JF25-014-IFB_Specifications_Roofing Repairs.pdf
PDF 293 KB Posted
- Attached to
- Construction: Roofing Repairs - Annual Contract
- Solicitation number
- JF25-014-IFB
- Issued by
- Utah
About this file
This document is an Invitation for Bid (IFB) issued by Granite School District (GSD) for roofing repair services on an as-needed basis at multiple locations throughout the district. The contractor must provide all equipment, materials, labor, and incidentals necessary to complete the projects, which are expected to be small jobs under $50,000. GSD will require a site visit and written price quotation for each job, and a purchase order will be issued prior to the start of each approved project. The contract will be for a one-year period with four one-year renewal options, for a maximum of five years.
Pricing terms include no markup on materials or subcontracted work, and no charges for mileage, travel time, or other ancillary costs. GSD reserves the right to reject any price proposal or component thereof. Bidders must demonstrate they are responsible, competent contractors with the resources to complete projects of this type and magnitude, and must hold a valid Utah S280 Roofing Contractor license (or higher). GSD anticipates awarding contracts to multiple vendors to meet the district's needs when internal staff cannot complete a required roof repair.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1269051-event.pdf | ||
| IFB Instructions and Provisions.pdf | ||
| SciQuest Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S o l i c i t a t i o n # J F 2 5 - 0 1 4 - I F B
PURCHASING DEPARTMENT
JULIE FISHER, CPPB, BUYER
2500 South State Street Salt Lake City, Utah 84115
SPECIFICATION SHEET "A"
GENERAL
SPECIFICATIONS TO PROVIDE ROOFING REPAIRS ON AN “AS NEEDED
BASIS” AT MULTIPLE LOCATIONS THROUGHOUT GRANITE SCHOOL DISTRICT
(GSD). PLEASE SEE HTTPS://WWW.GRANITESCHOOLS.ORG/SCHOOLS/ FOR
POTENTIAL LOCATIONS. BIDDERS MUST MEET OR EXCEED ALL SPECIFICATIONS AND
REQUIREMENTS AS SET FORTH IN THIS DOCUMENT AND ALL OTHER INFORMATION
POSTED ON THE UTAH PUBLIC PROCUREMENT PLACE (HEREAFTER REFERRED TO
AS U3P).
CONTRACTOR MUST FURNISH ALL EQUIPMENT, MATERIALS, LABOR, TOOLS,
TRANSPORTATION, SUPPLIES, AND INCIDENTALS NECESSARY TO COMPLETE THE
ENTIRE PROJECT AS DESCRIBED IN THE SPECIFICATIONS AND DRAWINGS (IF
APPLICABLE).
1. ACCESS TO SITE
ACCESS TO LOCATIONS FOR SITE INSPECTIONS AND/OR FOR PROJECT COMPLETIONS
MUST BE ARRANGED THROUGH THE CARPENTER SHOP FOREMAN, SAM BREINHOLT (801) 205-
9185 AND MUST BE WITH HIS KNOWLEDGE AND AT HIS CONVENIENCE. (DO NOT CONTACT SAM
DURING THE BIDDING PROCESS. QUESTIONS MUST BE PUBLISHED IN THE Q & A SECTION.)
2. AMENDMENTS TO INVITATION FOR BID
ANY CHANGES IN QUANTITY, SPECIFICATIONS, SCHEDULES, OPENING DATE,
CORRECTIONS, CLARIFICATIONS, ETC. WILL BE IN THE FORM OF AN ADDENDUM. ADDENDUMS
WILL BE POSTED AT U3P. IT IS THE RESPONSIBILITY OF THE BIDDER TO OBTAIN ADDENDUMS.
BID SUBMITTAL CONSTITUTES IMPLIED ACKNOWLEDGMENT OF ALL ADDENDUMS.
