JCCA_23791-8_Generator_Stack_Extension,_100__Approved.pdf
PDF 10 MB Posted
- Attached to
- Generator Stack Extension Services 24-42017-000
- Solicitation number
- 0000033629
- Issued by
- Napa County, Napa City, California
About this file
This is a complete set of construction drawings for a generator stack extension project at the Department of State Hospitals (DSH) facility in Napa, California. The project involves extending two existing co-generation baffle stacks to reduce air turbulence and comply with EPA compliance standards at Building 331's generator yard. The scope includes providing a ladder and platform on top of the new extension for Bay Area Air Quality Management District (BAAQMD) personnel to obtain air quality readings, installing a separate support tower for the new additions, and providing a maintenance receptacle at the stack extension with associated conduit and wiring back to the panel.
The drawings detail the technical specifications for the 150-inch stack extensions to be installed on top of the existing 146-inch baffle stacks. Key components include 409 stainless steel interior jackets with insulation, A36 carbon steel outer casings, expansion joints, and structural support frames. The project requires compliance with 2022 California building codes and standards, including mechanical, electrical, fire safety, and structural requirements. The drawings show detailed plans for foundation work, support structures, sampling ports, safety railings, and access ladders with cages. State Fire Marshal approval was granted on June 12, 2024 under permit number 24-1374.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CYPRESS CIR
S P R U C E D
R
IV
E
BIRCH DRIVE
M A P L E D
R
IV
E
N A P A V
A
LL
E J O H W
Y
SYCAMORE DRIVE
C E D A R D
R
IV
E
MADRONE DR
162A
MAGNOLIA DR
C E D A R D
R
177 178
NOTES, DRAWING
INDEX
T0.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D S H
-N a p a \C
A D \2
T .d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
1. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 33 -
FIRE SAFETY DURING CONSTRUCTION OF THE 2022 CALIFORNIA FIRE CODE.
FIRE SAFETY DURING CONSTRUCTION
DSA EXEMPTION NOTES
SEE STRUCTURAL DRAWINGS
SEISMIC NOTES
ALL UTILITY SHUTDOWNS MUST BE COORDINATED WITH FACILITY OPERATIONS WITH
AT LEAST 72 HOUR NOTICE. AND SHALL NOT EXTEND BEYOND 24 HOURS.
UTILITY SHUTDOWNS
PREPARED FOR:
DEPARTMENT OF STATE HOSPITALS - NAPA
2100 NAPA VALLEJO HWY,
NAPA, CALIFORNIA 94558
DEPARTMENT OF STATE HOSPITALS
1215 O ST, 2ND FLOOR
SACRAMENTO, CALIFORNIA 95814
JOSHUA KAISER
FACILITIES PLANING CONSTRUCTION
AND MANAGEMENT
PHONE: (916) 248-0015
EMAIL: JOSHUA.KAISER@DSH.CA.GOV.
CHILE GARCIA
ASSOC. CONSTRUCTION ANALYST
PHONE: (916) 601-6609
EMAIL: CHILE.GARCIA@DSH.CA.GOV
KRISTEN BROWN
DSH-NAPA PROJECT MANAGER UNIT
PHONE: (707) 253-5667
EMAIL: KISTEN.BROWN@DSH.CA.GOV
PREPARED BY:
J.C. CHANG & ASSOCIATES, INC.
ENGINEERS, ARCHITECTS AND PLANNERS
385 VAN NESS AVENUE, SUITE 208
TORRANCE, CALIFORNIA 90501
PHONE : (310) 212-7644
MECHANICAL ENGINEER OF RECORD
ROBERT NOLAN
LIC. NO. 31684
E-MAIL: RNOLAN@JCCAINC.COM
PHONE: (310) 212-7644
ARCHITECT OF RECORD
MYOUNGJIN KANG
LIC. NO. C-37614
E-MAIL: MJKANG@JCCAINC.COM
PHONE: (310) 212-7644 EXT. 255
ELECTRICAL ENGINEER OF RECORD
HECTOR LACSA
LIC. NO. E18399
385 VAN NESS AVE. #208
TORRANCE, CALIFORNIA 90501
STRUCTURAL ENGINEER OF RECORD
ROBERT ONISHI
LIC. NO. 3705
14426 S. RAYMOND AVE.
GARDENA, CA. 90247
HCAI NOTES
APPLICABLE CODES AND STANDARDS
A MINIMUM OF 72 HOURS NOTICE WILL BE PROVIDED TO THE STATE FIRE
MARSHAL WHEN SCHEDULING ANY TESTS OR INSPECTIONS.
DUCT, CONDUIT OR PIPE PENETRATIONS INSPECTIONS THRU FIRE RATED
ASSEMBLIES.
THIS PROJECT IS UNDERTAKEN SOLELY FOR THE PURPOSE OF EXTENDING
THE GENERATOR'S BAFFLE STACK. THIS PROJECT IS EXEMPT PER 2022 CBC
CODE SECTION 11B-203.5 AND DOES NOT REQUIRE DSA ACCESS COMPLIANCE
REVIEW. THIS PROVISION INCLUDES MECHANICAL ONLY PROJECTS THAT
CONTAIN INCIDENTAL STRUCTURAL UPGRADES REQUIRED SOLELY FOR THE
PURPOSE OF PERFORMING MECHANICAL ONLY WORK. HOWEVER,
COMPLIANCE WITH THE CALIFORNIA BUILDING CODE IS STILL REQUIRED AND
PROVIDED.
THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO EXTEND (2) EXISTING
CO-GENERATION BAFFLES TO REDUCE THE AIR TURBULENCE AND TO COMPLY
WITH MINIMUM REQUIRED EPA COMPLIANCE STANDARDS.
IN ACCORDANCE WITH THE 2022 CBC. SHOULD ANY CONDITIONS DEVELOP NOT
COVERED BY THE APPROVED CONSTRUCTION DOCUMENTS, AMENDED
CONSTRUCTION DOCUMENTS (ACDs) DETAILING AND SPECIFYING THE
REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE DSH HCAI
PEER REVIEWER BEFORE PROCEEDING WITH THE WORK.
1. 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
2. 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
3. 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
4. 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
5. 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
6. 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
7. 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.
8. 2022 CALIFORNIA EXISTING BUILDING CODE (CEBC), PART 10, TITLE 24 C.C.C.R.
9. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,
TITLE 24 C.C.R.
10. 2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
11. TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
PARTIAL LIST OF APPLICABLE STANDARDS
1. NFPA 90A INSTALLATION OF AIR - CONDITIONING AND 2022 EDITION
VENTILATING SYSTEM
2. NFPA 101 LIFE SAFETY CODE 2022 EDITION
3. NFPA 72 NATIONAL FIRE ALARM & SIGNALING CODE 2022 EDITION
REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35,
AND 2022 CFC CHAPTER 80 AND 2022 CMC CHAPTER 17.
NOTE:
WORK IS A "REPAIR" OF MECHANICAL EQUIPMENT PER 2022 CEBC CHAPTER 2.
BUILDING 331 GENERATOR YARD
DEPARTMENT OF STATE HOSPITALS
GENERATORS STACK EXTENSION
2100 NAPA VALLEJO HWY, NAPA, CALIFORNIA 94558
DSH-NAPA
PROJECT INFORMATION
DRAWING INDEX
1. EXTEND (2) EXISTING CO-GENERATION BAFFLES TO REDUCE THE AIR
TURBULENCE AND TO COMPLY WITH MINIMUM REQUIRED EPA
COMPLIANCE STANDARDS.
2. PROVIDE LADDER AND PLATFORM ON TOP OF THE NEW EXTENSION FOR
BAAQMD PERSONNEL TO GET PROPER AIR QUALITY READINGS.
3. PROVIDE SEPARATE SUPPORT TOWER FOR THE NEW ADDITIONS.
4. PROVIDE MAINTENANCE RECEPTACLE AT STACK EXTENSION WITH
ASSOCIATED CONDUIT AND WIRING BACK TO PANEL.
N
SCOPE OF WORK VICINITY MAP SITE PLAN
SITE SAFETY PLAN
REFERENCE: 2022 CALIFORNIA FIRE CODE
1. SEE OVERALL SITE PLAN FOR SITE ACCESS FOR BOTH PUBLIC RIGHT OF WAY
AND DSH FIRE DEPARTMENT.
