Jobs Creek_ 230kV Ring Bus_Conceptual.pdf

PDF 2 MB Posted

Attached to
Jobs Creek Switching Station
Solicitation number
PE-75553-NONST-2025-000000038
Issued by
Ware County, Georgia

About this file

This technical drawing is a preliminary design for the Jobs Creek Substation 230kV Ring Bus project for Dalton Utilities in Georgia, prepared by Burns & McDonnell Engineering Company. The document depicts a detailed electrical substation layout featuring a 24'-0" x 28'-0" control building, multiple 230kV transmission line connections including South Dalton, Customer, Dalton #6, and Loopers Farm lines, and a complex bus configuration with high and low bus arrangements. The drawing includes technical specifications for aluminum tubing, cable exits, battery rack configurations, and various electrical infrastructure components.

The document is marked as "Preliminary - Not for Construction" with a date of 03/12/2025, indicating it is a conceptual design stage drawing. The project appears to involve the design and potential construction of a high-voltage electrical substation with multiple transmission line interconnections, featuring sophisticated electrical routing and connection strategies. The drawing references multiple technical sheets and drawing references, suggesting a comprehensive engineering approach with detailed specifications for electrical infrastructure, grounding layouts, conduit arrangements, and yard lighting. The project is being developed for Dalton Utilities and engineered by Burns & McDonnell, a professional engineering firm located in Atlanta, Georgia.

View the file

Other files

File Type Posted
3212_X_PROFILE.pdf PDF
3212_X_PLAN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROL BUILDING

24'-0"" X 28"-0"

℄ BUILDING

Know what's below.

Call before you dig.

Utilities Protection Center, Inc.

GEORGIA

INTERNAL UNDERGROUND LOCATES

404-506-6539

230KV SUBSTATION

GENERAL NOTES:

1. ALL ALUMINUM TUBE SHALL BE 4IN SCH. 80 (MK. TVVE) WITH 795 AAC DAMPER UNLESS OTHERWISE NOTED.

DRAWING REFERENCES:

XXXXX-BM2000 BILL OF MATERIAL

XXXXX-BM7000 BILL OF MATERIAL

XXXXX-DXX SH. 1 24' X 28' CONTROL BUILDING, TWO CABLE EXITS, 14FT BATTERY RACK MAX, 365AH. BATTERY, 18 PANELS MAX FOR TRANS/SS/DIST STATIONS

XXXXX-DXX SH. 2 24' X 28' CONTROL BUILDING INDOOR LIGHTING AND CABLE TRAY LAYOUT

XXXXX-DXX SH. 3 24' X 28' CONTROL BUILDING, INDOOR CABLE TRAY & PANEL LAYOUT

XXXXX-DXX SH. 4 24' X 28' CONTROL BUILDING, INDOOR EQUIPMENT LAYOUT SECTIONS "A-A" & "B-B" XXXXX-DXX SH. 5 24' X 28' CONTROL BUILDING INDOOR EQUIPMENT LAYOUT - SECTIONS "C-C" & "D-D"

XXXXX-DXX SH. 1-3 230KV THREE PHASE P.T. SUPPORT STRUCTURE - ERECTION

XXXXX-HX FENCE & FOUNDATION LAYOUT

XXXXX-HX GROUNDING LAYOUT

XXXXX-HX CONDUIT LAYOUT

XXXXX-HXX LED YARD LIGHTS MOUNTED ON FIBERGLASS POLES, VARIOUS STRUCTURES & LIGHTNING MAST

XXXXX-HXX THREE LINE CONNECTION DIAGRAM-230KV RING BUS

SGP-0000-D3 SH. 1 MINIMUM ELECTRICAL AND SAFETY CLEARANCES

SGP-0000-D3 SH. 2 MINIMUM MAGNETIC CLEARANCES FOR AIR CORE LINE TRAP

LEGEND:

= "A" FRAME LOCATION

= EXPANSION CONNECTION

= FIX CONNECTION

= SLIDING CONNECTION

= YARD LIGHTS MOUNTED ON FIBERGLASS POLES AND VARIOUS STRUCTURES SEE DWG 11462-H12-001

A

E

F

S ɸ3 ɸ2 ɸ1

HIGH BUS

L O W

B U S ɸ3 ɸ2 ɸ1

L O W

B U S

HIGH BUS

S.S.

P.P #

SZFV

A

A

A

A

A

A ɸ3 ɸ1 ɸ3

HIGH BUSA

H1 H2

H1 H2

H1 H2 ɸ2

A ɸ1

A

SZFV

SOUTH DALTON

230KV LINE

ɸ3 ɸ1

X X X X

A C S R

X X

O H G W

X X X X

A C S R

X X X X

A C S R

X X

O H G W

XXXX ACSR

XXXX ACSR

X X" O.H.G.W ɸ1

SZBB

X X" O.H.G.W

XXXX ACSR

XXXX ACSR

XXXX ACSR

X X" O.H.G.W

CUSTOMER

230KV LINE

ɸ1 ɸ3

XXXX ACSR

X X" O.H.G.W

XXXX ACSR

XXXX ACSR

DALTON #6

230KV LINE

ɸ3

A ɸ1

A ɸ2

A ɸ2

XXXX ACSR

L O W

B U S

L O W

B U S

L O W

B U S

SZBB

SZBB

SZBB

SZBB

SZFV

SZFV

BUNP

SZBB

CPFB

CPFB

CPFB

ɸ3 ɸ2 ɸ1

HIGH BUS

A

A

A ɸ3 ɸ2 ɸ1

A

A

A ɸ3 ɸ2 ɸ1

A

A

A

LOOPERS FARM

230KV LINE

ɸ2

SZBB

ɸ2

SZBB

SZBB

HIGH BUS

HIGH BUS

HIGH BUS

H1H2

H1H2

H1H2 ɸ3 ɸ1

SZBB

BUNP

XXXX ACSR

X X" O.H.G.W

XXXX ACSR

XXXX ACSR

X X" O.H.G.W

SZFV

SZBB

BUNP

SZBB

ɸ3 ɸ2 ɸ1

A

A

A

HIGH BUS

CPFB

CPFB

CPFB

ɸ2

11'-0"12'-0"10'-0"8'-6"8'-6"

SZBB

BUNP

SZBB

CUSTOMER

230KV LINE

PRIMARY DOOR

10'-0" 15'-0" 15'-0" 10'-0"

S.S.

P.P #

10'-0"

62'-6" 64'-0"121'-0"

25'-0" 25'-0"

SZBB

121'-0" 62'-6" 64'-0"

52'-6"

300'-0"

BUNP

X X" O.H.G.W

SWITCH ℄

SWITCH ℄

ɸ2

EMERGENCY DOOR

THE REGISTRANT OF THE NEWLY APPLIED

SEAL, DATED .

ONLY ASSUMES RESPONSIBILITY FOR THE

CHANGES AS INDICATED BY THE FOLLOWING

REVISION(S) .

4004 SUMMIT BLVD. NE, SUITE 1200

ATLANTA, GA 30319

PHONE: (770)587-4776

Burns & McDonnell Engineering Co. Inc.

GA ENGINEERING LICENSE: PEF000100

EXPIRATION DATE: 6/30/2026

XX/XX/2023

P.I.#XXXXXXX

DALTON UTILITIES

JOBS CREEK SUBSTATION

rfazal Preliminary-Not for Construction

File details come from the government source that posted it. Updated .