JA01- FTQW 11-1044D Maintain Boiler 4 SOW 06Jan22.pdf

PDF 818 KB Posted

Attached to
Maintain Boiler 4 Federal contract opportunity
Solicitation number
FA500422B0006
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a statement of work and federal contract opportunity for maintaining Boiler 4 at Eielson Air Force Base in Alaska. The statement of work requires replacing approximately 528 economizer tubes and 64 superheater tubes on Boiler 4, high-pressure washing the outside of boiler tubes to remove slag buildup, and collecting and testing wash water from the cleaning operations. The 154-calendar day period of performance must be completed before September 15. The federal contract opportunity is a total small business set-aside between $5 million to $10 million issued by the Department of the Air Force Pacific Air Forces. The solicitation requires bids to be submitted by May 12, 2022 and awards a firm fixed-price contract including bid, payment, and performance bonds. A non-mandatory site visit will be held on April 21 and questions are due by April 25, with responses provided in an amendment.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

MAINTAIN SUPERHEATER AND

ECONOMIZER, BOILER #4

FTQW 11-1044D

EIELSON AIR FORCE BASE, ALASKA

DATED 06 JAN 2022

MAINTAIN BOILER #4 FTQW 11-1044D

1. DESCRIPTION OF WORK

This Statement of Work (SOW) is to provide the general scope of work to be performed on Eielson Air Force Base (EAFB), Alaska. The purpose of this project is to perform maintenance on Boiler #4 at Eielson’s Central Heat and Power Plant (CHPP). The Contractor shall provide all labor, materials, and equipment to facilitate the task outlined below. All work shall be in accordance with: This Statement of Work, all applicable UFC’s;

International Business Code; national, state, local building codes and standards; Federal, state and local safety and environmental laws and regulations. If conflicting guidance is provided, the stricter of the two shall be implemented. If standards are contradictory, they will be brought to the attention of the government to provide further guidance.

2. GENERAL INFORMATION:

The Project location is Eielson Air Force Base (EAFB). EAFB is located approximately twenty-five (25) miles southeast of Fairbanks, Alaska. It is highway accessible via the Richardson Highway. The site is also served by the Alaska Railroad.

This project is to be accomplished within the existing EAFB Central Heat and Power Plant (CHPP) complex and predominantly within the existing CHPP building. The CHPP complex is a secure site within the Air Force Base.

The CHPP complex is a mature and developed site. The CHPP provides essential utilities to the Base and has been meeting this need since the early 1950’s. It is critical to the operation of the Base and provides essential services. The operation of the CHPP cannot be interrupted and the plant is currently configured as a 25 MW coal fired cogeneration plant. It provides both primary electric energy and primary thermal energy, in the form of steam, to the Base.

Eielson Air Force Base is a secure military facility and access to the base and facilities are controlled. The Contractor will be required to plan, monitor, and execute security specific procedures since the CHPP is a secure site and all access to the plant is controlled. See Appendix A “Security and Access to Controlled Areas” for specific security requirements.

Contractor shall maintain all necessary personnel and equipment access for the ongoing operation and maintenance of the facility and systems. The existing overhead door on the north side of the plant, and the floor hatch on the inside of the plant (adjacent to the overhead door), are primary access points for plant personnel in moving oversized equipment and bulk materials. The Contractor shall coordinate through the Contracting Officer (CO) when requesting and scheduling material movement in and out of the CHPP.

The CHPP is critical to the operation of the EAFB as it provides essential services. The need for interruptions (beyond the contractual shut-down of Boiler #4) is not anticipated and is to be avoided. The Contractor shall carefully plan and coordinate all potential, partial interruptions or out of service requirements with the CO a minimum of 15 days in advance. Any interruptions or out of service periods shall be entirely avoided for the overall CHPP. Any interruptions or out of service periods for Boiler #4 during the duration of repair should be coordinated with the CHPP through the CO to ensure the ability of the other boilers at the CHPP to support the needs of the base. All coordination impacting the operation or change in status of any plant systems, equipment, or capabilities with Contracting Officer. Contractor shall not operate or manipulate existing facility systems without specific approval.

2.1 CONTRACT ADMINISTRATION

The EAFB CO and Contracting Specialist (CS) are responsible for administration of the contract. No change shall be made in the provisions of this contract without written authorization from the CO. The Base Civil Engineer (BCE) monitors the work and services furnished, and evaluates the performance of the Contractor as the CO’s Technical Representative (COTR). The COTR is not a CO and has no authority to contractually bind the Government or modify the contract.

