JBA HH-60W Training DRAFT PWS for RFI.pdf

PDF 1022 KB Posted

Attached to
Request for Information for JBA HH-60W Training
Solicitation number
RFI_JBA_HH60W
Issued by

About this file

This is a Performance Work Statement (PWS) for Joint Base Andrews (JBA) Aircrew Transition Training, dated February 9, 2026 (DRAFT status). The contractor shall deliver foundational training for UH-1N aircrew to achieve Basic Aircraft Qualification (BAQ) on the HH-60W Combat Rescue Helicopter platform in accordance with AFMAN 11-2HH-60W V1, V2, and V3. The training program is a turn-key solution encompassing all instruction, courseware management, and program management for academic, simulator, and flight training phases. The primary objective is to produce qualified Pilots and Special Missions Aviators (SMAs) proficient in safe aircraft operation and core systems under normal and emergency conditions. Air Combat Command (ACC) is the lead MAJCOM. The contract period consists of one 12-month Base Year and one 12-month Option Year, with training anticipated to begin no later than end of July 2026. Estimated annual student throughput includes 48 pilot trainees and 24 SMA trainees in the HH-60W Initial Qualification Training (IQT) course, with approximately 8 weeks per class and standard class composition of 4 pilots and 2 SMAs.

The contractor shall provide all management, personnel, equipment, and resources necessary for contract execution, with a designated Program Manager serving as single point of contact to the Government's Contracting Officer's Representative (COR). Key Personnel include the Program Manager (minimum 5 years contract management experience) and Site Lead/Lead Instructor (minimum 3 years flight training supervision experience), both subject to Government approval and requiring 10-business-day overlap during transitions. Instructor qualifications mandate minimum 1,000 total flight hours (1,000 in H-60/S-70 aircraft, 300 as certified instructor), current FAA CFII or ATP-H certification, NCR airspace qualification, Class II Medical Certificate, and SECRET security clearance. All instructors require formal Government certification and annual proficiency evaluations. The contractor shall conduct training in three phases: Phase I (academic ground instruction), Phase II (simulator/training device instruction using HH-60W-specific equipment), and Phase III (live aircraft flight training). Government Furnished Property includes HH-60W aircraft (minimum 2 Fully Mission Capable per location), courseware at Government discretion, classroom/simulator/office space at JBA, training devices (OFT and Egress Trainer), and information resources (Technical Orders, syllabus, MTTL, TMS, classified mission data). The contractor shall achieve 95% student graduation rate (excluding Government-directed eliminations via Training Review Board), maintain 100% timely documentation of training events in the TMS within 1 business day, ensure 98% training device availability, incorporate all mandatory safety-of-flight changes within 30 calendar days, and deliver all required CDRL submissions on schedule. The contractor must establish comprehensive Quality Control and Safety Programs, participate in quarterly Program Management Reviews, manage Risk/Issue/Opportunity logs, and comply with all security requirements including Personnel Security (SECRET clearance), Physical Security, COMSEC, OPSEC, and cybersecurity standards per DD Form 254 and Risk Management Framework protocols.

View the file

Other files

File Type Posted
JBA HH-60W Training RFI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Base Andrews (JBA) Aircrew Transition Training

PERFORMANCE WORK STATEMENT (PWS)