2. TURNAROUND CAN BE ACCOMPLISHED BY USING EXISTING SITE ROADS.
FIRE APPARATUS ACCESS
PROJECT LOCATION
NORTH OF BLDG. 331
SEE T0.2
SAN
FRANCISCO
SACRAMENTO
STOCKTON
SANTA
ROSA
SONOMA
TRACY
SAN
RAFAEL
ELK
GROVE
PLEASANTON
NAPA
PROJECT LOCATION
SAN PABLO
BAY
STATE FIRE MARSHAL SPECIAL
INSPECTIONS
100% SUBMITTAL
N
GENERAL
1. T0.1 NOTES, DRAWING INDEX
2. T0.2 SITE PLAN
3. T0.3 ENLARGED GENERATOR YARD & BUILDING DATA
STRUCTURAL
4. S0.1 STRUCTURAL NOTES
5. S2.1 FOUNDATION PLAN & ROOF FRAMING PLAN
6. S3.1 STRUCTURAL ELEVATION
7. S3.2 STRUCTURAL DETAILS
8. S3.3 STRUCTURAL DETAILS
MECHANICAL
9. M0.1 MECHANICAL NOTES, SYMBOL LIST AND
ABBREVIATIONS
10. M1.1 ENLARGED NEW WORK PLAN AND ELEVATION
11. M3.1 MECHANICAL SECTIONS
12. M3.2 MECHANICAL DETAIL
13. M3.3 LADDER DETAILS
14. M4.1 PHOTOS OF EXISTING CONDITIONS
ELECTRICAL
15. E1.1 ENLARGED ELECTRICAL NEW WORK PLAN AND ELEVATION
SHEET TITLE
SHEET
NO.
DWG.
NO.
A. 2022 CFC 3303.1 PROGRAM DEVELOPMENT AND MAINTENANCE. THE OWNER
OR OWNER’S AUTHORIZED AGENT SHALL BE RESPONSIBLE FOR THE
DEVELOPMENT, IMPLEMENTATION AND MAINTENANCE OF AN APPROVED,
WRITTEN SITE SAFETY PLAN ESTABLISHING A FIRE PREVENTION PROGRAM
AT THE PROJECT SITE APPLICABLE THROUGHOUT ALL PHASES OF THE
CONSTRUCTION, REPAIR, ALTERATION OR DEMOLITION WORK. THE PLAN
SHALL ADDRESS THE REQUIREMENTS OF THIS CHAPTER AND OTHER
APPLICABLE PORTIONS OF THIS CODE, THE DUTIES OF STAFF AND STAFF
TRAINING REQUIREMENTS. THE PLAN SHALL BE SUBMITTED AND APPROVED
BEFORE A BUILDING PERMIT IS ISSUED. ANY CHANGES TO THE PLAN SHALL
BE SUBMITTED FOR APPROVAL.
B. 3303.1.1 COMPONENTS OF SITE SAFETY PLANS:
SITE SAFETY PLANS SHALL INCLUDE THE FOLLOWING:
1. NAME AND CONTACT INFORMATION OF SITE SAFETY DIRECTOR.
2. DOCUMENTATION OF THE TRAINING OF THE SITE SAFETY DIRECTOR AND
FIRE WATCH PERSONNEL.
3. PROCEDURES FOR REPORTING EMERGENCIES.
4. FIRE DEPARTMENT VEHICLE ACCESS ROUTES.
5. LOCATION OF FIRE PROTECTION EQUIPMENT, INCLUDING PORTABLE FIRE
EXTINGUISHERS, STANDPIPES, FIRE DEPARTMENT CONNECTIONS AND
FIRE HYDRANTS.
6. SMOKING AND COOKING POLICIES, DESIGNATED AREAS TO BE USED
WHERE APPROVED, AND SIGNAGE LOCATIONS IN ACCORDANCE
WITH SECTION 3305.8.
7. LOCATION AND SAFETY CONSIDERATIONS FOR TEMPORARY HEATING
EQUIPMENT.
8. HOT WORK PERMIT PLAN.
9. PLANS FOR CONTROL OF COMBUSTIBLE WASTE MATERIAL.
10.LOCATIONS AND METHODS FOR STORAGE AND USE OF FLAMMABLE AND
COMBUSTIBLE LIQUIDS AND OTHER HAZARDOUS MATERIALS.
11.PROVISIONS FOR SITE SECURITY.
12.CHANGES THAT AFFECT THIS PLAN.
13.OTHER SITE-SPECIFIC INFORMATION REQUIRED BY THE FIRE CODE
OFFICIAL.
SFM PERMIT NUMBER: 24-1374
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-1374
JeremyWillett Wed May 22 09:14:55 2024: V2
GB 7
GB 8
GB 9
GB 2
GB 3
GB 1
CYPRESS CIR
S P R U C E D
R
IV
E
BIRCH DRIVE
M A P L E D
R
IV
E
N A P A V
A L L E
JO
H W
Y
SYCAMORE DRIVE
C E D A R D
R
IV
E
BUILDING 194
BUILDING
GB14
MB-6
MB-FF
2MB-6
GB-14
MADRONE DR
162A 162
MAGNOLIA DR
C E D A R D
R
176 177 178
IMOLA AVE
REDWOOD DR
S P R U C E D
R
SITE PLAN
T0.2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D S H
-N a p a \C
A D \2
T .d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
SITE PLAN
SCALE: N
E0.1
1" = 150'
75 0 15 300FEET 150
SEE ENLARGED
GENERATOR YARD T0.3
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
JeremyWillett Wed May 22 09:14:58 2024: V2
GT-1
GT-2
MADRONE DR
C E D A R D
R
BLDG 331
RADIATOR YARD
(E)
RADIATOR
(E)
RADIATOR
T
GT-3
(FUTURE)
CO-GENERATION PLANT
SITE PLAN -
GENERATOR YARD
T0.3
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D S H
-N a p a \C
A D \2
T .d w g
D A T E /T
IM
E M a y
:2
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
0 202 FEET 10
1/16" = 1'-0"
ENLARGED GENERATOR YARD
SCALE:
N
NEW STACK EXTENSION
TOP OF GAS
TURBINE GT-1
HEAT EXCHANGER
SYMBOL LOCATION
TOP OF GAS
TURBINE GT-2
HEAT EXCHANGER
56" (W) x 80" (L) x 150" (H)
INTERIOR JACKET
DIMENSION
409 SS
MATERIAL
409 SS
INSULATION
OUTER CASING
A36
CARBON
STEEL
SEE
EXPANSION JOINT
10,000
WEIGHT LBS
INTERIOR JACKET +
INSULATION +
OUTER CASING
1,500
EXPASION
JOINT
SEE 1,50010,000
NOTES
56" (W) x 80" (L) x 150" (H)
64" (W) x 88" (L) x 150" (H)
DIMENSION
64" (W) x 88" (L) x 150" (H) A36
CARBON
STEEL
MATERIAL
SEE
SEE
NOTES:
INTERIOR JACKET AND INSULATION. MUST BE ABLE TO WITHSTAND THE TEMPERATURE OF UP TO 1000°F. MANUFACTURED BY MORGAN THERMAL CERAMICS MODEL SUPER WOOL PLUS, 4" THICK AES WOOL, OR JOHNS MANVILLE CALCIUM CILICATE
SUPER CALTEMP GOLD 1700, 3" THICK, OR APPROVED EQUAL.
PROVIDE (4) EXTERNAL SUPPORT LUGS ON TOP (2 EACH ON OPPOSITE SIDE OF DUCT) AND (4) SUPPORTS LUGS AT THE BOTTOM OF THE NEW EXTENSION. 5/8" DIAMETER CARBON STEEL LUGS. SUPPORT LUGS WILL REST AND BE BOLTED TO THE
SUPPORT STRUCTURE.
PROVIDE (6) 4" SAMPLING PORTS 29" BELOW THE TOP OF NEW STACK.
FOR ADDITIONAL DETAILS SEE M3.2.
BUILDING DATA
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
M3.2
OF 154
DSA STAMP
DSH
IP: 310.212.7944 F:310.212.5272
JCCA #: 23791-8
oOFESSIO, PaKOKks T4K
%Prucutle7SOFCAUY
No.
Issue Date Description
30% SUBMITTAL11-01-23
2-21-24 60% SUBMITTAL
100% SUBMITTAL03-14-24
Project
GENERATORS
STACK EXTENSION
Drawn
Issue Date Vault File Number
XX/XX/XXXX
Sheet Title
STRUCTURAL NOTES
Reference North Sheet Scale
AS SHOWN
Sheet Number
SO.1
NO. 3705
Exp. 12/31/25
Checked
RN
Designed
SM
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
Project Number oooooooooooxxxx
Supervisor
RN
CD
Client Agency
DEPARTMENT OF STATE HOSPITALS
JCCA
Architects · Engineers
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
ABBREVIATIONS GENERAL NOTES
LLV.
LSV.
CONCRETE
REINFORCING: Footing reinforcing shall conform to ASTM A615, grade 60.
CEMENT: Tested, Type II Portland, ASTM C150.
AGGREGATES: ASTM C33. Maximum size 112” for footings and 1” for all other work.
TRANSV. . . . Transverse
STRUCTURAL STEEL
SHAPES AND PLATES shall conform to ASTM A36, Fy = 36 ksi. WF shapes shall conform to ASTM A992, Fy = 50 ksi min. All steel shall be identified with mark and mill
STEEL PIPE shall conform to ASTM A53, grade B, Fy = 35 ksi.
STEEL TUBE shall conform to ASTM A500, grade B, Fy = 46 ksi.
Seismic design category
FIELD PAINTING: Touch up all damaged paint, bolts and welds.
BOLTS All shop and/or field connections to be unfinished American Standard Regular, 74" diameter, unless noted otherwise. All bolts shown on structural drawings as "Anchor Bolts’
Unless otherwise noted or shown on plan, the minimum clear distance of the reinforcement to the face of the concrete shall be:
certification. Mill certification to be sent to Structural Engineer. Foreign steel shall be tested for chemical and physical properties. The physical test requirement may be waived by the Structural Engineer if satisfactory mill certification can be submitted.
Design soil pressure is based on sandy clay, compact with an allowable bearing pressure of 1,500 psf.
CONCRETE: Shall have an ultimate compressive strength of 3,000 psi at 28 days, unless noted otherwise on plan. All concrete shall be continuously inspected by a registered Deputy Building Inspector.
2’
3’EA.
EL.
E.N..
E.W.
F.A..
F.F.
FIN.
F.J..
The Contractor shall be responsible for supplying the means, methods, techniques, sequences, procedures and appropriate safety precautions required to perform the work.
FLR. .
FTG.
GA. .
G.B., G.L. .
GR. .
HD. .
HDR.
HGR.
HORIZ
HSS
TYP.
UNO.
U.P..
VERT
W/ .
W/O.
LONGIT. .
LSH
LAP SPLICES: Minimum length of lap splices in reinforcing steel shall be required for Class B splice (2’—0”min), unless otherwise noted on plan. Splices shall be well staggered.
GALVANIZING All steel exposed to weather shall be hot-dipped galvanized or primed and painted with weather protective finish per architectural drawings.
CONNECTIONS AND FABRICATION: AISC Specification, unless noted otherwise. All structural steel shall be fabricated in a Building Department approved shop. Building Department approved licensed fabricators only.
HT. . .
INFO. .
K.P. . .
LLH. . .
WELDING: Shall conform with latest AWS D1.1 standards. Welding shall be performed by Building Department approved certified welders under the supervision of a Special Inspector or in the shop of an approved fabricator. Continuous inspection required for all field welding.
shall be hook bolts (with 2” hooks) or machine bolts with plate washer 3” sq. x X” thick, tack welded to bolt head. Bolts shall conform to ASTM A307.
SHOP DETAILS to be submitted to Engineer for approval before fabrication. Steel erector shall provide all erection bracing required to maintain structure plumb and properly braced during construction.
Contractor shall verify all dimensions and conditions on the job and report any discrepancies to the Engineer before proceeding with the work.
No deviations from structural details without the written approval of the Structural Engineer.
Approval by the City inspector does not constitute authority to deviate from plans or specifications.
Basic Wind Speed (V) Exposure Category Importance factor, Category III (I) Minimum Design Wind Pressure. .
(A) .
A.B..
ARCH
(B) .
Bd. .
BLKG.
B.N..
BM. .
BOT.
BRG.
B.S..
C.J., CLG.
CLR.
CMU.
COL.
CONC.
CONN.
CONT.
C.P..
DBL.
DO. .
DRWG.
(E). .
38.2746838 -122.2692524 1.25 m D 1.916 0.67 2.299 1.139 1.532 0.759 D
Typical
Unless Noted Otherwise Underpinning
Vertical With Without
SEISMIC DESIGN CRITERIA (site-specific)
(based on 2022 CBC)
WIND DESIGN CRITERIA
(based on ASCE 7-16 & 2022 CBC)
Above Anchor Bolt Architectural
Below Board Blocking
Boundary Nailing Beam Bottom
Bearing Both Sides Ceiling joist
Ceiling Clear
Concrete Masonry Unit Column Concrete
Connection Continuous
Complete joint penetration Double Ditto Drawing
Existing (Contractor to field verify) Each
Elevation Edge Nailing Each Way
Framing Anchor (Simpson A35/LPT4)
Finished Floor Finish Floor Joist
Floor
Footing Gauge Grade Beam Glued-laminated beam
Grade Holdown Header Hanger
Horizontal Hollow structural section
MATL. . .
MAX. . .
MIN. . .
NAT . .
(N)
NOM. . .
NTS. . .
O.C P.A
PL
PLYWD. .
P.T
RAFT . .
REQD. . .
SCH. . .
SHT. . .
SHTG. . .
SIM. . .
SMS. . .
S.N
SPCG . .
STD. . .
STL
S.W. . .
SYM. . .
THK. . .
T&B . .
. . Height
. . Information
. . King Post . . Long Leg Horizontal
(Orientation of unequal leg angle) . . Long Leg Vertical
(Orientation of unequal leg angle)
. . Longitudinal
. . Long Side Horizontal (Orientation of rectangular tube)
. . Long Side Vertical (Orientation of rectangular tube)
. . Material
. . Maximum . . Minimum
. . Natural . . New . . Nominal
. . Not to scale . . Center to Center . . Post above
. . Plate
. . Plywood . . Pressure Treated . . Rafter
. . Required
. . Schedule
. . Sheet . . Sheathing . . Similar
. . Sheet Metal Screw
. . Shear Nailing . . Spacing
. . Standard
. . Steel
. . Shear Wall . . Symmetrical . . Thick
. . Top and Bottom
100 mph "C"
1.0
16.0 psf (LRFD)
A. Slab on grade B. Concrete against earth
Formed
Without form
Latitude Longitude Seismic Importance Factor (I). . .
Occupancy Category Site Class Spectral response coefficient (Ss )
(S1 )
(SMS)
(SMI )
(SDS )
(SDI )
i
D A
T E
/T
IM
E
M a r
:2
P
M F
IL
E
O
J O
B F
O L
D E
R \D
S H
\D S
H N a p a \D
S H
N A
P A
C o g e n
G e n e ra to r S ta c k E x te n s io n \D
S H
N a p a
G e n e ra to r S ta c k S
.1 d w g
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
OF 155
I
I
LADDER PER
MECH DRWGS
8 15
V I
C
LADDER PER
MECH DRWGS
[I
I
SE AUST
2/STACK
I i
2-6” 6’—0” w8X15 W8X15 s 8X15 W8X15
ELEV
6 SQ X % HSS
COL, (TYP 4)
S3.1
O
J to
CONT 8"X6”X3” HSS
(LSV), L= 14’-0”±
CONT 8"X6"X3" HSS
(LSV), L= 14’—0”±
GW 112” X 76” McNICHOLS
BAR GRATING
6 SQ X % HSS
COL, (TYP 4)
PLANT
2-6” 7’—6”±
ELEV
S3.1
6—0
ELEV
S3.1
1'— O' 99
—7
J □ 9926
ELEV
JL
(E) GAS TURBINE
LEV
y 7
□ 2 99
2′6
ELEV
JL
(E) GAS TURBINE
W
SCALE: X” = T-O'
S3.1
STACK SUPPORT
FOUNDATION PLAN
S3.1
ELEV
(11 S3.1
ELEV
6” SQ X 3” HSS
COL, (TYP 4)
6” SQ X 3” HSS
COL, (TYP 4)
PROJ
N
53.2
S3.2
S3.1
S3.1 o o r o r s o o I to s o J to
6-0”
3-0”
3-0”
10-0” X 12-0” X 48”
DEEP FOOTING, REFER TOI
■1’-0”
6-0”
10-0” X 12’-0” X 48”
DEEP FOOTING, REFER TOI
ELEV
S3.1
CO-GENERATION
I I
GW 112” X 36” McNICHOLS
CONT 8"X6"X3" HSS
(LSV), L= 14’-0”±
L
MW8 g gkmn run
-e* tsusgungu/"b
I EH™
z Bx
W8X15
W X15
7’—6”±
CONT 8”X6”X%” HSS/OON i
_ (LSV) 14’—0”±, L=
SE AUST
2/STACK
RAILING,
S3.1 S3.3/TYP
(E) GAS TURBINE7 1 1
S3.1
ELEV
\ (14 S3.2)
TYP WF 1
WF CONN
AN PRR
PROJECT
LOCATION
KEY P
NOT TO SCALE
O
I. II
ELEV
STACK SUPPORT FRAMING PLAN
SCALE: X” = T-0!
PROJ
N
RAILING,
S3.1 S3.3/TYP
TYP WF TO
WF CONN
(E) GAS TURBINEr 11 S3.1
ELEV
S3.2
DSA STAMP
DSH
IP: 310.212.7944 F:310.212.5272
JCCA #: 23791-8
oOFESSIO/ PaKOKks T4K
%Prucutle7SOFCAUY
No.
