JA Brand Name - Monaco Fire Alarm.pdf
PDF 419 KB Posted
- Attached to
- Construct an Indoor Range
- Solicitation number
- F7K3SQ0162AW01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA Brand Name - Automatic Logic Final.pdf | ||
| JA Brand Name - Advantor Final v2.pdf | ||
| W50S8Z-21-C-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No: 20-001
Justification Review Document for Other than Full and Open Competition
Program/Equipment: Brand Name Fire Alarm Panel/Transmitter for the Monaco Fire Detection and
Alarms System. Estimated cost is $24,900.
Authority: FAR 6.302-1(c) Brand Name Determination
Prepared by:
Typed Name: Phil Chik Telephone: 503-584-3784
Signature:
Date Reviewed:
Contracting Officer:
Typed Name: Ricardo E. Torres Telephone: 703 963-9308
Technical Representative:
Typed Name: Patrick G. Walsh Telephone: 541-885-6442
Requirements Representative:
Typed Name: Capt. Oscar Alonso Telephone: 541-885-6568
Control No. 20-001
Justification and Approval for Other Than Full and Open Competition
1. Contracting Activity:
USPFO for Oregon
1776 Militia Way
Salem, OR 97309
2. Description of Action: A new competitive firm fixed price construction contract for project which includes “Brand Name Only” component for the Fire Alarm Panel/Transmitter - Monaco Fire
Detection and Alarms System. The funding source will be MILCON.
3. Description of Supplies/Services: ANG Project # KJAQ159096, Construct Indoor Range at
Klamath Falls Airport – Kingsley Field, OR included one Brand Name for the Fire Alarm
Panel/Transmitter - Monaco Fire Detection and Alarm including the Panel, Transmitter and all associated installation by a certified installer, commissioning and training requirements for the implementation of a complete Fire Alarm Panel and Mass Notification System. MILCON funds will be utilized for this requirement.
4. Authority Cited: 10 United States Code 2304(c) (1), as implemented in Federal Acquisition
Regulation 6.302-1 Only one responsible source and no other responsible source and no other supplies or services will satisfy agency requirements - it is likely that award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition.
5. Reason for Authority Cited: Only one responsible source, Monaco Enterprises, Inc. and no other source of supply will satisfy agency requirement for the Fire Alarm System. The 173rd Civil
Engineering Squadron currently uses the Monaco Fire Alarms System at Kingsley ANGB. The new fire station will need to fully integrate with the existing Fire Alarm System. The central supervising station receiving equipment is Monaco D2100 and the transceiver must be fully compatible with this equipment. Acquiring a different alarm system as a whole would incur the additional cost of training as well as doubling maintenance and equipment costs due to maintaining two different systems. By procuring an identical system, maintaining will be standardized and costs would be easier to control. Kingsley Field currently send three (3) personnel to annual Monaco training at a cost of approximately $7,500 annually. Procuring a different panel would add an additional annual training requirement that Kingsley Field’s travel authorizations may not be able to guarantee.
6. Efforts to Obtain Competition: The solicitation for the construction contract is being issued as a total 8(a) Sole Source set-aside. The brand name components represent a small portion (0.5%) of the overall construction project that is being competed.
7. Actions to Increase Competition: None
8. Market Research: The following market research techniques (FAR Part 10) were conducted within the previous 6 months:
a. Contacted knowledgeable individuals in the Government, including the ORANG Base Civil
Engineer and Deputy Base Civil Engineer, Fire Prevention Officer, Base Electricians and the
ANG Civil Engineer Technical Support Center regarding the market capabilities to meet the requirements.
b. Querying the Government wide database of contracts and other procurement instruments intended for use by multiple agencies that provide information relevant to agency acquisitions.
Search of www.fbo.gov indicated within the last 12 months that the Departments of the Army and Air Force has posted similar justifications for brand name requirements for their applicable construction contracts.
c. In addition, the pre-solicitation notice specifying the intent to purchase this brand name equipment will be posted to FebBizOpps. This notice will invite persons who may have interest or capability to provide compatible equipment to respond accordingly. Any responses will be evaluation accordantly.
9. Interested Sources: There are no known alternative systems that are fully compatible with the aforementioned systems based upon lessons learned and expert judgement by the subject matter experts and experience of the Oregon Air National Guard, National Guard Bureau, and Air Force.
10. Other Facts: N/A
11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name:
Patrick G. Walsh
Telephone:
Title:
Deputy Base Civil Engineer
12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name:
Capt. Oscar Alonso
Telephone:
Base Civil Engineer
13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the
Government for this contract action will be fair and reasonable. The estimated cost of $24,900 is determined based on the A-E’s cost estimate for this procurement action. The A-E received the cost directly from Monaco Enterprises, Inc. The estimated cost comparable with standard practice RS
Means cost estimating software estimates quoting similar Fire Alarm Control panels from $24,500-
$27,000.
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Approval
Based on the foregoing justification, I hereby approve the procurement of Monaco M-2 Fire Alarm
Control Panel on an other than full and open competition basis pursuant to the authority of 10
U.S.C.2304(c)(1), FAR 6.302-1(c), subject to availability of funds, and provided that the services herein described have otherwise been authorized for acquisition.
Name: Ricardo E. Torres
Contracting Officer
| 2020-08-19T07:11:09-0700 | |
| CHIK.PHILLIP.LEON.JR.1155596321 |
| 2020-08-21T10:46:00-0400 | |
| TORRES.RICARDO.1183119474 |
| 2020-08-18T10:18:07-0700 | |
| WALSH.PATRICK.G.1140478438 |
| 2020-08-18T12:53:26-0700 | |
| ALONSO.OSCAR.NMN.1463019424 |
| 2020-08-18T10:18:24-0700 | |
| WALSH.PATRICK.G.1140478438 |
| 2020-08-18T12:53:48-0700 | |
| ALONSO.OSCAR.NMN.1463019424 |
| 2020-08-21T10:46:33-0400 | |
| TORRES.RICARDO.1183119474 |
| 2020-08-21T10:46:48-0400 | |
| TORRES.RICARDO.1183119474 |
| 2020-08-21T10:47:03-0400 | |
| TORRES.RICARDO.1183119474 |
File details come from the government source that posted it. Updated .