9 February 2026

DRAFT

Contents General Information

1.1. Introduction

1.2. Scope & Objective

1.3 Acronyms

1.4. Definitions

1.5. Applicable Documents & Publications

1.6. Period of Performance

Program Management

2.1 General Management and Contractor Responsibilities

2.2. Post-Award / Kickoff Meeting

2.3. Program Management Review (PMRs)

2.4. Working Groups, Boards, and Meetings

2.5. Reporting Requirements

2.6. Government Furnished Property, Equipment, and Information (GFP/GFE/GFI)

2.7. Place of Performance & Contractor Travel

2.7.1 Primary Government Place of Performance

2.7.2 Secondary Contractor Performance Locations

2.7.3 Local Operating Areas and Travel Definition

2.8. Transition Plan (Phase-In / Phase-Out)

2.8.1 The Transition Plan Deliverable

2.8.2. Phase-In Activities

2.8.3. Phase-Out Activities

2.9. Quality Assurance (QA)

2.9.1 Contractor Quality Control

2.9.2 Government Quality Assurance Surveillance

2.10. Risk, Issue, and Opportunity (RIO) Management

2.11. Safety Program

2.12. Key Personnel

2.12.1. Replacement of Key Personnel

Training Management and Execution

3.1. General Training Requirements

3.1.1 Estimated Student Workload

3.2. Training Review Board (TRB)

3.3. Student Services

3.3.1. Scheduling

3.3.2. Registrar & Student Records

3.4. Instructor Management

3.4.1. Instructor Qualifications & Prerequisites

3.4.2. Instructor Certification & Evaluation

3.5. Training Program Execution

3.5.1. Phase I: Academic Ground Instruction

3.5.2. Phase II: Simulator and Training Device Instruction

3.5.3. Phase III: Aircraft Flight Training

3.6 Aircrew Transition Training

Courseware Management

4.1. Primary Method: Government Furnished Courseware

4.2 Alternate Method: Contractor Proposed Courseware

4.3. Learning Management System (LMS)

4.4. Training Change Proposal (TCP) Process

4.5. Master Training Task Lists (MTTL)

4.6. Test and Examination Development and Management

4.7. Courseware Small Group Try-Outs (SGTO)

System Security

5.1. General Security & Cybersecurity Requirements

5.2. Industrial & Personnel Security

5.3. Physical Security & Access Control

5.4. Communications Security (COMSEC)

5.5. Operations Security (OPSEC)

5.6. Security Violations and Reporting

Configuration & Data Management

6.1. Configuration Management (CM)

6.2. Data Management and Access

6.3. Contract Data Requirements List (CDRL) Deliveries

6.4. Library Management

6.5 Data Rights

6.6 Records Management

Appendices

Appendix 1: Courses and Student Throughput

Appendix 2: List of Government Furnished Property & Equipment

Appendix 3: Performance Requirements Summary

General Information

1.1. Introduction

This Performance Work Statement (PWS) describes the requirements of this contract. While there are separate sections in this PWS, the Contractor shall consider the PWS in its totality, as most sections complement other sections. The Contractor shall develop their processes, procedures, and approaches, to accomplish requirements of this contract.

1.2. Scope & Objective

The scope of this PWS is for a contractor to deliver the foundational training required for UH-1N aircrew to achieve Basic Aircraft Qualification (BAQ) on the HH-60W platform, in accordance with AFMAN 11-2HH-60W V1, V2, and V3. The contractor shall provide a turn-key training solution that includes all instruction, courseware management, and program management necessary to execute the Government-provided syllabus for academic, simulator, and flight training.

The primary objective is to produce Pilots and Special Mission Aviators (SMAs) who are proficient and certified in the safe operation of the aircraft and its core systems under normal and emergency conditions. This effort provides the foundational qualification upon which the Government will build advanced mission and combat skills.

Note: The lead MAJCOM for the HH-60W is Air Combat Command (ACC).

1.3 Acronyms

Acronym Definition

1 HS 1st Helicopter Squadron

AC Aircraft Commander

ACC Air Combat Command

AFI Air Force Instruction

AT Anti-Tamper

ATO Authorization to Operate

ATP-H Airline Transport Pilot - Helicopter

BAQ Basic Aircraft Qualification

CAC Common Access Card

CBT Computer-Based Training

CDRL Contract Data Requirements List

CFII Certified Flight Instructor - Instrument

CM Configuration Management

COMSEC Communications Security

CONUS Continental United States

COR Contracting Officer's Representative

CPI Critical Program Information

CPT Cockpit Procedures Trainer

CRM Crew Resource Management

CRO COMSEC Responsible Officer

DISS Defense Information System for Security

DoD Department of Defense

FAA Federal Aviation Administration

FE Flight Examiner

FRZ Flight Restricted Zone

GFE Government Furnished Equipment

GFI Government Furnished Information

GFP Government Furnished Property

HH-60W Combat Rescue Helicopter

IMI Interactive Multimedia Instruction

IQT Initial Qualification Training

IRC Instrument Refresher Course

JBA Joint Base Andrews, MD

JTR Joint Travel Regulations

LMS Learning Management System

MTTL Master Training Task List

NCR National Capital Region

NVG Night Vision Goggle

OFT Operational Flight Trainer

OPSEC Operations Security

PII Personally Identifiable Information

PMR Program Management Review

PPP Program Protection Plan

PWS Performance Work Statement

QA Quality Assurance

QCP Quality Control Plan

RAB Restricted Area Badge

RIO Risk, Issue, and Opportunity

RMF Risk Management Framework

SCORM Sharable Content Object Reference Model

SFRA Special Flight Rules Area

SGTO Small Group Try-Out

SMA Special Missions Aviator

SME Subject Matter Expert

T.O. Technical Order

TCP Training Change Proposal

TDY Temporary Duty

TMS Training Management System

TRB Training Review Board

UH-1N Utility Helicopter, "Huey"

WST Weapons System Trainer

1.4. Definitions

Aircraft Commander: An experienced pilot who has been formally certified by the Government to command the aircraft and be responsible for the crew and mission.

Basic Aircraft Qualification (BAQ): A BAQ crewmember is qualified in the assigned crew position to perform basic aircraft duties in the unit aircraft. This qualification is the prerequisite for all subsequent missions and combat training.

Contracting Officer's Representative (COR): The Government official designated in writing by the Contracting Officer to serve as the technical point of contact for monitoring and managing contractor performance.

Courseware: All instructional materials used for training, including but not limited to, the syllabus, lesson plans, student guides, presentations, examination materials, and Interactive Multimedia Instruction (IMI).

Flight Examiner (FE): A Government pilot or Special Missions Aviator (SMA) who is specifically certified by the Air Force to conduct flight evaluations and grant qualifications.

Initial Qualification Training (IQT): The formal, comprehensive course of instruction that qualifies an aircrew member for the first time on a new Mission Design Series (MDS) aircraft.

Master Training Task List (MTTL): The Government-approved, comprehensive list of all individual and crew tasks, conditions, and standards that must be trained and evaluated for a specific course. It is the source document for all courseware development.

Program Manager (PM): The contractor employee designated as the single point of contact responsible for overall contract performance and communication with the Government COR.

Syllabus: The Government-provided document that outlines the curriculum, including the sequence and duration of instruction, lesson objectives, and required resources for a specific training course.

Training Management System (TMS): The official Government-approved software or system used for scheduling, tracking, and documenting all student training records and progress.

Training Review Board (TRB): A formal board, chaired by a designated Government representative, convened to review the performance of students who are failing to meet course standards and to determine a final disposition.

