J6 Tomahawk Trail Drawings.pdf
PDF 1 MB Posted
- Attached to
- Superior National Forest GAOA Stony Spur Trail Rehabilitation and Tomahawk Trail Culvert
- Solicitation number
- 12445523Q0090
- Issued by
-
Department of Agriculture Forest Service
About this file
This set of construction drawings and specifications is for a culvert replacement project on the Tomahawk Trail located on the Superior National Forest in Minnesota. Work includes removing an existing 30-foot long, 48-inch diameter corrugated steel pipe and installing a new pipe in the same location. Additional work consists of dewatering the site, installing erosion control measures, excavating for the culvert, backfilling with gravel after placement, and grading approaches. Material quantities estimated include various signage, silt fence, turbidity barriers, sheet piling, pipe, gravel, seed and mulch. The project is funded by the Great American Outdoors Act and being conducted by the USDA Forest Service on the Kawishiwi Ranger District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J4 Stony Spur Drawings.pdf | ||
| J1 Wage Determination DB20235022 Lake Cty MN.pdf | ||
| J3 Stony Spur Specs.pdf | ||
| J5 Tomahawk Trail Specs.pdf | ||
| 12445523Q0090 (4).pdf | ||
| J2 Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 FT
FROM MN DNR
LAKEFINDER DATA
EDGE OF WATERFROM MN DNR
LAKEFINDER DATA
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
FROM THE KAWISHIWI RANGER DISTRICT OFFICE, FOLLOW MN 169 NORTH 1 MILE TO LAKE COUNTY
ROAD 16.
FOLLOW LAKE COUNTY ROAD 16 / KAWISHIWI TRAIL TO THE EAST FOR APPROXIMATELY 6.7 MILES
TO THE PROJECT LOCATION.
SHEET OF
United States Department of Agriculture
Forest Service
1 6
3/1 4/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
R09 EASTERN REGION SUPERIOR NATIONAL FOREST KAWISIHI RANGER DISTRICT
MINNESOTA CONGRESSIONAL DISTRICT 8 LAKE COUNTY
PROJECT LOCATION
DISTRICT RANGER
DATE
APPROVED BY:
DATE
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET 3/13/2023
C-01 GENERAL NOTES 3/13/2023
C-02 PLAN VIEW 3/13/2023
C-03 SECTION VIEWS 3/13/2023
C-04 PROFILE 3/13/2023
C-05 CULVERT DETAIL 3/13/2023
RECOMMENDED BY:
FOREST ENGINEER DATE
DISTRICT RANGER
DATE
APPROVED BY:
FOREST SUPERVISOR
DATE
CULVERT REPLACEMENT
USDA FOREST SERVICE
KAWISHIWI RANGER DISTRICT OFFICE
1393 Hwy 169
Ely, MN 55731
M
N
L
C
K
A
W
T
R
A
I
L
WHITE IRON
LAKE
FARM
LAKE
FALL
LAKE
SHAGAWA
LAKE
TOMAHAWK TRAIL AT SOUTH FARM LAKE
GREAT AMERICAN OUTDOORS ACT (GAOA)
KAWISHIWI RANGER DISTRICT TRAIL IMPROVEMENTS
03/15/2023
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 3/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
(R09)
EASTERN REGION
TOMAHAWK
TRAIL AT SOUTH
FARM LAKE
CULVERT
REPLACEMENT
SUPERIOR NATIONAL
FOREST
KAWISHIWI DISTRICT
NOTES
3/13/2023
J. SMREKAR
B. KENNEDY
X.XXX
C-01 2 6
GENERAL NOTES: (SEE SPECIFICATIONS FOR FULL REQUIREMENTS)
ALL WORK UNDER THIS CONTRACT SHALL CONFORM TO:
Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP-14), AS MODIFIED BY THE PROJECT-SPECIFIC SUPPLEMENTAL
SPECIFICATIONS.
1. CONTRACTOR RESPONSIBILITY INCLUDES:
a. UTILITY LOCATES
b. TRAFFIC CONTROL
c. EROSION CONTROL
2. BEFORE BEGINNING ANY WORK THE FOLLOWING SHALL BE
SUBMITTED AND APPROVED BY CO/COR: (SEE SUBMITTAL
SCHEDULE IN SPEC)
a. CONSTRUCTION SCHEDULE
b. GOPHER STATE TICKET NUMBER AND LIST OF UTILITIES IN
THE AREA
c. HAZARDOUS SPILL PLAN
d. LIST OF SUBCONTRACTORS AND SUPPLIERS
e. TRAFFIC CONTROL SIGNAGE PLAN
f. CUT SHEETS, SPECIFICATIONS, CERTIFICATIONS, AND/OR
GRADATIONS FOR ALL PRODUCTS AND MATERIALS TO BE
SUPPLIED TO THE PROJECT
3. PRIOR TO MOBILIZING, CLEAN ALL EQUIPMENT AND VEHICLES
TO AVOID INTRODUCING NOXIOUS WEED SEEDS TO THE SITE.
4. STRIP TOPSOIL FROM ALL DISTURBED AREAS AND STOCKPILE
FOR USE IN TURF ESTABLISHMENT.
MNDOT CLASS V
AGGREGATE
SIEVE SIZE % PASSING
1" 100
3 / 4" 90-100 3 / 8" 50-90
#4 35-80 #10 20-65 #40 10-35
#200 3-10
CALL BEFORE YOU DIG
GOPHER STATE ONE CALL
651-454-0002 800-252-1166 www.gopherstateonecall.org
GENERAL DESCRIPTION OF WORK:
WORK CONSISTS OF THE REMOVAL OF A 30 FOOT, 48" DIAMETER
CORRUGATED STEEL PIPE. A NEW 30 FOOT, 48" DIAMETER
CORRUGATED STEEL PIPE WILL BE PLACED IN THE SAME
APPROXIMATE LOCATION.
ALL WORK TO BE DONE IN DRY CONDITIONS. THE CULVERT
LOCATION MUST BE DEWATERED. CONTRACTOR SHALL SUBMIT
DEWATERING PLAN FOR APPROVAL BEFORE STARTING WORK.
MNDOT CLASS V AGGREGATE WILL BE PLACED OVER THE PIPE TO
ACHIEVE SPECIFICATIONS FOR PIPE COVER. AGGREGATE
SURFACING WILL ALSO BE PLACED ALONG THE CAUSEWAY TO
BLEND THE NEW GRADE AT THE PIPE INTO THE EXISTING GRADE.
APPROXIMATE MATERIAL QUANTITIES
NOTE: APPROX. QTYS ARE SHOWN FOR REFERENCE ONLY. NOT ALL
REQUIRED MATERIAL ITEMS ARE SHOWN. WORK IS PAID PER
CONTRACT ITEMS SHOWN ON THE SCHEDULE OF ITEMS
DESCRIPTION QTY UNIT
718 TRAFFIC CONTROL SIGNS/BARRICADES 6 EA
713.16 SILT FENCE 100 LF
713.21 TURBIDITY CURTAIN
(QTY PER DEWATERING SAMPLE DEWATER
METHOD SHOWN - CONTRACTOR TO SUBMIT
ACTUAL DESIGN TO BE USED FOR APPROVAL)
100 LF
715.07 SHEET PILE
(QTY PER DEWATERING SAMPLE DEWATER
METHOD SHOWN - CONTRACTOR TO SUBMIT
ACTUAL DESIGN TO BE USED FOR APPROVAL)
90 LF
703.02 PIPE CULVERT 30 LF
704.03 PIPE BACKFILL 50 CY
704.02 PIPE BEDDING 2 CY
703.05 BASE/SURFACE AGG. - CLASS 5 GRAVEL 20 CY
713.04 / 713.17 SEED / MULCH 150 SY
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
EXISTING 48" DIAMETER
CORRUGATED STEEL PIPE
(REMOVE AND REPLACE)
EDGE OF WATER
APPROXIMATE ELEVATION - 1387.08
EDGE OF
TOMAHAWK TRAIL
13871388
UNAMED CREEK
ENTERING SOUTH FARM LAKE
WATER ELEV 1386.9
06/03/22
SOUTH FARM LAKE
FL
OW
STA 0+80
EL 1389.0
STA 0+90
EL 1389.0
STA 1+33
EL 1390.0
STA 1+95
EL 1389.0
STA 2+05
EL 1389.0
STA 0+70
SET ℄
HUB
STA 2+15
SET ℄ H
UB
BENCHMARK-NAIL IN TREE
ELEV- 1389.3
APPROXIMATE EDGE
OF WATER
SAMPLE
TURBIDITY CURTAIN
CENTERLINE OF
TOMAHAWK TRAIL
SAMPLE DEWATERING
SYSTEM
0+50
1+00
1+50
2+00
2+50
EXTENT OF
GRADING / FILL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 3/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
(R09)
EASTERN REGION
TOMAHAWK
TRAIL AT SOUTH
FARM LAKE
CULVERT
REPLACEMENT
SUPERIOR NATIONAL
FOREST
KAWISHIWI DISTRICT
PLAN VIEW
3/13/2023
J. SMREKAR
B. KENNEDY
X.XXX
C-02 3 6
N
S
W E
Feet 0 10 20
NOTES: (SEE SPECIFICATIONS FOR FULL REQUIREMENTS)
1. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION
SURVEYING. BEFORE STARTING ANY EARTHWORK, LAYOUT
THE STATIONING AND REFERENCES NEEDED TO COMPLETE
THE WORK. SET THE LOCATION OF THE EXISTING CULVERT AT
THE TRAIL CENTERLINE AS STA 1+33 AND ESTABLISH PROJECT
STATIONING FROM THIS POINT. ESTABLISH EXISTING TRAIL
CENTERLINE HUBS AT STA 0+70 AND STA 2+15 AND SET THE
PROPOSED CL ALIGNMENT AS A STRAIGHT LINE BETWEEN
THESE POINTS. SET OFFSET HUBS TO ALLOW
REESTABLISHMENT OF THIS CENTERLINE IF NECESSARY.
