This justification and approval document outlines a sole source procurement for door hardware, security systems, and chiller equipment as part of a design-build construction contract for a new Stage Processing Facility at Vandenberg Space Force Base in California. The project includes purchasing Schlage door cylinders due to compatibility with the existing key coding system, Honeywell Vindicator 5 security systems to integrate with the base's current security network, and Trane chillers which have been mandated as the standard for HVAC systems at Vandenberg Space Force Base. The justification cites risks around operational disruption, additional costs for retrofitting and retraining, and increased lifecycle expenses if incompatible products were introduced. The overall construction contract will be competitively awarded but includes these sole source components.

View the file

Other files for this federal contract opportunity

Other files attached to Design-Build, Ground Based Strategic Deterrent Stage Processing Facility, Vandenberg Space Force Base, CA, newest first.
File Type Posted
W912PL22R0003_AM0005.pdf PDF
W912PL22R0003_0004.pdf PDF
Site Visit Sign In Sheet_W912PL22R0003.pdf PDF
W912PL22R0003_AM0003.pdf PDF
W912PL22R0003_AM0002.pdf PDF
W912PL22R0003_AM0001.pdf PDF
W912PL22R0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GBSD DB Stage Processing Facility W912PL22R0003 Vandenberg Space Force Base, CA

Department of the Army

U.S. Army Corps of Engineers Los Angeles District

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Agency: The contracting agency responsible for this procurement action is the U.S. Army Corps of Engineers, South Pacific Division, Los Angeles District (CESPL), Los Angeles, CA.

2. Description of Action: A new competitive firm fixed-price Design-Build construction contract which includes a “brand name only” components for door hardware, security systems and chiller equipment will be awarded using MILCON-AF funding.

3. Description of the Supplies/Services: The new construction project, FY22 Stage Processing Facility, Vandenberg Space Force Base, CA includes the “Brand Name” components below:

a. Schlage Door Cylinders: The current “in place” key coding matrix at Vandenberg utilizes the Schlage keyway system, non-compatible hardware would create an exponential cost to the installation. The current estimated direct materials cost of this brand name component listed is: $

b. Honeywell Vindicator Security Systems: VSFB’s Electronic Security System (ESS) Network Enterprise uses the Honeywell Vindicator 5 system for Command and Control within its Security Operations Centers (Whiskey Control and Alternate) to monitor Access Control, Intrusion Detection System and Duress Alarms of Protection Level 1 – 4 Resources. The Vindicator 5 system is also used as the central station for all Electronic Access Control. VSFB’s ESS Network Enterprise is the 3rd largest ESS Network Enterprise within the Air Force (soon to be tied for the largest). The current government estimated direct material cost of the brand name components listed above is

c. Trane Chiller has been mandated by the AFCEC/CL and is required and authorized by the Air Force Installation Contracting Center (AFICC). Approved J&A is dated June 2019. The standardization of HVAC chiller system to a single manufacturer has been mandated at the installation level. The current estimated direct material cost of this brand name component listed is: $

4. Authority Cited: 10 U.S.C. 2304(c)(1) and FAR 6.302-1 and 11.105. Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Reason for Authority Cited:

a. Schlage Door Cylinders: Due to the current “in place” key coding matrix at Vandenberg that utilizes the Schlage keyway system, non-compatible hardware would create an exponential cost to the installation, including the purchasing of Lock Shop Equipment to retrofit the entire installation to accommodate a new brand. Furthermore, it would require additional labor and asset’s to create a new key coding matrix, which in turn would impede the support of the lock shop’s limited manpower to the Vandenberg Mission.

Specifications for lock hardware must meet commercial standards for grade 1 lever handle lock that can accommodate a Schlage regular or large format interchangeable core. For uniformity across the installation, a US26D/626 brushed stainless finish lock set is used at VSFB. With multiple brand names, the end user would need to be trained how to use all the different systems. The Base Civil Engineer (BCE) spare parts inventory will remain manageable with all systems of the same brand name.