Type 1 Training: Defined in AFI 36-2201 as “contractor” or “factory” training. It is also referred to as “train the trainer” training. The purpose of Type 1 training is to train the initial cadre of operators / maintainers to a state of knowledge and proficiency sufficient to not only operate the aircraft, but to also become subject matter experts (SMEs) on the aircraft with the ability to return to their unit and train the rest of the operators the newly acquired knowledge and skills.

1.5. Applicable Documents & Publications

Document Title

AFMAN 11-202V1 Aircrew Training

AFMAN 11-202V2 Aircrew Standardization/Evaluation Program

AFMAN 11-202V3 General Flight Rules

AFMAN 11-2HH-60WV1 HH-60W Series - Aircrew Training

AFMAN 11-2HH-60WV2 HH-60W Series - Aircrew Standardization/Evaluation

AFMAN 11-2HH-60WV3 HH-60W Series - Operations Procedures

AFI 11-215 Flight Manuals Program (FMP)

AFMAN 11-290 Cockpit/Crew Resource Management

DAFMAN 11-401 Aviation Management

AETCI 36-2605 Flying Training

AFI 36-2909 Air Force Professional Relationships and Conduct

T.O. 1H-60(H)W-1 Flight Manual, HH-60W

DAFI 36-2710 Equal Opportunity Program

DAFI 91-202 The Department of the Air Force Mishap Prevention Program

AETCI 11-203 Flying Training Simulator Instructor Programs

1.6. Period of Performance

The Period of Performance (POP) for this contract shall consist of one (1) twelve-month Base Year and one (1) twelve-month Option Year, which may be exercised at the discretion of the Government. Period of Performance is roughly twelve (12) months from date of contract award.

The primary training effort described in this PWS, encompassing the Initial Qualification Training (IQT) for the student workload specified in Section 3.1.1, is anticipated to have a duration of approximately one (1) year. Follow-on Option Years will be exercised to continue providing recurring training and any new IQT requirements as they arise. It is the Government's expectation that this transition training shall begin no later than end of July 2026.

Program Management

2.1 General Management and Contractor Responsibilities

The Contractor shall provide all management, support personnel, staff, hardware, software, materials, equipment, consumables, peripherals, tools, packaging and shipping, as required to accomplish the requirements of this contract and to maintain flexibility to react to real-world events and changing requirements.

All Contractor personnel shall communicate in English and shall be fluent in reading, speaking, and writing in English. The Contractor shall provide management, support personnel, and staff who have thorough knowledge of their jobs, including the job duties and tasks, and the associated intellectual skills to accomplish job duties and tasks.

The Contractor shall provide the PMO and COR written notification of employee hires, and terminations within three working days of event.

The Contractor shall maintain professional relationships, in accordance with Air Force Instruction AFI 36-2909, Air Force Professional Relationships and Conduct, Air Force Instruction 36-2710, Equal Opportunity Program. Contract employees, who have had complaints of violations of AFI 36-2909 made against them, will be addressed through the cognizant contracting officer.

Contractor shall not engage in unauthorized and unwanted physical contact with another, maltreatment, or improperly depriving another of basic physical necessities.

All communication with students will be on student training matters, the Contractor shall not establish contact with an individual student outside of regular business hours unless it is to inform the student of a change in training. The Contractor will also only contact either the class senior ranking officer or the entire class.

The Contractor shall support Government no-notice tests, inspections, audits, certifications, and validations and shall acknowledge the receipt of findings within three (3) working days and report corrective actions proposed/taken to correct discrepancies found within fifteen (15) working days in Contractor Format or via the DD Form 1232 when requested.

The Contractor shall coordinate, collaborate, and co-operate with other contractor of other contracts, providing services to accomplish requirements of this contract.

If the Government provides training to Contractor personnel, the Contractor shall incur a 1-year employment commitment with respect to the applicable training and position. If the trainee’s employment ceases within the year, the Contractor shall owe equivalent training/cost reimbursement to the Government.

The Contractor shall monitor reference documents, publications, and Technical Orders (TOs) identified within the Reference Document List for updates.

The contractor shall deliver to the Government quarterly notification of formal Reference Document List with changes detailing the updates, changes, and impacts to this contract.

Contractor personnel and their subcontractors must identify themselves as Contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this contract.

Contractor-occupied facilities (on Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, nameplates or other identification, showing that these are work areas for Contractor or subcontractor personnel.

Meetings and communication, whether virtual or in-person, between Contractor personnel and Government personnel shall not be recorded in any manner without explicit permission from the Government.

The contractor shall manage all activities specified in this PWS to ensure the successful execution of the HH-60W training program. The contractor shall designate a Program Manager (PM) who will be the single point of contact for the government Contracting Officer's Representative (COR).

2.2. Post-Award / Kickoff Meeting

Within 30 business days of contract award, the contractor shall coordinate with the government to conduct a Post-Award Kickoff Meeting. The contractor shall prepare and deliver a presentation that includes introductions of key personnel, the program schedule, and the draft Transition-In Plan. The costs incurred shall be considered a cost of doing business and will not be reimbursable. The Contractor is not responsible for Government travel, lodging and meals.

2.3. Program Management Review (PMRs)

The contractor shall conduct quarterly Program Management Reviews with government representatives. The contractor shall present program status, schedule updates, cost performance, student throughput statistics, and a summary of risks and issues.

2.4. Working Groups, Boards, and Meetings

The contractor shall participate in meetings, reviews, and working groups as required by the Government to ensure effective communication, program oversight, and the resolution of technical and administrative issues. Contractor participation may be required either in person at government facilities, or via teleconference.