2.2 GOVERNMENT DOCUMENTATION

“As-Built”, show drawings, and operation and maintenance manuals that the Government may have are not guaranteed to be either accurate or complete. It shall be the Contractor’s responsibility to verify any information or data that is given to them by the Government.

6 January 2022

3. WORK REQUIREMENTS:

The Contractor shall provide all plant, management, supervision, labor, tools, supplies, parts, equipment, related services, and applicable licenses and permits necessary to complete the requirements in accordance with this SOW and project specification. Once all materials and equipment are on site, and all design submittals and pre-construction submittals are approved by the Government, the Contractor shall start with repair and maintenance of Boiler #4.

3.1 ENVIRONMENTAL PROTECTION

The work area is not known to contain asbestos in this project but is present in the facility. If the Contractor finds asbestos, they must follow the following procedures:

a. All asbestos waste manifests shall be signed by the Government prior to removal of such waste from the base. A copy of the completed manifest (signed by the receiving landfill) shall be submitted to the Government.

b. The Contractor is responsible for identifying the asbestos containing material (ACM) prior to conducting maintenance, abatement, renovation, or demolition activities.

c. The Contractor is responsible for making proper notification and providing copies to CES.

d. Prior to final approval of job completion, a copy of asbestos removal procedures, amounts removed, type of product removed, location of removal actions and residual product left in place be provided to CES.

e. The U.S. Environmental Protection Agency requires demolition notification for all buildings that are to be destroyed regardless of the amount of asbestos contain in the building.

Lead based paint is known to exist in the project area.

Contractors are required to list any hazardous materials to be delivered under the contract in Excel format. The appropriate Safety Data Sheets (SDSs) shall be submitted and a list of corresponding identification numbers such as National Stock Numbers or Special Item Number prior to construction.

Contractor Hazardous Materials Usage Tracking Form is required to be completed by the Contractor. The Contractor must provide the government the following info: material to be used, material unit of issue, quantities, frequency of use, location of us, process description, intended disposal, and storage location. Each request must be accompanied by the SDS. This includes any material in a liquid, gel, semi- solid or gaseous state. Any contract that is less than six-months in duration will be reported at the end of the contract period, and any contract over six-months in duration will be reported no less than monthly.

3.2 OBJECTIVES

The Contractor shall provide the Government with sufficient technical, supervisory, and administrative personnel to ensure repair of Boiler #4 and other components required to accomplish the work specified in this SOW to complete the maintenance on Boiler #4. The work shall meet all relevant UFC, ASME BVPC, and DOD standards. The Contractor shall meet the following requirements at a minimum:

• Boiler #4 shall be repaired with quality materials and workmanship throughout and in accordance with all applicable codes and industry standard references.

• CRITICAL: Boiler #4 can only be off-line during a specific period, typically 15 April through 15 September each calendar year. The Contractor’s Period-of-Performance (PoP) shall be 154 calendar days from the date Boiler #4 is officially transferred to the Contractor (in writing). All repair work, including completion of final on-line testing, shall be completed prior to the end of this PoP. Note: Off-site and on-site, pre-repair activities (e.g. mobilization, safety plans, etc.) that do not require Boiler #4 being off-line may be accomplished following Notice to Proceed and prior to the PoP.

• Successful support of the mission is of the highest importance. Choice of materials and methods of construction shall not compromise the mission of the facility or the safety of operating personnel and shall optimize quality, function, aesthetics, economy, maintainability, and life cycle cost. It is the intent of the Air Force that this facility and the equipment and auxiliary systems have a 25-year useful design life and a 50 year life expectancy with industry accepted maintenance and repair cycles.

• The repairs should provide an appropriate level of quality to ensure the continued use of the facility, equipment and systems over that time period with the application of reasonable preventive maintenance and repairs. It is the Air Force’s objective that this project support and contribute to the operation of a stable, highly reliable electric and steam generation system. Therefore, the repairs shall provide an appropriate level of reliability, availability, and maintainability with the application of reasonable preventative maintenance and repair. Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged.

• The goal of the Air Force is to deliver quality facilities that enhance mission effectiveness and protect the environment. The focus on quality must be maintained throughout project. The objectives of the Air Force are to deliver the project on time, within available funds and in a safe manner that satisfies the needs of the users.