3. BID SECURITY
N/A
4. BONDS
N/A
5. CHANGE ORDERS
NO PAYMENTS WILL BE MADE TO THE CONTRACTOR FOR ADDITIONAL WORK OR MATERIALS
https://www.graniteschools.org/schools/
UNLESS A CHANGE ORDER HAS BEEN SIGNED AND EXECUTED. ANY CHANGE ORDER WHICH
INCREASES THE CONTRACT AMOUNT SHALL BE SUBJECT TO PRIOR WRITTEN CERTIFICATION THAT
THE CHANGE ORDER IS WITHIN THE DETERMINED PROJECT OR CONTRACT BUDGET.
6. CONFLICT WITH SUBMITTALS/INCONSISTENCIES IN CONDITIONS
IN THE EVENT OF CONFLICT WITH SUBMITTALS FROM BIDDERS OR INCONSISTENCIES IN
BIDDING DOCUMENTS, THIS BID DOCUMENT WILL TAKE PRECEDENCE.
7. CONSIDERATION, AWARD AND REJECTION OF BIDS
ALL BIDDERS MUST BE ABLE TO DEMONSTRATE THAT THEY ARE RESPONSIBLE, COMPETENT
CONTRACTORS WITH THE RESOURCES TO COMPLETE A PROJECT OF THIS TYPE AND MAGNITUDE
AND MUST BE PREPARED TO PROVIDE DOCUMENTED PROOF OF SUCH UPON REQUEST INCLUDING
REFERENCES AND FINANCIAL STATEMENTS. THE CONTRACTOR'S PAST PERFORMANCE HISTORY,
ORGANIZATION, EQUIPMENT AND DEMONSTRATED ABILITY TO PERFORM AND COMPLETE THEIR
CONTRACTS IN THE MANNER AND WITHIN THE TIME LIMIT SPECIFIED WILL BE ELEMENTS ALONG WITH THE DOLLAR AMOUNT OF THE BID WHICH WILL BE CONSIDERED BY GSD IN THE LETTING OF THE CONTRACT, IF ANY AWARD IS MADE. IT IS ANTICIPATED, GSD WILL AWARD TO MULTIPLE
VENDORS TO MEET THE NEEDS OF THE DISTRICT WHEN OUR STAFF CAN’T COMPLETE A
REQUIRED ROOF REPAIR. AWARD WILL BE MADE IN ACCORDANCE WITH R33-112-301 (5) (A)
(II) responsive and responsible bidders will be awarded a contract, provided the contract specifically directs that orders must be placed first with low bidder unless the lowest bidder cannot provide the needed procurement item, then with the second lowest bidder unless the second lowest bidder cannot provide the needed procurement item, then with the third lowest bidder unless the third lowest bidder cannot provide the needed procurement item, and so on in order from the lowest responsive and responsible bidder to the highest responsive and responsible bidder AND ORDERING FROM AWARDED VENDORS WILL BE MADE IN ACCORDANCE WITH R33-112-301B (1) (A) (II) place the order for the procurement item with the lowest bidder on contract unless the lowest bidder cannot provide the needed procurement item, then the order may be placed with the second lowest bidder unless the second lowest bidder cannot provide the needed procurement item and on, in order, from lowest bidder to highest bidder. GSD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS BY REASON OF THIS PARAGRAPH. BIDS SHALL BE IRREVOCABLE FOR A PERIOD OF 60 DAYS FROM THE BID
DUE DATE.
a) ANY CONTRACTOR THAT DOES NOT PERFORM IN AN EXEMPLARY PROFESSIONAL MANNER FOR
GSD OR IF THEIR WORK QUALITY IS LESS THAN EXCEPTIONAL WILL BE NOTIFIED OF THE
PROBLEM AND WILL NOT BE INVITED TO QUOTE OR BID ON ANY ADDITIONAL GSD JOBS OR
PERFORM ANY ADDITIONAL WORK FOR GSD UNTIL THEY HAVE DEMONSTRATED TO GSD’S
SATISFACTION THAT THE CAUSE OF THE PROBLEM(S) HAS BEEN CORRECTED.
b) ANY CONTRACTOR THAT HAS NOT PERFORMED UP TO OUR HIGH STANDARDS IN THE PAST FOR
GSD WILL NOT BE ALLOWED TO BID ON THIS CONTRACT.
c) IF A CONTRACTOR IS AWARDED THIS CONTRACT BUT THEN FAILS TO PERFORM, GSD
RESERVES THE RIGHT TO AWARD THE CONTRACT TO THE NEXT LOW BIDDER.
8. CONTRACT DATES/DEADLINES
REPAIRS WILL BE CONDUCTED DEPENDENT ON RECEIPT OF PURCHASE ORDER.
EQUIPMENT, DELIVERY LEAD TIME, AND WORK SHALL BE COORDINATED WITH THE GSD CONTACT
LISTED IN PARAGRAPH 1.
THE HOURS OF CONSTRUCTION SHALL BE FROM 7:00 AM TO 7:00 PM, MONDAY THROUGH
FRIDAY.
9. CONTACT
QUESTIONS MUST BE SUBMITTED ON-LINE THROUGH U3P. ANSWERS WILL BE PROVIDED
IN THE SAME MANNER.
10. CONTRACT CLAUSES
ANY CONTRACT ARISING FROM THIS INVITATION TO BID WILL INCLUDE THE FOLLOWING:
A. THE UNILATERAL RIGHT OF GSD TO ORDER WRITTEN CHANGES IN THE WORK AND/OR TIME
OF PERFORMANCE (CHANGES CLAUSE);
B. SUSPENSION OF WORK CLAUSE;
C. PRICE ADJUSTMENT CLAUSE;
D. CLAIMS BASED ON A PROCUREMENT OFFICER’S ACTIONS OR OMISSIONS CLAUSE;
E. DEFAULT DELAY – TIME EXTENSION CLAUSE
F. REMEDIES CLAUSE - ANY DISPUTE ARISING UNDER OR OUT OF THIS CONTRACT IS SUBJECT
TO THE PROVISIONS OF PART H (LEGAL AND CONTRACTUAL REMEDIES) OF THE UTAH
PROCUREMENT CODE;
G. LIQUIDATED DAMAGES AS APPROPRIATE;
H. SPECIFIC EXCUSABLE DELAYS ARE AS FOLLOWS: IF THE CONTRACTOR IS DELAYED BY
GSD OR ARCHITECT OR BY CHANGE ORDERS.
I. GSD MAY TERMINATE THE CONTRACT FOR ANY REASON AT ANY TIME IF THE CONTRACTOR
FAILS TO PERFORM (DEFAULT) OR IF IT IS IN THE BEST INTEREST OF GSD
(CONVENIENCE CLAUSE).
11. INSPECTIONS
CONTRACTOR MUST BE PREPARED, WILLING AND ACCOMMODATING TO ON-SITE
INSPECTION OF ALL WORK, AT ANY TIME, BY A GSD REPRESENTATIVE, DURING JOB PROGRESS.
12. INSURANCE/LIABILITY/SAFETY/SECURITY
THE CONTRACTOR MUST SECURE AND MAINTAIN LIABILITY INSURANCE (GENERAL AND
AUTO) OF ONE MILLION DOLLARS EACH OCCURRENCE AND THREE MILLION DOLLARS GENERAL
AGGREGATE (OR MORE AS MAY BE REQUIRED IN THE PROJECT MANUAL ON CONTRACT) AGAINST
CLAIMS FOR INJURIES TO PERSONS OR DAMAGES TO PROPERTY WHICH MAY ARISE FROM OR IN
CONNECTION WITH THE PERFORMANCE OF THE WORK HEREUNDER. THE CONTRACTOR’S
COMMERCIAL GENERAL LIABILITY POLICY MUST INCLUDE BUILDERS RISK INSURANCE AND
COMPLETED OPERATIONS COVERAGE TO GUARANTEE RECOVERY OF DAMAGES TO THE WORK IN
PROGRESS DURING CONSTRUCTION. INSURANCE MUST BE MAINTAINED FOR THE DURATION OF
THE PROJECT. CONTRACTOR MUST PROVIDE PROOF OF INSURANCE (POLICY OR ENDORSEMENT)
UPON DEMAND BY GSD AND AGREES TO, AT ALL TIMES, PROTECT, INDEMNIFY, DEFEND AND HOLD
HARMLESS GSD AND GSD EMPLOYEES FROM ANY AND ALL CLAIMS.