Required meetings include, but are not limited to:

• Program Management Reviews (PMRs): Conducted quarterly, as detailed in Section 2.2.

• Training Review Boards (TRBs): Conducted as needed to adjudicate student performance issues, as detailed in Section 3.2.

• Monthly Forecast Meeting (MFM): Training forecast provided for students, which may be combined with the Monthly Status Report (MSR).

• Weekly Scheduling Meetings: A recurring meeting to deconflict and approve the weekly and daily training schedules.

• Ad Hoc Technical or Programmatic Meetings: As required by the COR to address emergent issues related to training, courseware, or contract performance.

The contractor shall be responsible for preparing and delivering meeting agendas, presentation materials, and formal meeting minutes as specified in the Contract Data Requirements List

(CDRL).

2.5. Reporting Requirements

The contractor shall provide a Monthly Status Report (MSR). This report shall be delivered in accordance with the Contract Data Requirements List (CDRL), no later than the 10th calendar day of the month following the reporting period. The MSR shall detail, at a minimum:

• All training conducted during the reporting period, including student progress and graduation statistics.

• Current instructor and student manning levels.

• Simulator availability rates and any significant downtime.

• A summary of all training schedule deviations greater than three (3) business days from the Government-approved schedule, including the root cause of the delay and any corrective actions taken or proposed.

• A summary of any other significant issues encountered during the reporting period that may impact cost, schedule, or performance.

2.6. Government Furnished Property, Equipment, and Information

(GFP/GFE/GFI)

The Government will provide the property, equipment, and information necessary for the performance of this contract, as specified in Appendix 2: List of Government Furnished Property.

All GFP/GFE/GFI shall be used for official contract purposes only. This includes, but is not limited to, providing access to HH-60W aircraft for all syllabus-required flight training, government facilities as specified in the appendix, and access to an electronic library of all required Technical Orders (T.O.s) and publications. The contractor is responsible for the proper management, control, and accountability of all items furnished by the Government.

2.7. Place of Performance & Contractor Travel

The primary place of performance for this contract shall be designated by the Government at the time of contract award.

2.7.1 Primary Government Place of Performance

The anticipated primary place of performance is Joint Base Andrews (JBA), MD. The contractor is solely responsible for all costs associated with employee recruitment, hiring, and relocation to the National Capital Region to support operations at this location.

2.7.2 Secondary Contractor Performance Locations

The contractor shall identify in their proposal any contractor-owned or operated facilities intended for use in the performance of this contract (e.g., for simulator, academic or flight training). These proposed locations are subject to Government evaluation and approval. If approved, they will be incorporated into the contract as formal Secondary Performance Locations.

2.7.3 Local Operating Areas and Travel Definition

To define what constitutes a normal duty day versus reimbursable travel, the following definitions apply:

• JBA Local Operating Area: This area is defined as the airspace and facilities within a 90 nautical mile radius of JBA. Movement by contractor personnel within this area is not considered travel. This definition is for the purpose of defining reimbursable ground travel and does not restrict syllabus-approved flight training sorties (e.g., cross-country navigation missions) that are planned to operate beyond this radius as part of a single, continuous duty day.

• Contractor Local Operating Area: Each approved Secondary Performance Location shall also have a Local Operating Area, defined as the facilities and airspace within a 90 nautical mile radius of that location. Movement by contractor personnel within any single approved Local Operating Area is not considered travel.

• Travel (TDY): For the purposes of this PWS, "travel" is defined as any official, government-directed temporary duty (TDY) that requires movement (1) between the JBA Local Operating Area and an approved Contractor Local Operating Area or (2) To any other location outside of all approved operating areas (e.g., to another CONUS DoD facility).

2.8. Transition Plan (Phase-In / Phase-Out)

The contractor shall manage a seamless transition at both the beginning and end of the contract period to ensure no degradation of the training mission. The objective is to achieve a transparent and efficient handover of responsibilities with no negative impact on the quality or scheduling of student training.

2.8.1 The Transition Plan Deliverable

The contractor shall develop and deliver a comprehensive Transition Plan as a formal contract deliverable, in accordance with the CDRL. This plan shall be delivered to the government no later than 15 days after contract award. The plan must detail the contractor's timeline, procedures, and risk mitigation strategies for both the Phase-In and Phase-Out periods.

2.8.2. Phase-In Activities

During the Phase-In period, the contractor shall execute the activities outlined in their approved Transition Plan. These activities shall include, at a minimum:

• Recruitment, hiring, and onboarding of all key personnel.

• Initiation of all required security clearance transfers and requests for Common Access Cards (CAC) and flight line access.

• A joint inventory, with government personnel, of all GFP including facilities, simulators, and training materials.

• A period of familiarization with government procedures and coordination with outgoing personnel (if applicable) to assume full performance responsibility on the agreed-upon date.

2.8.3. Phase-Out Activities

During the Phase-Out period, as detailed in the approved Transition Plan, the contractor shall ensure an orderly transfer of all functions to the government or a successor contractor. These activities shall include, at a minimum:

• A final, joint inventory of all GFP.

• The complete transfer of all student records, instructor certification records, courseware, data, and other materials generated in the performance of the contract.

• Full cooperation with incoming personnel to ensure a seamless transition of all responsibilities.

2.9. Quality Assurance (QA)

The contractor shall establish and maintain a comprehensive Quality Control Program to ensure all services provided meet the standards of this PWS. The contractor's program shall be formally documented in a Quality Control Plan (QCP), which shall be delivered in accordance with the CDRL, no later than 30 days after contract award.