• NOTE: Boiler #4 has been previously abated, with hazardous materials removed, in 1994. Reference drawings in Appendix B, Rehabilitate Boiler #1, CH&PP, for an idea of the extent of rework and hazardous materials removal that was conducted on Boiler #4. The information in Appendix B is “For Information Only” to help the Contractor understand the general layout and extents of Boiler #1 and is not part of the work required within this contract. In addition, Boiler #1 was surveyed for any residual contamination (such as asbestos fibers adhered within the boiler tube slag) prior to rehabilitation work in 2015, with no hazardous materials encountered. Since Boiler #1 is nearly identical in its construction, upkeep, and rehabilitation, the Contractor shall assume for proposal pricing there is no hazardous materials removal involved with the work in this contract. Follow Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, Paragraph 3.1.2 Unforeseen Hazardous Material, if any hazardous materials are discovered or encountered.

3.3 SCOPE, BASE CONTRACT (applies only to Boiler #4 unless specifically stated otherwise):

The Contractor shall provide the Government with sufficient technical, supervisory, and administrative personnel to ensure repair of Boiler #4 and other components required to accomplish the work specified in this SOW to complete the maintenance on Boiler #4. The work shall meet all relevant UFC, ASME BVPC, and DOD standards. The Contractor shall meet the following requirements at a minimum:

• Replace economizer & super-heater tubes: See Appendix C or drawings of tubing layouts and quantities.

There are approximately 528 economizer tubes and 64 super-heater tubes.

• The Contractor shall high-pressure wash the outside of the boiler tubes (those not being removed completely, and not to include water-wall tubes) to remove slag build-up.

• The Contractor shall exercise due caution when cleaning tubes to prevent damage to refractory tile, castable refractory, and/or tile baffles within the boiler in accordance with UFC 3-430-07 Operations and Maintenance:

Inspection and certification of Boilers and Unfired Pressure Vessels.

• The Contractor shall control and capture all runoff from cleaning operations to avoid any impacts to ongoing

CHPP operations or maintenance. Ash transport piping and accessories shall be suitably plugged and/or disconnected to prevent impacts/damage to the rest of the operating ash removal system in accordance with UFC 3-430-08N Central Heating Plants.

• Contractor shall collect and test all wash water used in slag removal. To collect and test water, the Contractor shall pump water from existing stock tanks to a secondary filter. From the secondary filter, water shall be pumped to large roll-off tanks. Samples shall be taken from each tank used to collect water and shall be tested by a qualified laboratory to identify potential contaminants. Testing shall only be required for items listed below. Metals shall be testing in accordance with EPA Method SW 6020 and pH testing shall be field tested.

If testing confirms contents are within acceptable limits, upon receiving confirmation from the CO, the contents shall be discharged into plant drains. In the event that contents exceed limits, the Contractor will be responsible for onsite treatment and re-testing before discharge or offsite disposal by a qualified hazardous waste transport and disposal company.

• Wash water shall be tested for pH and the concentrations of the following contaminants:

Possible Contaminant Discharge limit for discharge to Plant Drains and Waste Water Treatment Plant in parts per million

(ppm) pH Level

Arsenic 1 Between 6&9 Cadmium 0.5 Between 6&9 Chromium <5 Between 6&9

Cobalt Monitor Between 6&9 Lead <5 Between 6&9

Molybdenum Monitor Between 6&9 Mercury <0.2 Between 6&9 Nickel 61 Between 6&9

Selenium <1 Between 6&9 Zinc 500 Between 6&9

• The wash water shall not exceed the following limits when discharged to the base sewage system:

Pollutant or Pollutant Property Maximum for any 1 day (mg/l)

Average of daily values for 30 consecutive days shall not exceed (mg/l) Total Suspended Solids 100.0 30.0

Oil & Grease 20.0 15.0 Copper, Total 1.0 1.0

Iron, Total 1.0 1.0

• NOTE: The wash water will be allowed to be released into the base sanitary sewer system after testing pending test results and confirmation from the CO.

• During slag removal, the Contractor shall provide all necessary PPE and containment necessary to ensure the safety of employees and government employees working in the plant. The Contractor shall conduct air sampling inside and outside the containment to ensure personnel are not exposed to excess concentrations of the contaminants of concern.

• The Contractor shall be responsible for clean-up following cleaning, re-connection of all temporarily disconnected/plugged systems, and for dry-out of the boiler interior prior to re- firing.

• The Contractor shall collect all slag sediment and sludge washed off the tubes, and chunks of slag removed from the tubes. Collected slag and sediment shall be tested for RCRA metals, either by TCLP or total metals.

