorough inspection of the referenced properties above.
Based on our assessment, we are pleased to present a proposal to provide comprehensive services, including labor, materials, equipment, and supervision, to complete the work in accordance with the following specifications.
Jones Armory Boiler Stack
5200 South Cottage Grove Avenue, Chicago, IL 60615
Description
Fabricate boiler exhaust system including
1st part fabricates 38" by 48" diameter exhaust pipe
2nd part fabricates 45-degree angle 48" diameter
3rd part fabricates 132" of straight pipe 48" diameter
4th part fabricates 45-degree exhaust 48" diameter
Fabricate flange 48 " diameter
Fabricate straight pipe 15 ft x 48" above roof
Fabricating metal coping around roof curb
Fabricate exhaust cap
Crain rental and set up to dismetal existing unit
Crain rental and set up to install new unit
Thickness and specifications of new unit to match existing
Total Cost 98,264.15
WWW.AMPOLGROUP.COM
Initials_____
Part 1 Part 2
Part 3 Part 4
WWW.AMPOLGROUP.COM
Initials_____
Insurance
We would like to emphasize that Ampol Group International Inc has taken extensive measures to ensure complete coverage for workmen's compensation, public liability, and property damage insurance. This coverage provides added protection and peace of mind for both parties involved.
Please find below the terms and conditions that will govern our contractual agreement:
1. Payment Terms: The client acknowledges and agrees that payment for the completed work is due upon its conclusion. In the event of non-payment, the client will be responsible for any collection costs, including court fees and reasonable attorney's fees.
2. Changes and Additional Costs: Any modifications or deviations from the specified project requirements that result in additional expenses will only be carried out upon written authorization. Such changes will incur additional charges beyond the original estimate.
3. Contract Cancellation: A written notice of cancellation is required to terminate the contract. No adjustments or replacements will be made until the agreed contract amount is paid in full.
4. Finance Charges: In the event that payment is not received within one month from the statement's closing date, a finance charge of 2% per month will be applied. This equates to an annual rate of 24%.
5. Price Validity: If the contract is not signed within 30 days from the date mentioned above, the price is subject to change.
6. Jurisdiction: This contract is considered finalized and executed in the City of Chicago, County of Cook, and State of Illinois.
We sincerely appreciate the opportunity to submit this proposal for your consideration, and we eagerly anticipate the possibility of collaborating with you. If you have any inquiries or require further information, please do not hesitate to contact us. We are committed to providing excellent service and remain at your disposal.
Thank you once again for considering our proposal.
Best regards, Peter Shultz
CEO
Ampol Group Inc
Accepted By: _____________________________ Date: ___________________________