2.9.1 Contractor Quality Control

The QCP shall detail the contractor's methodology for internal quality surveillance. The QCP shall include, at a minimum:

• A program of regular self-inspections and performance monitoring.

• Procedures for conducting internal evaluations of all instructor personnel to ensure proficiency and standardization.

• A system for documenting all quality control activities, including spot checks, evaluations, and findings.

• A corrective action process to identify the root cause of any deficiencies and prevent their recurrence.

2.9.2 Government Quality Assurance Surveillance

Government oversight of this PWS will be performed by the designated Government Flight Representative (GFR). The purpose of Government surveillance is not to replace the contractor's quality control system, but to verify its effectiveness and ensure all PWS requirements are met.

The GFR will monitor contractor performance and verify the quality of instruction through various methods of surveillance, which may include, but are not limited to:

• Periodic and no-notice spot-checks of contractor operations.

• Direct observation of academic, simulator, and in-flight instruction.

• Attendance at flight briefings and debriefings.

• Review of student training records, contractor quality control documentation, and instructor evaluation files.

The GFR will notify the contractor of any identified deficiencies, and the contractor shall be responsible for documenting and executing corrective actions through their QCP.

2.10. Risk, Issue, and Opportunity (RIO) Management

The contractor shall maintain a Risk, Issue, and Opportunity (RIO) log. This log shall be reviewed and updated during each Program Management Review (PMR). High-priority risks and issues shall be communicated immediately to the COR.

2.11. Safety Program

The contractor shall establish and maintain a comprehensive Safety Program to ensure the protection of all personnel and Government resources. The contractor is responsible for instilling a culture of safety and shall be held accountable for the safety of all operations conducted under this PWS.

The contractor shall comply with all applicable Federal, State, local, and DoD/USAF safety regulations. In the event of conflicting safety regulations, the most stringent requirement shall apply. This includes, but is not limited to, compliance with DAFI 91-202, The Department of the Air Force Mishap Prevention Program.

The contractor shall utilize the principles of Operational Risk Management (ORM) in all aspects of contract performance. The contractor shall have a documented process for identifying, assessing, and mitigating risks associated with all training events, particularly flight and simulator training.

The contractor shall immediately report all mishaps, incidents, and identified hazards to the Government Ground and/or Flight Safety Representative and the COR. This includes any event that results in injury to personnel or damage to Government property. The contractor shall cooperate fully with any subsequent Government safety investigation.

The contractor shall designate a primary and alternate Safety Point of Contact (POC) who will be responsible for managing the contractor's safety program and will serve as the primary interface with the Government Safety office.

2.12. Key Personnel

The Government has identified the following positions as Key Personnel for this contract due to their critical impact on program success. The contractor agrees that the individuals proposed and accepted for these positions are essential to the successful performance of this PWS.

• Program Manager (PM): The single point of contact for the Government, responsible for overall contract management, performance, and issue resolution. The PM shall have a minimum of five (5) years of experience managing government contracts of similar size and complexity, preferably in aviation or training services.

• Site Lead / Lead Instructor: The on-site leader responsible for the day-to-day execution of the training program, direct supervision of the instructor cadre, and ensuring the quality and standardization of instruction. The Site Lead shall meet or exceed all qualifications for an instructor pilot as specified in Section 3.4.1 and possess a minimum of three (3) years of supervisory or management experience in a flight training environment.

2.12.1. Replacement of Key Personnel

The contractor shall not replace or reassign any Key Personnel without the prior written consent of the Contracting Officer (CO) or the designated Contracting Officer's Representative (COR). In the event a replacement is necessary, the contractor shall submit a formal request to the COR at least 30 days in advance, if possible. The request must include a detailed resume for the proposed substitute, highlighting their qualifications as they relate to the requirements of this PWS.

Any proposed substitute for a Key Personnel position shall have qualifications, experience, and certifications that are equal to or greater than the qualifications of the person being replaced. The Government reserves the right to interview the proposed substitute and approve or disapprove the replacement at its sole discretion. To ensure a seamless transition, the contractor shall provide for a minimum of a ten (10) business day overlap period where the outgoing and incoming Key Personnel work together, unless this requirement is waived in writing by the COR.

Training Management and Execution

3.1. General Training Requirements

The contractor shall provide all management, supervision, personnel, and resources necessary to conduct a formal and comprehensive HH-60W training program. All training shall be conducted in strict accordance with this PWS, the government-approved syllabus of instruction, the Master Training Task List (MTTL), and all applicable publications listed in Section 1.5. The contractor shall ensure the program is sufficient to bring all students to the proficiency levels required to achieve Basic Aircraft Qualification (BAQ). Safety shall be the paramount concern in all training environments, and the contractor is responsible for maintaining a professional atmosphere conducive to learning and the development of military airmanship.

3.1.1 Estimated Student Workload

The estimated annual student throughput for courses of instruction is specified in Appendix 1.

These numbers are provided for contractor planning and proposal purposes and do not constitute a minimum guarantee of student load. The actual number of students enrolled may vary based on Government requirements and funding availability. The core Initial Qualification Training (IQT) course is expected to have a duration of approximately eight (8) weeks for each class, with a standard class composition of four (4) pilots and two (2) Special Mission Aviators (SMAs). The contractor shall maintain sufficient instructor staffing, resources, and scheduling capacity to support the estimated workload specified in Appendix 1.

