J7 Schedule of Items..pdf
PDF 54 KB Posted
- Solicitation number
- 12343420Q0013
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Cost Total Cost
201(01)A Clearing and Grubbing, Slash Treatment Methods for Top and Limbs (4), Logs (4), and stumps (4), Utilization of Timber
DQ ac 2.90
201(10) Clearing and Grubbing, Decking of Markable Timber DQ ac 2.90
203(01) Excavation, Placement Method 1 DQ yd3 2358
203(16) Drainage Excavation, Type Outlet Ditches DQ ft 117
203(16)A Drainage Excavation, Construct Broad Base Dip DQ Each 5
204(01) Temporary Seeding AQ ac 2.20
204(07) Silt Fence AQ ft 120 251(03)A Placed Riprap, Class II, Method A DQ yd2 16.0
304(11)A Crushed Aggregate Base, 1 1/2 Crusher Run Compaction B VQ T 2195
304(11)B Crushed Aggregate Base, AASHTO # 2, Compaction
B VQ T 150
601(01) Mobilization LSQ ls 1 603B(01)18 18 inch HDPE pipe, Type S, Method B SQ ft 126 603B(01)24 24 inch HDPE pipe, Type S, Method B SQ ft 86
625(02) Seeding DQ ac 1.10 633(02) Steel Post DQ ft 12
633(16) Route Marker DQ each 1
Total PW
Estimated Public Works Road Construction Cost
Schedule of Items - Forest Road 1560G Road Construction Project (1.05 mi)
Item No. Description Method Measure Unit Quantity
File details come from the government source that posted it. Updated .