The accumulated slag may be a hazardous waste and should be treated as such until test results show otherwise. When disposing at a landfill, the slag fits the definition of a solid waste and needs to be assessed whether or not a hazardous waste. If testing determines that accumulated slag and sediment removed from the boiler tubes is classified as hazardous waste, legally dispose of the collected material at an appropriately permitted landfill.

• Replace soot blower lance bearings, and fabricate/install external soot blower supports:

o There are eighteen (18) soot blowers on Boiler #4 (9 on the left, 9 on the right) Soot Blowers are identified as Copes-Vulcan (Clyde Bergemann) Model D5E o The Contractor shall be responsible for purchasing and installing bearing assemblies with the proper Code documentation. The Contractor shall develop shop-drawing-level sketches and details of proposed soot blower support framing (external to the blower and boiler), for review and approval by the Government prior to fabrication and installation. Support framing must prevent soot blowers from sagging (under their own weight over time) without impacting soot blower operations, and without impacting or impeding preventative maintenance tasks.

• For soot blowers pairs 1, 5, 7 8 and 9, provide additional support from either the building structure, or the structural members forming the structure of the boiler. Added support shall include appropriately sized spring hangers. New supports shall not block access by maintenance personnel to soot blowers or existing valves or instruments.

• For Soot Blowers 1L and 1R, provide manufacturer approved flex coupling assemblies between the soot blowers and the steam lances to accommodate differential expansion of the boiler casing and superheater tubes when the boiler is fired. Internal steel baffles shall be inspected, removed and stored to facilitate cleaning. All internal refractory baffles shall also be inspected, and partially or wholly demolished as required to facilitate cleaning. The Contractor shall provide a report of the areas (total square feet) of internal baffle (steel and refractory) that require repair. The Contractor shall reinstall all baffles. Any repairs authorized by the CO will be incorporated into the reinstallation effort, with materials that meet or exceed the original.

• Re-face header side of hand-holes and replace hand-hole gaskets. There are approximately 21 hand-holes in the super-heater header, approximately 30 in the economizer inlet header, approximately 28 in the economizer outlet header, approximately 26 hand-holes in the economizer blow-off header (lower drum), and approximately 26 on the upper side waterwall headers. The provided number of hand-holes are an approximation for information only and the Contractor is responsible for all hand-holes and hand-hole gaskets. Hand-holes are roughly 4 inches by 3-1/4 or 3-1/2 inches in size. All hand-hole gaskets shall be replaced with like material (spiral-wound, 4.5 x 3.5 x 0.5, rated for 500 deg F, oval shaped). Hand-holes shall be inspected during hydrostatic testing to ensure leaks have been eliminated.

• Replace all casing insulation, internal tile refractory (“brick”), and steel casings above the Scale Deck (i.e at and above Elevation 571’-3”, or 40’-3” above the Elevation 531’-0” basement floor). The 10- gauge steel casings shall be removed completely to access the insulation. Note: The Scale Deck elevation is about 3 feet above the bottom of the super-heater tubes. The centerline of the steam drum is listed at Elevation 583’-6” (52’-6” above the basement). The Contractor is responsible for properly curing the brick and mortar and for drying out the boiler, prior to re-firing. New casings shall be accurately sized, trimmed, and installed to provide an as-new condition, and shall be painted to match other “like-new”, painted boiler casings in the Plant.

• Inspect boiler casing below the Scale Deck for hot spots and internal refractory insulation at hot spots. Then, when boiler is off-line, inspect the internal tile refractory brick below the Scale Deck. Any external insulation and casing sections below the Scale Deck that requires replacement, or other recommended repairs discovered during investigation, shall be submit as an LRR with photographs

• Face all visible and accessible cracks in internal tile refractory brick below the Scale Deck.

• Remove main and auxiliary feed-water valves (welded ends) and replace with 4-inch, Class 900 flanges valves. Main and auxiliary feed-water valves, along with compatible slip-on flanges, are provided by the Government for installation by the Contractor. Modification of the adjacent piping is required to replace these valves. The Contractor is responsible for procuring and installing the appropriate bolt kits.

• Replace intermediate steam stop valve with a manual gate valve and install a new 1-inch warm- up line with manual gate valve around the stop valve. The stop valve, along with compatible slip-on flanges, is provided by the Government for installation by the Contractor. Modification of the adjacent piping is required to replace this valve. The Contractor is responsible for procuring and installing the appropriate bolt kits and seals. The Contractor is responsible for procuring and installing the 1-inch valve, piping, flanges, gaskets, etc.

for the warm-up line.

• Completely remove and re-brick the sides of the economizer section.

• The Contractor shall install a new Stoker Cooling Water Header with isolation valves on both the inlet and outlet sides of the header.