3.2. Training Review Board (TRB)

The contractor shall establish and facilitate a formal Training Review Board (TRB) process to review the performance and progress of students who fail to meet course standards. The TRB shall be chaired by the Commander, 1st Helicopter Squadron (1 HS) or, upon unit activation, the commander of the new HH-60W squadron, or their designated representative. While the contractor shall provide a formal recommendation, final disposition authority for all students rests solely with the Government chairperson.

Contractor responsibilities for the TRB process shall include, at a minimum:

• Preparing and presenting all required documentation for each student, to include academic records, performance data, instructor comments, and records of any prior counseling or remedial training.

• Providing a formal recommendation for student disposition, such as a formal warning, a structured remedial training plan, or elimination from the course.

• Executing the final disposition as directed by the Government TRB chairperson.

• Recording and delivering the official meeting minutes of the TRB for Government review and approval, in accordance with the CDRL.

3.3. Student Services

The contractor shall perform all administrative functions necessary to manage the student population from in-processing through graduation. These services are critical for ensuring the orderly flow of students through the training pipeline and for the accurate documentation of all training accomplishments. This responsibility includes the following requirements for scheduling and records management.

3.3.1. Scheduling

The contractor shall support all training scheduling requirements. The contractor shall either be responsible for the direct scheduling of all students, instructors, and resources or shall provide qualified scheduling personnel to directly support and integrate with the Government's scheduling process, as directed by the COR. In either capacity, the contractor's function is to deconflict all training resources to ensure the most efficient use of assets. A weekly, daily, and monthly training schedule shall be developed, published, and submitted to the Government for review and approval prior to execution. Changes to

3.3.2. Registrar & Student Records

The contractor shall support all registrar and student records management functions. The contractor shall either be directly responsible for all registrar functions or shall provide qualified registrar personnel to directly support and integrate with the Government's records management process, as directed by the COR. In either capacity, the contractor is responsible for ensuring the following tasks are accomplished:

• In-processing new students, creating, maintaining, and auditing official student training records within the Government-approved Training Management System (TMS).

• Documenting all training events, grades, and comments in the TMS within one (1) business day of the event's completion.

• Out-processing graduating personnel and preparing the final, completed training record for inclusion in the member’s permanent records.

3.4. Instructor Management

The contractor shall provide and maintain a cadre of instructor personnel who meet or exceed all qualifications set forth in this PWS. The contractor is responsible for all aspects of instructor management, including recruitment, qualification screening, and managing the recurring evaluation and certification process under Government oversight.

3.4.1. Instructor Qualifications & Prerequisites

The contractor shall ensure all instructor personnel meet, at a minimum, the following prerequisite qualifications prior to being presented for Government certification:

• Flight Experience & Instructional Qualifications: Possess a minimum of 1,000 total flight hours, which must include a minimum of 1000 hours in any combination of H-60 or S-70 aircraft, and a minimum of 300 hours as a certified instructor pilot or SMA in any aircraft. In addition, candidates must provide formal documentation proving they are instrument qualified, familiar with Crew Resource Management (CRM), and Night

Vision Goggle (NVG) operations. Furthermore, instructors must possess and demonstrate sufficient familiarity with HH-60W-specific systems to effectively instruct all topics within the Government-provided syllabus.

• Federal Aviation Administration (FAA) Certification: Candidates must hold a current FAA rating of Certified Flight Instructor - Instrument (CFII) or Airline Transport Pilot - Helicopter (ATP-H).

• National Capital Region (NCR) Airspace Qualification: For flight operations in the NCR, candidates must be current and qualified on NCR airspace procedures, including but not limited to, FAA-mandated Flight Restricted Zone (FRZ) and Special Flight Rules Area (SFRA) training.

• Medical Certification: Hold a current and valid FAA Class II Medical Certificate (or military equivalent).

• Security Clearance: Possess and maintain a SECRET security clearance.

In exceptional cases, the Government, at its sole discretion, may consider a waiver for candidates who do not meet one or more of the specific prerequisites listed above but who possess other unique and highly valuable experience. The contractor must submit a formal written request for a waiver to the Contracting Officer's Representative (COR), providing detailed justification for why the candidate is suitable for the position. The Government is under no obligation to grant such a waiver, and approval must be granted in writing by the COR before the candidate may be presented for Government certification.

3.4.2. Instructor Certification & Evaluation

All contractor instructors, regardless of prior experience, must be formally evaluated and certified by a Government Flight Examiner (GFE), GFR, or designated government instructor prior to instructing students. The contractor shall manage an Instructor Certification Program, approved by the Government, that prepares candidates for this evaluation. Following initial certification, all contractor instructors will be subject to annual proficiency evaluations conducted by the Government. The Government reserves the right to conduct no-notice evaluations of any instructor at any time.

3.5. Training Program Execution

The contractor shall execute the HH-60W training program using a phased approach as detailed in the Government-provided syllabus. Each phase builds upon the previous one, ensuring a logical progression from foundational knowledge to advanced application. Progression to the next phase is contingent upon the student's successful completion of the preceding phase's requirements.

3.5.1. Phase I: Academic Ground Instruction

The contractor shall deliver all academic and ground instruction required to provide students with a comprehensive, system-level understanding of the HH-60W. All academic subjects, lesson objectives, and performance standards shall be taught in strict accordance with the Government-provided syllabus. Successful completion of all required academic examinations is required to advance to Phase II.

The Contractor shall provide academic instructors who are trained, evaluated, qualified, certified, current, and documented IAW AETCI 36-2604, Flying Training Instructor Programs.