Issue Date Description
30% SUBMITTAL11-01-23
2-21-24 60% SUBMITTAL
100% SUBMITTAL03-14-24
Project
GENERATORS
STACK EXTENSION
Drawn
Issue Date Vault File Number
XX/XX/XXXX
Sheet Title
Reference North Sheet Scale
AS SHOWN
Sheet Number
S2.1
FOUNDATION PLAN &
ROOF FRAMING PLAN
NO. 3705
Exp. 12/31/25
DEPARTMENT OF STATE
HOSPITALS, NAPA
Checked
RN
Designed
SM
DEPARTMENT OF
STATE HOSPITALS
(DSH)
Client Agency
DEPARTMENT OF STATE HOSPITALS
Supervisor
RN
Project Number oooooooooooxxxx
JCCA
Architects · Engineers
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
CD
"X
"X
H S
S
L S
V
"X
"X
H S
S
L S
V
”X
”X
H S
S
L S
V
H S
S
L S
V
"X
"X
L— I
L x
JC
W X
N )L x J
C
-0
(A S
) S S
H
X .9
X .8 a
H S
S
L S
V
"X
"X
C
L x J
L x
JC
i 1 i i i 1
। i 1 i m
G L X
M
-6 i o D
A T
E /T
IM
E
M a r
:0
P
M
F
IL
E O
J O
B F
O L D
E R
\D S
H \D
S H
N a p a
\D S
H N
A P
A C o g e n G e n e ra to r
S ta c k E x te n s io n \D
S H
N a p a
G e n e ra to r S ta c k S
.1
.d w g
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
OF 156
38” PLATE
/7 L
I
·3
PLATE
6-0” ii it
II
it
II
·J
II
ji
3” PLATE
f?
0)
3" PLATE
CONT 8”X6” X
%” HSS (LSV)
"7
7/ f
3” PLATE
Ny
4 3” PLATE
* j
C_C
CONT 8”X6” X 7" HSS1 (LSV)
3” PLATE
S
(O
3” PLATE
%”IHSS NT-8”X6” X C
STACK
EXTENSION
S3.2
X G co
S3.2
S3.3
Y a
I w’-o”±
G
EXHAUST
STACK (E)
TOP OF-
FOOTING
S3.3
EXPANSION
JOINT
T
(LSV)
o I to
AT RAIL
Gy J
-TOP OF
FOOTING
EXHAUST
STACK (E)
S3.2
F CONTl 8”X6” X %" HSS (LSV)
PLATE
I
8,° X
88 8
CO
3" PLATE-.
CONT HSS (LSV)99 99 99
1O’-O”±
STACK—\
EXTENSION
EXPANSION
JOINT
S3.2
S3.3
5 _ S3.2
S3.3
S3.2.
4 _ S3.2
Xs
1 + x o 0)w1 W8X15
4-0” PLATFORM
J
-TOP OF
FOOTING
S3.2
II
S3.2
S3.2 x
O 0) o O k x o 0)
3” PLATE
7/ C
3” PLATE
[(LSV)8”X6” X %” HSS
3” PLATE
3” PLATE
II
it
II
ji
L
L
~y
9/
6-0” s/
X
H
O
-H
O) J
-H
O) J
IM
2 _ S3.2
S3.2
S3.2
%” PLATE
V
PLATE
a /
0)
3” PLATE
Ny
%” PLATE/
8”X6” X 38
A 78
(LSV).HSS
3” PLATE
7/
7/ V
38” PLATE
* J
V/
7)
L
O
C
A V
9/
8”X6” X 3”
HSS (LSV)
DTL FRAME1
38” = 1-0”
(6 63.2
63.2
3” PLATE 7.
7?
—3" PLATE
8”X6” X %”
HSS (LSV) _
3” PLATE
C)
V
C,07/
9/
—3" PLATE
8"X6" X %”
HSS (LSV)—
E 59 99
FRAME ELEVATION 1 %" = 1‘-0"
DTL FRAME2
6’—0"
II
It
II
It
II
J)
8”X6” X 3”
HSS (LSV) \
S3.2
S3.2
(2) 8”X6” X
HSS
3” PLATE
X
Vr
/ %” PLATE
II
JJ
II
it
8]
6-0”
O O k x o co
=f
II
JJ
AT RAIL
ZS3.3
6) W8X15 (
PLATFORM
TOP OF
FOOTING
S3.2 o J "co
Ik fl
L T i
4’—0”
99 99 99 99 99 99
FRAME ELEVATION FRAME ELEVATION 3 FRAME ELEVATION 2
S3.13 3.
%" = 1-0”
DTL FRAME3
%" = 1-0”
DTL FRAME4
S3.2
DSA STAMP
DSH
IP: 310.212.7944 F:310.212.5272
JCCA #: 23791-8
oOFESSIO, PaKOKks T4K
%Prucutle7SOFCAUY
No.
Issue Date Description
30% SUBMITTAL11-01-23
2-21-24 60% SUBMITTAL
100% SUBMITTAL03-14-24
Project
GENERATORS
STACK EXTENSION
Drawn
Issue Date Vault File Number
XX/XX/XXXX
Sheet Title
Reference North Sheet Scale
AS SHOWN
Sheet Number
S3.1
STRUCTURAL
ELEVATION
NO. 3705
Exp. 12/31/25
DEPARTMENT OF STATE
HOSPITALS, NAPA
Checked
RN
Designed
SM
DEPARTMENT OF
STATE HOSPITALS
(DSH)
Client Agency
DEPARTMENT OF STATE HOSPITALS
Supervisor
RN
Project Number oooooooooooxxxx
JCCA
Architects · Engineers
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
CD
S Q
X
H
S S
C O
H s
Q
S Q
X
H
S S
C
S Q
X
H
S S
C
S Q
X
H
S S
C O
L
H S
S C
O L
S Q
X
H
X
S Q
X
H
S S
C
Q X
H S
S C
H S
S C
O L
S Q
X
H
S S
C O
L
S Q
X S
S Q
X H
S S
C O
L H
S S
H S
S C c o
C y
O
-9 W co C l
N co C l i
C M
C C l
N
-9
(0 t Io
O
S Q
X
H
S S
C O
L
S
S H
X O
S
X O
.9 y
“C n
A v o
H S
S C
O L
H S
S C
S
C c o
C D
O o
M
N O
F t
S
Q X
H S
S C
S Q
T O
G
C
O Y
O
H S
S C
E
M
1C O
C M
C
1C O
C O
C l r
C O
C l i
C O
C N
C M
1U
-9 i
D A
T E
/T
IM
E
M a r
:3
P M
F
IL
E
O
J O
B F
O L
D E
R \D
S H
\D S
H N a p a \D
S H
N A
P A
C o g e n G e n e ra to r
S ta c k E x te n s io n \D
S H
N a p a
G e n e ra to r S ta c k S
.1 d w g
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
OF 157
3” PLATE
3” PLATE
1 /8"X6" X %”
| / HSS (LSV)
/fl
C C
.9/ y /
O
62)
W8X15 (
PLATFORM
SIM
EXHAUST STACK-
2) ON 3” = r-o199
DTL - 100
HSS COL1
C.P
N HSS BEAM C.P
I
14‘ 99
1”CLR-
- HSS COL
1 / f/ /
HSS BRACE, SLOTTED
AT GUSSET PLATE
A
HSS TO MATCH
COLUMN
10 SIM
S3.2)
3" THICK
CONT. PLATE
S3.2
9 _ S3.2
AT RAIL
(4 S3.3)
G2).
—L o I to
4-0” a / O) /
8"X6" X 3‘
/ HSS (LSV)
1—
%” THICK PLATE
GUSSETT, TYP
PARTIAL ELEVATI
V----------
PROVIDE STD
HOOK AT ENDS
#5 @ 6” O.C.-
EACH WAY
4 4
PROVIDE 45*
BEVEL AT
EDGES, TYP
PROVIDE
CAULKING AT
JOINT
HSS COL.——
REFER TO_15
S3.2
Q.
£ —1 N O
HSS COL
C.P
HSS COL
HSS BEAM
/ HSS BEAM
C.P
C.P 14”
1” CLR—
— HSS COL
HSS COL
C.PN /
/1‘99 v
(8) $3.2)
74 2 BEAM TO COLUMN BEAM TO COLUMN 1” = 1’—0
$3.2/AT BRACE DTL - 306 DTL - 303
HSS BEAM
C.P
HSS BEAM HSS BEAM
c.P
C.P
HSS BEAM
14”
I
X”HSS COL
I
(32) 1” = 1’-0! 99
$3.2/ AT BRACE DTL - 308 DTL - 304A
C.P
HSS BEAM
HSS BEAM
C.P HSS COLN 7499
1”CLR
1”74 99
O)
HSS COL 99 = r—o29
13” THICK PLATE C.P.