• Inspect boiler back wall castable refractory and provide any necessary LRRs with photographs & existing volume measurements and multiple cross-sections showing existing conditions, recommended final operating surface, and total cubic feet of castable refractory that would be required to bring the surface up to the recommended thickness. The Contractor is responsible for properly curing the castable refractory and for drying out the boiler, prior to re-firing.

• The Contractor shall unbolt and remove the internal rear-wall economizer insulated panels (4 columns by 8 rows of varying sizes, approximately 200 square feet of panel) nearest the corners, remove and replace the 3-inch insulation on the panels, add additional insulation in the corners, and replace/rebolt the panels into place.

• Contractor is to remove the Boiler #4 combustion camera prior to starting demolition, shall turn the camera over to the CHPP Operations Manager for maintenance, storage, and re-installation.

• The Contractor shall inspect the ash hopper refractory to include include areas in any of the forward, intermediate, or economizer ash hoppers.

• The Contractor shall replace all conduit and wiring, including power and control wiring, between the soot blowers and the soot blower control panel(s). Replacement wiring shall be of the same gauge, insulation type and thickness, and make-up as existing wiring, unless current Electrical Code requires a heavier gauge, type of insulation, etc. The Contractor shall provide submittal cut sheets for the proposed wiring replacements (for Government approval) prior to procurement.

3.4 Recommended Repairs

Within five (5) days after inspection of any component for which the contractor recommends repairs or replacement not already required by the specifications, submit a Letter of Recommended Repair (LRR).

Contractor shall not let LRRs accumulate. Each LRR shall include a detailed listing of all components, to include part number, model, descriptive nomenclature, and manufacturer as well as suggested sources of procurement and lead time for arrival on site. Additionally, the Contractor will supply the specific reference which identifies the component as being out of compliance with manufacturer requirements and/or recommendations. Each LRR shall also include a description of the component’s condition, recommended repair or replacement, cost proposal and estimated time to complete the recommended work after Notice-To-Proceed has been received. Each cost proposal shall show itemized material and subcontractor costs, as well as labor hours and rates. If defects in components are discovered, which, in the contractor’s opinion are optional to correct, the Contractor shall submit a letter describing the defect. The Contracting Officer will review the information provided by the Contractor and decide whether or not to make the optional repair.

The Contracting Officer will review each LRR submitted. If the recommended additional repair is approved, a fair and reasonable price will be negotiated and the Contractor will be issued a Notice-To-Proceed with the repair.

For approved repairs, furnish all needed parts and repair services, welding, machining and reshaping of the Boiler’s components to restore to within recommended tolerances.

4. QUALITY CONTROL AND SAFETY:

4.1. Safety

The Contractor shall follow all applicable requirements of ASME BPVC, and AFOSH (Air Force Occupational Safety and Health Standard 91-501) in performing these repairs.

4.2 Preliminary Testing

Upon completion of the repairs, Boiler #4 shall be subjected to functional and operational tests to determine if it is ready to return to service, to include hydrostatic testing per ASME BPVC Section VII.

Prior to operational testing, Boiler #4 and its ancillary systems shall be inspected by a qualified NBBPVI (National Board of Boiler and Pressure Vessel Inspectors) inspector, hired by the Contractor. The Contractor must provide a copy of the inspectors NBBPVI issued Certification to the Contracting Officer. The Inspector shall provide written notification whether the boiler is ready for service and send the notification to the CO. If the report indicates any conditions that would prevent boiler operation (directly related to the work under this contract), the Contractor shall make the necessary repairs and coordinate a subsequent inspection and report.

Once Boiler #4 has been successfully inspected, testing shall be in accordance with ASME BPVC, Section VII.

The recommended tests in BPVC Section VII and all manufacturers’ recommended tests shall be considered mandatory. If deficiencies are found, corrections shall be made and the Boiler shall be retested to assure that it is functional. If, during the course of preliminary tests, the Contracting Officer's Representative determines the Boiler and/or its components are not functionally complete, the preliminary testing will be rescheduled for a later date.

4.3 Final Testing

Final testing shall not be performed until Boiler #4 has passed NBBPVI inspection and has passed preliminary testing. The Contractor shall provide written notification to the Government that Boiler #4 is ready for firing no less than 3 days before the day of the final test.

The Contractor shall provide a recommended start-up/bake-out plan for ensuring proper curing of new cast refractory, avoiding spalling and cracking that would result in cast refractory coming apart or falling off.

