3212_X_PLAN.pdf
PDF 490 KB Posted
- Attached to
- Jobs Creek Switching Station
- Solicitation number
- PE-75553-NONST-2025-000000038
- Issued by
- Ware County, Georgia
About this file
This document is a preliminary layout and profile sheet for a utility infrastructure project involving the installation of a loop in/loop out transmission line at the New Jobs Creek 230kV Substation, located near the existing South Dalton and Dalton #6 Substations. The project, dated 03-31-2025, appears to involve electrical transmission infrastructure modifications, specifically creating new interconnections between existing substations.
The preliminary site plan shows the geographic layout of the proposed transmission line, with red and blue markers indicating proposed structural points and route segments. The image depicts the new substation site in relation to existing infrastructure, surrounded by forested and developed areas. The plan is marked as a preliminary layout, suggesting the project is in the early stages of design and engineering, with potential for further refinement before final implementation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Jobs Creek_ 230kV Ring Bus_Conceptual.pdf | ||
| 3212_X_PROFILE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESTC
ODEESTC
ODE
ESTC
ODE
ESTC
ODE
ESTC
ODEESTC
ODE
ESTC
ODEESTC
ODE
ESTC
ODE
ESTC
ODE
ESTC
ODEESTC
ODE
ESTCODE
ESTCODE
ESTCODE ESTCODE
ESTCODEESTCODE
ESTCODE ESTCODE
ESTC
ODE
ESTC
ODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTC
ODE
ESTC
ODE
ESTCODEESTCODEESTCODE ESTCODE
ESTC
ODE
ESTC
ODE
ESTCODE
ESTC
ODE
ESTCODE
ESTCODE
ESTCODE
ESTCODE
ESTCODEESTCODE
36A
36B
PRELIM STR 1
PRELIM STR 2
37B
PRELIM STR 8
PRELIM STR 7
PRELIM STR 6
PRELIM STR 5
AJR
03-31-2025
MSM
Install Loop In/Loop Out for new Jobs
Creek 230kV substation
SOUTH DALTON - LOOPERS FARM
A
Profile Sheet
A 03-31-2025 PRELIMINARY LAYOUTAJR MSM
Page 1/1
Not To Scale
PRELIM STR 4
NEW JOBS CREEK
230KV SUBSTATION
PRELIM STR 3
E
X
I
S
T
I
N
G
S
O
U
T
H
D
A
L
T
O
N
K
V
S
U
B
S
T
A
T
I
O
N
EXISTING DALTON #6 SUBSTATION
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
APPROVALS
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV.
AutoCAD SHX Text
THIS DOCUMENT IS FOR REFERENCE ONLY.
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
CHK'D
AutoCAD SHX Text
THIS DRAWING PRODUCED BY CAD.
AutoCAD SHX Text
DO NOT REVISE MANUALLY.
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .