About this file

This document is a Justification and Approval (J&A) for a 12-month bridge contract with NIKKEN SOGYO CO, LTD for wastewater treatment plant services at Commander Fleet Activity Yokosuka (CFAY), Japan. The contract, with Justification and Approval Number 25-JA-FECON-0012, will run from 01 June 2025 to 31 May 2026, using FY25 Operations and Maintenance Navy appropriations. The sole-source contract is being awarded under 10 U.S.C. §3204(a)(2) for Unusual and Compelling Urgency due to delays in generating a technical requirements package for the follow-on contract.

The contractor will provide labor, management, supervision, tools, equipment, and transportation to operate and maintain wastewater treatment plants, incinerator plants, weight scales, potable water tanks, and related equipment at U.S. Naval Installations in Kanto Plains, Japan. NIKKEN SOGYO is the incumbent contractor and is already performing these services. The Navy determined that full and open competition is not practical due to the technical complexity introduced by adding a Granular Activated Carbon (GAC) filtration system, which significantly altered the original procurement strategy and requires additional time for solicitation development and evaluation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .