This document appears to be a Scope of Work for a state or local government contract opportunity. The project entails conducting soil sampling and analysis services for the Joint Environmental Policy Commission (JEPC). The Scope of Work outlines the required quantities and locations for soil samples, as well as the testing procedures and deliverables. It specifies a due date for responses and indicates that a mandatory bidder's conference will be held prior to the submission deadline.

The Scope of Work does not provide details on pricing or funding sources. It also does not mention any set-aside requirements, incumbent contractors, or the term of the contract. Additional details on these commercial and administrative terms would likely be found in separate attachments or the main solicitation document.

View the file

Other files

File Type Posted
Soil Level Maintenance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Soil Sampling on Jim Edgar Panther Creek

Soil sampling is an important component of properly ensuring that the soil health of agricultural systems is not depleted. In order to accomplish this, samples need to be taken at least every 5 acres. A minimum of 5 cores will be collected within 10 ft. of each sampling point. Samples will be taken in accordance with University of Illinois Agronomy Handbook standards (http://extension.cropsciences.illinois.edu/handbook/pdfs/chapter08.pdf).

The samples will be taken include the soil profile from 0-7 inches. No depths greater than 7 in is acceptable. Multiple profiles will be taken in each sampling location, mixed together, and put into a sampling bag that is labelled with Field number and sampling point. Samples will be sent off to the lab for analysis. The main levels that must be reported include soil pH, amount of Phosphorus (P), and amount of Potassium (K). Other micronutrients can be reported on but are not required. Please see attached Minimum Nutrient Level below on this sheet. The majority of the fields are in row crop production, but some may be in hay fields or food plots.

A final nutrient report for each lease and recommendations will be submitted electronically to the contacts below. Soil sampling location points have been predetermined. Hard maps or a GIS shapefile will be given to the winning bidder when the project starts.

Vendor is responsible for taking all samples, having them analyzed, and sending to the IDNR via email to DNR.Aglease@Illinois.gov and Bob.Caveny@Illinois.Gov

Location:

Jim Edgar Panther Creek State Fish and Wildlife Area 10149 County Highway 11, Chandlerville, Il 62627 217-452-7741

Total Samples to be taken:

IDNR Ag Lease - Min Soil Test Levels for Ag Fields

Soil pH Maintenance Levels – 6.2 goal, 6.0 – 6.5 acceptable

Phosphorus (P) Maintenance Levels

Soil P Supplying Regions
Units
High
Medium
Low
Minimum Soil Level
30
40
45
lbs/ac
Recommended Levels Corn/Beans
40
45
50
lbs/ac
Recommended Levels Wheat/Oats
60
67.5
75
lbs/ac

Potassium (K) Maintenance Levels

Soil K Exchange Capacity Regions
Units
High (>12 mEq)
Low (<12 mEq)
Minimum Soil Level
300
260
lbs/ac
Above with No Addition
400
360
lbs/ac
Levels >100 lb. above Min
Replace Yield K
Replace Yield K
lbs/ac
Levels Below Minimum
Replace Yield K + Build to Min

· Adjustments needed based on location and timing of sampling. See Attachments.

Phosphorus (P) Maintenance Levels Illinois Agronomy Handbook (Ch 8, 100) Minimum soil test levels required to produce optimal crop yields vary depending on the crop to be grown and the soil’s P-supplying power. Near maximal yields of corn and soybeans are obtained when levels of available P are maintained at 30, 40, and 45 pounds per acre for soils in the high, medium, and low P-supplying regions, respectively. Since these are minimal values, to ensure soil P availability will not restrict crop yield it is recommended that soil test results be built up to 40, 45, and 50 pounds per acre for soils in the high, medium, and low P-supplying regions, respectively. This is a practical approach because P is not easily lost from the soil, other than through crop removal or soil erosion. To compensate for the higher P requirements of wheat and oats, it is suggested that 1.5 times the amount of expected P removal be applied prior to seeding these crops.

When soil test levels are between the minimum and 20 pounds above the minimum (40 to 60, 45 to 65, and 50 to 70 for the high, medium, and low P-supplying regions, respectively), apply enough to replace expected removal by the crop. When soil test levels are below the desired values (40, 45, and 50 for the high, medium, and low P-supplying regions, respectively), it is suggested that enough fertilizer be added to build the test to the desired goal and to replace what the crop will remove (as described in the previous paragraph). At this test level, the yield of the crop will be affected by the amount of P applied that year.

On average, Illinois soils require 9 pounds of P2 O5 per acre to increase the P1 soil test by 1 pound. The recommended rate of buildup for P is thus nine times the difference between the soil test goal and the actual soil test value. For a typical 4-year buildup program, divide the rate by 4 to determine the annual rate. Because the 9-pound rate is an average for Illinois soils, some soils will fail to reach the desired goal in 4 years with P2 O5 applied at this rate, and others will exceed the goal.

Potassium (K) Maintenance Levels Illinois Agronomy Handbook (Ch 8, 103) Soils with a CEC less than 12 milliequivalents per 100 grams are classified as having low capacity, while soils with values equal to or greater than 12 milliequivalents per 100 grams are considered to have high capacity. Tests on soil samples that are taken before May 1 or after September 30 should be adjusted downward as follows: subtract 30 for the dark-colored soils in central and northern Illinois; subtract 45 for the light-colored soils in central and northern Illinois and for fine-textured bottomland soils; subtract 60 for the medium- and light-colored soils in southern Illinois.

Minimum soil test levels required to produce optimal crop yields vary depending on the crop to be grown and the soil’s CEC. As with P, the only significant loss of soil-applied K is through crop removal or soil erosion, so to ensure that K availability will not limit crop yields it is recommended that soil test levels be slightly higher than that required for maximum yield. For corn and soybean, it is recommended to have 260 and 300 pounds of exchangeable K per acre for soils in the low and high CEC regions, respectively.

No K additions are suggested if test levels are above 360 and 400 for the low and high CEC regions, unless crops that remove large amounts of K (such as alfalfa or corn silage) are being grown. When soil test levels are between the minimum and 100 pounds above the minimum (260 to 360 and 300 to 400 for the low and high capacity, respectively), apply enough to replace what the crop to be grown is expected to remove using values from Table 8.6. When soil test levels are below the desired values (260 and 300 for the low and high capacity, respectively), it is suggested that enough fertilizer be added to build the test to the desired goal and to replace what the crop will remove (as described in the previous paragraph). On average most Illinois soils require 4 pounds of K2 O per acre to increase the K exchangeable soil test by 1 pound. The recommended rate of buildup for K is thus 4 times the difference between the soil test goal and the actual soil test value. For a typical 4-year buildup program, divide the rate by 4 to determine the annual rate.

image2.emf

3786-11

3786-8

3786-17A

3786-16

3786-10

3786-6

3786-17B

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

0 0.25 0.50.125 Miles

Ag Fields IDNR Sites

%, Soil Sampling Points

Jim Edgar Panther Creek - Western Unit - Cass Co

Date: 5/24/2019 image3.emf

3786-9 3786-2

3786-315 3786-21

3786-93

3786-15

3786-29

3786-24

3786-277

3786-59

3786-7

3786-278

3786-274

3786-285

3786-44

3786-19,20

3786-4,18

3786-95

3786-28

3786-96

3786-275

3786-56

3786-4

3786-107

3786-108 3786-335

3786-281

3786-106

3786-99

3786-94

3786-1,5

3786-283

3786-105

3786-102 3786-104

3786-26

3786-57

3786-3

3786-27

3786-276

3786-12

3786-91

3786-110

3786-50

3786-1133786-97

0 0.65 1.30.325 Miles

Jim Edgar Panther Creek - NW - Cass Co image4.emf

3786-329

3786-169

3786-168

3786-300

3786-173

3786-188

3786-59

3786-79 3786-331

3786-299

3786-328

3786-145

3786-303

3786-117

3786-1613786-301

3786-305

3786-143

3786-138

3786-277

3786-160

3786-154

3786-63

3786-73

3786-187

3786-80

3786-82

3786-326

297B

3786-140

3786-278

3786-87

3786-330

3786-332

3786-296

3786-134

3786-298 3786-167

3786-334

3786-71

3786-274

3786-343

3786-68

3786-83

3786-142

3786-293

3786-119

3786-297A

3786-275

3786-52

3786-115

3786-56

3786-325 3786-114

3786-295

3786-1163786-111A

3786-294

3786-292A

3786-166

3786-132

3786-84

3786-69

3786-150

3786-333

3786-292B

3786-163

3786-178

3786-77

3786-131

3786-111B

3786-162A

3786-118

3786-327

3786-162B

3786-81

3786-67

3786-97

3786-137 3786-74

3786-139

3786-57

3786-180

3786-133

3786-165

3786-141

3786-121

3786-276

3786-86

3786-70

3786-109

3786-175

3786-76

3786-181

3786-184

3786-113

3786-155

3786-317

3786-193

3786-183

3786-122

3786-245

Jim Edgar Panther Creek - WC - Cass Co image5.emf

3786-310

3786-176

3786-309

3786-242

3786-311

3319-225

3786-241

3786-3033786-1613786-301

3786-240

3786-307

3786-336

3786-220

3786-212

3786-239

3786-237

3786-87

3786-214

3786-249

3786-341

3786-298 3786-235

3786-208

3786-308

3786-313

3786-345

3786-217

3786-216 3786-218

3786-229

3786-236

3786-201

3786-213

3786-232

3786-338

3786-209

3786-234

3786-312B

3786-312A

3786-204B

3786-178

3786-131

3786-244

3786-339

3786-195

3786-344

3786-198B 3786-198A

3786-198C

3786-84

3786-210

3786-80

3786-194

3786-204A

3786-231

3786-82

3786-86

3786-77

3786-155

Jim Edgar Panther Creek - S - Cass Co image6.emf

3786-310

3786-221

3786-176

3786-309

3786-311

3786-2423786-243

3786-241

3786-269A

3786-240

3786-307

3786-212

3786-239

3786-269B

3786-237

3786-214

3786-249

3786-235

3786-208

3786-226

3786-268

3786-313

3786-3373786-216 3786-218

3786-201

3786-213

3786-209

3786-312B

3786-263

3786-312A

3786-204B

3786-178 3786-244

3786-195

3786-344

3786-198B

3786-198A

3786-198C

3786-210

3786-194

3786-204A

3786-2703786-1263786-109

3786-224

3786-106 3786-265

Jim Edgar Panther Creek - EC - Cass Co image7.emf

3786-9

3786-221

3786-315

3786-21

3786-323

3786-269A

3786-15

3786-324

3786-269B

3786-326

3786-259

3786-254

3786-298 3786-235

3786-265

3786-319

3786-19,20

3786-226

3786-262

3786-320

3786-245

3786-268

3786-340

3786-317

3786-247

3786-7

3786-50

3786-321

3786-337 3786-216

3786-252

3786-52

3786-325

3786-322

3786-256

3786-255

3786-263

3786-3333786-131

3786-339

3786-257

3786-318A

3786-97

3786-26

3786-2

3786-318B

3786-27

3786-270

3786-12

3786-126

3786-224

3786-24

3786-258

0 0.8 1.60.4 Miles

Jim Edgar Panther Creek - NE - Cass Co image8.png image9.png image10.png image11.wmf image12.wmf image13.png image14.png image15.png image1.emf

0 1.5 30.75 Miles

Jim Edgar Panther Creek - Cass Co