X” /7 GUSSETT, TYP
L DTL - 301BRACE
%” END PLATE
HSS BEAM
/6
BEAM TO COLUMN 1” = 1‘—O9999
$3.2 AT BRACE$3.2 AT BRACE DTL - 305DTL - 309
—HSS COL
F
HSS COL-
HSS COL
1‘99
C.PN / / 7
ZK
HSS BEAM
/ HSS BEAMC.P
- ■1”CLR C.PN X’
C.P C.P
HSS COL - /
HSS BEAM
HSS BEAM
HSS COL
C.P
1/ /
3” THICK PLATE
GUSSETT, TYP
I
I
I
I
1” END
PLATE
I
I
I
3” THICK PLATE
GUSSETT, TYP
3" THICK PLATE
GUSSETT, TYP
3” THICK PLATE
GUSSETT, TYP
HSS BRACE, SLOTTED
AT GUSSET PLATE
HSS BRACE, SLOTTED
AT GUSSET PLATE
HSS BRACE, SLOTTED
AT GUSSET PLATE
HSS BRACE, SLOTTED
AT GUSSET PLATE
HSS BRACE, SLOTTED
AT GUSSET PLATE
HSS BRACE, SLOTTED
AT GUSSET PLATE
37” THICK PLATE
GUSSETT, TYP
HSS TO MATCH
COLUMN
HSS TO MATCH
COLUMN
3" THICK-------
CONT. PLATE
I
I
I
I
I
I
I
I I
3" THICK CONT.
PLATE
l /
I
I
I
I
I
I
I I
-1”CLR
A
I
I
I
I
I
I
(2 BEAM TO COLUMN
$3.2)
/10 BEAM TO COLUMN
-2/ AT BRACE
/// / 11 a / O) /
2 s a / O) /
2 e a /
O) /
I
1” = 1-0”
/f
1” = 1-0” y /
III
III
71/
= 1-0”
BEAM TO COLUMN 112” = 1-0'
DTL - 311
L4”X4”X 3", BOTTOM
HSS BEAM HSS BEAM
| EXHAUST STACK | %” %”
3 > %” %”K
HSS BEAM
HSS COL HSS COL
PLAN VIEW
12” = r-o”
DTL - 103
21‘ 99 112 99
3-SIDES
1 X
WF BEAM14
N s S
WF BEAM
3) 112” = 1-0'
DTL - 313
U 14 99 sHSS COL
7f 99
/ CLR 14
n
- TOP OF FOOTING
/ 4 th it
W
1” PLATE
STIFFENER
2” @
16” O.C
3" THICK PLATE W/
2 - A325 BOLTS
2” @
12” O.C
HSS BRACE, SLOTTED
AT GUSSET PLATE
2” @
16” O.C.
2” @
12” O.C.
2” @ x
16” O.C.
2” @
J 6” O.C.
O)
3" THICK PLATE
GUSSET, TYP
(4) SUPPORT LUGS
TOP & BOTTOM, PER
MANUFACTURER
AT
ANGLE
M)
1 / s Se
Z
/y
EXHAUST STACK
SUPPORT
i i i i i i i
Jj
-L6”X6”X %”
E B
V
WF BEAM
= 1-0”1 1” = 1’—0
DTL - 302 DTL - 310 DTL - 307
BEAM TO COLUMN
AT BRACE
1” = r-o”
CONCRETE FOOTING r = r-o 99
DTL - 113
= 1-0”1
DTL - 110
BEAM TO COLUMN
AT BRACE
F
HSS COL
/ 7 14”7
—1"CLR
i
C.P 14 99
2 HSS BEAM
C.P
HSS COL
3" THICK PLATE
GUSSETT, TYP
HSS BRACE, SLOTTED
AT GUSSET PLATE
I
I
I a / O) /
V 7 /
6 112” = 1’-0”
DTL - 102
,99
A S
S
%” HSS COLUMN
s
CD
N
3" THICK PLATE
GUSSET
14” X 18” X 34" THICK
PLATE W/ (4) -%”0
BOLTS, TYP
T-2
S3.2
1FOOTING r = r-o' BEAM TO COLUMN99
S3. $3.2/AT BRACEDTL - 101
(15 CONCRETE
$3.2/ AT BRACE
,99
DSA STAMP
DSH
IP: 310.212.7944 F:310.212.5272
JCCA #: 23791-8
oOFESSIO, PaKOKks T4K
%Prucuthe7SOFCAUY
No.
Issue Date Description
30% SUBMITTAL11-01-23
2-21-24 60% SUBMITTAL
100% SUBMITTAL03-14-24
Project
GENERATORS
STACK EXTENSION
Drawn
Issue Date Vault File Number
XX/XX/XXXX
Sheet Title
Reference North Sheet Scale
AS SHOWN
Sheet Number
S3.2
NO. 3705
Exp. 12/31/25
DEPARTMENT OF STATE
HOSPITALS, NAPA
Checked
RN
DEPARTMENT OF
STATE HOSPITALS
(DSH)
Designed
SM
Client Agency
DEPARTMENT OF STATE HOSPITALS
Supervisor
RN
Project Number oooooooooooxxxx
STRUCTURAL
DETAILS
JCCA
Architects · Engineers
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
CD
S Q
X H
S S
C O
L
S
S C
O L
/0
/2
/0
AJ)IL
C L
R
-6 i
D A
T E
/T
IM
E
M a r
:1
P M
F
IL
E
O
JO
B
F O
L D
E R
\D S
H \D
S H
N a p a
\D S
H N
A P
A C o g e n
G e n e ra to r S ta ck
E xt e n si o n \D
S H
N a p a
G e n e ra to r S ta ck
S .2
.d w g
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
OF 158
HSS
BEAM \14
1V
HSS BEAM
ACCESS LADDER
PER ARCH DRWGS
4" X 3” THICK
PLATE, TYP
N
112"p STD PIPE
TOP RAIL
112"p STD PIPE
INTERMEDIATE RAILS
1%2"p SCH 80 PIPE
POST @ 4’—0” O.C.
MAX SPACING
LADDER SUPPORT GUARDRAIL%” = 1-0”
.3 .3HSS BEAMS DTL-112
/3STACK SUPPORTSUPPORT 112” = r-o 99
.3. .3/TO BEAMBOTTOM DTL-111 DTL-106
1” = 1-0” E
LSS BEAM
TOP OF FOOTING
OOF ACCESS LADDER
PER ARCHITECTURAL
EXHAUST STACK
EXTENSION PER
MANUFACTURER 2” @
16” O.C
L6X6 X %6 W/ 7"$
SUPPORT LUG PER
MANUFACTURER
7}" X 6” X X” PLATE
W/ (2) 12”o SIMPSON
TITEN HD ANCHOR
_2" @ y” 12" O.C.
o o o
99 112” = r-o 991
DTL-109 DTL-105
(6 GUARDRAIL
$3.3/CONNECTION
(2 STACK SUPPORT
yTO BEAM
= 1-0” y”
%e” 99
X” PLATE N
LHSS BEAM
EXHAUST STACK (E)
WF BEAM
PER PLAN
EXHAUST STACK
EXTENSION, PER
MANUFACTURER
EXPANSION JOINT
PER MECHANICAL
2” @
12” O.C
2” @
.12” O.C.
2"p PIPE
SLEEVE
L6X6 X 56" W/ %”p
SUPPORT LUG, PER
MANUFACTURER
T
112” = r-o’ 99
DTL-108 DTL-104
(5 GUARDRAIL
$3.3/CONNECTION
(1STACK SUPPORT
$3.3) 1” = 1-0”
L4 l
I CLR
%6”42”
X”0 PLATE
IV
EXHAUST STACK (E)
EXHAUST STACK
EXTENSION, PER
MANUFACTURER
EXPANSION JOINT
PER MECHANICAL
WF BEAM
PER PLAN
L4”X4” X
2 0 PIPE SLEEVE
WELDED TO
PLATE
712”
3”u se
PLAN VIEW
1% 1%
(O s ■ Se
112”
/16/20
A
74” = 1‘—O‘ 23
DTL-107
WF BEAM
PER PLAN
$3.3 $3.3 $3.3
/17 $3.3)
/13 $3.3)
/14
.3
(18 $3.3) —D $3.3)
/10 $3.3)
/19 S3.3
(9, $3.3/
DSA STAMP
DSH
IP: 310.212.7944 F:310.212.5272
JCCA #: 23791-8
oOFESSIO, PaKOKks T4K
%Prucutle7SOFCAUY
No.
