JH_SOW_Quarters_Replace_Furnaces.pdf
PDF 172 KB Posted
- Attached to
- Jones Hole HVAC and Water Heater Replacement
- Solicitation number
- 140F0621R0044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140F0621R0044_Amd_0003.pdf | ||
| Sol_140F0621R0044_Amd_0002.pdf | ||
| Sol_140F0621R0044_Amd_0001.pdf | ||
| JH_SOW_Hatchery_BLDG.pdf | ||
| Sol_140F0621R0044.pdf | ||
| B03_-_DOL_Wage_Determination_(6-29-21).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Service
Replace Single Family (Housing) Furnaces
1. General:
1.1 Jones Hole National Fish Hatchery (NFH), 24495 East Jones Hole Hatchery Road, Vernal, UT 84078-2042. Service, Replace HVAC in Hatchery Building.
1.2 Purpose/End Application: This project is to provide a safe and healthy workspace and visitor experience within the Hatchery Building. COVID-19 is a present threat, thus making providing air purification a top priority. The winters at Jones Hole can be harsh, with temperatures dropping below zero degrees farenheight; therefore the furnaces need to be replaced and the ductwork needs to be thoroughly cleaned of dust and debrit that has collected for over 50 years.
1.3 Contractor Qualifications: The contractor must be appropriately lisenced and certified within the state of Utah for HVAC replacement and repair.
1.4 Other: The contractor must follow all associated regulations and laws including:Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work is to be performed at Jones Hole National Fish Hatchery, 24495 East Jones Hole Hatchery Road, Vernal, UT 84078-2042.
2.2 This project needs to be completed prior to October 1, 2021, due to cold weather.
2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 The contractor shall remove and legally dispose of old furnace units in for single housing units. The air ducts will be thoroughly cleaned of all dust and debris by the contractor. Contractor shall install four new propane furnaces, one for each of the quarters: Quarters #1, Quarters #2, Quarters #3, and Quarters #4, and train designated hatchery empoyees on the operation of the installed systems.
4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended)
4.1 For each of the four single family housing units, the contractor shall procure and install one new 95% efficient or greater 70,000-80,000 BTU, or equivalent appropriate for 1860 quare feet, propane furnaces; with all ventilation changes and materials required.
4.2 For each of the four single family housing units, the contractor will supply 12 activated carbon filters that will capture 95% of airborne particles at the size of 0.3 microns and 90% ultra fine particles down to 0.1 microns.
4.3 The contractor shall provide the designated U.S. Fish and Wildlife Service representative with all user manuals, data sheets, warranty paperwork, etc.; and ensure the designated users understand operation and maintenance procedures for the installed equipment.
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Jones Hole NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Evaluation and Acceptance
7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.
8. Quality Control/Quality Assurance:
8.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.
8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable.
9. Technical Coordinator:
9.1 Primary individual responsible for the final product or service.
Travis Anderson Acting Project Leader
24495 East Jones Hole Hatchery Road Vernal, UT 84078-2042 Office: 435-789-4481 x12 travis_anderson@fws.gov
9.2 Secondary individual responsible for the final product or service.
Kristopher “Kris” Johnson Facility Management Coordinator (FMC) Asset Management Coordinator (AMC) U.S. Fish and Wildlife Service Fish and Aquatic Conservation (FAC) 1380 South 2350 West Vernal, UT 84078 Cell: 435-299-5150 Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov mailto:travis_anderson@fws.gov mailto:kristopher_b_johnson@fws.gov
| STATEMENT OF WORK |
| 1. General: |
| 2. Place of Performance and Period of Performance |
| 2.1 Work is to be performed at Jones Hole National Fish Hatchery, 24495 East Jones Hole Hatchery Road, Vernal, UT 84078-2042. |
| 2.2 This project needs to be completed prior to October 1, 2021, due to cold weather. |
| 2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. |
| 2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day). |
| 3. Scope |
| 4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended) |
File details come from the government source that posted it. Updated .