GSD WILL ASSUME NO LIABILITIES FOR THE CONTRACTOR INCLUDING ANY OF THE
CONTRACTOR’S REPRESENTATIVES, EMPLOYEES OR PROPERTIES.
CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN SAFEGUARDS FOR SAFETY AND
PROTECTION AND KEEP THE WORK AREA IN A NEAT, CLEAN, SAFE AND SECURE CONDITION TO
AVOID INJURY, RISK OF LOSS, THEFT, VANDALISM OR SABOTAGE.
ANY DAMAGES OCCURRING DURING THE COMPLETION OF THIS PROJECT, INCIDENTAL OR
OTHERWISE, TO GSD OR ADJACENT PROPERTIES MUST BE REPAIRED, AT THE CONTRACTORS
EXPENSE, TO THE OWNER’S SATISFACTION.
13. LAWS/CODES
CONTRACTOR MUST ABIDE BY ALL FEDERAL, STATE AND LOCAL LAWS INCLUDING, BUT NOT
LIMITED TO EMPLOYMENT LAWS SUCH AS THE AMERICANS WITH DISABILITIES ACT AND E-VERIFY
AND MEET OR EXCEED ALL APPLICABLE BUILDING CODES AND UTAH STATE ENERGY CODE
REQUIREMENTS. UNDOCUMENTED (ILLEGAL IMMIGRANT) LABOR WILL NOT BE ALLOWED TO WORK
ON GSD PROPERTY. ANY CONTRACT THAT MIGHT ARISE FROM THIS INVITATION FOR BIB WILL
BE GOVERNED BY UTAH STATE LAWS.
14. LICENSING
BIDDERS MUST MEET ALL CURRENT LICENSING REQUIREMENTS OF THE CITY, COUNTY AND
STATE OF UTAH TO DO THE TYPE OF WORK REQUIRED UNDER THIS BID INCLUDING THE PROPER LICENSE CLASSIFICATIONS WITH A SUFFICIENT MONETARY LIMIT AS ESTABLISHED AND ISSUED BY
THE DIVISION OF OCCUPATIONAL AND PROFESSIONAL LICENSING, STATE DEPARTMENT OF
COMMERCE, AS LEGALLY REQUIRED BY STATE CODE TITLE 58, CHAPTER 55. LICENSING MUST
BE CURRENT AND VALID AT THE DATE OF BID OPENING.
a) Bidder must hold a current, valid Utah S280 Roofing Contractor license (OR B100 General Building Contractors license or higher).
15. LIQUIDATED DAMAGES N/A
16. NOTICE TO PROCEED
NOTICE TO PROCEED WILL BE IN THE FORM OF A PURCHASE ORDER FROM THE GSD
PURCHASING DEPARTMENT. DO NOT PROCEED WITHOUT A PURCHASE ORDER.
17. PAST PERFORMANCE
ANY CONTRACTOR THAT DOES NOT PERFORM IN AN EXEMPLARY PROFESSIONAL MANNER
FOR GSD OR IF THEIR WORK QUALITY IS LESS THAN EXCEPTIONAL WILL BE NOTIFIED OF THE
PROBLEM AND WILL NOT BE INVITED TO QUOTE OR BID ON ANY ADDITIONAL GSD JOBS OR
PERFORM ANY ADDITIONAL WORK FOR GSD UNTIL THEY HAVE DEMONSTRATED TO GSD’S
SATISFACTION THAT THE CAUSE OF THE PROBLEM(S) HAS BEEN CORRECTED.
ANY CONTRACTOR THAT HAS NOT PERFORMED UP TO OUR HIGH STANDARDS ON PAST
GSD JOBS WILL NOT BE AWARDED A CONTRACT UNDER THIS BID.