Issue Date Description
30% SUBMITTAL11-01-23
2-21-24 60% SUBMITTAL
100% SUBMITTAL03-14-24
Project
GENERATORS
STACK EXTENSION
Drawn
Issue Date Vault File Number
XX/XX/XXXX
Sheet Title
Reference North Sheet Scale
AS SHOWN
Sheet Number
S3.3
NO. 3705
Exp. 12/31/25
DEPARTMENT OF STATE
HOSPITALS, NAPA
Checked
RN
Designed
SM
DEPARTMENT OF
STATE HOSPITALS
(DSH)
Client Agency
DEPARTMENT OF STATE HOSPITALS
Supervisor
RN
Project Number oooooooooooxxxx
STRUCTURAL
DETAILS
JCCA
Architects · Engineers
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
CD
C O
L O
E
Q B
A Y
S
I10
C O C J
N O
-6
E M
B E
D i
D A
T E
/T
IM
E
M a r
:3
P M
F
IL
E
O
JO
B
F O
L D
E R
\D S
H \D
S H
N a p a \D
S H
N A
P A
C o g e n G e n e ra to r
S ta ck E xt e n si o n
\D S
H N a p a G e n e ra to r
S ta ck S
.3
.d w g
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
MECHANICAL NOTES,
SYMBOL LIST AND
ABBREVIATIONS
M0.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 M
.d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION,
MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, WAREHOUSING,
AND ANY OTHER SERVICES REQUIRED TO COMPLETE THE WORK IN A
TIMELY AND EFFICIENT MANNER.
2. PRIOR TO BID CONTRACTOR SHALL THOROUGHLY EXAMINE AND VERIFY
ALL EXISTING CONDITIONS, POINTS OF CONNECTION, SIZES,
LOCATIONS, ELEVATIONS, ETC. CONTRACTOR SHALL NOTIFY PROJECT
MANAGER OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS,
DIMENSIONS AND CONTRACT DRAWINGS PRIOR TO BID.
3. CONTRACTOR BIDS SHALL BE BASED UPON COMPLETING THE WORK
WITHIN THE AMOUNT BID. ANY QUESTIONS PERTAINING TO UNKNOWN
CONDITIONS, CHANGES IN DESIGN, OMISSIONS IN THE DESIGN OR
SCOPE OF WORK, MATERIALS, AND INSTALLATION TECHNIQUE SHALL BE
DISCUSSED WITH PROJECT MANAGER. UNKNOWN CONDITIONS
ENCOUNTERED DURING THE COURSE OF WORK, WHICH MAY DELAY
WORK OR ADD COST, WILL BE REPORTED TO THE PROJECT MANAGER
IMMEDIATELY, SO THAT PROPER ARRANGEMENTS CAN BE MADE
WITHOUT WORK STOPPAGE.
4. FOR PURPOSES OF CLEARNESS AND LEGIBILITY, THE CONTRACT
DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND, ALTHOUGH
LOCATION OF THE EQUIPMENT IS DRAWN TO SCALE, THE CONTRACTOR
SHALL MAKE USE OF ALL DATA IN ALL THE CONTRACT DOCUMENTS,
AND VERIFY THIS INFORMATION AT THE BUILDING SITE PRIOR TO BID TO
ACCOMPLISH A COMPLETE, OPERABLE AND MAINTAINABLE
INSTALLATION.
5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT CUT
SHEETS FOR REVIEW PRIOR TO INSTALLATION OF WORK.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE
THAT ALL APPLICABLE SAFETY LAWS ARE STRICTLY ENFORCED AND TO
MAINTAIN A SAFE CONSTRUCTION PROJECT.
7. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS
DAMAGED BY DEMOLITION OR CONSTRUCTION, AND FINISH TO MATCH
EXISTING ADJACENT SURFACES.
8. AT THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER
TO THE PROJECT MANAGER COMPLETE AS-BUILT DRAWINGS SHOWING
WORK AS ACTUALLY INSTALLED.
9. DAILY, AND UPON COMPLETION OF WORK, CONTRACTOR SHALL
REMOVE DEBRIS, RUBBISH, WASTE, AND SURPLUS MATERIAL FROM
WORK SITE.
10. THE CONTRACTOR SHALL PROTECT AND COVER ALL EQUIPMENT IN
AREAS AFFECTED BY WORK, AND UPON COMPLETION OF WORK, SHALL
THOROUGHLY CLEAN ALL FIXTURES, EQUIPMENT, WALLS, CEILING,
FLOOR AND HARDWARE.
11. ALL WORK SHALL COMPLY WITH THE 2022 CBC, CMC, CPC, CFC, AND
CEC, AND 2022 TITLE 24 ENERGY STANDARDS AND ALL OTHER
APPLICABLE CODES AND REGULATIONS.
12. ALL INSULATION AND COVERINGS INSTALL ON PIPING AND TUBING
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A
SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE
WITH ASTM E-84. (PER SECTION 719.7). DUCT SYSTEMS SHALL BE
CONSTRUCTED, INSTALLED AND INSULATED AS PROVIDED IN
CHAPTER 6 OF CMC 2022.
13. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL
FITTINGS, TRANSITIONS, DAMPERS, VALVES AND OTHER DEVICES
REQUIRED FOR A COMPLETE WORKABLE INSTALLATION.
14. ALL EQUIPMENT, DUCTS, AND OTHER DEVICES AND MATERIALS
INSTALLED OUTSIDE OF THE BUILDING OR OTHERWISE EXPOSED TO
THE WEATHER SHALL BE COMPLETELY WEATHERPROOFED.
15. THE CONTRACTOR SHALL PROVIDE THE PROJECT MANAGER AT THE
END OF THE PROJECT (NOT LIMITED TO):
A. OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S)
OF COMPLIANCE AND A LIST OF NEW FEATURES, MATERIALS,
COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE
BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM
EFFICIENTLY.
B. MAINTENANCE INFORMATION: REQUIRED ROUTINE
MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND
INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL
MAY BE LIMITED TO IDENTIFYING THE OPERATION AND
MAINTENANCE MANUAL.
18. THE CONTRACTOR SHALL MAKE AVAILABLE THE INSTALLATION
CERTIFICATES FOR MANUFACTURED DEVICES REGULATED BY THE
APPLIANCE EFFICIENCY REGULATIONS FOR ALL APPROPRIATE
INSPECTIONS. THESE CERTIFICATES SHALL:
A. IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH
THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6.
B. INCLUDE A STATEMENT INDICATING THAT THE INSTALLED
DEVICES CONFORM TO THE APPLIANCE EFFICIENCY
REGULATIONS AND PART 6 AND THE REQUIREMENTS FOR SUCH
DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS.
C. STATE THE NUMBER OF THE OSHPD BUILDING PERMITS UNDER
WHICH THE CONSTRUCTION OR INSTALLATION WAS
PERFORMED.
19. CONTRACTOR SHALL THOROUGHLY CLEAN ALL EXISTING SYSTEMS
WITH STANDARD MATERIAL AND TOOLS.
20. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND
INSTALL".
21. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE
NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX NOT
GREATER THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER
THAN 50 (2019 CMC SECTION 602.2)
22. CONSTRUCTION WASTE MANAGEMENT PLAN; SUBMIT A
CONSTRUCTION WASTE MANAGEMENT PLAN MEETING ITEMS 1
THROUGH 4 OF C SECTION 5.408.1.1. CAL GREEN CODE
23. WASTE MANAGEMENT COMPANY. UTILIZE A WASTE MANAGEMENT
COMPANY THAT CAN PROVIDE VERIFIABLE DOCUMENTATION THAT THE
PERCENTAGE OF CONSTRUCTION AND DEMOLITION WASTE MATERIAL
DIVERTED FROM THE LANDFILL COMPLIES WITH SECTION 5.408.1.2 CAL
GREEN CODE.
24. PER CAL GREEN CODE SECTION 5.408.1.3 WASTE STREAM REDUCTION
ALTERNATIVE. THE COMBINED WEIGHT OF NEW CONSTRUCTION
DISPOSAL THAT DOES NOT EXCEED TWO POUNDS PER SQUARE FOOT
OF BUILDING AREA MAY BE DEEMED TO MEET THE 65 PERCENT
MINIMUM REQUIREMENT AS APPROVED BY THE ENFORCING AGENCY.
25. DOCUMENTATION. DOCUMENTATION SHALL BE PROVIDED TO THE
ENFORCING AGENCY, WHICH DEMONSTRATES COMPLIANCE WITH
SECTIONS 5.408.1.1 THROUGH 5.408.1.3, CAL GREEN CODE.
26. FINISH MATERIAL POLLUTANT CONTROL. FINISH MATERIALS SHALL
COMPLY WITH CAL GREEN SECTIONS 5.504.4.1 THROUGH
27. ADHESIVES, SEALANTS AND CAULKS. ADHESIVES, SEALANTS, AND
CAULKS USED ON THE PROJECT SHALL MEET THE REQUIREMENTS OF
THE FOLLOWING STANDARDS:
A. ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS,
SEALANTS, SEALANT PRIMERS AND CAULKS SHALL COMPLY
WITH LOCAL OR REGIONAL AIR POLLUTION CONTROL OR AIR
QUALITY MANAGEMENT DISTRICT RULES WHERE APPLICABLE OR
SCAQMD RULE 1168 VOC LIMITS, AS SHOWN IN TABLES 5.504.4.1
AND 5.504.4.2
B. AEROSOL ADHESIVES, AND SMALLER UNIT SIZES OF ADHESIVES
AND SEALANT OR CAULKING COMPOUNDS (IN UNITS OF
PRODUCT, LESS PACKAGING, WHICH DO NOT WEIGH MORE THAN
ONE POUND AND DO NOT CONSIST OF MORE THAN 16 FLUID
OUNCES) SHALL COMPLY WITH STATEWIDE VOC STANDARDS
AND OTHER REQUIREMENTS, INCLUDING PROHIBITIONS ON USE
OF CERTAIN TOXIC COMPOUNDS, OF CALIFORNIA CODE OF
REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94507.