The Contractor shall provide personnel support to the CHPP staff during initial flushing/blow-down, firing, warm-up, pressurization, and while bringing Boiler #4 back on-line, to include at least one work lead. CHPP operators will be responsible for normal CHPP start-up activities. The Contractor shall respond to items identified by the Program Manager and/or the Contracting Officer as deficiencies in the work performed under this Contract.

The Contractor’s repair of Boiler #4 shall not be accepted until the Government has operated the Boiler at 400 psig for 48 consecutive hours without disruptions which are attributable to the work performed by the Contractor.

If the firing and on-line process must be interrupted to correct a deficiency resulting from work under this Contract, the 48-hour clock shall restart for the next start-up/on-line cycle.

Once Boiler #4 is fully operational and on-line, and the 48-hour period has elapsed and full government acceptance has occurred than, any further deficiencies identified shall be addressed under the Warranty Management.

5. REFERENCE SPECIFICATION AND STANDARDS

Any reference to State Government, Federal Government, or Industry Standards or specification made herein shall form a part of this specification to the extent referenced thereto, and all materials and workmanship under this contract shall comply with or exceed these standards and references. All referenced standards shall be the latest edition. All work shall be done in strict accordance with Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International Plumbing Code (IPC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), National Electrical Contractors Association (NECA) Boiler and Pressure Vessel Code (BPVC), and Eielson Air Force Base Standards.

All manufactured equipment and products shall be new materials in good condition and installed as per manufacturer's latest printed instructions, unless specified otherwise herein.

The Contractor is responsible for protection of existing facilities equipment from damage during installation and testing operations.

The Contractor shall take into account the special treatment of hazardous waste, as well as the environmental implications related to building demolition management (i.e. fluorescent lighting tubes, t-stats, etc.). Every effort shall be made to recycle eligible materials, and those not suitable, shall be disposed of off base in accordance with all Department of Health and Environmental Control regulations.

The Contractor shall include make, model number and inherent operational characteristics on all major equipment supplied for the facility. The Contractor shall supply manufacturer’s cut sheets with the submittal where the component is identified.

If any submittal doesn’t, in the opinion of the Contracting Officer, meet or exceed the requirements contained within this SOW, or in any referenced design guidance or nationally recognized code, then it shall be considered to be unacceptable and returned to the Contractor for correction and resubmission. The Contracting Officer has the option, in lieu of disapproval, to provide acceptance of a submittal with required corrections identified if it is determined the submittal is substantially complete and correct.

Any demolition, utility cut and capping, and debris removal service performed as a part of the proposed project shall be completed in such a manner that will restore a neat and professional appearance of base areas.

The facility/area shall be cleaned in its entirety, including exterior areas, before being returned the government.

During construction, the Contractor shall take care not to damage existing structures, etc. that will not be replaced as part of this contract. The Contractor shall be responsible for the temporary support of all devices as required to perform work. Any demolition work that needs to be accomplished to complete the contract is the responsibility of the Contractor. All material shall be installed per manufacturers’ recommendations. All items listed are to be supplied and installed by the Contractor unless otherwise noted.

5.1 CODE REQUIREMENTS

AFH 32-1084 FACILITIES REQUIREMENTS

ASME BOILER & PRESSURE VESSEL CODE (BPVC), SECTION I, RULES FOR CONSTRUCTION

OF POWER BOILERS

ASME BPVC, SECTION V, NONDESTRUCTIVE EXAMINATION

ASME BPVC, SECTION VII, RECOMMENDED GUIDELINES FOR THE CARE OF POWER BOILERS

ASME BPVC, SECTION VIII, RULES FOR CONSTRUCTION OF PRESSURE VESSELS

ASME BPVC, SECTION IX, WELDING, BRAZING, AND FUSING QUALIFICATIONS

ASME B31.1 POWER PIPING

UFC 03-401-01 MECHANICAL ENGINEERING

UFC 3-430-08N CENTRAL HEATING PLANTS

6. WORKING CONDITIONS

The Government’s normal duty hours are five days per week, Monday through Friday, from 7:30 AM to 5:00 PM.

However, the Command Post functions on a 24/7 operations schedule. The Contractor shall take all precautions to insure that his operations are conducted in a manner as to minimally interfere with the normal operations of the base and the safety and convenience of the base personnel.

6.1 RECOGNIZED HOLIDAYS:

Any of the below holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday.

New Year’s Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

6.2 SECURITY REQUIREMENTS FOR UNCLASSIIED CONTRACTS

The following security requirements sections are required for the prosed project when contract work does not involve access to classified information.

