Material Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sewage Lagoons, newest first.
File Type Posted
amendment.pdf PDF
sign_in.pdf PDF
pd28C0E.pdf PDF
Attachment_8_Financial_Institution_Reference_Sheet.doc DOC document
solcoverletter.pdf PDF
Attachment_9_-PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
JGAR201027_Plans.pdf PDF
YEAR_2012.xls XLS spreadsheet
JGAR201027_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

JGAR201027

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 4

4 Project Site Plan. Sec. 01000, Para. 7.2.1 4

5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

7 Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2 4

8 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

9 Final As-Built Drawings. Sec. 01000, Para. 12.8 1

10 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 4

11 Storm Water Protection Plan. Sec. 01000, Para. 13.5 4

12 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 13.6.2 4

13 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

14 Dust Control Plan. Sec. 01000, Para. 13.7 4

15 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

16 Spill Control Plan. Sec. 01000, Para. 13.12 4

17 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

18 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

19 O & M Manuals. Sec. 01000, Para. 16 3

20 Sec. 01000, Affirmative Procurement Report Form 4

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

MAINTAIN SEWAGE LAGOON - SECONDARY

NORTH & TERTIARY FA4659-09-D-A003

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D

A

TA

C E

R

TI

FI

C

A

TE

S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

Maintain Sewage Lagoon - Secondary North Tertiary -

JGAR201027 01000-1 156-014

PROJECT NO.

JGAR201027

APPROVED DISAPPROVED

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

MAINTAIN SEWAGE LAGOON - SECONDARY

NORTH & TERTIARY FA4659-09-D-A003

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D

A

TA

C E

R

TI

FI

C

A

TE

S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

21 Materials Testing 4 02205

22 Aggregate Gradation Report 4 02207

23 Rip Rap Gradation Report 4 02275

24 Geotextile Fabric 4 02248

25 PVC Forcemain 4 02710

26 Fusible PVC 4 02710

27 Flanges 4 4 4 02710

28 Gate Valves 4 4 4 02710

29 Seed Mix 4 02936

30 Concrete 4 03001

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

Maintain Sewage Lagoon - Secondary North Tertiary -

JGAR201027 01000-2 156-014