28. PAINTS AND COATINGS. ARCHITECTURAL PAINTS AND COATINGS SHALL
COMPLY WITH THE VOC LIMITS IN TABLE 1 OF THE ARB ARCHITECTURAL
COATINGS SUGGESTED CONTROL MEASURE, AS SHOWN IN CAL GREEN
CODE TABLE 5.504.4.3 UNLESS MORE STRINGENT LOCAL LIMITS APPLY.
29. CAL GREEN CODE 504.4.3.1 AEROSOL PAINTS AND COATINGS. AEROSOL
PAINTS AND COATINGS SHALL MEET THE PRODUCT- WEIGHTED MIR
LIMITS FOR ROC IN SECTION 94522(A)(3) AND OTHER REQUIREMENTS,
INCLUDING PROHIBITIONS ON USE OF CERTAIN TOXIC COMPOUNDS
AND OZONE DEPLETING SUBSTANCES IN SECTIONS 94522(C)(2) AND
(D)(2) OF CALIFORNIA CODE OF REGULATIONS, TITLE 17, COMMENCING
WITH SECTION 94520.
30. CAL GREEN CODE 5.504.4.3.2 VERIFICATION. VERIFICATION OF
COMPLIANCE WITH THIS SECTION SHALL BE PROVIDED AT THE
REQUEST OF THE ENFORCING AGENCY. DOCUMENTATION MAY
INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING:
A. MANUFACTURER’S PRODUCT SPECIFICATION
B. FIELD VERIFICATION OF ON-SITE PRODUCT CONTAINERS
31. CAL GREEN 5.508.1.1 CHLOROFLUOROCARBONS (CFCS). INSTALL HVAC,
REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT
CONTAIN CFCS.
32. CAL GREEN 702.1 INSTALLER TRAINING. HVAC SYSTEM INSTALLERS
SHALL BE TRAINED AND CERTIFIED IN THE PROPER INSTALLATION OF
HVAC SYSTEMS INCLUDING DUCTS AND EQUIPMENT BY A NATIONALLY
OR REGIONALLY RECOGNIZED TRAINING OR CERTIFICATION PROGRAM.
33. CAL GREEN 702.2 SPECIAL. SPECIAL INSPECTORS MUST BE QUALIFIED
AND ABLE TO DEMONSTRATE COMPETENCE TO THE ENFORCING
AGENCY IN THE DISCIPLINE IN WHICH THEY ARE INSPECTING.
34. CAL GREEN 703.1 DOCUMENTATION. DOCUMENTATION OF COMPLIANCE
SHALL INCLUDE, BUT IS NOT LIMITED TO, CONSTRUCTION DOCUMENTS,
PLANS, SPECIFICATIONS, BUILDER OR INSTALLER CERTIFICATION,
INSPECTION REPORTS, OR OTHER METHODS ACCEPTABLE TO THE
LOCAL ENFORCING AGENCY. OTHER SPECIFIC DOCUMENTATION OR
SPECIAL INSPECTIONS NECESSARY TO VERIFY COMPLIANCE ARE
SPECIFIED IN APPROPRIATE SECTIONS OF CALGREEN.
GENERAL NOTES SYMBOL LIST ABBREVIATIONS
ABOVE FINISHED FLOOR
BUILDING MANAGEMENT SYSTEM (DDC)
BRITISH THERMAL UNITS PER HOUR
CONSTANT AIR VOLUME
CUBIC FEET PER MINUTE
DRY BULB
DIAMETER
DOWN
ENERGY EFFICIENCY RATIO
EXHAUST
EXISTING
DEGREE FAHRENHEIT
FIRE DAMPER
HORSEPOWER
HERTZ
HEIGHT
POUND
LENGHT
NOT APPLICABLE
NEW
MAXIMUM
THOUSAND BTU PER HOUR
MINIMUM
NATIONAL ENVIRONMENTAL BALANCING BUREAU
NATIONAL FIRE PROTECTION ASSOCIATION
NUMBER
NOT TO SCALE
OUTSIDE AIR
OPPOSED BLADE DAMPER
PRESSURE
POUNDS PER SQUARE INCH
REVOLUTION PER MINUTE
RETURN AIR
SUPPLY AIR
SMOKE/FIRE DAMPER
STATIC PRESSURE
STAINLESS STEEL
TOTAL STATIC PRESSURE
TEMPERATURE
TYPICAL
VOLUME DAMPER
WET BULB
WIDTH
AFF
BMS/BAS
BTUH
CAV
CFM
DB
DIA.
DN
EER
EXH
(E)
°F
FD
HP
HZ
(H)
LB
(L)
N/A
(N)
MAX
MBH
MIN
NEBB
NFPA
NO.
N.T.S.
OA
OBD
PRESS.
PSI
RPM
RA
SA
SFD
SP
SS
TSP
TEMP
TYP.
VD
WB
(W)
POINT OF CONNECTION
POINT OF DISCONNECTION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
(E) GAS TURBINE
(E) GAS TURBINE
(N) 5'-0"x5'-0" FRAME FOR
(N) STACK. SEE S2.1
(N) 5'-0"x5'-0" FRAME FOR
(N) STACK. SEE S2.1
M3.1
M3.1
(N) EXTENSION ON
TOP OF (E) BAFFLE
STACK (TYP.)
M1.1
M3.1
M3.1
M1.1
SE
LADDER WITH
CAGE. TYP.
ENLARGED
NEW WORK PLAN
& ELEVATION
M1.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 M
.d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
ENLARGED NEW WORK PLAN
SCALE:
ZML
M1.1 N
0 101 FEET5
3/16" = 1'-0"
ELEVATION
N.T.S. M1.1
NAME
(6) 4" SAMPLING
PORTS
HOT AIR
EXPANSION
JOINT, SEE
S3.1
M3.1
M3.1
M3.2
29"
PLATFORM AND
GUARD RAIL,
SEE
NEW 150" STACK
EXTENSION
EXISTING 146"
STACK
SE
72"
LADDER WITH
CAGE, SEE M3.3
(N) SUPPORT
FRAME
EXISTING 185"
HEAT EXCHANGER
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
MECHANICAL
SECTIONS
M3.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 M
.d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
ZML
SECTION
SCALE: M3.1
NAME
SECTION
M3.1
NAME
OUTER CASING
INSULATION
STAINLESS STEEL
INTER JACKET
(E) BAFFLE STACK
OUTER CASING
INSULATION
STAINLESS STEEL
INTER JACKET
(E) EXHAUST DUCT
(E) GAS TURBINE
RAIL
NEW
EXTENSION
NEW
EXTENSION
EXHAUST
TOP OF
FOOTING
S T R
U C
T U
R A L S
U P P O
R T F
O R
T H
E N E X T E N S
IO
N S E E S
.1
(E H
E A T E
X C H A N G
R
PLATFORM
STRUCTURAL
SUPPORT,
SEE
(E H
E A T E
X C H A N G
R
EXPANSION JOINT
S T R
U C
T U
R A L S
U P P O
R T F
O R
T H
E N E X T E N S
IO
N S E E S
.1
S3.2
(6) 4" SAMPLING PORTS
64"±88"±
(6) 4" SAMPLING PORTS
0 51 FEET3
3/8" = 1'-0"
2 SCALE: 0 51 FEET3
3/8" = 1'-0"
TOP OF
FOOTING
M3.2
M3.2
EXHAUST
1 1
KEYNOTES
1 FOR THE NEW EXTENSION DUCT PROVIDE (4) EXTERNAL
SUPPORT LUGS (2 EACH ON OPPOSITE SIDES OF DUCT) TO
REST ON AND BE BOLTED TO THE SUPPORT STRUCTURE.
(E) BAFFLE STACK
SESE
THE INSTALLER OR CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE THAT
THE APPLIANCE IS CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF
THIS CODE. THE PERMANENTLY ATTACHED LABEL OF AN APPROVED AGENCY
SHALL BE PERMITTED TO BE ACCEPTED AS SUCH EVIDENCE. 301.4 ELECTRICAL
CONNECTIONS. FOR EQUIPMENT REGULATED BY THIS CODE:
1. EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS OF MORE THAN 50 VOLTS
SHALL HAVE A POSITIVE MEANS OF DISCONNECT ADJACENT TO AND IN SIGHT
FROM THE EQUIPMENT SERVED. EXCEPTION: OTHER POWER DISCONNECT
MEANS SHALL BE ACCEPTABLE WHERE IN ACCORDANCE WITH THE CALIFORNIA
ELECTRICAL CODE.
