JA03- FTQW 11-1044D Maintain Boiler 4_Submittal Register.pdf

PDF 72 KB Posted

Attached to
Maintain Boiler 4 Federal contract opportunity
Solicitation number
FA500422B0006
Issued by
Department of the Air Force Pacific Air Forces

About this file

This submittal register outlines 66 line items of required submittals for a construction project to maintain Boiler 4 at Eielson Air Force Base in Alaska. Key deliverables include an accident prevention plan, crane operator and rigger certificates, construction progress photographs, as-built drawings, preventative maintenance instructions, and operation and maintenance manuals. The contractor must provide the submittals for government review and approval by the dates indicated.

The federal contract opportunity is a solicitation from the Department of the Air Force Pacific Air Forces for the Maintain Boiler 4 project at Eielson Air Force Base. This is a total small business set-aside with an estimated value between $5-10 million. The project scope is to repair and maintain Boiler 4 at the base's Central Heat and Power Plant. The 154-calendar day performance period will require furnishing labor, materials and equipment. The solicitation is seeking a firm fixed price contract, and bid, payment and performance bonds are required. The submission deadline for bids is May 12, 2022. The pre-bid site visit will be on April 21 and questions are due by April 25.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line Activity # Transmittal # Specification Section SD # Submittal Description Item Submitted Paragraph # Classification: GOVT or A/E Reviewer Submit Approval Needed By Material Needed By Action Code Date Of Action Date FWD to APPR / Auth Date RCD From

CONTR Date FWD To Other Revwr Date RCD From Other Reviewer Action Code Date Of Action Mailed To CONTR/ Date RCD From APPR

Authority Remarks

1 01 14 00 1 Preconstruction Submittals List of Contact Personnel 1.1 G 2 01 20 00 1 Preconstruction Submittals Schedule of Prices 1.3.1 G 3 01 20 00 3 Preconstruction Submittals Weight Certificates 1.2 4 01 33 00 1 Preconstruction Submittals Submittal Register 1.4 G 5 01 35 26 1 Preconstruction Submittals Accident Prevention Plan (APP) 1.7 G

6 01 35 26 1 Preconstruction Submittals Request for use of Ionizing Radiation (if required) 1.14 G

7 01 35 26 1 Preconstruction Submittals Request for use of Lasers (if required) 1.15 G

8 01 35 26 1 Preconstruction Submittals Request for use of Radioactive Materials (if required) 1.16 G

9 01 35 26 1 Preconstruction Submittals Request for use of Radio Frequency Radiation (if required) 1.17 G

10 01 35 26 1 Preconstruction Submittals Request for use of Ultraviolet Radiation (if required) 1.18 G

11 01 35 26 1 Preconstruction Submittals LHE Invesigation Reports 1.11.3 12 01 35 26 6 Test Reports Accident Reports 1.13.2 G 13 01 35 26 7 Certificates Crane Operators/Riggers 1.5.1.3 G 14 01 35 26 7 Certificates Standard Lift Plan 1.7.2.2 G 15 01 35 26 7 Certificates Cricial Lift Plan 1.7.2.3 G 16 01 35 26 7 Certificates Activity Hazard Analysis (AHA) 1.7 17 01 35 26 7 Certificates Confined Space Entry Permit 1.14 18 01 35 26 7 Certificates Hot Work Permit 1.19 19 01 35 26 7 Certificates Certificate of Compliance 1.11.4 20 01 35 26 7 Certificates License Certirficates 1.4.1 21 01 45 00.10 6 Test Reports Construction Progress Photographs 3.3 22 01 57 19 1 Preconstruction Submittals Safety and Health Program 1.3 G 23 01 57 19 1 Preconstruction Submittals Environmental Protection Plan 1.7 G

24 1 57 19 1 Preconstruction Submittals

Stormwater Notice of Intent and copy of ADEC approval (for APDES coverage under the general permit for construction activities

3.2.1

25 1 57 19 1 Preconstruction Submittals Dirt and Dust Control Plan 1.7.11.1 26 1 57 19 1 Preconstruction Submittals Employee Training Records 1.6.5 27 1 57 19 1 Preconstruction Submittals Environmental Manager Qualifications 1.6.4

28 1 57 19 1 Preconstruction Submittals Completed Checklist for Spruce Lake Disposal; if applicable 3.7.2.2 G