6.2.1 LISTING OF EMPLOYEES

The Contractor shall maintain a current list of employees. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to Air Force controlled/restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager and sponsoring agency’s Security Manager. An updated list shall be provided when an employee's status or information changes.

6.2.2 SECURITY TRAINING

The Contractor shall ensure all contractor employees are made available to receive initial and recurring security education training from the sponsoring agency’s security manager. Training must be conducted IAW DOD 5200.1-R, Information Security Program Regulation, and AFI 31-401, "Information Security Program Management". Contractor personnel who work in Air Force controlled/restricted areas must be trained IAW AFI 31-101, The Air Force Installation Security Program.

6.2.3 PASS AND REGISTRATION ITEMS:

The Contractor shall ensure that pass and registration items required for contract performance are obtained for employees. Contractors cannot sponsor other contractors on base. Only Government employees (military or civilian) are authorized to sponsor contractors. The Contractor shall comply with all requirements and procedures in accordance with (IAW) Air Force Federal Acquisition Regulations System (AFFARS) 5352.242-9000, Contractor Access to Air Force Installations. The Contractor shall ensure that pass and identification items required for contract performance are obtained for employees. All contractor employees shall undergo a background check conducted by 354th Security Forces Squadron prior to issuance of base access credentials.

Until 1 Oct 2021 Eielson AFB will accept identification cards or driver's licenses from all states and territories except ones marked "NOT VALID FOR FEDERAL IDENTIFICATION” or “FEDERAL LIMITS MAY APPLY” or any other words to that effect. Effective 1 Oct 2021 only REAL ID identification cards or driver's licenses will be accepted. For a full list of REAL ID Act and compliant and non-compliant states, please visit https://www.dhs.gov/current-status-states-territories. Contact 354th Security Forces Squadron for alternative forms of acceptable identification to conduct background checks. All documentation shall be submitted for base passes or base identification per Base Security Requirements. Contractor personnel shall obtain and wear specific Contractor base passes. Contractor personnel who have personal Department of Defense (DoD) retiree or dependent identification cards (ID), shall not use those personal ID cards for base access when performing contract work. All Contractor personnel who operate a vehicle in performance of this contract shall possess a valid driver’s license, current registration and insurance. Failure to turn in a base credential when requested can result in a non-recommend from Security Forces for future base access. The Contractor is responsible for employee inability to obtain base access required for contract performance. The contractor will be responsible for ensuring their employees are added to the Security Forces Entry Authorization List (EAL) to facilitate their servicing within the flight line perimeter.

NOTICE: All contract employees shall submit to a criminal background check accomplished by Eielson Air Force Security Forces prior to the employee being issued base access credentials. Contractors must submit request for installation identification no later than one (1) week following the contract award and five (5) days prior to the individual requiring entry to installation. Failure to submit requested information as indicated can result in denial or delay of issuing base access credentials.

6.2.4 RETRIEVING IDENTIFICATION MEDIA:

The Contractor is responsible for retrieving all identification media from employees who depart for any reason before the contract expires: e.g. terminated for cause, retirement, etc. The contractor shall return retrieved items to the Security Forces Pass and Registration Office.

6.2.5 WEAPONS, FIREARMS, AND AMMUNITION:

Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Eielson Air Force Base.

6.2.6 FOR OFFICIAL USE ONLY (FOUO):

The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

6.2.7 REPORTING REQUIREMENTS:

Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

6.2.8 PHYSICAL SECUIRTY:

The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

The Government and their representative shall have access to the work area for inspection at all times. Entry into the work area by unauthorized individuals shall be reported immediately to the project supervisor and the Government representative.

The Contractor shall remain in compliance with all rules, codes, standards, and regulations governing the safety of all individuals at the worksite and shall be solely responsible for any injuries, accidents, exposures or liabilities occurring due to non-compliance or failure to secure the work area.

7. HAZARDOUS MATERIALS

The Contractor shall have approval from the Hazardous Material Management Program (HMMP) team prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require a Material Safety Data Sheet (MSDS). The Contractor shall identify these materials on a Contractor Hazardous Material Inventory list. The Contractor shall provide this inventory list and one copy of the MSDS for each item to the HAZMAT Office for review and HMMP approval prior to any chemicals being brought onto Eielson AFB, or within 15 days of the start of this contract. This inventory is also used by the Contractor to annually report hazardous material usage. By 30 January of each calendar year, the Contractor shall submit two copies of the completed Contractor Hazardous Material Inventory list to 354 CES/CEIE. The Contractor shall maintain one copy of the MSDS for each hazardous material line item used within the work center.