2. A 120 VOLT RECEPTACLE SHALL BE LOCATED WITHIN 25 FEET (7620 MM) OF THE
EQUIPMENT FOR SERVICE AND MAINTENANCE PURPOSES. THE RECEPTACLE
NEED NOT BE LOCATED ON THE SAME LEVEL AS THE EQUIPMENT.
3. ELECTRICAL WIRING, CONTROLS, AND CONNECTIONS TO EQUIPMENT AND
APPLIANCES REGULATED BY THIS CODE SHALL BE IN ACCORDANCE WITH THE
CALIFORNIA ELECTRICAL CODE.
2022 CMC 301.3 DESIGN OF EQUIPMENT
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
NEW
EXTENSION
18" (H)
EXPANSION
JOINT
(E)
BAFFLE
STACK
88"± (L) x 64" (W) x 150" (H)
80"± (L) x 56" (W) x 146" (H)
MECHANICAL
DETAIL
M3.2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 M
.d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
ZML
EXPANSION JOINT DETAIL
M3.2
SCALE:
EXHAUST
N.T.S.
HOT FRAME ASSEMBLY - 1/4" A387 CARBON STEEL FLANGE
CLAMP BAR SET - 2"x3/8" FLATBAR WITH 1/2" NUTS
TYPE 304 STAINLESS STEEL.
FABRIC ELEMENT - SUPRATEF 1200 GT MODEL 13-115-120GT
OR APPROVED EQUAL.
PRESET/LIFT LUG, 3/8" PLATE CARBON STEEL.
COLD FRAME ASSEMBLY - 4"x4"x1/4" ANGLE GRADE A36 STEEL.
OUTER CASING - A36 CARBON STEEL.
INTER JACKET - 409 STAINLESS STEEL, MUST BE ABLE TO
WITHSTAND THE TEMPERATURE OF UP TO 1000°F.
COLD FRAME CAVITY INSULATION - CERAMIC, WRAPPED IN
STAINLESS STEEL MESH.
COLD FRAME LINER, 10 GAUGE STAINLESS STEEL TYPE 304
DOME SEAL, CERAMIC SILICA CLOTH & STAINLESS STEEL MESH.
HOT FRAME LINER, 3/16" PLATE 304 STEEL.
CAVITY FILL - FIBER GLASS WRAPPED IN STAINLESS STEEL MESH.
INSULATION. MUST BE ABLE TO WITHSTAND THE TEMPERATURE
OF UP TO 1000°F. MANUFACTURED BY MORGAN THERMAL
CERAMICS MODEL SUPER WOOL PLUS, 4" THICK AES WOOL, OR
JOHNS MANVILLE CALCIUM CILICATE SUPER CALTEMP GOLD 1700
3" THICK, OR APPROVED EQUAL.
(E) SOUND BAFFLES TO REMAIN.
FIELD VERIFY DIMENSIONS OF EXISTING BAFFLE STACK BEFORE
ORDERING ANY MATERIALS.
ALL INTERMAL AND EXTERMAL CARBON STEEL SURFACES WILL
BE COATED WITH THE FOLLOWING PAINT SYSTEM:
SURFACE PREP: COMMERCIAL BLAST CLEANING, SSPC-SP10
PRIME COAT: DIMECOTE 9H, 2-3 MILS DFT.
TOP COAT: AMERON AMERCOAT 741, 2-3 MILS DFT,
PEARL GRAY COLOR.
FOR THE NEW EXTENSION DUCT PROVIDE (4) EXTERNAL
SUPPORT LUGS (2 EACH OPPOSITE SIDES OF DUCT) TO REST ON
AND BE BOLTED TO THE SUPPORT STRUCTURE.
EXPANSION JOINT SHALL BE DESIGNED TO ACCOMMODATE
TYPICAL LATERAL (DUE TO WIND AND SEISMIC) AND VERTICAL
(DUE TO THERMAL GROWTH OF CURRENT STACK) MOVEMENT
ALLOWANCES. RATED THERMAL MOVEMENTS FOR THE
EXPANSION JOINT SHALL BE 3" AXIAL COMPRESSION MAX, 1/2"
AXIAL EXTENSION MAX, AND 1/2" LATERAL MOVEMENT.
PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR
SHALL THROUGHLY CLEAN INSIDE OF THE EXISTING BAFFLE
STACKS TO ENSURE THERE ARE NO DEBRIS OR OBSTRUCTIONS
INSIDE THE STACKS.
EXPANSION JOINT IS PART OF THE OVERALL HEIGHT OF 150"
STACK.
KEYNOTES
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
PHOTOS
OF EXISTING
CONDITION
M4.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 M
.d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
(E) BAFFLE STACK
N.T.S. M4.1
NAME
(E) TURBINES AND BAFFLE STACK
N.T.S. M4.1
NAME
(E) TURBINES, HEAT EXCHANGERS AND STACK
N.T.S. M4.1
NAME
TOP VIEW OF (E) BAFFLE STACK
N.T.S. M4.1
NAME
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
(E) GAS TURBINE
(E) GAS TURBINE
(N) 5'-0"x5'-0" FRAME FOR
(N) STACK. SEE S2.1
(N) 5'-0"x5'-0" FRAME FOR
(N) STACK. SEE S2.1
E1.1
(N) EXTENSION ON
TOP OF (E) BAFFLE
STACK (TYP.)
E1.1
SE
LADDER WITH
CAGE. TYP.
(E) PANEL 'A'
WP
WP
J
J
A-27
A-25
3/4"C (GRS),
2#10 + 1#10 GND.
3/4"C (GRS),
2#10 + 1#10 GND.
3/4"C (GRS),
2#10 + 1#10 GND.
CIRCUITS A-25,27
3/4"C (GRS),
3#10 + 1#10 GND.
WP
ENLARGED
ELECTRICAL
NEW WORK PLAN
& ELEVATION
E1.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 23791-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, NAPA
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
GENERATORS
STACK EXTENSION
XX/XX/XXXX
RN RN
F
IL
E L \2
-8
C o g e n S ta c k E x te n s io n D
S H -N a p a \C
A D
\2 E .d w g
D A T E /T
IM
E M a y
:1
A M
- 11-01-23 30% SUBMITTAL
Client Agency
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7944 F:310.212.5272I
SM
- 02-21-24 60% SUBMITTAL
OF 15
- 03-14-24 100% SUBMITTAL
ENLARGED NEW WORK PLAN
SCALE:
ZML
E1.1 N
0 101 FEET5
3/16" = 1'-0"
ELEVATION
N.T.S.E1.1
HOT AIR
PROVIDE 20A, 2P, 3W,
120V, GFCI DUPLEX
RECEPTACLE ON
COLUMN AT +24" AFF
WITH AN "IN-USE"
NEMA 3R COVER
NEW 150" STACK
EXTENSION
EXISTING 146"
STACK
LADDER WITH
CAGE, SEE M3.3
(N) SUPPORT
FRAME
EXISTING 185"
HEAT EXCHANGER
ROUTE 3/4"C (GRS),
2#10 + 1#10 GND
DOWN VERTICAL
COLUMN TO PANEL
FOR CONTINUATION,
SEE PLAN AT LEFT,
THIS SHEET
SE
THE INSTALLER OR CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE THAT
THE APPLIANCE IS CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF
THIS CODE. THE PERMANENTLY ATTACHED LABEL OF AN APPROVED AGENCY
SHALL BE PERMITTED TO BE ACCEPTED AS SUCH EVIDENCE. 301.4 ELECTRICAL
CONNECTIONS. FOR EQUIPMENT REGULATED BY THIS CODE:
1. EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS OF MORE THAN 50 VOLTS
SHALL HAVE A POSITIVE MEANS OF DISCONNECT ADJACENT TO AND IN SIGHT
FROM THE EQUIPMENT SERVED. EXCEPTION: OTHER POWER DISCONNECT
MEANS SHALL BE ACCEPTABLE WHERE IN ACCORDANCE WITH THE CALIFORNIA
ELECTRICAL CODE.
2. A 120 VOLT RECEPTACLE SHALL BE LOCATED WITHIN 25 FEET (7620 MM) OF THE
EQUIPMENT FOR SERVICE AND MAINTENANCE PURPOSES. THE RECEPTACLE
NEED NOT BE LOCATED ON THE SAME LEVEL AS THE EQUIPMENT.
3. ELECTRICAL WIRING, CONTROLS, AND CONNECTIONS TO EQUIPMENT AND
APPLIANCES REGULATED BY THIS CODE SHALL BE IN ACCORDANCE WITH THE
CALIFORNIA ELECTRICAL CODE.
2022 CMC 301.3 DESIGN OF EQUIPMENT
V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
06/12/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-1374