18. PAYMENT
PAYMENTS WILL BE A "LUMP SUM" AMOUNTS MADE AT THE COMPLETION AND CLEAN-UP OF
EACH PROJECT AND WILL NOT BE MADE UNTIL A FINAL INSPECTION AND APPROVAL (SIGNING OF
THE INVOICE). NO "DRAWS", PREPAYMENTS OR PARTIAL PAYMENTS WILL BE ALLOWED.
19. PRE-BID CONFERENCE
N/A
20. SALES TAX
PLEASE NOTE THAT SALES MADE TO UTAH SCHOOL DISTRICTS ARE EXEMPT FROM SALES
TAX (UTAH CODE 59-12-104).
21. SUBCONTRACTORS
GSD RESERVES THE RIGHT TO REJECT ANY SUBCONTRACTOR. GSD MAY WITHHOLD
AWARDING THE CONTRACT TO A BIDDER IF ANY OF THE PROPOSED SUBCONTRACTORS ARE
CONSIDERED BY GSD TO BE UNQUALIFIED. SUBCONTRACTORS MUST BE HELD, BY THE
GENERAL, TO ALL REQUIREMENTS LISTED HEREIN. A LIST OF SUBCONTRACTORS AND THEIR
LICENSING CLASSIFICATION WILL BE REQUIRED. BIDDER SHALL CERTIFY THAT ALL
SUBCONTRACTORS ARE LICENSED AS REQUIRED BY STATE LAW.
22. SUBMITTALS
SUBMIT BIDS AS PER INSTRUCTIONS ON U3P. ADDITIONAL ATTACHED OR ENCLOSED
MATERIALS, NOT REQUESTED, ARE NOT REQUIRED WILL BE DISCARDED AND MAY CAUSE BID
REJECTION IF THE ATTACHMENTS ARE ATTEMPTS TO ALTER OR AMEND THE BID SPECIFICATIONS
AND/OR REQUIREMENTS. ADDITIONAL OR ALTERNATE TERMS OR PROPOSALS WILL NOT BE
ACCEPTED
23. SUBSTITUTE PRODUCTS
N/A
24. TECHNICAL SPECIFICATIONS
a) CONTRACT FOR ROOFING REPAIR WORK ON A TIME AND MATERIALS BASIS TO
INCLUDE MAINTENANCE SERVICES SUCH AS DRAIN WORK, SMALL REPAIRS
USING HOT ASPHALT, GRAVEL STOP REPAIRS, GUTTER WORK, WALL AND
CURB FLASHING REPAIRS, REMOVING DEBRIS FROM ROOF AREAS, ROOF
COATINGS, FOUNDATION DAMP PROOFING, COUNTER FLASHING REPAIRS,
ETC.
b) RESPONSE TIME MUST BE WITHIN THREE CALENDAR DAYS. EMERGENCY
RESPONSE TIME MUST BE SAME DAY.
c) CONTRACTOR MUST HAVE BEEN IN CONTINUOUS BUSINESS FOR THE
PREVIOUS FIVE YEARS.
d) CONTRACT WILL BE FOR SMALL JOBS ONLY WITH A COST OF LESS THAN
$50,000. OPPORTUNITIES OVER $50,000.00 WILL BE PUBLISHED, BID, AND
AWARDED SEPARATELY FROM THIS CONTRACT.
e) GSD WILL REQUIRE A SITE VISIT AND WRITTEN PRICE QUOTATION FOR EACH
JOB, AT NO CHARGE. QUOTES MUST LIST MATERIALS AND LABOR HOURS
FOR AUDITING PURPOSES. GSD WILL PROVIDE A “JOB COSTING FORM”
FOR THE QUOTATION (SEE THE ATTACHED SAMPLE FORM). IF THE PROJECT
ACTUALLY REQUIRES LESS TIME AND/OR MATERIALS THAN LISTED ON THE
JOB COSTING FORM, THE INVOICE MUST REFLECT THIS; HOWEVER, NO
PAYMENTS WILL BE MADE FOR MORE THAN IS LISTED ON THE JOB COSTING
FORM WITHOUT A CHANGE ORDER. CHANGE ORDERS MUST BE ISSUED,
PRIOR TO THE COMMENCEMENT OF ADDITIONAL WORK.