b. Honeywell Vindicator Security Systems: Introducing new security systems outside of Vindicator 5 system will have rippling affects as a result of causation related to changing configuration standards, training and O&M needs/requirements. If new systems are installed, outside of the existing Vindicator 5 Network Enterprise, new network standards would have to be implemented and maintained. Over the life cycle of any new system this would drive new configuration tracking standards/requirements and could be affected by VSFB’s operating environments. The existing V 5 Network Enterprise currently meets all configuration and ATO requirements set for by Air Force Life Cycle Management Center. With the implementation of any new system there are also training requirements. The average training costs associated with basic system O&M training is $15K per course type – per person (technician) over the life cycle of the system. The effects of new training requirements would also ripple down to the 40 Airmen that are currently certified to monitor Vindicator 5 Alarms and any future Airmen that would monitor the forever expanding ESS Network Enterprise. Each associated Airmen would have to be trained and certified to control any new system; with training course cost at $35K per group course (existing and as new personnel are assigned. There would also be an initial learning curb associated with any additional system. Technicians that are assigned to the Fix Site Sustainment O&M Contract are required to be Vindicator 5 certified as a condition of employment and current Airmen that monitor the Vindicator 5 system are certified as Vindicator alarm monitors. Implementing new systems also creates additional cost associated with maintaining the system. If any parts of the system would fail after a 12-month warranty expires funding would have to be obtained to procure parts. The existing Vindicator 5 Network Enterprise has access to a shared parts supply system that is spread-out throughout the country which is part of the Fixed Site Sustainment contract. Installing/Integrating new security projects through the use of the

Vindicator 5 system saves the government on funding that would be needed for sustainment, training, overall implementation and life cycle management.

c. Trane Chiller Standardization of HVAC chiller systems has been mandated by the Air Force Civil Engineer Center Directorate (AFCEC/CL). Standardization of all installation HVAC chiller equipment significantly reduces the total cost of ownerhsip to include procurement, subsequent maintenance and associated training costs to operate the system over its lifecycle. The AFCEC/CO requested that installations evaluate, and recommend a single manufacturer for their installation and submit a Memorandum of Request (MOR) to AFCEC/CO for approval. Trane was the manufacturer chosen and approved for Vandenberg Space Force Base. See attached support documentation from AFCEC.

It is important to note that these requirements are further identified in the Whole Building Design Guide; www.wbdg.org for “CONUS – Vandenberg AFB IFS)” requirements where you can find the Installation Facility Standards (IFS) specific for Vandenberg Space Force Base requirements.

This IFS is part of the Air Force Corporate Facilities Standards (AFCFS) program and provides standards for Vandenberg Space Force Base.

6. Efforts to Obtain Competition: The Solicitation for the Stage Processing Facility will be issued on an unrestricted bases. The brand name components represent a small portion of the overall construction project that is being competed.

7. Actions to Increase Competition: See Paragraph 6 above.

8. Market Research: There are no known alternative systems that are fully compatible with these systems based on lessons learned and expert judgment by subject matter experts and experience of the Air Force.

9. Certification

a. Technical Certification

I certify the supporting data under my cognizance which are included in this Justification are accurate and complete to the best of my knowledge and belief.

Date: Signature

Title: Project Manager Vandenberg SFB

Name:

11/9/21

b. Requirements Certification

I certify that the above-described items are necessary to meet the Government’s minimum needs for the described facility, and that the supporting data under my cognizance which are included in this Justification and Approval are accurate and complete to the best of my knowledge and belief.

Date: Signature Title: Project Manager

USACE

Name:

10. Fair and Reasonable Cost Determination: The unit prices for the materials components being purchased under this contract are part of the software data base contained in the Micro-Computer Aided Cost Estimating System (MCACES) and historical procurement history at Vandenberg Space Force Base.

I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based upon previous procurement history at Vandenberg SFB, CA.

Date: ________________ Signature:

Title: Contracting Officer Name:

11. Procuring Contracting Officer Certification:

I certify that justification is accurate and complete to the best of my knowledge and belief.

Date: Signature:

Title: Contracting Officer Name:

11/19/21

11/9/21

SIGNATURES REQUIRED BELOW:

I have reviewed this Justification and find the justification adequate to support other than full and open competition.

District Counsel:

Date: Signature:

Phone: (213) 452-3946 Name: USACE Office of Counsel

APPROVAL

Based on the foregoing justification, I hereby approve the procurement of the listed equipment on other than full and open competition basis pursuant to the authority of 10 U.S.C. 2304(c)(1), subject to availability of funds, and provided that the equipment herein described have otherwise been authorized for acquisition.

Date: Signature:

Contracting Officer Los Angeles District U.S. Army Corps of Engineers

11/18/21