3.5.2. Phase II: Simulator and Training Device Instruction

The contractor shall provide instruction in certified HH-60W training devices to apply academic knowledge in a controlled environment. Instruction shall primarily utilize the HH-60W specific Cockpit Procedures Trainer (CPT), Operational Flight Trainer (OFT), or Weapons System Trainer (WST). The use of other training devices, such as those based on commercial S-70 or other UH-60 variants, requires the advance written approval of the COR. All required simulator events, profiles, and performance standards shall be conducted as specified in the Government-provided syllabus. Students must demonstrate proficiency in all required simulator events before progressing to Phase III.

The contractor shall provide simulator instructors who are trained, qualified, certified, and current. All instructor qualifications, certifications, and continuation training shall be accomplished and documented in accordance with AETCI 11-203, Flying Training Simulator Instructor Programs. This includes the mandatory attendance of all instructors at required Continuation Training (CT) meetings to maintain currency.

The Government reserves the right to supplement simulator instruction with active-duty aircrew in a not to interfere basis, (to include adding visual databases). The Contractor shall still be responsible for on-time graduation and student throughput when the Government supplements simulator instruction.

3.5.3. Phase III: Aircraft Flight Training

Upon successful completion of Phase II, the contractor shall conduct live flight training in the HH-60W aircraft. This capstone phase shall integrate all previously learned skills to qualify students in real-world aircraft operations. All required flight maneuvers, procedures, and evaluation criteria shall be in accordance with the Government-provided syllabus to achieve Basic Aircraft Qualification (BAQ). The final event of this phase is the successful completion of a formal qualification flight evaluation (checkride) administered by a Government Flight Examiner.

3.6 Aircrew Transition Training

The contractor shall develop and conduct Aircrew Transition Training for government aircrew.

The USAF will provide access to Fully Mission Capable (FMC) aircraft in the intended operational condition and configuration shall be provided with available operational time to fuel to meet daily syllabus requirements. A minimum of two (2) Fully Mission Capable FMC aircraft shall be provided at each training location during the training conduct period of performance.

The contractor shall develop and conduct an Aircrew Training Conversion Course based on government provided syllabus, designed to take qualified USAF UH-1N rotary wing aircrew and produce qualified HH-60W aircrew. The aircrew training shall include all instruction and flight training necessary to operate the aircraft and its systems in the intended operational conditions and configurations. Criteria shall utilize AFMAN 11-2HH-60WV1, AFMAN 11-2HH-60WV3 and evaluation criteria IAW AFMAN 11-2HH-6W0V2 as a baseline for aircrew training development.

Courseware Management The contractor shall be responsible for the management and delivery of all courseware required to execute the training syllabus. All courseware used in this program, regardless of origin, shall be technically accurate, instructionally sound, and directly traceable to the Government-approved Master Training Task List (MTTL).

4.1. Primary Method: Government Furnished Courseware

The Government will provide the core training curriculum—including the syllabus, Master Training Task List (MTTL), lesson plans, and presentation materials—as Government Furnished Information (GFI). All training shall be conducted using this Government-provided courseware.

The contractor's primary responsibilities for courseware are as follows:

• Instructor Proficiency: Contractor instructors shall become fully proficient in the content and delivery of all Government-provided courseware.

• Feedback and Recommendations: The contractor shall act as a primary source of feedback on the GFI curriculum. Any identified deficiencies, required updates, or potential improvements shall be formally documented and submitted to the Government via a Courseware Change Recommendation.

• Modification Authority: The contractor is not authorized to make substantive changes to GFI courseware. Minor, non-substantive modifications (e.g., correcting typographical errors, adjusting for local procedures) may be made only with prior written approval from the Contracting Officer's Representative (COR).

• Reproduction and Distribution: The contractor shall be responsible for the reproduction and distribution of all necessary GFI courseware materials for student and instructor use.

4.2 Alternate Method: Contractor Proposed Courseware

The contractor may propose the use of their own proprietary or newly developed courseware as an alternative or supplement to the Government-Furnished Courseware. Any such proposal is subject to the following conditions:

• Formal Proposal: The contractor must submit a formal proposal to the COR detailing the courseware, its advantages, and how it meets all Government syllabus and MTTL requirements.

• Government Review and Approval: All proposed contractor-provided courseware is subject to a formal Government review and approval process. The Government, at its sole discretion, may approve or disapprove the use of any non-Government courseware. Approval must be granted in writing by the COR prior to its use in any training.

• Data Rights and Delivery: If contractor-developed courseware is approved and used, the Government shall have Unlimited Government Purpose Rights to all materials. A complete, editable, electronic copy of all source files shall be delivered to the Government.

4.3. Learning Management System (LMS)

The contractor shall be responsible for providing a Sharable Content Object Reference Model (SCORM)-conformant Learning Management System (LMS) capable of hosting all training materials, administering examinations, and tracking individual student progress. Any contractor-provided LMS must achieve and maintain a Government Authorization to Operate (ATO) on Government networks.

Alternatively, the contractor may request in their proposal to utilize a Government-provided LMS, if one is made available. If the Government approves this approach, the contractor shall be responsible for all tasks related to loading, managing, and maintaining their courseware and student data within the designated Government system. The Government will provide the necessary access and user permissions to contractor personnel to perform these functions.

4.4. Training Change Proposal (TCP) Process

The contractor shall manage a formal TCP process for all proposed modifications to Government approved courseware. This process will be the mechanism for submitting recommendations for changes of government approved courseware.

