Justification and Approval (J&A) for Other Than Full and Open Competition

For Official Use Only

For Official Use Only 20 Apr 2017 it is “urgent and compelling” to preclude adverse impact to military readiness. Merely citing a Joint Urgent Operational Need (JUON),Force Activity Designator (FAD) rating, Program Management Directive (PMD)/Program Action Directive (PAD) guidance, or DX priority rating is not in and of itself sufficient reason to use this exception from the requirement to obtain full and open competition.

Note that only the minimum quantity required to satisfy the unusual and compelling urgency qualifies for this exception; thus, this exception might not suffice to justify option quantities. For example, a JUON covering an entire program may not necessarily warrant a class J&A for all program requirements. The inclusion of future “unknown” requirements in class J&As proceeding on this basis is disfavored. In addition, actions covered by a relevant JUON should, a) cite the JUON, b) describe the nature of the need covered by the JUON, and c) describe the relationship between the JUON and the requirements contemplated under the J&A (e.g., whether the J&A includes requirements not covered by the JUON, whether the J&A covers just a portion of the JUON's scope, etc.). JUONs can provide important support for the J&A; however, the J&A is a stand-alone document and should not rely solely upon the fact that a JUON has been issued as a basis for approval. Activities are under a continuing duty to ensure maximum competition practicable under the circumstances, and JUONs to not automatically provide relief from that duty.

The exception for “unusual and compelling urgency” does not authorize a sole source contract. This exception only authorizes limitation to the greatest number of potential sources than can fulfill the requirement in the time needed. Therefore, the J&A should also describe the method and rationale for identifying the sources to which the solicitation will be limited. If the solicitation is to be limited to only one source, the J&A must be based on an exception that authorizes selection of a single source.

C. Industrial Mobilization; or Engineering, Developmental, or Research Capability (FAR 6.302-3)

The most important part of justifications citing this authority is demonstrating the need to maintain the capability possessed by the identified source(s). Some form of market survey may be critical in demonstrating the uniqueness of this capability.

D. Authorized or Required by Statute (FAR 6.302-5)

It is imperative to identify what is being acquired and the applicable statute authorizing other than full and open competition. Note:

Some statutes do not require a written J&A.

E. National Security (FAR 6.302-6)

Provide the minimum essential information needed to establish validity of the justification. This information will make the J&A a classified document. Special handling procedures are required for processing such documentation to the approval authority. Only parties with a “need to know” and the proper level of security clearance should be permitted access to the documentation. Such acquisitions are also exempt from synopsis under FAR 5.202(a)(1).

F. Public Interest (FAR 6.302-7)

This authority may only be used when none of the other authorities is appropriate and may not be made on a class basis. Provide detail addressing the reasons full and open competition is not in the public interest and why no other authority is appropriate for use.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:

Sources Sought Synopsis. If a sources sought synopsis was issued, state the date the synopsis was issued, the synopsis number, and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. This is particularly important when citing the authority of 10 USC 2304(c)(1), “Only one (or a limited number of) responsible source(s)”, since it is this survey of the market place that confirms our assumptions regarding the capability of industry to meet our needs.

Address whether this acquisition will require a synopsis IAW FAR 5.201. If the proposed action was not or will not be synopsized, cite the specific authority for not doing so (FAR 5.202) and the rationale for the synopsis exception. Note that although synopsis of proposed contract actions initiated pursuant to FAR 6.302-2 may not be required, use of this authority is not an automatic exemption from

For Official Use Only

For Official Use Only 20 Apr 2017 synopsis. (FAR 5.202(a)(2)).

Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable.

Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here.

Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits. (FAR 6.303-2(b)(7))

VIII. Description of the market research conducted and the results, or explain why market research was not conducted.

Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fill the government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.

Generally, some form of market research should be conducted, but it is most critical when citing the authority of FAR 6.302-1, Only one (or a limited number of) responsible source(s). Under such circumstances, use the following sentence: “As described in Section VI above, market research, in accordance with FAR Part 10, was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition and soliciting inquiries from interested parties.”

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If no market research was conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available. (FAR 6.302-1(b)(2) and 6.303-2(b)(9)(i)).

X. List of sources, if any, that expressed interest in the acquisition.

State “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired.

Describe potential actions that could be undertaken to remove the barriers to competition that have been identified in the justification and include a milestone schedule for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and give planned award date (FAR 6.303-2(b)(11)), or state the Government will attempt to acquire rights in technical data and

For Official Use Only

For Official Use Only 20 Apr 2017 computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this J&A, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that that technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.

Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.

If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.

XII. Certification by the Contracting Officer.

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief. (FAR 6.303-2(b)(12))

XIII. Certification by the technical/requirements personnel

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete. (FAR 6.303-2(c))

The following page contains a suggested template for “International Agreement Competitive Restrictions (IACR)”. The authority to prepare an IACR has been delegated from the HCA to the Contracting Officer. (AFFARS 5306.302-4)