f) GSD RESERVES THE RIGHT TO REJECT A PRICE PROPOSAL (JOB COSTING
FORM) OR ANY OTHER COMPONENT OF THE PRICE PROPOSAL, FOR ANY
REASON AND IS UNDER NO OBLIGATION TO PROCEED WITH THE JOB.
g) GSD WILL ISSUE A PURCHASE ORDER PRIOR TO THE START OF EACH JOB IF
THE JOB COSTING FORM IS ACCEPTED AND APPROVED.
h) CONTRACT WILL BE FOR A ONE YEAR PERIOD AND WILL INCLUDE FOUR, ONE
YEAR RENEWAL OPTIONS FOR A MAXIMUM CONTRACT LENGTH OF FIVE YEARS,
IF AND ONLY IF, BOTH PARTIES AGREE TO RENEW.
i) LABOR RATES MUST REMAIN THE SAME FOR THE DURATION OF THE
CONTRACT.
j) CONTRACTOR MUST SUBMIT ACTUAL INVOICES FOR MATERIALS IF
REQUESTED BY GSD FOR AUDITING PURPOSES.
k) MILEAGE CHARGES, TRIP CHARGES, TRAVEL TIME, FUEL CHARGES, OFFICE
TIME, ETC. WILL NOT BE ALLOWED.
l) “MARKUP” ON MATERIALS AND SUBCONTRACTED WORK WILL NOT BE
ALLOWED.
25. TERMS AND CONDITIONS
IN THE EVENT OF BREACH, THE PREVAILING PARTY WILL BE ENTITLED TO ATTORNEY’S
FEES, REGARDLESS OF WHETHER THE ISSUE IS BROUGHT TO COURT.
GSD REQUESTS ASSIGNMENT OF RIGHTS TO RECOVER DAMAGES FROM ANY ANTITRUST
VIOLATIONS.
GSD IS A GOVERNMENTAL ENTITY AND AS SUCH WE DO NOT WAIVE ANY RIGHTS GRANTED
UNDER THE “GOVERNMENTAL IMMUNITY ACT OF UTAH” [UTAH CODE, TITLE 63G, CHAPTER 07].
NOTE: THE USE OF ALCOHOL, TOBACCO (INCLUDING SMOKELESS OR CHEWING TOBACCO) OR E-
CIGARETTES ON GSD PROPERTY IS PROHIBITED.
26. WARRANTY
CONTRACTOR WARRANTS ALL EQUIPMENT, MATERIALS, AND LABOR FURNISHED OR
PERFORMED WILL BE FREE FROM DEFECTS FOR A MINIMUM PERIOD OF TWELVE (12) MONTHS
(UNLESS LONGER AS LISTED IN THE TECHNICAL SPECIFICATIONS OR DRAWINGS) FROM DATE OF
DISCOVERY (OR WHEN DISCOVERY SHOULD HAVE BEEN MADE). UPON NOTICE FROM GSD OF
ANY DEFECT DURING THE APPLICABLE WARRANTY PERIOD, THE AFFECTED ITEM, PARTS OR WORK
SHALL BE REDONE, REDESIGNED, REPAIRED OR REPLACED BY THE CONTRACTOR (AT THE
CONTRACTOR’S EXPENSE) AT A TIME ACCEPTABLE TO GSD.
Sample - JOB COSTING FORM
Contract Number:
Contractor Name:
Job Location: Date:
Scope of work (description): Attach drawings or expanded description if necessary.
LABOR
FOREMAN HOURS: X $ = $
JOURNEYMAN HOURS: X $ = $____________
LABORER HOURS: X $ = $____________
LABOR TOTAL: $
Materials: Attach an itemized list of materials showing costs. $
MATERIALS AT COST – NO MARKUP
Total Cost of Job (labor + Materials):
File details come from the government source that posted it. Updated .