29 1 57 19 1 Preconstruction Submittals Notice of Intent for Asbestos Abatement; if applicable 3.1

30 1 57 19 1 Preconstruction Submittals Stormwater Pollution Prevention Plan (SWPP), if applicable 3.2.1.1

31 1 57 19 1 Preconstruction Submittals Evidence of Delivery of SWPP to ADEC if applicable 3.2.1.2

32 1 57 19 1 Preconstruction Submittals Contaiminated Soil Sampling and Analysis Plan (SAP), if applicable 1.5.3 G

33 1 57 19 1 Preconstruction Submittals Contaiminated Soil Sapling and Analysis field Report, if applicable 1.5.3 G

34 1 57 19 1 Preconstruction Submittals Initial Contractor Hazardous Material Inventory 1.7.6 G

35 01 57 19 6 Test Reports Laboratory Analysis 3.7.1.1.2 G 36 01 57 19 6 Test Reports Inspection Reports 3.2.1.3 G 37 01 57 19 6 Test Reports Solid Waste Management Report 1.1 G 38 1 57 19 7 Certificates Employee Training Records 1.6.5

39 1 57 19 7 Certificates Erosion and Sediment Control Inpector Qualifications, if applicable 1.6.5

40 1 57 19 7 Certificates ADEC Transport, Treatment, & Disposal Approval Form for Contaiminated Media (ATT), if applicable

1.5.5 G

41 1 57 19 7 Certificates Hazardous Waste accumulation log (submitted quartely) 1.7.6

42 01 57 19 11 Closeout Submittals Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4 G

43 01 57 19 11 Closeout Submittals

Sotrmwater Notice of Termination to ADEC (for NPDES coverage under the general permit for construction activities)

3.2.1.1

44 1 57 19 11 Closeout Submittals Waste Determination Documentation 3.7.1

45 1 57 19 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste, monthly (weight tickets, invoices, receipts, mainfests)

3.7.3.6 G

46 1 57 19 11 Closeout Submittals Assembled Employee Training Records 1.6.5 47 1 57 19 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 48 1 57 19 11 Closeout Submittals Regulatory Notifications 1.6.2 49 1 57 19 11 Closeout Submittals Sales Documentation 3.7.2.1 50 1 57 19 11 Closeout Submittals Contractor Certification 3.7.2.1

51 1 57 19 11 Closeout Submittals ADEC Approved Disposal Facility Weight and/or Acceptance Ticket for Contaminated Soil, if applicable

3.15

52 1 57 19 11 Closeout Submittals

ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal of Contaminated Soil along with Confirmatory Sample Results, if applicable

3.15

53 01 74 19 1 Preconstruction Submittals Construction Waste Management Plan 1.6 G

54 01 78 00 3 Product Data As-Built Record of Equipment and Materials 1.4 G

55 01 78 00 3 Product Data Manufaturer's Warrenties 1.4.1 G

TITLE: Submittal Register

SUBMITTAL REGISTER

JOB NAME: MAINTAIN SUPERHEATER AND ECONOMIZER, BOILER #4

LOCATION: Eielson AFB, Alaska

CONTRACT NO:

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE DATES CONTRACTOR ACTION

56 01 78 00 3 Product Data Spare Parts Data 1.5 G 57 01 78 00 3 Product Data Warranty Tags 1.4.5 G 58 1 78 00 8 Manufacturer's Instructions Preventative Maintenance 1.4 G

59 1 78 00 8 Manufacturer's Instructions Condition Monitoring (Predictive Testing) 1.4 G

60 1 78 00 8 Manufacturer's Instructions Inspection 1.4 G 61 1 78 00 8 Manufacturer's Instructions Posted Instructions 3.5

62 1 78 00 `0 Operation and Maintenance Data Operation and Maintenance Manuals 3.4 G

63 1 78 00 11 Closeout Submittals As Built Drawings 3.1.2 G

64 1 78 00 11 Closeout Submittals As Built Record of Equipment and Materials 1.4

65 1 78 00 11 Closeout Submittals Final Approved Shop Drawings 3.2 G 66 1 78 00 11 Closeout Submittals Interim DD Form 1354 1.3 G 67 1 78 00 11 Closeout Submittals Checklist for DD Form 1354 1.3 G