The generation of hazardous waste is not expected from this contract. It is the responsibility of the Contractor to determine if hazardous waste is generated from Contractor operations. 354 CES/CEIE will assist with determination if requested by the Contractor. The Contractor shall manage and dispose of universal waste in accordance with the base Hazardous Waste Management Plan and 40 CFR Part 273, Universal Waste Rules.

8. MATERIAL RECYCLING:

The Contractor shall comply with all federal, state, and local recycling and solid waste diversion requirements in addition to base-specific Solid Waste Management plans and procedures. Participation shall include maximum use of recycled paper products and replacement parts.

9. CLEAN UP:

The Contractor shall keep interior and exterior of the Contractor’s office/maintenance location and all work areas and storage areas free from accumulation of waste material and rubbish. Upon completion of the job, the Contractor shall leave the work area and surrounding premises in a clean, neat, workmanlike condition and in accordance with commercial practice.

10. COORDINATION WITH OTHER CONTRACTORS:

The Government may undertake or award other contracts for additional work. The Contractor shall cooperate with the other Contractors and Government employees and adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other Contractor or by Government employees.

11. FIRE PREVENTION:

The Contractor is responsible for following fire prevention practices and procedures. The Contractor shall provide approved storage facilities meeting National Fire Code 30, Flammable and Combustible Liquids Code, requirements for storage of flammable materials.

12. NO SMOKING POLICY:

The Contractor and employees shall comply with policies stating that smoking is prohibited within any Air Force Facility and use designated outdoor smoking areas.

13. PERFORMANCE OF WORK DURING NOTIONAL CRISIS:

In accordance with DODI 3020.37 "Continuation of Essential DoD Contractor Services During Crises”, all services or any specifically designated portions of the functions accomplished under this contract shall be performed during all wartime operations. Wartime operations are those actions including wartime commitments and contingency planning and exercises necessary to support current or future United States Air Force wartime commitments. Contractor personnel will be advised of the functions that will be continued during wartime-related contingencies. The Government shall have the unilateral right to extend performance of this contract as long as the wartime contingencies exist. Contract payment will be in accordance with the existing contract rate.

14. APPENDICES:

1. Appendix A – SECURITY AND ACCESS TO CONTROLLED AREAS

2. Appendix B – REHABILITATE BOILER #1, CH&PP DRAWINGS

3. Appendix C – REPAIR ECONOMIZER/SUPERHEATER BOILER #4

4. Appendix D – REPAIR SOOT BLOWER – BLR #4

END OF STATEMENT OF WORK

1. DESCRIPTION OF WORK
2. GENERAL INFORMATION:
2.1 CONTRACT ADMINISTRATION
2.2 GOVERNMENT DOCUMENTATION
3. WORK REQUIREMENTS:
1
2
3
3.1 ENVIRONMENTAL PROTECTION
3.2 OBJECTIVES
3.3 SCOPE, BASE CONTRACT (applies only to Boiler #4 unless specifically stated otherwise):
3.4 Recommended Repairs
4. QUALITY CONTROL AND SAFETY:
4.1. Safety
4.2 Preliminary Testing
4.3 Final Testing
5. REFERENCE SPECIFICATION AND STANDARDS
5.1 CODE REQUIREMENTS
6. WORKING CONDITIONS
6.1 RECOGNIZED HOLIDAYS:
6.2 SECURITY REQUIREMENTS FOR UNCLASSIIED CONTRACTS
1.
2.
3.
4.
5.
6.
6.1.
6.2.
6.2.1 LISTING OF EMPLOYEES
6.2.2 SECURITY TRAINING
6.2.3 PASS AND REGISTRATION ITEMS:
6.2.4 RETRIEVING IDENTIFICATION MEDIA:
6.2.5 WEAPONS, FIREARMS, AND AMMUNITION:
6.2.6 FOR OFFICIAL USE ONLY (FOUO):
6.2.7 REPORTING REQUIREMENTS:
6.2.8 PHYSICAL SECUIRTY:
7. HAZARDOUS MATERIALS
8. MATERIAL RECYCLING:
9. CLEAN UP:
10. COORDINATION WITH OTHER CONTRACTORS:
11. FIRE PREVENTION:
12. NO SMOKING POLICY:
13. PERFORMANCE OF WORK DURING NOTIONAL CRISIS:
4
5
6
7
14. APPENDICES:
Lead:
Zinc:

File details come from the government source that posted it. Updated .