PROJECT BENCHMARK IS SHOWN. CONTRACTOR TO CHECK
BENCHMARK ELEVATION AGAINST EXISTING CONDITIONS
SHOWN AND REPORT ANY DISCREPANCIES TO THE COR
BEFORE STARTING ANY EARTHWORK.
2. ALL EXCAVATION WORK MUST BE DONE IN DRY CONDITIONS.
CONTRACTOR IS RESPONSIBLE FOR DEVELOPING A
DEWATERING PLAN AND SUBMITTING TO THE COR FOR
APPROVAL BEFORE STARTING ANY EXCAVATION. A SAMPLE
COFFERDAM SYSTEM IS SHOWN FOR REFERENCE ONLY.
3. PROVIDE AND INSTALL EROSION CONTROL AND WATER
TURBIDITY PROTECTION BEFORE STARTING ANY GROUND
DISTUBANCE.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
1+10
0 10 20 300-10-20-30
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
0+75
0 10 20 300-10-20-30
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
1+50
0 10 20 300-10-20-30
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
2+25
0 10 20 300-10-20-30
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
1+33
0 10 20 300-10-20-30
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
PROPOSED SURFACE
PROPOSED SURFACE
PROPOSED NEW TRAIL SURFACE
EL 1390.0 - VERIFY - 12" COVER OVER PIPE MINIMUM
EXISTING & NEW
CULVERT INVERT
EL 1384.70
SECTION AT CULVERT
SECTION AT START NEW FILL/SURFACING
SECTION SHOWING NEW FILL/SURFACING
SECTION AT END NEW FILL/SURFACING
SECTION SHOWING NEW FILL/SURFACING
EXISTING PIPE
WATER LEVEL AT SURVEY
EL 1386.9
WATER LEVEL AT SURVEY
EL 1386.9
WATER LEVEL AT SURVEY
EL 1386.9
WATER LEVEL AT SURVEY
EL 1386.9
WATER LEVEL AT SURVEY
EL 1386.9
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 3/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
(R09)
EASTERN REGION
TOMAHAWK
TRAIL AT SOUTH
FARM LAKE
CULVERT
REPLACEMENT
SUPERIOR NATIONAL
FOREST
KAWISHIWI DISTRICT
SECTION VIEWS
3/13/2023
J. SMREKAR
B. KENNEDY
X.XXX
C-03 4 6
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
STATION (FEET)
CENTERLINE OF ROAD PROFILE
0+00 0+50 1+00 1+50 2+00 2+50
1.89% -1.61%
ST
A
0+
B
EG
IN
C
EN
TE
R
LI
N
E O
F R
O
AD
EL
9.
0'
G R
AD
E
BR
EA
K
ST
A
1+
EL
0.
0'
ST
A.
+9
EN
D C
EN
TE
R
LI
N E
O F
R O
AD
EL
.0
EXISTING TRAIL SURFACE
PROPOSED TRAIL SURFACE
REMOVE EXISTING CULVERT AND REPLACE
WITH 48" DIA X 30 FOOT CULVERT
INLET ELEV - 1384.70
OUTLET ELEV - 1384.70
(REPLACEMENT MATCHES EXISTING)
10' LONG FLAT
OVERFLOW SECTION
EL 1389.0
(MATCHES EXISTING TRAIL ELEV)
10' LONG FLAT
OVERFLOW SECTION
EL 1389.0
(MATCHES EXISTING TRAIL ELEV)
139113
STA 0+80
EL 1389.0
STA 0+90
EL 1389.0
STA 1+33
EL 1390.0
STA 1+95
EL 1389.0
STA 2+05
EL 1389.0
STA 0+70
SET ℄ H
U B
STA 2+15
SET ℄ H
U B
0+
0+
1+
1+
2+
2+
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 3/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
(R09)
EASTERN REGION
TOMAHAWK
TRAIL AT SOUTH
FARM LAKE
CULVERT
REPLACEMENT
SUPERIOR NATIONAL
FOREST
KAWISHIWI DISTRICT
PROFILE
3/13/2023
J. SMREKAR
B. KENNEDY
X.XXX
C-04 5 6
N
S
W
E
Feet 0 10 20
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FOR BEDDING AND FILL ON PIPE
TOP OF PIPE: PLACE AND COMPACT TO SPECIFIED DENSITY USING
HAND-OPERATED EQUIPMENT.
SIDES OF PIPE: PLACE IN BALANCED LIFTS AND COMPACT AS REQUIRED.
BELOW PIPE: PROVIDE MNDOT TYPE 4 GEOTEXTILE FABRIC BETWEEN
GRANULAR BACKFILL AND SUBGRADE WHERE SUBGRADE IS UNSTABLE
(MUCK). PLACE AND SHAPE BEDDING MATERIAL AS SHOWN - DO NOT
COMPACT BEDDING.ROAD SURFACING
WHERE HAND COMPACTION IS SPECIFIED, PLACE IN 4" LIFTS.
ALL OTHER PIPE BACKFILL TO BE PLACED IN A BALANCED FASHION IN 6"
COMPACTED LIFTS, AND COMPACTED PER SPECIFICATIONS.
COMPLETE AND REGULAR MONITORING OF THE CMP SHAPE IS
NECESSARY DURING ALL BACKFILLING OF THE STRUCTURE.
PREVENT EXCESSIVE DISTORTION OF SHAPE AS NECESSARY BY VARYING
COMPACTION METHODS AND EQUIPMENT.
MIN. LIMITS OF PIPE BACKFILL MATERIAL. SEE NOTE 1.
MINIMUM LIMITS OF COMPACTED
STRUCTURAL BACKFILL
4.
3.
2.
D
C
3/4 S
PIPE SPAN - S
CRITICAL BACKFILL ZONE: HAND PLACE AND TAMP BELOW SPRINGLINE.
CAREFULLY COMPACT TO SPECIFIED DENSITY USING HAND-OPERATED
EQUIPMENT.
NOTES:
B
B
A
RECOMPACTED
EXISTING
EMBANKMENT
6" UNCOMPACTED BEDDING
D
UNDISTURBED
EXISTING
EMBANKMENT
1/2 S
MNDOT TYPE 4
GEOTEXTILE FABRIC
C
S
(NOT TO SCALE)
A
C
H
1/2 S
LIMITS OF
EXCAVATION. SEE
SPEC FOR ADD'L
REQUIREMENTS.
MEET OSHA REQ.
B 1.
12" MIN. COVER
OVER CULVERT
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/1 3/2
3 1 5:
JJ
SM
RE
KA
R
C:
\U
SE
RS
\JJ
SM
RE
KA
R\
BO
X\ R0
9 E
NG
P
RO
JE
CT
S\ R0
9 S
NF
\T
RA
IL
\20
-G
AO
A-
KA
W
IS
HI
W
IT
RA
IL
IM
PR
OV
EM
EN
TS
\1-
SO
UT
HF
AR
ML
K-
CU
LV
ER
T\
DE
SI
GN
D
EV
EL
OP
\C
AD
\S D\
_A
CA
D-
DW
G-
SE
T\ _K
AW
TR
-S
FA
RM
CU
LV
ER
T-
LA
KE
FT
.D W
G;
(R09)
EASTERN REGION
TOMAHAWK
TRAIL AT SOUTH
FARM LAKE
CULVERT
REPLACEMENT
SUPERIOR NATIONAL
FOREST
KAWISHIWI DISTRICT
CULVERT DETAIL
3/13/2023
J. SMREKAR
B. KENNEDY
X.XXX
C-05 6 6
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| 1-Coversheet |
| SFarmCulvert-02-Notes.pdf |
| Sheets and Views |
| 2-Notes |
| OLE1 |
| SFarmCulvert-03-Plan View.pdf |
| Sheets and Views |
| 3-Plan View |
| OLE1 |
| SFarmCulvert-04-Section Views.pdf |
| Sheets and Views |
| 4-Section Views |
| OLE1 |
| SFarmCulvert-05-PlanProfile.pdf |
| Sheets and Views |
| 5-PlanProfile |
| OLE1 |
| SFarmCulvert-06-Culvert Detail.pdf |
| Sheets and Views |
| 6-Culvert Detail |
| OLE1 |
| SFarmCulvert-Coversheet-SIGS.pdf |
| Sheets and Views |
| 1-Coversheet |
| SFarmCulvert-Coversheet-signed.pdf |
| Sheets and Views |
| 1-Coversheet |
| 2023-03-27T10:53:14-0500 | |
| THOMAS HALL |
| 2023-03-16T15:17:53-0500 | |
| JAMES STREZISHAR |
File details come from the government source that posted it. Updated .