This is a Justification and Approval (J&A) document for a sole-source contract award authorizing procurement without full and open competition.
The Naval Air Systems Command (NAVAIR) seeks to award a sole-source, firm-fixed-price contract to Parker Meggitt Defense Systems Inc. (PMDSI) of Irvine, California for the procurement of F/A-18E/F Infrared Search and Track (IRST) Block II Environmental Control Unit (ECU) Weapons Replaceable Assemblies in full rate production quantities across three production lots. The total estimated contract value is $34 million, funded through fiscal years 2025-2027 via Aircraft Procurement Navy (APN-5) appropriations ($27 million from NAVAIR and $7 million from Navy Working Capital Funds via NAVSUP). The contract supersedes prior J&A 21-0253 and includes a base award for FRP Lot 1 with two additional contract options for FRP Lots 2 and 3. The statutory authority cited is 10 U.S.C. 3204(a)(1), which permits sole-source awards when only one responsible source can satisfy agency requirements. The Government justifies the non-competitive approach based on unacceptable schedule delays that would result from qualifying an alternative vendor; developing a production-representative system would require four to five years, followed by three to four years for qualification through Production Readiness Reviews and flight testing, cumulatively presenting approximately nine years of delay. A sources-sought notice was posted on Sam.Gov on January 30, 2026, and a synopsis was published on the same date with no competitive responses received. The Contracting Officer has determined the anticipated cost to be fair and reasonable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA 26 0094 Signature Page Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
PROGRAM EXECUTIVE OFFICER
TACTICAL AIRCRAFT PROGRAMS
47123 BUSE ROAD BLDG 2272
PATUXENT RIVER, MARYLAND 20670-1547
J&A 26-0094
JUSTIFICATION AND APPROVAL
FOR OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity.
Naval Air Systems Command (NAVAIR), Headquarters.
2. Description of the Action Being Approved.
This Justification and Approval (J&A) authorizes and approves an action on a sole-source basis to Parker Meggitt Defense Systems Inc. (PMDSI) of Irvine, California, under a Firm-Fixed-Price (FFP) contract type. This contract will support NAVAIR and Naval Supply Systems Command (NAVSUP) requirements for the procurement of F/A-18E/F Infrared Search and Track (IRST) Block II Environmental Control Unit (ECU) Weapons Replaceable Assembly (WRA) Full Rate Production (FRP) Lots 1, 2 and 3. This J&A supersedes J&A 21-0253 and covers a base contract award for FRP Lot 1 and two additional options for FRP Lots 2 & 3.
3. Description of Supplies/Services.
This acquisition is for the procurement of a total estimated quantity of IRST Block II ECUs:
Estimated ECU Quantities:
Production Lot NAVAIR NAVSUP Total
FRP I - III
The total estimated value of these requirements is $34M, which will be funded with Aircraft Procurement, Navy (APN-5 and APN-6), Navy Working Capital Funds (NWCF) appropriations as follows:
Estimated Dollar Value in Millions
APPN ($M)
FY25-FY27
Total
APN-5 (NAVAIR) $27
APN-6/NWCF (NAVSUP) $7
Total: $34
4. Statutory Authority Permitting Other Than Full and Open Competition.
10 U.S.C. 3204(a)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.
5. Rationale Justifying Use of Cited Statutory Authority.
Full and Open competition is not feasible for this procurement. In accordance with FAR 6.103-1(c)(2), the Government has deemed the requirements listed above to be available only through the original source and award to any other source would result in unacceptable delays to the Government in fulfilling the Navy’s requirements.
From a schedule perspective, without the procurement of unlimited data rights to a full Technical Data Package (TDP) that includes the proprietary source code, competitively awarding and qualifying another vendor to meet the same specification requirements, would take approximately eight to ten years based on historical timelines for development and qualification of a new supplier.
Without a complete TDP, any new vendor would be required to redevelop an ECU for the IRST Block I system to incorporate the necessary Block II changes. A new vendor would take four to five years to develop a production representative system. The Government would need three to four years to qualify a new source through Production Readiness Reviews, and component and flight test of the ECU build up into an IRST system. This cumulative timeline of approximately nine years would present an unacceptable delay to IRST fleet requirements and introduce significant risk for production line gaps.
The Government has obtained the necessary technical data to support the maintenance concept to be employed. At this time the Government does not intend to procure a full TDP (includes SW), CORE determination was made that SW would be held at the Original Engineering Manufacturer (OEM). MDSI has the only active production line capable of providing this WRA within the needed timeframes to support fleet requirements. For these reasons, the ECU cannot be procured by any source other than MDSI, without resulting in unacceptable schedule impacts.
6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable.
A sources-sought was posted on Sam.Gov in accordance with DFARS PGI 206.302-1 on 30 January 2026. responded to the sources sought. The NAVAIR Technical Point of Contact (TPOC) has reviewed the capability statement provided by TAT and concluded these ECUs do not fulfill the size, weight, and dimensions or type of cooling system required for the IRST program. The ECU for IRST is already designed, developed, and tested for a specific form, factor, fit, with a requirement for Polyalphaolefin (PAO) cooling and performance specifications, hence the mention of FRP in the sources sought. The design, development, and test necessary for reprogramming and adaptation of these ECUs will not fulfill the production timelines demanded. NAVAIR Capability Determination Memo SER V2234/26-004 was released in response to As required by FAR 5.101, a synopsis of the proposed contract was published on sam.gov on 30 January 2026 and no responses were received.
7. Determination of Fair and Reasonable Cost.
The Contracting Officer has determined the anticipated cost to the Government for the supplies/services covered by this J&A will be fair and reasonable.
8. Actions to Remove Barriers to Future Competition.
For the reasons set forth in Paragraph 5, NAVAIR has no plans at this time to compete future contacts for the types of supplies/services covered by this document. If another potential source emerges, NAVAIR will assess whether competition for future requirements is feasible. As this is a follow-on for supplies and services previously awarded on a non-competitive basis, in accordance with DFARS PGI 206.104-71, the prior CJ&A 21-0254 was provided to the approval authority for review. Approval of this CJ&A signifies the approval authority has made the determination required by DFARS
PGI 206.104-72.