4.5. Master Training Task Lists (MTTL)

All courseware content, examination questions, and evaluation criteria shall be directly traceable to a specific task, condition, and standard listed on the government-approved MTTL. If Path A is exercised, the contractor shall develop the MTTL for government approval. If Path B is exercised, the contractor shall use the government-provided MTTL.

4.6. Test and Examination Development and Management

The contractor shall develop, maintain, and secure a bank of examination questions for all academic modules. All test questions shall be directly traceable to the Government-provided

MTTL. The contractor is responsible for test administration, scoring, analysis, and maintaining the integrity of all test materials.

4.7. Courseware Small Group Try-Outs (SGTO)

Applies to: Only Path A (Contractor-Developed Courseware) Prior to the implementation of new courses developed by the contractor, a Small Group Try-Out (SGTO) shall be conducted to validate instructional soundness and technical accuracy. This requirement is not applicable if the contractor is using Government-Furnished Courseware.

System Security The contractor shall comply with all security requirements as specified in this section and the DD Form 254, Contract Security Classification Specification.

5.1. General Security & Cybersecurity Requirements

The contractor shall conduct all work in strict compliance with the attached DD Form 254, which delineates the security requirements for the program. The contractor is further tasked with supporting the Government’s Program Protection Plan (PPP) by providing engineering and technical expertise to identify, assess, and protect Critical Program Information (CPI) throughout the system's life cycle.

The contractor shall safeguard all Personally Identifiable Information (PII) collected, processed, or stored in the performance of this contract, in accordance with the Privacy Act of 1974 and DoD 5400.11-R, DoD Privacy Program. PII includes, but is not limited to, student and instructor records, security clearance data, and any other information that can be used to distinguish or trace an individual's identity. Any suspected or actual breach of PII shall be immediately reported to the COR in accordance with the procedures outlined in Section 5.6.

To safeguard the weapon system, the contractor shall implement a robust cybersecurity program capable of securing an Authorization to Operate (ATO) under the Risk Management Framework (RMF), as required by DoD Instruction DoDI 8510.01. This includes conducting thorough risk assessments, implementing security controls, and continuously monitoring system performance to detect and respond to emerging threats.

In furtherance of program security, the contractor shall design, develop, and implement Anti- Tamper (AT) measures to prevent reverse engineering, exploitation, or duplication of CPI in the event the system is captured or compromised, in alignment with DoDI 5200.47E. The contractor is responsible for ensuring full compliance with the RMF, and failure to meet these requirements may constitute a breach of contractual obligations per FAR 52.204-21, Basic Safeguarding of Covered Contractor Information Systems.

5.2. Industrial & Personnel Security

The contractor shall comply with DoDM 5200.02, Procedures for the DoD Personnel Security Program. All contractor personnel requiring access to classified information, or who have unescorted access to restricted areas, must possess and maintain a SECRET security clearance.

The contractor is responsible for verifying clearances via the Defense Information System for Security (DISS).

5.3. Physical Security & Access Control

The contractor shall safeguard all government facilities and equipment entrusted to their use. The contractor shall comply with all Joint Base Andrews entry control procedures for base access. Furthermore, the contractor is responsible for obtaining all required credentials for their personnel, including but not limited to, Common Access Cards (CAC) for network access and Restricted Area Badges (RAB) for unescorted access to the flight line and other controlled areas.

The contractor shall establish and maintain an effective system of administrative control over all issued badges and access credentials. The contractor is responsible for immediately retrieving all government identification, including CACs and RABs, from their personnel upon transfer, termination of employment, or contract completion.

5.4. Communications Security (COMSEC)

The contractor shall be responsible for the safeguarding, control, and use of all COMSEC materials provided for training purposes, in accordance with AFMAN 17-1302-0. If required, the contractor shall appoint a COMSEC Responsible Officer (CRO) who will be trained and certified by the government.

5.5. Operations Security (OPSEC)

The contractor shall establish and maintain an Operations Security OPSEC program to protect critical information and observable activities from unauthorized collection and analysis. The contractor shall ensure that sensitive, unclassified information—such as training schedules, student names, instructor rosters, aircraft tail numbers, and maintenance status—is appropriately protected from public disclosure. All contractor personnel shall complete the initial and annual OPSEC awareness training provided by the Government and shall comply with all local OPSEC procedures.

5.6. Security Violations and Reporting

The contractor shall immediately report all potential or actual security violations, incidents, or compromises to the government Security Manager and the Contracting Officer's Representative (COR). This includes, but is not limited to, the loss or suspected compromise of classified information or any other security anomaly. The contractor shall cooperate fully with any subsequent government investigation.

The contractor shall appoint a primary and alternate COMSEC Responsible Officer (CRO) who must be formally trained and certified by the supporting Government COMSEC office prior to assuming their duties. The contractor shall maintain 100% accountability of all COMSEC material and shall immediately report any known or suspected COMSEC incident, including the potential loss or compromise of material, to the Government COMSEC Manager and the Contracting Officer's Representative (COR).

Configuration & Data Management

6.1. Configuration Management (CM)

The contractor shall establish and maintain a Configuration Management (CM) process. This process shall ensure all courseware, training devices, and simulators accurately reflect the operational configuration of the HH-60W aircraft, including all hardware, software, and technical publication updates. The contractor shall participate in government CM boards as required to remain current.

6.2. Data Management and Access

All data, including but not limited to reports, plans, schedules, and training records, generated in the performance of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .