JOC_2027_Bid_Form_final.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- 2027-RFP-00203
- Issued by
- San Mateo County, California
About this file
This is a bid form for Painting Job Order Contracts (JOC 2718 and 2719) issued by San Mateo County's Department of Public Works for Class C33 licensed contractors. The county intends to award up to two contracts, with proposals due December 10, 2026, and each agreement carries an aggregate fiscal obligation not to exceed $1.0 million with a maximum individual term of one year. Work consists of providing all labor, materials, tools, and equipment for painting services to be performed within designated county areas, though the county reserves the right to require work at any location or facility under its jurisdiction. Separate Job Orders and Notices to Proceed will be issued as warranted. The apparent lowest, responsive, and responsible bidder will be selected for each JOC but excluded from consideration for each successive contract.
The bid form requires contractors to submit seven adjustment factors based on facility type and working hours: General Facilities, Detention Facilities, and HCAI Facilities, each with normal working hours (Monday-Friday 6:00 am to 6:00 pm, excluding holidays) and other than normal working hours rates (Monday-Friday 6:01 pm to 5:59 am, all day Saturday and Sunday, and county holidays). A separate PLA Compliance Adjustment Factor applies to Job Orders subject to the Prevailing Wage Agreement, which must be greater than or equal to 1.0000, while Other Than Normal Working Hours Adjustment Factors must equal or exceed Normal Working Hours Adjustment Factors. Compensation is calculated as Unit Prices multiplied by quantities multiplied by the applicable Adjustment Factor, with all costs not included in Unit Prices incorporated into the Adjustment Factors. The evaluation criteria assigns weighted percentages to each adjustment factor category, totaling 100 percent, to determine the lowest proposed price. No assurances are provided that work will be distributed consistent with weighted percentages.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form Bid Form/Adjustment Form Instructions
Company Name:
Notes to Bidders:
| 1. Before submitting this proposal, each Contractor is directed to the Construction Task Catalog provided to you in the Proposal Document to review the explanation of the costs included in the Unit |
| Prices and in the Adjustment Factors. Except for a Non Pre-priced Task, the only compensation to be paid to a Contractor will be the total of the Unit Prices multiplied by the quantities multiplied by the |
| Adjustment Factor. No additional payments of any kind whatsoever will be made. All costs not included in the Unit Prices must be part of the Adjustment Factors. |
| 2. There are seven (7) Adjustment Factors for Contractors to submit when preparing a price proposal, the Contractor shall select the appropriate Adjustment Factor(s). The Adjustment Factors are as follows: | |
| a. General Facilities Normal Working Hours : Monday through Friday 6:00 am to 6:00 pm except holidays. | |
| b. General Facilities Other Than Normal Working Hours: Monday through Friday 6:01 pm to 5:59 am including all day Saturday and Sunday and County Holidays to be performed in General Facilities | |
| c. Detention Facilities Normal Working Hours : Monday through Friday 6:00 am to 6:00 pm except holidays. | |
| d. Detention Facilities Other Than Normal Working Hours: Monday through Friday 6:01 pm to 5:59 am including all day Saturday and Sunday and County Holidays to be performed in Detention Facilities | |
| e. HCAI Facilities Normal Working Hours : Monday through Friday 6:00 am to 6:00 pm except holidays. | |
| f. HCAI Facilities Other Than Normal Working Hours: Monday through Friday 6:01 pm to 5:59 am including all day Saturday and Sunday and County Holidays to be performed in OSHPD Facilities | |
| g. PLA Compliance Adjustment Factor: Applies to Job Orders that are subject to the PLA. (This Adjustment Factor is added to the Facility Adjustment Factor based on the location of the Job Order (General Facilities, Detention Facilities, or HCAI Facilities)). |
4. The Other Than Normal Working Hours Adjustment Factors must be equal to or greater than the Normal Working Hours Adjustment Factors.
5. The PLA Compliance Adjustment Factor must be greater than or equal to 1.0000.
| Adjustment Factor Name | Weighted Evaluation % | Adjustment Factor Bid | Adjustment Factors To Be Awarded | |
| General Facilities Normal Working Hours Adjustment Factor | 35% | General Facilities Normal Working Hours | 0.0000 | |
| General Facilities Other Than Normal Working Hours Adjustment Factor | 10% | General Facilities Other Than Normal Working Hours | 0.0000 | |
| Detention Facilities Normal Working Hours Adjustment Factor | 15% | General Facilities Normal Working Hours - Compound PLA | -1.0000 | |
| Detention Facilities Other Than Normal Working Hours Adjustment Factor | 10% | General Facilities Other Than Normal Working Hours - Compound PLA | -1.0000 | |
| HCAI Facilities Normal Working Hours Adjustment Factor | 15% | Detention Facilities Normal Working Hours | 0.0000 | |
| HCAI Facilities Other Than Normal Working Hours Adjustment Factor | 10% | Detention Facilities Other Than Normal Working Hours | 0.0000 | |
| PLA Compliance Adjustment Factor | 5% | Detention Facilities Normal Working Hours - Compound PLA | -1.0000 | |
| Evaluation Criteria Figure (Sum of the Weighted Adjustment Factors) | 0.0000 | Detention Facilities Other Than Normal Working Hours - Compound PLA | -1.0000 | |
| HCAI Facilities Normal Working Hours | 0.0000 | |||
| HCAI Facilities Other Than Normal Working Hours | 0.0000 | |||
| HCAI Facilities Normal Working Hours - Compound PLA | -1.0000 | |||
| HCAI Facilities Other Than Normal Working Hours - Compound PLA | -1.0000 |
| NOTES TO CONTRACTORS: | 1. The evaluation weighting above is for the purpose of calculating an Evaluation Criteria Figure and determining the lowest proposed price. No assurances are made by the Owner that Work will be ordered under the Contract in a distribution consistent with the weighted percentages above. |
| 2. When submitting Job Order Price Proposals related to specific Job Orders, the Contractor shall utilize one or more of the Adjustment Factors applicable to the Work being performed. |
| Bid Form Submitted for JOC | |
| Print JOC Numbers/Trade |
Print Name of Signatory Print Name of Signatory Authorized Official's Signature Date Signed
Business Address City/State/Zip Code Telephone Email
&"-,Bold"&16Adjustment Factor Bid Form